Hvac Tenders

Hvac Tenders

Vennesla Kommune Tender

Services
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Norway
Details: Title: Framework Agreement For Technical Assistance/consultancy/consulting Engineers/architects. description: The Framework Agreement Shall Ensure The Contracting Authority Access To Consultancy And Technical Assistance, With Relevant Competence Within The Following Disciplines: 1. Consultant Engineer For Construction (rib) 2. Consultant Engineer For Fire (ribr) 3. Consultant Engineer For Electro (rie) 4. Consultant Engineer For Hvac (riv) 5. Consultant Engineer For Water Sewage And Surface Water (riva) And Roads 6. Consultant Engineer For Geo Engineering (rig) 7. Consultant Engineer For Energy (rien), And Environmental Consultant (rim) 8. Architect (ark) 9. Area Planning And Development Work 10. Engineering Design Manager And Engineering Design Group Manager (plg) 11. Landscape Architect (lark) The Framework Agreement Will Be Valid For 2 Years, With An Option For The Contracting Authority To Extend The Contract For 1+1 Year. The Contracting Authority Can Announce Individual Competitions For Larger/special Projects. Where Assignments Included In The Descriptions In The Framework Agreement Are Included As Part Of A Larger Project, The Contracting Authority Can, After A Total Assessment In The Specific Case, Decide That The Assignment Can Be Added To Another. For Example, Where A Turnkey Contractor Is Engaged. The Framework Agreement Is Divided Into 11 Sub-contracts, See The Tender Documentation And Requirement Specifications For Further Information.
Closing Date10 Jan 2025
Tender AmountNOK 52.6 Million (USD 4.7 Million)

Qatar Energy Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Qatar
Details: Contractor Shall Carry Out The Procurement, Supply, Delivery, Installation, Construction, Pre-commissioning, Commissioning, And Handing Over Of Facility Named As 'new Drilling Support Warehouse And Yard At Rlic' With Total Built Up Area Of Warehouse, Approximate 2600 M2 And Open Storage Yard Area Of Approximate 2200 M2. The Proposed Facility Consists Of The Following: 1.warehouse Building A.,,warehouse Building With Reinforced Concrete Sub-structure And Grade Slab, External Walls, Roofing Works, Internal Walls, Doors, Windows, Louvers, Finishing Works, Storage Racking System And All Accessories As Mentioned In Contract Documents. B.,,building Services Including Lighting, Small Power, Earthing And Lightning Protection, Ups, Ict/elv And Telecom, Cctv, Acs, Hvac, Plumbing, Drainage, Fire And Gas Detection And Alarm System, Fire Protection Systems 2,,external Works And Services Building A.,,outdoor Storage Yard And Internal Access Roads B.,,landscaping And Perimeter Fence And Gate C.,,services Building Comprised Of The Water/irrigation Tank And Pump Room, Electrical Room And Yard For Puss. D.,,site Utilities Including Area Lighting, Cctv, Surface Drainage, Fire Protection, And All Tie-in Works With The Existing Services Networks Including Power, Telecom, Potable Water, Fire Water, Sewage.
Closing Date19 Jan 2025
Tender AmountRefer Documents 

Soci T Wallonne De Financement Compl Mentaire Des Infrastructures Tender

Works
Civil And Construction...+2Others, Civil Works Others
Belgium
Details: Title: Marché De Travaux Ayant Pour Objet La Réhabilitation Complète D’un Immeuble De Bureaux Situé Rue Du Canal De L’ourthe, 9/3 À 4031 Angleur description: Les Bureaux De La Sofico Se Situent Actuellement Dans Un Bâtiment Situé Rue Du Canal De L’ourthe, 9, Bte 3 À B-4031 Angleur. Ce Bâtiment, Érigé Dans Les Années 1990, Ne Répond Plus Aux Normes Et Standards Actuels (incendie, Électricité, Isolation, Chauffage, Bien-être Des Travailleurs, Etc.). Le Présent Marché De Travaux Vise La Réhabilitation Complète De Ce Bâtiment. Les Travaux À Réaliser Sont Essentiellement Les Suivants : - Travaux De Démolition Et De Curage Du Bâtiment Existant En Vue De Sa Réhabilitation ; - Gros Œuvre Et Parachèvement En Vue De La Réhabilitation Du Bâtiment ; - Travaux De Menuiseries Extérieures ; - Installation D’équipements De Techniques Spéciales (hvac Et Électricité) ; - Aménagement Des Abords Et Des Places De Stationnement. Les Travaux Décrits Ci-dessus Ne Sont Pas Exhaustifs. Le Détail Des Travaux Est Repris Dans Les Clauses Techniques Et Le Métré Récapitulatif.
Closing Date10 Jan 2025
Tender AmountEUR 6.7 Million (USD 7.1 Million)

Soci T Wallonne De Financement Compl Mentaire Des Infrastructures Tender

Works
Civil And Construction...+2Others, Civil Works Others
Belgium
Details: Title: Marché De Travaux Ayant Pour Objet La Réhabilitation Complète D’un Immeuble De Bureaux Situé Rue Du Canal De L’ourthe, 9/3 À 4031 Angleur description: Les Bureaux De La Sofico Se Situent Actuellement Dans Un Bâtiment Situé Rue Du Canal De L’ourthe, 9, Bte 3 À B-4031 Angleur. Ce Bâtiment, Érigé Dans Les Années 1990, Ne Répond Plus Aux Normes Et Standards Actuels (incendie, Électricité, Isolation, Chauffage, Bien-être Des Travailleurs, Etc.). Le Présent Marché De Travaux Vise La Réhabilitation Complète De Ce Bâtiment. Les Travaux À Réaliser Sont Essentiellement Les Suivants : - Travaux De Démolition Et De Curage Du Bâtiment Existant En Vue De Sa Réhabilitation ; - Gros Œuvre Et Parachèvement En Vue De La Réhabilitation Du Bâtiment ; - Travaux De Menuiseries Extérieures ; - Installation D’équipements De Techniques Spéciales (hvac Et Électricité) ; - Aménagement Des Abords Et Des Places De Stationnement. Les Travaux Décrits Ci-dessus Ne Sont Pas Exhaustifs. Le Détail Des Travaux Est Repris Dans Les Clauses Techniques Et Le Métré Récapitulatif.
Closing Date30 Dec 2024
Tender AmountEUR 6.7 Million (USD 7.1 Million)

Caraga State University Tender

Security and Emergency Services
Philippines
Details: Description This Is A 1 Lot Procurement Item 1. Fire Detection & Alarm System (csu-main Ladies & Gents Dormitory) 1. Scope This Specification Covers The Design, Supply, Installation, Testing, And Commissioning Of A Fully Functional Fire Detection & Alarm System (fdas) For Life Safety And Early Fire Detection In A Building. 2. Applicable Standards And Codes • Nfpa 72 – National Fire Alarm And Signaling Code • Nfpa 70 – National Electrical Code • En 54 – European Standards For Fire Detection Systems • Iec 60331 – Fire-resistance Of Electrical Cables • Bs 5839 – Fire Detection And Alarm Systems In Buildings • Iso 7240 – International Standards For Fire Detection And Alarm Systems • Local Codes & Regulations (philippine Fire Code) 3. System Requirements The Fdas Shall Have The Following Key Components: 4. Material: • Fire Alarm System (call Box, Control Panel, • Pull Station / Call Point) • Smoke Detectors, Heat Detectors, Flame Detector 1. Control And Monitoring Panel (facp) O Microprocessor-based Control Unit With Lcd Display. O Supports Both Conventional And Addressable Loop Protocols. O Zone-wise Display Of Alarms And Faults. O In-built Battery Backup For 24 Hours Of Operation. 2. Detectors O Smoke Detectors – Photoelectric Or Ionization Type For Early Detection Of Smoke. O Heat Detectors – Rate-of-rise Or Fixed-temperature Type. O Multi-sensor Detectors – Combination Of Smoke, Heat, And Co Sensing. 3. Manual Call Points (mcp) O Wall-mounted, Break-glass Type. O Provides Manual Activation Of Alarms. 4. Alarm Notification Devices O Sounders And Sirens – Audible Devices Producing 85 Db Or Higher At 3 Meters. O Strobe Lights – Visual Indicators For Noisy Environments Or Areas With Hearing-impaired Individuals. 5. Fire Alarm Interface Modules O Input Modules – For Connecting External Signals (e.g., Sprinkler Water Flow). O Output Modules – For Triggering External Systems (e.g., Fire Doors, Elevators, Hvac Shut-off). 6. Repeater Panel (optional) O Mimics The Status Of The Facp In Remote Locations. 7. Cabling O Fire-resistant, Low-smoke Zero-halogen (lszh) Cables. O Installed In Conduit Or Raceways As Per Nfpa 70. 4. Functional Requirements • Detection And Notification: O The System Shall Automatically Detect Fire, Raise Alarms, And Activate Visual/audible Devices. O Manual Activation Through Mcps. • Supervision: O Continuous Monitoring For Detector Integrity And Wiring Faults. O Automatic Fault Detection And Status Display On The Facp. • Interface With Other Systems: O Hvac Control To Shut Down Air Systems In Fire Events. O Integration With Sprinklers And Fire Suppression Systems. O Elevator Recall For Fire Scenarios. O Emergency Lighting Activation. 5. Power Requirements • Primary Power Supply: O 230v Ac, 50/60hz. • Secondary Power Supply: O Battery Backup Sufficient For 24 Hours Standby And 5 Minutes Of Full Alarm. O Automatic Battery Charging And Switchover. 6. Environmental Conditions • Operating Temperature: 0°c To 49°c (32°f To 120°f) • Humidity: 0 To 93% Rh, Non-condensing 7. Installation Requirements • Install Detectors According To Nfpa 72 Guidelines For Spacing And Placement. • Mcps Should Be Installed Along Escape Routes, At 1.4 Meters From The Floor. • All Alarm Devices Shall Be Mounted At Visible And Accessible Locations. • Proper Labeling And As-built Drawings To Be Provided. 8. Testing And Commissioning • Pre-commissioning Tests: O Check For Wiring Continuity And Insulation Resistance. O Verify Connections Between Detectors, Mcps, And The Control Panel. • Functional Tests: O Test Each Detector For Correct Alarm Activation. O Verify Correct Operation Of Sounders And Strobe Lights. O Test Manual Call Points For Proper Response. • System Integration Tests: O Confirm Proper Interaction With Other Systems (hvac, Elevators, Sprinklers). 9. Documentation Requirements • Operation And Maintenance Manual. • As-built System Drawings. • Test And Commissioning Reports. • Training Documents For System Operators. 10. Warranty And Support • Minimum 1-year Warranty For All System Components. • Availability Of Technical Support And Spare Parts For At Least 10 Years. • Optional: Preventive Maintenance Contract. 11. Safety And Compliance • Compliance With Local Fire Codes And Safety Regulations. • Use Of Certified Detectors And Equipment From Recognized Manufacturers. Item 2. Fire Detection & Alarm System (csucc Ladies & Gents Dormitory) 1. Scope This Specification Covers The Design, Supply, Installation, Testing, And Commissioning Of A Fully Functional Fire Detection & Alarm System (fdas) For Life Safety And Early Fire Detection In A Building. 2. Applicable Standards And Codes • Nfpa 72 – National Fire Alarm And Signaling Code • Nfpa 70 – National Electrical Code • En 54 – European Standards For Fire Detection Systems • Iec 60331 – Fire-resistance Of Electrical Cables • Bs 5839 – Fire Detection And Alarm Systems In Buildings • Iso 7240 – International Standards For Fire Detection And Alarm Systems • Local Codes & Regulations (philippine Fire Code) 3. System Requirements The Fdas Shall Have The Following Key Components: 4. Material: • Conventional Smoke Detector With Base - Sumring/dl Brand – • Conventional Manual Call Point - Sumring/dl Brand • Conventional Fire Bell 6" - Sumring/dl Brand • Conventional Fire Alarm Control Panel (8 Zones)- Sumring/dl Brand • Wires, Cables, And Pvc Conduits (roughing Ins) • Mobilization And Demobilization • Power And Water Consumption • Temporary Facilities (temfacil) • Contingencies • Site Safety And Health (ppes) • Ladders And Scaffolds, Tools And Equipment • Testing And Commissioning 5. Control And Monitoring Panel (facp) O Microprocessor-based Control Unit With Lcd Display. O Supports Both Conventional And Addressable Loop Protocols. O Zone-wise Display Of Alarms And Faults. O In-built Battery Backup For 24 Hours Of Operation. 6. Detectors O Smoke Detectors – Photoelectric Or Ionization Type For Early Detection Of Smoke. O Heat Detectors – Rate-of-rise Or Fixed-temperature Type. O Multi-sensor Detectors – Combination Of Smoke, Heat, And Co Sensing. 7. Manual Call Points (mcp) O Wall-mounted, Break-glass Type. O Provides Manual Activation Of Alarms. 8. Alarm Notification Devices O Sounders And Sirens – Audible Devices Producing 85 Db Or Higher At 3 Meters. O Strobe Lights – Visual Indicators For Noisy Environments Or Areas With Hearing-impaired Individuals. 9. Fire Alarm Interface Modules O Input Modules – For Connecting External Signals (e.g., Sprinkler Water Flow). O Output Modules – For Triggering External Systems (e.g., Fire Doors, Elevators, Hvac Shut-off). 10. Repeater Panel (optional) O Mimics The Status Of The Facp In Remote Locations. 11. Cabling O Fire-resistant, Low-smoke Zero-halogen (lszh) Cables. O Installed In Conduit Or Raceways As Per Nfpa 70. 12. Functional Requirements • Detection And Notification: O The System Shall Automatically Detect Fire, Raise Alarms, And Activate Visual/audible Devices. O Manual Activation Through Mcps. • Supervision: O Continuous Monitoring For Detector Integrity And Wiring Faults. O Automatic Fault Detection And Status Display On The Facp. • Interface With Other Systems: O Hvac Control To Shut Down Air Systems In Fire Events. O Integration With Sprinklers And Fire Suppression Systems. O Elevator Recall For Fire Scenarios. O Emergency Lighting Activation. 13. Power Requirements • Primary Power Supply: O 230v Ac, 50/60hz. • Secondary Power Supply: O Battery Backup Sufficient For 24 Hours Standby And 5 Minutes Of Full Alarm. O Automatic Battery Charging And Switchover. 14. Environmental Conditions • Operating Temperature: 0°c To 49°c (32°f To 120°f) • Humidity: 0 To 93% Rh, Non-condensing 15. Installation Requirements • Install Detectors According To Nfpa 72 Guidelines For Spacing And Placement. • Mcps Should Be Installed Along Escape Routes, At 1.4 Meters From The Floor. • All Alarm Devices Shall Be Mounted At Visible And Accessible Locations. • Proper Labeling And As-built Drawings To Be Provided. 16. Testing And Commissioning • Pre-commissioning Tests: O Check For Wiring Continuity And Insulation Resistance. O Verify Connections Between Detectors, Mcps, And The Control Panel. • Functional Tests: O Test Each Detector For Correct Alarm Activation. O Verify Correct Operation Of Sounders And Strobe Lights. O Test Manual Call Points For Proper Response. • System Integration Tests: O Confirm Proper Interaction With Other Systems (hvac, Elevators, Sprinklers). 17. Documentation Requirements • Operation And Maintenance Manual. • As-built System Drawings. • Test And Commissioning Reports. • Training Documents For System Operators. 18. Warranty And Support • Minimum 1-year Warranty For All System Components. • Availability Of Technical Support And Spare Parts For At Least 10 Years. • Optional: Preventive Maintenance Contract. 19. Safety And Compliance • Compliance With Local Fire Codes And Safety Regulations. Use Of Certified Detectors And Equipment From Recognized Manufacturers. Note: This Is An Early Procurement Activity For F.y. 2025
Closing Date23 Dec 2024
Tender AmountPHP 2.6 Million (USD 45 K)

Government Of New Brunswick Tender

Civil And Construction...+1Civil Works Others
Canada
Chudgld - Angio Salle J Retrofit - Siemens - Nb
Closing Soon12 Dec 2024
Tender AmountRefer Documents 

Ziekenhuis Aan De Stroom ZAS Vzw Tender

Works
Civil And Construction...+1Civil Works Others
Belgium
Details: Title: Zas Augustinus Afwerking En Technieken Nicu Incl. Aanleveren As-built Dossier description: Afwerking Bouw (incl. Coördinatie-opdracht) En Installatie Technieken Voor De Nieuwe Nicu Afdeling En Het Fertiliteitscentrum Op De Site Zas Augustinus. Het Betreft De Realisatie Van Een Nieuwbouw (waarbij Het Lot Ruwbouw Reeds In Uitvoering Is) Voor De Diensten Nicu En Fertiliteit Binnen Zas. Het Gebouw Bestaat Uit 4 Bouwlagen, Waarbij Op Het Gelijkvloers En De Eerste Verdieping Ca. 3.450 M² Bruto Vloeroppervlakte Voorzien Wordt Voor De Afdeling Nicu En Waarbij Op De Tweede Verdieping Ca. 1.400 M² Bruto Vloeroppervlakte Voorzien Wordt Voor De Afdeling Fertiliteit. De Technische Ruimte Is Geïntegreerd In De Tweede Verdieping En De Kelderverdieping, Waardoor Er Geen Technieken Op Het Dak Dienen Geplaatst Te Worden. De Horizontale Aansluiting Tussen Het Bestaande Gebouw En De Nieuwbouw Verloopt Via Een Glazen Verbindingsgang Op De Drie Niveaus. De Opdracht Is Opgedeeld In Volgende Percelen: Perceel 1 Afwerking Bouw En Vast Meubilair + Coördinatieopdracht Perceel 2 Hvac Perceel 3 Elektriciteit Perceel 4 Sanitair En Brandbestrijding Perceel 5 Medische Gassen En Ln2
Closing Date14 Feb 2025
Tender AmountRefer Documents 

Dublin City Council Tender

Works
Civil And Construction...+1Building Construction
Ireland
Details: Title: Dcc - Expression Of Interest For Parnell Square Project – Phase 1 description: Dublin City Council Are Seeking To Carry Out Construction Works At Parnell Square North For Phase 1 Which Includes The Following Works: 1. Construction Of A New 5-storey Building Over Basement Of Approximately 6,100m2 (excluding Roof Plant Space) Located At The Rear Of Georgian Houses Nos. 23-28 Parnell Square North, Dublin 1 To Form The Core Of The New City Library. This Includes Connections To The Georgian House No. 26 And To The Hugh Lane Gallery. 2. The Partial Renovation/essential Works Of Georgian Houses Nos. 23-28 Parnell Square North, Measuring Approximately 5,500m2. 3. Restoration Of Georgian House No. 26 Parnell Square North Of Approximately 700m2. This Includes The Partial Refurbishment Of No. 27 And Roof And Basement Refurbishment Of No. 25. 4. Refurbishment Works To The 1930’s Wing Of The Hugh Lane Gallery, Charlemont House, Parnell Square, Dublin 1 Of Approximately 2,100 M2 . This Includes Repair And Upgrade Of Roof Works And Rooflights To 1930s Wing And Francis Bacon Studio, New Hvac Systems, Cabling And Lighting To 1930’s Wing And Associated Bms And New Environmental Control Lobbies To Main And Rear Entrances. The Construction Value Is In The Order Of €100m. Please Note That This Project Is Subject To Funding. For Further Information Please Refer To Documentation Available To Download From Www.etenders.gov.ie Resource Id 4664774.
Closing Date20 Dec 2024
Tender AmountEUR 100 Million (USD 105.7 Million)

R Gie Des B Timents Tender

Works
Civil And Construction...+2Others, Building Construction
Belgium
Details: Title: Charleroi - Spf Interieur - Dbm Etudes Techniques, Construction Et Maintenance D’un Nouveau Centre Fermé Pour Illégaux description: Le Présent Marché Porte Sur Les Études Techniques, La Construction Et La Maintenance (pour Une Période De 9 Ans) D'un Centre Fermé Pour Illégaux À Charleroi. Pour Réaliser Ce Projet, Le Pouvoir Adjudicateur Recourt À Un Marché De Type Design Light, Build & Maintain (dbm) Par Le Biais D’une Procédure Concurrentielle Avec Négociation, En Application De L'article 38 § 1er 1°b) De La Loi Du 17 Juin 2016 Relative Aux Marchés Publics. Il Est Important De Noter Que La Partie "design Light" Concernera Essentiellement Les Études Des Techniques Spéciales (hvac, Électricité, Ascenseur, Etc.), Les Études De Stabilité Et L’établissement Du Dossier D'exécution. En Effet, Un Projet A Été Étudié Par La Régie Des Bâtiment Et Une Demande De Permis Unique A Été Introduite En Date Du 21 Mai 2024 Auprès De La Ville De Charleroi. La Mission De L’adjudicataire Démarrera Donc Après L'obtention Du Permis Unique. En Phase De Sélection, Un Minimum De 3 Et Un Maximum De 5 Candidats Seront Sélectionnés, Lesquels Recevront Le Guide D'attribution Afin De Soumettre Une Offre.
Closing Date6 Jan 2025
Tender AmountRefer Documents 

Dublin City Council Tender

Works
Civil And Construction...+1Building Construction
Ireland
Details: Title: Expression Of Interest For Parnell Square Project – Phase 1 description: Dublin City Council Are Seeking To Carry Out Construction Works At Parnell Square North For Phase 1 Which Includes The Following Works: 1. Construction Of A New 5-storey Building Over Basement Of Approximately 6,100m2 (excluding Roof Plant Space) Located At The Rear Of Georgian Houses Nos. 23-28 Parnell Square North, Dublin 1 To Form The Core Of The New City Library. This Includes Connections To The Georgian House No. 26 And To The Hugh Lane Gallery. 2. The Partial Renovation/essential Works Of Georgian Houses Nos. 23-28 Parnell Square North, Measuring Approximately 5,500m2. 3. Restoration Of Georgian House No. 26 Parnell Square North Of Approximately 700m2. This Includes The Partial Refurbishment Of No. 27 And Roof And Basement Refurbishment Of No. 25. 4. Refurbishment Works To The 1930’s Wing Of The Hugh Lane Gallery, Charlemont House, Parnell Square, Dublin 1 Of Approximately 2,100 M2 . This Includes Repair And Upgrade Of Roof Works And Rooflights To 1930s Wing And Francis Bacon Studio, New Hvac Systems, Cabling And Lighting To 1930’s Wing And Associated Bms And New Environmental Control Lobbies To Main And Rear Entrances. The Construction Value Is In The Order Of €100m. Please Note That This Project Is Subject To Funding. For Further Information Please Refer To Documentation Available To Download From Www.etenders.gov.ie Resource Id 4664744.
Closing Date20 Dec 2024
Tender AmountEUR 100 Million (USD 105.7 Million)
421-430 of 458 active Tenders