Hvac Tenders
Hvac Tenders
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Others, Building Construction
United States
Closing Date6 Dec 2025
Tender AmountRefer Documents
Details: A Market Survey Is Being Conducted To Determine If There Are A Reasonable Number Of Interested Small Business Concerns To Set This Future Project Aside For Them. If Your Firm Is A Small Business, Certified Hubzone, 8a, Woman-owned Small Business Or Service-disabled Veteran Owned Business And You Are Interested In This Project Please Respond Appropriately. project Location: Wright-patterson Afb, Dayton, Oh project Description: Facility 20145 Requires Construction Services For A Design-bid-build Reconfiguration Of An Existing High-bay Space By Constructing New Endo-skeleton Structure Within An Existing Facility And Renovating Existing Space To Create Secure Laboratory Space. the Project Includes Construction Of 4 Floors At The High-bay Area In Facility 20145 By Providing Three Additional Separate Elevated Floors (total 17,941 Sf) Above The Existing Basement Floor. These Spaces Will Create Additional Secure Laboratory Space Within The Building Envelope Of The High Bay Existing Footprint. 2. Additionally, A Renovation Shall Include 9,666 Sf Of Existing Space. space Will Include Modeling, Simulation & Analysis (ms&a) Laboratories, Control Rooms, And Network Operations Center (noc) Rooms. Repairs Include Necessary Work To Supporting Mechanical, Electrical & Plumbing (mep) Systems And Applicable Communications. project Will Comply With Intelligence Community Directive (icd) 705 Requirements, As Well As Standards Established In Ufc-3-410-01 (hvac Systems), Ufc 3-401-01 (mechanical Engineering), Ufc 3-520-01 (design, Interior Electric Systems), Ufc 3-530-01 (design, Interior & Exterior Lighting And Controls), Nfpa 13 (standard For The Installation Of Sprinkler Systems), Nfpa 101 (life Safety Code), Nfpa 70 (national Electrical Code). contract Duration Is Estimated At 820 Calendar Days. The Estimated Cost Range Is Between $10-$25 Million. Naics Code Is 236220. All Interested Small Businesses, Certified Hubzone, 8a, Woman-owned Small Business Or Service-disabled Veteran-owned Business Contractors Should Respond To This Survey Via Email No Later Than Friday, 6 December 2024 At 3:00 Pm Eastern Standard Time. responses Should Include: identification And Verification Of The Company’s Small Business Status. contractor’s Unique Entity Identifier (uei)) And Cage Code(s). documentation From The Firm’s Bonding Company Showing Current Single And Aggregate Performance And Payment Bond Limits. description Of Experience – Provide Descriptions Of Your Prime Contractor Past Experience Up To Three (3) Projects With Greater Than 95% Construction Complete Or Those Projects Completed Within The Last Five Years Which Are Similar To This Project In Size And Scope. Provide Documentation Demonstrating Experience For Construction Of Similar Type Buildings And Managing Multiple Sub-contractors. Demonstrate Experience Including Self-performing 15% Of The Construction. Provide Documentation Demonstrating Experience For Projects Of Similar Type Projects. Each Project Must Include The Name, Title, Project Role, E-mail Address, And Telephone Number Of At Least One Reference. References May Be Used To Verify Project Size, Scope, Dollar Value, Percentages, And Quality Of Performance. projects Similar In Scope To This Project Included: New Steel Frame Multi-floor Construction With Micro-pilings. Installation Of Structural, Mechanical, Electrical, Fire Protection, Building Control Systems And Fixtures Associated With New Construction. Space Will Include Modeling, Simulation & Analysis (ms&a) Laboratories, Control Rooms, And Network Operations Center (noc) Rooms. Renovations Will Consist Of Mechanical, Electrical, Fire Protection, Building Control Systems And Fixtures Associated With Renovated Lab Facility Construction. a. Projects Similar In Size To This Project Include: New Construction Of At Least 10,000 Square Foot Endo-skeleton Building Within A Building And Renovation Of At Least 6,000 Square Feet Of Lab Space. b. Based On Definitions Above, For Each Project Submitted Include: current Percentage Of Construction Complete And The Date When It Was Or Will Be Completed. size Of The Project scope Of The Project the Dollar Value Of The Construction Contract the Percentage Of Work That Was Self-performed As Project And/or Construction Management Services Or Physical Construction Type Work. Must Be At Least 15% Self-performed. 5.small Businesses Are Reminded Under Far 52.219-14, Limitations On Subcontracting; They Must Perform At Least 15% Of The Cost Of The Contract, Not Including The Cost Of Materials, With The Firm’s Own Employees For General Construction-type Procurement. Include The Percentage Of Work That Will Be Self-performed On This Project, And How It Will Be Accomplished. note: Total Submittal Package Shall Be No Longer Than 8 Pages. Please Only Include A Narrative Of The Requested Information; Additional Information Will Not Be Reviewed. email Responses And Any Questions To Morgan Greenwell At Morgan.l.greenwell@usace.army.mil. This Is Not A Request For Proposal And Does Not Constitute Any Commitment By The Government. Responses To This Sources-sought Notice Will Be Used By The Government To Make Appropriate Acquisition Decisions. All Interested Sources Must Respond To Future Solicitation Announcements Separately For Responses To This Market Survey. notice: The Following Information Is Provided For Situational Awareness And Is Not Required To Respond To This Sources Sought. all Contractors Must Be Registered In The System For Award Management (www.sam.gov) Prior To Award Of A Contract. All Proposed Contractors Are Highly Encouraged To Review Far Clause 52.232-33 Payments By Electronic Funds Transfer – System For Award Management, Which Indicates “all Payments By The Government Under This Contract Shall Be Made By Electronic Funds Transfer (eft).” Those Not Currently Registered Can Obtain Registration By Going To The Website Http://www.sam.gov. The Process Can Usually Be Completed From 24 To 48 Hours After Submission. Contractors Will Need To Obtain A Unique Entity Identifier (formerly Duns Number) For Processing Their Registration. If You Do Not Already Have A Unique Entity Identifier, One Can Be Obtained From Http://www.sam.gov. Refer To Www.sam.gov For Information Formerly Found In Ccr, Epls, Orca And Fedreg. please Begin The Registration Process Immediately In Order To Avoid Delay Of The Contract Award Should Your Firm Be Selected. alert: You Must Submit A Notarized Letter Appointing The Authorized Entity Administrator Before Your Registration Will Be Activated. This Requirement Now Applies To Both New And Existing Entities. Effective 29 April 2018, The Notarized Letter Process Is Now Mandatory On All Current Registrants At Sam Who Have A Requirement To Update Data On Their Sam Record. The Notarized Letter Is Mandatory And Is Required Before The Gsa Federal Service Desk (fsd) Will Activate The Entity's Registration. effective 29 June 2018, Vendors Creating Or Updating Their Registration Can Have Their Registration Activated Prior To The Approval Of The Required Notarized Letter. However, The Signed Copy Of The Notarized Letter Must Be Sent To The Gsa Federal Service Desk (fsd) Within 30 Days Of Activation Or The Vendor Risks No Longer Being Active In Sam. vendors Can Check Whether An Account Is Active By Performing A Query By Their Cage Or Unique Entity Identifier (known As Duns). The New Registration Process May Now Take Several Weeks, So Vendors Are Highly Encouraged To Begin Registering As Soon As Possible To Avoid Any Possible Delays In Future Contract Awards. Remember, There Is No Cost To Use Sam. to Find Out Additional Information About The Changes Of The Sam Registration Process, Contractors Should Visit The Frequently Asked Questions (faq) Link Located At The Top Of The Sam Homepage (www.sam.gov).
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Civil Works Others
United States
Closing Date15 Mar 2025
Tender AmountRefer Documents
Details: Statement Of Work
for
replace Pitched Roof Building 1
project # 542-25-105
coatesville Va Medical Center
1400 Blackhorse Hi Rd
coatesville, Pa 19320 page 2 Of 2 a Full Replacement For The Building 1 Pitched Shingled Roof To Include The Flashing For Exhausts, Equipment, And Other Roof Components As Required To Be Completed Fully In Accordance With The Attached Master Construction Specifications That Are Included In The Contract Documents. This Will Include The Removal And Full Replacement Of All Flashing Involved With The Roof Replacement, Pitched Shingled Roof, And Lightning Protection That Will Need To Be Completed To Replace The Roof Alongside The Replacement And Installation Of The Gutter Lining. The Following Specifics Are Detailed In Accordance With The Drawings And Required Work:
the Contractor Must Replace The Entire Pitched Shingled Roof Of Building 1 While Considering The Increased Height In Comparison To The Rest Of The Facilities Buildings Resulting In A Higher Safety Need.
the Contractor Must Upon Removal Of The Pitched Shingled Roof, Investigate And Survey The Structural Integrity Of The Wood Decking. Confirm Any Damage And Repair The Wood Decking Where Needed To Prevent Further Water Penetration And Damage To The Floors Below.
the Contractor Must Replace All The Flashing In Kind With 16 Oz. Copper Where The Pitched Shingle Roof Meets The Conjoined Areas Of The Building. (includes Drip Edge)
the Contractor Must Replace All The Lightning Protection Involved With The Pitched Shingled Roof Properly Without Damaging The New Pitched Shingled Roof Replacement While Gaining The Proper Certification For The Lightning Protection System.
the Contractor Must Phase The Replacement Of The Pitched Shingled Roof With Prior Notice To The Cor For Shutdowns Of Individual Faces As The Building Has Many Entrances That Staff And Patients Use Daily Around The Entirety Of The Building.
the Contractor Must Ensure That No Debris Or Equipment Falls From The Worksite Down The Roof During Demolition. This Must Be Coordinated With The Cor To Ensure The Safety Of The Patients And A Shutdown Of The Building S Entrances Will Be In Effect During This Time.
the Contractor Must Ensure That Proper Weather Protection Is Provided For Times That The Pitched Shingled Roof S Envelope Is Removed, And Construction Is Ongoing Up Until The Full Replacement Of The Pitched Shingled Roof Is Complete.
the Contractor Is To Replace The Shingled Portions Of The Dormers Upon The Roof Fully And Held To The Va Standards.
the Gutters Connected To The Pitched Shingle Roof Are To Be Cleaned, Prepared, Sealed, And A New Gutter Membrane Installed. The Materials Used Are To Meet Or Exceed The Referenced Spec Section Presented. general Requirements -
all Work Will Occur Monday To Friday From 6:30 Am To 5 Pm. All Evidence Of Work On The Project Must Be Cleaned And Removed Daily To Prevent Patient Tampering. At No Time Will Tools Or An Active Job Site Be Unmanned.
some After-hours Work Must Be Conducted And Must Be Highly Coordinated With The Cor, The Electricians, Plumbers, Hvac, And The Cvamc Medical Staff.
contractors Will Need To Remain Highly Flexible To Rearrange Scheduling When Necessary. An Extensive Partnership And Coordination Must Be Designed Between The Contractor, The Cor, Contracting Officer, The Cvamc Engineering Staff, And The Cvamc Medical Staff. the Contractor Must Provide Their Own Storage. The Cvamc Has A Small Field Where A Construction Trailer Can Be Placed Only For The Duration Of The Project And Must Be Coordinated With The Cor For Size And Footprint. Parking Shall Occur Only In Approved Places So The Need To Shuttle Men And Materials May Be Necessary. Other Than This Location, The Va Will Not Supply Storage Space. All Exterior Work Will Require A Locked 6-foot Chain Link Fence Around The Perimeter. A Dumpster Must Always Remain Secured.
contractor Must Be Responsible To Verify All Site Conditions Prior To Performing Any Work. Contractor Must Follow All Guidelines And Standards, Applicable To The Task, As Described In The Construction Safety Standards And Master Construction Specifications All Available On The Va Technical Information Library. No Production Or Purchases Shall Occur Until All Products Are Submitted For Approval As Per Section 01â 33â 23, Shop Drawings, Product Data, And Samples. Submittal Drawings Shall Show Size, Configuration, And Fabrication And Installation Details.
the Contracting Officer Is The Only One Who Can Authorize The Proceeding Of Work Through Signed Documentation. The Contractor Must Substantiate Those Manufacturers And Installers Qualifications Which Comply With Specifications. Contractor Must Provide A Minimum One-year Warranty On All Material And Workmanship Unless Otherwise Noted In The Specifications.
all Work Shall Be Performed In Compliance With All Federal, State And Local Laws And Regulations. In Addition, Work Must Meet Equipment S Manufacturer Specifications And Generally Accepted Industry Standards Of Good Workmanship. All Waste Materials Must Be Disposed Of By The Contractor In Compliance With Federal State And Local Laws And Regulations. Contractors Will Supply Receipts For Quantities Of Material Removed For Recycling Accountability. The Lot T21 Is Used For Metal Recycling And Shall Receive All Metal Debris And For Disposal.
no Work May Proceed By The Contractor Until All Material Cut Sheets Are Submitted To The Cor For Approval. Cor Will Review And Submit To Contracting Officer. No Work May Proceed Until Contracting Officer Authorizes Work. The Cor Is Not Authorized To Issue A Notice To Proceed. a Site Visit Must Be Conducted With Perspective Offerors To Visually Access The Site To Avoid Mistaken Installation Practices. The Reference Materials Listed Below Must Be Cited With All Perspective Offerors. Offerors Will Receive A Briefing On Parking, Facilities, And Patient Safety Prior To Submitting A Bid As The Proposal May Be Affected By Hospital Procedures.
contractor Must Be Required To Comply With Physical Security Requirements To Include Checking In With The Va Police Or Va Sponsor/cor Each Time They Come On Site To Perform Services And Obtaining A Va Compliant Id Badge Which Must Be Always Worn While On Va Property.
all Damage Done To Structures, Equipment, Or Va Property By The Contractor During Construction Is To Be Repaired As Per The Specifications At The Contractor S Expense. contractor Will Have 160 Days To Complete The Project From Ntp.
City Of Saratoga Springs Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Electrical Works
United States
Closing Soon18 Feb 2025
Tender AmountRefer Documents
Description: Veterans Memorial Park And Field House Hvac Construction
Department Of Labor Tender
Electrical and Electronics...+1Electrical Works
United States
Closing Date5 May 2028
Tender AmountRefer Documents
Description: Preventative Maintenance on HVAC Fan Coil Units
Round Rock Independent School District Tender
United States
Closing Date3 Jun 2025
Tender AmountRefer Documents
Description: Hvac Repair Parts - Non Warehouse Stock
Palm Beach Tender
United States
Closing Date1 Dec 2027
Tender AmountRefer Documents
Description: Hvac Duct Cleaning Services, Lump Sum
421-430 of 518 active Tenders