Heater Tenders
Heater Tenders
Bureau Of Fisheries And Aquatic Resources Region Viii Tender
Electrical Goods and Equipments...+1Electrical and Electronics
Philippines
Details: Description Please Quote Your Lowest Price Inclusive Of Vat On The Following Item/s Or Lot/s Listed Below, Subject To The Terms And Conditions Of This Rfq, And Submit Your Quotation Duly Signed By Your Representative Not Later Than January 13, 2025, At Bids And Awards Committee Of Bfar 8, 3rd Floor Mrgp Commercial Bldg, Marasbaras, Tacloban City. For More Information, Please Call The Bac Secretariat At Telephone Nos.: 888-0381 (local 1003) Or Browse The Philgeps Website. Item/ Job Description: Lot 1 1 1000 1ph Watts Water Heater Rod 4 Unit 19,200.00 2 Portable Water Analyzer ( Temperature, Salinity, Ph)battery Type 1 Unit 49,000.00 Lot 2 1 Electric Stand Fan; 16 Inches Plastic Blade; 220 Volts; Heavy Duty And Branded 3 Unit 5,985.00 Lot 3 1 24 Inches Ips Hd Monitor 1 Unit 7,000.00 2 4mp Wifi Ip Ptz Outdoor Camera With 64gb Sdcard 4 Unit 40,000.00 3 650va Ups 3 Unit 15,000.00 4 6u Data Cabinet With Glass Front Door, Brushless Motor Fan 1 Unit 5,198.00 Terms And Conditions: 1. Quality And Quantity Of Goods: The Winning Supplier Is Required To Provide The Goods/materials As Specified In The "purchase Order," Ensuring That They Meet The Required Quality, Condition, And Exact Quantity. 2. Delivery Schedule: The Winning Supplier Must Deliver The Specified Items Within 25 Days Of Receiving And Accepting The Purchase Order, To Bfar-gsu. 3. Return Of Items: The End User Reserves The Right To Return The Items If The Winning Supplier Fails To Meet The Specifications Outlined In The Contract. 4. Payment Terms: Payment Will Be Made Upon Completion Of Delivery/ies, Following Inspection And Acceptance By The Authorized Bfar Representative Or Personnel, And Upon Submission Of All Required Supporting Documents. All Necessary Documents Must Be Processed Before Payment Is Issued. 5. Payment Method: Payments Will Be Processed Through The Land Bank Of The Philippines’ Lddap (land Bank Disbursement Account Payment), An Electronic Payment System For The Government Bidders Must Submit The Following Documents: 1.) Philgeps Registration Number 2.) Mayor's Permit 3.) Request For Quotation (rfq) 4.) Omnibus Sworn Statement (oss)* *for Single Proprietorship – Special Power Of Attorney, In Case The Person Signing This Request For Quotation Is Not The Business Owner, In Its Original And Duly Notarized Form. *for Corporation – Board Resolution/secretary’s Certificate, In Its Original And Duly Notarized Form. *for One Person Corporation (opc) – President’s Certificate/secretary’s Certificate, In Its Original And Duly Notarized Form.
Closing Date13 Jan 2025
Tender AmountPHP 141.3 K (USD 2.4 K)
Offizielle Bezeichnung Tender
Others
Germany
Description: Contract notice - general guideline, standard regulation, open procedure (construction work) Air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small ... Multi-room air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small laboratory areas. The listed building is being completely renovated and an extension is being added. The dismantling and pollutant remediation of the existing building has already taken place. Execution of ventilation installation consisting of air conditioning systems in the basement and on the roof including duct network, fire dampers and air outlets. The ventilation of the interior ancillary rooms and toilet areas is carried out by two air conditioning systems with heat recovery and heaters, each with approx. 1,000 m³/h, and smaller individual fans. The ventilation of the lecture hall is carried out by an air conditioning system with heat recovery and heating and cooling functions with approx. 4,000 m³/h. The laboratory areas are mechanically ventilated by two air conditioning systems with heat recovery and heating and cooling functions with approx. 5,500 m³/h and 6,80 m³/h. In addition, two special exhaust fans with approx. 1,000 m³/h and 1,500 m³/h with the associated plastic duct network are planned.
Closing Date8 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n774.3 |gys|717-605-3918|russell.w.kreider.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||to Be Determined |n00104|to Be Determined|to Be Determined|see Schedule|to Be Determined|see Schedule ||to Be Determined||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg|
equal Opportunity (sep 2016)|2|||
option For Increased Quantity (mar 1989)|1|365 Days After Contract Award Date |
alternate A, Annual Representations And Certifications (oct 2024)|13|x|||||||||||||
annual Representations And Certifications (may 2024)|13|333414|500|x|x||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Solicitation Is Issued Pursuant To Emergency Acquisition Flexiblities (eaf).
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Russell.w.kreider.civ@us.navy.mil.
b. General Requirements: Mil-std Packaging, Government Source Inspection Required.
c. All Freight Is Fob Origin.
d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
e. Only A Firm-fixed Price (ffp) Will Be Accepted.
f. Must Adhere To Iuid Requirements Of Dfars 252.211-7003
g. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
h. Your Quote Should Include The Following Information For Justification Purposes:
- New Procurement Unit Price____________________
- Total Price _____________________
- Procurement Delivery Lead Time (ptat) _________________ Days
- Award To Cage _______________
- Inspection & Acceptance Cage, If Not At Award To Cage _____________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________ (90 Days Minimum Is Requested).
- Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq)
i. Important Traceability Notice:
if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items.
j. Options
prospective Option Quantity Up To 100%
notes:
the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government Requests Up To A 100% (9 Ea) Option For A Period Of 365 Days. The Option Grants The Government The Unilateral Authority To Increase
this Order Up To The Above Quantity Within 365 Days Of The Contract Award Date. This Will Incorporate Far Clause 52.217-6 (option For Increased Quantity) Into The Award. The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit
price Specified. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract,
unless The Parties Otherwise Agree. A Modification Will Be Completed At The Time The Option Is Exercised And All Current Contract Terms And Conditions Will Apply To The Option Quantity.
please Indicate If The Contracting Officer May Exercise The 100% Option Quantity For The Contract.
yes ____ Or No ____
or If You Request A Variation To The Option Please Let Me Know In Your Quote.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Heater,fluid,electr .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Heater,fluid,electr Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;74924 350-142167
7pzx0 Pa12650129;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
Closing Date17 Jan 2025
Tender AmountRefer Documents
DEPARTMENT OF LABOR AND EMPLOYMENT REGION I Tender
Others
Philippines
Details: Description Wpfo-2025-01-88; Supply And Delivery Of Bakery Equipment, Supplies, And Ingredients For The Implementation Of Dilp Project Re: "community-based Bakery & Coffee Vending Store "tinapayan At Kapehan Sa Babuyan" Projects - Infanta (ro1-dilp-wpfo-2024-0052) Items: "gas Oven 6 Trays, Black Iron And Stainless With Fiber Glass Insulators: 57”l X 28”w X 30”h, Stand: 22”h" "filled Gas Tank W/ Complete Accessories 11 Kg Gas Tank With Hose And Regulator" "dough Roller Machine Metal 4x16 1.5 Hp" "pan Slicer 13x18, 30 Blades" "coffee Vending Machine 3 Flavor Coffee Vending Machine, Coin Operated, 305 X 550 X 700 Mm, 25 Kg, 800 Watts, 1.6 L Heater, 65 Cups, 3 Kls Powdered Coffee Flavor, 300 Pcs, 6.5 Paper Cups And Led Signage" "mixer (masahan) Stainless, Bangka Style 2x4 Ft" "table (stainless, 3x6 Ft)" "tray Rack 24 Baking Pans Capacity, Stainless" "measuring Cups & Measuring Spoons 10 Pcs, Measuring Cooking Tools For Baking And Cooking" "measuring Cup 500 Ml, 16 Oz, Stainless" "mixing Bowl 22 Cm Stainless Steel" "rolling Pin Wood" "cutter Stainless" "pastry Spatula Silicone, Small" "food Scraper Wooden Handle Stainless Steel" "baking Pan Size Tray 13 X 18, Steel" "plastic Tray Large" "tasty Pan Tray Size 11, Steel" "mamon Tray Medium, Steel" "bread Display Cabinet Aluminum With Glass, L4.5 Ft, W 2ft, H 2 Ft, 3 Layers" "display Rack Pure Metal, Powder Coated 5-layer, 142 Cm X 64 Cm X 33 Cm" "cling Wrap Plastic, 12 X 300 / 15 X 500 M" "plastic Sando Bag 50 Pcs/pack (micro)" "plastic Sando Bag 50 Psc/pack(mini)" "plastic Sando Bag 50 Pcs/pack (medium)" "plastic Sando Bag 50 Pcs/pack (large)" "kraft Paper Roll 30m X 18 M" "multi-purpose Packing Hd Roll Plastic Bag 8x11 (1000 Pcs)" "multi-purpose Packing Hd Roll Plastic Bag 10x114 (1000 Pcs)" Bread Flour (25 Kg Per Sack) All Purpose Flour (25 Kg Per Sack) Fresh Milk (1 L/pc) White Sugar (50 Kg Per Sack) Yeast (1kg/pack) Eggs (30 Pcs Per Tray, Size: Large) Margarine (11 Kg/pail) Vegetable Shortening (lard(6.5kg/pail)) Vanilla Extract Condensed Milk (360m/can) Salt (25kg/sack) Cheese (430 G) Vegetable Oil (1.5 Liters) Food Coloring (red)
Closing Date14 Jan 2025
Tender AmountPHP 340.2 K (USD 5.8 K)
KIC Innoenergy SE Tender
Services
Energy, Oil and Gas...+1Environmental Service
Netherlands
Details: Title: Environmental Impact Assessment Study Finland For Company Builder Volaghy
description: The Scope Is Related To Managing The Complete Eia (environmental Impact Assessment) Process On Behalf Of The Company Builder Volaghy. Volaghy Will Establish Several Production Facilities For The Production Of Synthetic Aviation Fuel (esaf). The Project Location Is Situated Somewhere In Finland. On High-level, The First Volaghy Site Will Have The Following Characteristics: •intake O 200 – 250 Kton/y Captured Co2 From Flue Gases O 220 – 250 Mw Of Electrical Energy O 300 – 400 Kton/y Of Water •intermediates O130 – 150 Kton/y Methanol (alternative 1) • Products O 40 – 60 Kton/y Kerosene (esaf) O 1 – 4 Kton/y Naphtha (enaphtha) O 1 – 2 Kton/y Diesel • Other Emissions O Flue Gas From Flare And Fired Heaters O Treated Wastewater •storage Facilities (capacity: Tbd) For: O Co2 O Raw Meoh O Meoh, Grade Aa O Esaf O Naphtha O Diesel •land O 10 – 20 Ha With T/kem Zoning Approved In Finland Deliverables (for One Site) 1. Eia Planning And Permitting Schedule (first Step) O A Detailed Time Plan For The Eia Process From Start To Approval, Including An Assessment Of Key Risks And Necessary Process Steps. O A Time Plan Incorporating All The Other Necessary Permits And Their Timing From Application To Approval 2.eia Programme And Report (second Step) O Alternatives ▪ 1. The Plant Is Not Built ▪ 2. Production Capacity Of 50 Kton/y ▪3. Production Capacity Of 100 Kton/y O The Work Shall Include The Compiling Of The Eia Programme And The Eia Report For The Project And Its Alternatives As Regulated In The Finnish Act On The Environmental Impact Assessment Procedure 252/2017 And The Decree Of The Government On The Environmental Impact Assessment Procedure 277/2017. O Other ▪ The Eia Shall Include The Necessary Piping Needed To Integrate Process Streams Between The Co2 Source And Our Site. This Distance Is Foreseen To Be 0 – 3 Km. ▪the Eia Shall Include The Integration Work From Our Plant To The Existing District Heating Network. The Point Of Interface Shall Be 0 – 3 Km From Our Site. Options The Following Options Shall Be Provided Within The Tender: 1.the Complete Process And Deliverables (1. And 2. In Deliverables Above) For A Second Site With The Same Characteristics 2.a Site-specific Natura Assessment (one Site) 3.air Quality Modelling (one Site) 4.noise Modelling (one Site) 5.questionnaire To Key Stakeholders (drafting, Analyzing And Summarizing The Survey) (one Site) 6.interviews With Key Stakeholders (one Site)
Closing Date15 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Electrical Generators And Transformers...+1Electrical and Electronics
United States
Details: This Sources Sought/market Survey Notice Is Being Conducted By Aleda E. Lutz Va Medical Center, 1500 Weiss Street, Saginaw Mi, 48602 To Identify All Sources That Are Capable Of Providing Maintenance Service For Emergency Generator For The Period Of April 5, 2025 April 4, 2026 At The Discretion Of The Government In Strict Accordance With All Schedules, Specifications, Terms, Conditions And Provisions Of This Contract.
general Information
visit #1 Furnish All Tools, Labor, Materials, Parts, And Laboratory Services To Perform The Following Specified Maintenance On The Five Generators Listed At The End Of This Document:
all Maintenance, Service, Operational Checks, And Parts Shall Be Performed And Supplied Per The Manufacturer S Recommendations By Manufacturer Certified Technicians.
contractor Shall Provide All Fluid Analysis Reports And Within 7 10 Days After Completion Of Maintenance.
contractor Performance Shall Be Monitored Through Service Reports That Shall Be Submitted After Each Repair Has Been Conducted.â Field Service Reports Must Be Submitted Within 7-10 Days And Will Be Reviewed For Accuracy And Timely Submission.
contractor Shall Perform Services Within 60 Days Of Award.
maintenance Checks:
radiator Core For Air Flow
antifreeze Protection
coolant Level
coolant Inhibitor Strength (add Conditioner If Required To Update Strength)
radiator Cap And Seal
coolant Leaks
lube Oil Level
fan Belt Tension
condition Of All Hoses
hose Clamps
condition Of Flex Fuel Lines
day Tank Float Controls, Solenoid, And Main Fuel Pump Operation
fuel System For Leaks
cranking Voltage Drop
battery Electrolyte Level
battery Voltage
battery Charger Rate
battery Cables And Connections
flex Exhaust Couplings Rain Flashing
turbo Wheel For Bearing Wear
terminal Strip Connections
loose Relays In Control Panel
jacket Water Heater Operation
governor Oil Level
governor Linkage
remote Governor Control Operation
air Gap On Generator
collector Rings And Brushes
oil And Dirt Buildup In Generator
system For Loose Bolts, Etc.
crank Termination Time
engine Instruments
abnormal Noise Or Vibration
exhaust Characteristics
Louver Operation
crankcase Blow By
voltage And Frequency
all Switches In Correct Position
drain Water And Sediment From Day Tank
lubricate Generator Bearing
clean Engine Crankcase Breather
lubricate Fan Pulley
clean Primary Filter
drain Exhaust Moisture Traps
inspect The Turbocharger For End Play And Leaks
maintenance Services:
note: All Filters Shall Be Oem
change Air Cleaner Elements, Check Seals, Air Cleaner Indicators And Air Induction System
take Oil Sample And Perform Infrared Analysis (performed By A Fluid Analysis Lab)
take Fuel And Coolant Samples And Perform Analysis (performed By A Fluid Analysis Lab)
change Lube Oil And Filters, Lube Oil Is To Be Replaced With Fully-synthetic Oil In Accordance With Manufacturers Recommendations
change Fuel Filters
oil, Fuel, And Coolant Samples Taken Will Be Delivered To The Testing Laboratory In A Reasonable Time As To Not Compromise The Samples. Care Will Be Taken As To Storing The Samples As Recommended By The Testing Laboratory Until They Are Delivered.
operational Checks:
recheck Oil Level While Running
recheck All Fluid Systems For Leaks
used Oil Transportation And Recycling:
transportation And Recycling Of Used Oil Shall Be Performed In Accordance With Federal, State And Local Regulations Including:
michigan Natural Resources And Environmental Protection Act 451, Of 1994 As Amended, Part 121 Liquid Industrial By-product.
prior To Transporting Used Oil From The Property, The Transporter Must Provide A Shipping Document Describing The Materials In Accordance With Above Regulation For Certification By The Detroit Vamc Gems Program Manager Or Designee. The Contractor Shall Arrange For The Designated Recycling Facility To Notify The Cor, In Writing, That The Shipment(s) Arrived At Its Destination Within 7 Days Of The Date The Shipment Left The Facility.
michigan Hazardous Material Transportation Act 138.
prior To Transporting Used Oil From The Property, The Contractor Shall Provide A Copy Of The Act 138 Transporter S Permit And Registration To The Cor For The Approval Of The Gems Program Manager. During Transport, The Transporter Must Also Be Able To Produce A Copy Of The Act 138 Permit And Registration, Either Via Electronic Record Or Hard Copy, To Deq Staff Or A Peace Officer When Requested.
generator #1
cummins/onan Model: Dfeb-4955010 Sn: B010204440
kw: 400 Pf: .8 Volt: 120/208 Amp: 1387
generator #2
mtu Onsite Energy Model: 400pxc6dt3 Sn: 331914-1-1-0411
kw: 400 Pf: .8 Volt: 120/208 Amp: 1387
generator #3
cummins/onan Model: 350 Dfcc Sn: G920477586
kw: 350 Pf: .8 Volt: 277/480 Amp: 526
generator #6
mtu Onsite Energy Mod: 750rxc6dt2(g05) Sn: Wa-572596-0410
kw: 750 Pf: .8 Volt: 277/480 Amp: 1127
generator #7
mtu Onsite Energy Mod: Ds00500d6srah1583 Sn: 331787-1-1-0411
kw: 500 Pf: .8 Volt: 277/480 Amp: 751
If This Is A Service Your Business Can Provide, Respond To This Sources Sought By Friday, January 3, 2025; 3:00 P.m. Eastern Time. Responses Should Include: (1) Business Name And Address (2) Point Of Contact Name, Phone Number, And E-mail Address (3) Sam Uei And Naics Code (4) Business Size Small Or Large (5) Type Of Business Service Disabled Veteran Owned, Veteran Owned, 8a, Hubzone, Women-owned Etc. (6) Applicable Gsa/fss Contract Number (if Applies). All Businesses Eligible To Provide This Service Are Encouraged To Reply As This Information May Be Used To Determine Potential Set-asides For The Above Noted Service. E-mail Responses To: Ariel Bautista-lagares, At Ariel.bautista-lagares@va.gov (note: This Is Not A Request For Quote Or An Announcement Of A Solicitation.)
Closing Date3 Jan 2025
Tender AmountRefer Documents
Correctional Service Canada Tender
Electrical Generators And Transformers...+1Electrical and Electronics
Canada
Details: Generator Radiator Replacement This Requirement Is For: The Correctional Service Of Canada, Ontario Region, Bath Institution. Trade Agreement: Canadian Free Trade Agreement (cfta). Tendering Procedures: All Interested Suppliers May Submit A Bid. Competitive Procurement Strategy: Lowest Priced Compliant Bid. Set-aside Under The Procurement Strategy For Indigenous Business: This Procurement Is Not Subject To Any Set-asides For Indigenous Suppliers. Comprehensive Land Claim Agreement: This Procurement Is Not Subject To A Comprehensive Land Claims Agreement. Security Requirements: This Contract Does Not Include Security Requirements. Nature Of Requirements: The Following Is A Summary Of The Statement Of Work For This Requirement. The Correctional Service Of Canada Requires The Services Of A Qualified Contractor To Supply And Install Two (2) New Radiators For A Cummins Qsk60-g6 Generator. Objectives: To Replace Two (2) Leaking Radiators With Two (2) New Compatible Cummins Radiators. Deliverables: The Contractor Must: • Drain The Engine Coolant From The Current Radiator Assemblies And Dispose Of It As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Remove Front End Enclosure Housing Panels To Permit Radiator Removal. • Remove The Two Leaking Radiators, Disposing Of Them Offsite As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Supply And Install Two (2) New Cummins Radiators, With Full Length Header Plates. • Replace All Gaskets (fibre) And Sealant. • Replace All Thermostats. • Replace All Radiator Hoses. • Supply And Fill Radiators With New Engine Coolant As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Install Two (2) Radiator Heaters With Integral Pumps (to Reduce Thermal Expansion Shock). • Re-assemble Entire Enclosure Housing. • Supply, Connect And Fuel A Temporary, Two-point-two (2.2) Gigawatt Generator For The Entire Period That The Bath Generator Will Be Offline. • Ensure The Temporary Generator Automatically Starts And Provides Power To Both Bath And Millhaven Institutions Within Ten (10) Seconds In The Event Of Power Loss From The Distribution Grid. • Disconnect And Remove The Temporary Generator From The Site Once Replacement Of The New Radiators Is Complete. • Ensure The Cummins Qsk60-g6 Generator Is Reconnected And Functioning As Required. Any Conditions For Participation Of Suppliers Not Specified In Solicitation Documentation: None. Estimated Quantity Of Commodity: See Solicitation Document Statement Of Work And Basis Of Payment. Duration Of Contract And Time Frame For Delivery: Construction Time: The Contractor Must Perform And Complete The Work On Or Before March 31st, 2025. File Number: 21421-25-4942653 This Bid Solicitation Cancels And Supersedes Previous Bid Solicitation Numbers: 21423-23-4357694 Dated 2023/04/21 That Closed On 2023/05/25 At 10:00est And 21421-25-4883316 Dated 2024-10-29 That Closed On 2024-12-03 At 10:00est. Csc Will Provide A Debriefing Or Feedback Session Upon Request To Bidders Who Bid On The Previous Solicitations. Contracting Authority: Robin Riha Telephone Number: 613-328-9727 E-mail: Robin.riha@csc-scc.gc.ca Note To Bidders: Bidders Can Obtain The Complete Statement Of Work And Evaluation Criteria By Downloading The Solicitation Document And Associated Documents From The Canada Buys / Tender Opportunities Website. The Crown Reserves The Right To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada (english Or French). After Contract Award, Bidders May Request A Debriefing On The Results Of The Bid Solicitation Process. Bidders Should Make The Request To The Contracting Authority Within Fifteen (15) Working Days Of Receipt Of The Results Of The Bid Solicitation Process. The Debriefing May Be In Writing, By Telephone Or In Person. Procurement Assistance Canada (pac) Offers Seminars To Businesses Interested In Learning How To Sell Goods And Services To The Government Of Canada. The Seminars Are Free. Topics Include: ? Understand The Federal Procurement Process; ? Learn About Searching For Opportunities; ? Find Out How To Bid On Opportunities; ? Discover How To Prepare To Sell To The Government. The Full Schedule Of Seminars Can Be Found On The Procurement Assistance Canada Website, Under Find An Event (procurement Assistance Canada: Find An Event - Canada.ca).
Closing Date7 Jan 2025
Tender AmountRefer Documents
Stadt Finsterwalde Tender
Others...+2Civil And Construction, Civil Works Others
Germany
Details: Lot 20 Heating/ventilation/sanitary 10 pcs. Floor drains With sludge bucket Approx. 50 m stainless steel drinking water pipe 1 sink system With small instantaneous water heater 1 pc. Heating pump group With distributor bar Approx. 70 m stainless steel system pipe Heating up to Dn 25 5 pcs. Ceiling radiant panels Delivery lengths 2-5 m 1 pc. Flat radiator 6 pcs. Pendulum fan With control
Closing Date16 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.40|wvl|717-605-1842|desiree.d.meyers.civ@us.navy.mil|
item Unique Identification And Valuation (mar 2016)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|inspection: D Acceptance: D|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x|||x|||||
variation In Quantity (apr 1984)|3|+10%|-10%||
time Of Delivery (june 1997)|20|50 Lbs||||||||||||||||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|n39040 Certification; S4306a Material|n50286 Portsmouth|tbd|133.2||n/a|certification N39040|||ss Dd1423 Or Specified By Block 14a||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year From Date Of Delivery|365 Days After Acceptance Of Material|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (sep 2021)|13|333992|1,250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
evaluation Criteria And Basis For Award-|1||
1. The Offer Due Date Is Updated To 14 January 2025.
\
1. The Offer Due Date Is Updated To 2 December 2024.
\
1. The Offer Due Date Is Updated To 14 November 2024.
\
1. The Offer Due Date Is Updated To 21 October 2024.
2. The Poc Is Updated To Amanda Bailey Amanda.l.bailey50.civ@us.navy.mil.
3. The Small Business Set-aside Is Hereby Dissolved.
4. The Quantity Is Updated To 500.
5. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
\
this Amendment Is Issued To Extend Closing To 28jul23.
this Amendment Is Issued To Extend Closing Date To 05may23.
\
this Amendment Is To Extend The Closing Date To 16dec22.
\
this Amendment Is Issued To Extend The Closing Date To 09 Sep 2022.
\
the Purpose Of This Amendment Is To Extend The Closing Date To 10aug22.
\
amendment Issued To Extend Closing Date To 17jun22.
this Amendment Is Issued To Extend The Closing Date To 13 May 22.
\
this Amendment Is Issued To Extend The Closing Date To 15 Apr 22.
this Amendment Is To Extend The Closing Date To 15 Mar 2022.
this Amendment Is To Extend The Closing Date To 14 Feb 2022.
poc Changed To Benjamin.t.spangler.civ@us.navy.mil
all Prior Offers Shall Be Resubmitted To Above Poc Or Neco.
\
1. Dd1423 Data Item Aoo1 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286.
3.all Contractual Documents (i.e. Contracts,purchase Orders,task Order,delivery Order,& Modifications) Related To The Instant Procurement Considered To Be "issues" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In.
4. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offfers. See Clause 252.213-7000.
5. The Following Proposes Delivery Schedule Applies:
submission Odf All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Workig Days After Receipt.
180 Actual Days To Manufacture Part
final Delivery Of Material 365 Days
delivery Days And Past Performance Will Be Evaluation Factors In Determining Awardee.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=aws A5.01 | | | |930101|a| | |
document Ref Data=aws A5.28 | | | |200630|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Aws-a5.28, Except As Amplified Or Modified Herein. Aws-a5.28 Ordering Data Information Is Provided Below:
a. American Welding Society Specification Aws-a5.28; Low Alloy Steel Filler Metals For Gas Shielded Arc Welding.
aws Classification - ;er70s-b2l;
size, Diameter - ;1/16 Inch;
spool Size, Weight - ;n/a;
cut Length - ;36 Inches;
b. American Welding Society Specification Aws-a5.01; Filler Metal Procurement Guidelines.
lot Classification - Class S2
intensity Of Testing - Schedule J
3.2 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;quality Conformance/compliance Inspection (includes Chemicals And Mechanicals);
item - ;rod, Welding;
performance - ;aws A5.01 And Aws A5.28;
acceptance - ;aws A5.01 And Aws A5.28;
3.3 Container Size - Welding Electrodes Must Be Supplied In ;10; Pound Containers.
3.4 Welding Electrode Strip Heaters - Electrical Resistance Rod-type Or Pad-type Heaters (i.e. Strip Heaters) That Are Controlled Automatically By Thermocouples Or Manually By An On-off Switch Must Be Used To Maintain Preheat/interpass Temperatures Within The
required Range Before And During Welding Of The Usability (i.e. Soundness) Test Plate And The Mechanical Property (when Required) Test Plate. The Test Plate Must Be Insulated Or Separated From The Work Bench. Oxy-fuel Heating Of Any Test Plate Is Not
permitted.
3.5 Radiography - Radiography Is Required For Test Weldments And Must Be Performed In Accordance With T9074-as-gib-010/271 As Modified By Aws-a5.28. Acceptance Criteria Must Be Aws-a5.28.
3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The
information Listed Below.
a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor.
b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration.
c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product.
d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification.
b. A Complete Description Of The Change To Be Made And The Need For That Change.
c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis.
d. Proposed Changes To Documents Controlled By The Government.
e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration.
f. Recommendations About The Way A Retrofit Should Be Accomplished.
g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct.
h. Impacts To The Operational Use Of The Product.
i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
j. Milestones Relating To The Processing And Implementation Of The Engineeringchange.
3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements
established In The Contract/purchase Order.
3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities
available For Audit By The Contracting Officer Or His Authorized Representative.
3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer.
3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco.
3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For
operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The
government.
3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The
applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility,
applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate
planning For Government Inspection Can Be Accomplished.
3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.12.2 Inspection For Completeness And Proper Type.
3.12.3 Verification Of Material Quality Received.
3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.12.6 Identification And Protection From Improper Use Or Disposition.
3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity
for Withholding The Material From Use.
3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.12.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Unit Containers. This Traceability Marking Must Provide
direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14.1 Permanent Markings Are Not Required For Consumable Material (weld Filler Material, Etc.). Traceability Must Be By A Label Attached To Each Unit Container. The Unit Container Identification Label Must Include, In Addition To The Contract Number And The
national Stock Number (nsn), All Markings Required For Identity And Traceability. Each Container In The Lot Must Contain Material From The Same Traceability Number Or Heat/lot, As Defined In The Applicable Specification. Identification Marking Must Be The Type
designation In Accordance With The Applicable Detail Specification.
3.14.2 For Covered Welding Electrodes, The Type Designation Or Classification Number Must Also Be Applied To The Electrode Covering Within The Space 2 1/2 Inches From The Grip End Of The Electrode. The Marking Must Consist Of At Least One Complete Type
designation Or Two Or More Partial Type Designations That Can Be Read Or Positively Interpreted As The Intended Designation. The Two Partial Type Designations Must Consist Of At Least The Top Portion And The Bottom Portion Of The Designation.
3.14.3 Individual Cut Length Bare Welding Rods Must Be Identified In Accordance With The Applicable Commodity Specification. In The Absence Of Specific Specification Marking Requirements, At Least One Legible Type Designation/classification Number Must Be
applied To Each Rod, Either By Stamping Or By Tagging (i.e. Flag Tagging).
3.14.4 Spool And Coil Weld Filler Material Must Be Identified In Accordance With The Applicable Commodity Specification.
3.15 Material Certification - In Addition To The Certification Data Requirements Specified In The Detailed Specification Invoked In This Contract, The Following Material Certification Requirements Apply:
3.15.1 See Cdrl Di-misc-81020 (quality Conformance/required Tests) - Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications).
3.15.2 In Addition To Quantitative Chemical And Mechanical Properties, (as Required By The Applicable Specification), The Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type And Finish, As Applicable, Of The Material
supplied.
3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.16 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance:
3.16.1 All Welding Electrodes/inserts Must Be Sample Inspected In Accordance With The Applicable Welding Electrode/insert Specification, Except The Unit Containers Must Be 100% Inspected For Traceability Marking And That The Markings Are Legible.
3.16.2 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material/unit Container Marking) And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The
certification Test Reports Must Be 100% Inspected For Completeness And Legibility, And That There Is A Test Report For Each Heat Or Lot Of Material Being Shipped.
3.17 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To The Contractor -
4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be
considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And
contract Number Must Be Submitted To The Pco.
4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied
conforms To The Specified Requirements.
6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability,
Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;10/20/2016 - Updated Ecds Url
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- May 16 2013 - Removed Gsi From This Material.
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
the Following Paragraphs Of Di-misc-81020 Must Be Modified As Shown Below:
10.1.1 - Add: Material Marking For Spooled Wire Must Be As Identified Within The Applicable Commodity Specification.
10.1.2 - Add: For Weld Materials, The Weld Material Manufacturer Is Considered The Original Mill.
10.2 - Replace The Entire Paragraph With: For Weld Materials, Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications)
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date14 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand wash basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand wash basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with piping made of PPs, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler piping for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date13 Jan 2025
Tender AmountRefer Documents
341-350 of 355 archived Tenders