Heater Tenders
Heater Tenders
Offizielle Bezeichnung Tender
Others
Germany
Description: Contract notice - general guideline, standard regulation, open procedure (construction work) Air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small ... Multi-room air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small laboratory areas. The listed building is being completely renovated and an extension is being added. The dismantling and pollutant remediation of the existing building has already taken place. Execution of ventilation installation consisting of air conditioning systems in the basement and on the roof including duct network, fire dampers and air outlets. The ventilation of the interior ancillary rooms and toilet areas is carried out by two air conditioning systems with heat recovery and heaters, each with approx. 1,000 m³/h, and smaller individual fans. The ventilation of the lecture hall is carried out by an air conditioning system with heat recovery and heating and cooling functions with approx. 4,000 m³/h. The laboratory areas are mechanically ventilated by two air conditioning systems with heat recovery and heating and cooling functions with approx. 5,500 m³/h and 6,80 m³/h. In addition, two special exhaust fans with approx. 1,000 m³/h and 1,500 m³/h with the associated plastic duct network are planned.
Closing Date8 Jan 2025
Tender AmountRefer Documents
DEPARTMENT OF LABOR AND EMPLOYMENT REGION I Tender
Others
Philippines
Details: Description Wpfo-2025-01-88; Supply And Delivery Of Bakery Equipment, Supplies, And Ingredients For The Implementation Of Dilp Project Re: "community-based Bakery & Coffee Vending Store "tinapayan At Kapehan Sa Babuyan" Projects - Infanta (ro1-dilp-wpfo-2024-0052) Items: "gas Oven 6 Trays, Black Iron And Stainless With Fiber Glass Insulators: 57”l X 28”w X 30”h, Stand: 22”h" "filled Gas Tank W/ Complete Accessories 11 Kg Gas Tank With Hose And Regulator" "dough Roller Machine Metal 4x16 1.5 Hp" "pan Slicer 13x18, 30 Blades" "coffee Vending Machine 3 Flavor Coffee Vending Machine, Coin Operated, 305 X 550 X 700 Mm, 25 Kg, 800 Watts, 1.6 L Heater, 65 Cups, 3 Kls Powdered Coffee Flavor, 300 Pcs, 6.5 Paper Cups And Led Signage" "mixer (masahan) Stainless, Bangka Style 2x4 Ft" "table (stainless, 3x6 Ft)" "tray Rack 24 Baking Pans Capacity, Stainless" "measuring Cups & Measuring Spoons 10 Pcs, Measuring Cooking Tools For Baking And Cooking" "measuring Cup 500 Ml, 16 Oz, Stainless" "mixing Bowl 22 Cm Stainless Steel" "rolling Pin Wood" "cutter Stainless" "pastry Spatula Silicone, Small" "food Scraper Wooden Handle Stainless Steel" "baking Pan Size Tray 13 X 18, Steel" "plastic Tray Large" "tasty Pan Tray Size 11, Steel" "mamon Tray Medium, Steel" "bread Display Cabinet Aluminum With Glass, L4.5 Ft, W 2ft, H 2 Ft, 3 Layers" "display Rack Pure Metal, Powder Coated 5-layer, 142 Cm X 64 Cm X 33 Cm" "cling Wrap Plastic, 12 X 300 / 15 X 500 M" "plastic Sando Bag 50 Pcs/pack (micro)" "plastic Sando Bag 50 Psc/pack(mini)" "plastic Sando Bag 50 Pcs/pack (medium)" "plastic Sando Bag 50 Pcs/pack (large)" "kraft Paper Roll 30m X 18 M" "multi-purpose Packing Hd Roll Plastic Bag 8x11 (1000 Pcs)" "multi-purpose Packing Hd Roll Plastic Bag 10x114 (1000 Pcs)" Bread Flour (25 Kg Per Sack) All Purpose Flour (25 Kg Per Sack) Fresh Milk (1 L/pc) White Sugar (50 Kg Per Sack) Yeast (1kg/pack) Eggs (30 Pcs Per Tray, Size: Large) Margarine (11 Kg/pail) Vegetable Shortening (lard(6.5kg/pail)) Vanilla Extract Condensed Milk (360m/can) Salt (25kg/sack) Cheese (430 G) Vegetable Oil (1.5 Liters) Food Coloring (red)
Closing Date14 Jan 2025
Tender AmountPHP 340.2 K (USD 5.8 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Electrical Generators And Transformers...+1Electrical and Electronics
United States
Details: This Sources Sought/market Survey Notice Is Being Conducted By Aleda E. Lutz Va Medical Center, 1500 Weiss Street, Saginaw Mi, 48602 To Identify All Sources That Are Capable Of Providing Maintenance Service For Emergency Generator For The Period Of April 5, 2025 April 4, 2026 At The Discretion Of The Government In Strict Accordance With All Schedules, Specifications, Terms, Conditions And Provisions Of This Contract.
general Information
visit #1 Furnish All Tools, Labor, Materials, Parts, And Laboratory Services To Perform The Following Specified Maintenance On The Five Generators Listed At The End Of This Document:
all Maintenance, Service, Operational Checks, And Parts Shall Be Performed And Supplied Per The Manufacturer S Recommendations By Manufacturer Certified Technicians.
contractor Shall Provide All Fluid Analysis Reports And Within 7 10 Days After Completion Of Maintenance.
contractor Performance Shall Be Monitored Through Service Reports That Shall Be Submitted After Each Repair Has Been Conducted.â Field Service Reports Must Be Submitted Within 7-10 Days And Will Be Reviewed For Accuracy And Timely Submission.
contractor Shall Perform Services Within 60 Days Of Award.
maintenance Checks:
radiator Core For Air Flow
antifreeze Protection
coolant Level
coolant Inhibitor Strength (add Conditioner If Required To Update Strength)
radiator Cap And Seal
coolant Leaks
lube Oil Level
fan Belt Tension
condition Of All Hoses
hose Clamps
condition Of Flex Fuel Lines
day Tank Float Controls, Solenoid, And Main Fuel Pump Operation
fuel System For Leaks
cranking Voltage Drop
battery Electrolyte Level
battery Voltage
battery Charger Rate
battery Cables And Connections
flex Exhaust Couplings Rain Flashing
turbo Wheel For Bearing Wear
terminal Strip Connections
loose Relays In Control Panel
jacket Water Heater Operation
governor Oil Level
governor Linkage
remote Governor Control Operation
air Gap On Generator
collector Rings And Brushes
oil And Dirt Buildup In Generator
system For Loose Bolts, Etc.
crank Termination Time
engine Instruments
abnormal Noise Or Vibration
exhaust Characteristics
Louver Operation
crankcase Blow By
voltage And Frequency
all Switches In Correct Position
drain Water And Sediment From Day Tank
lubricate Generator Bearing
clean Engine Crankcase Breather
lubricate Fan Pulley
clean Primary Filter
drain Exhaust Moisture Traps
inspect The Turbocharger For End Play And Leaks
maintenance Services:
note: All Filters Shall Be Oem
change Air Cleaner Elements, Check Seals, Air Cleaner Indicators And Air Induction System
take Oil Sample And Perform Infrared Analysis (performed By A Fluid Analysis Lab)
take Fuel And Coolant Samples And Perform Analysis (performed By A Fluid Analysis Lab)
change Lube Oil And Filters, Lube Oil Is To Be Replaced With Fully-synthetic Oil In Accordance With Manufacturers Recommendations
change Fuel Filters
oil, Fuel, And Coolant Samples Taken Will Be Delivered To The Testing Laboratory In A Reasonable Time As To Not Compromise The Samples. Care Will Be Taken As To Storing The Samples As Recommended By The Testing Laboratory Until They Are Delivered.
operational Checks:
recheck Oil Level While Running
recheck All Fluid Systems For Leaks
used Oil Transportation And Recycling:
transportation And Recycling Of Used Oil Shall Be Performed In Accordance With Federal, State And Local Regulations Including:
michigan Natural Resources And Environmental Protection Act 451, Of 1994 As Amended, Part 121 Liquid Industrial By-product.
prior To Transporting Used Oil From The Property, The Transporter Must Provide A Shipping Document Describing The Materials In Accordance With Above Regulation For Certification By The Detroit Vamc Gems Program Manager Or Designee. The Contractor Shall Arrange For The Designated Recycling Facility To Notify The Cor, In Writing, That The Shipment(s) Arrived At Its Destination Within 7 Days Of The Date The Shipment Left The Facility.
michigan Hazardous Material Transportation Act 138.
prior To Transporting Used Oil From The Property, The Contractor Shall Provide A Copy Of The Act 138 Transporter S Permit And Registration To The Cor For The Approval Of The Gems Program Manager. During Transport, The Transporter Must Also Be Able To Produce A Copy Of The Act 138 Permit And Registration, Either Via Electronic Record Or Hard Copy, To Deq Staff Or A Peace Officer When Requested.
generator #1
cummins/onan Model: Dfeb-4955010 Sn: B010204440
kw: 400 Pf: .8 Volt: 120/208 Amp: 1387
generator #2
mtu Onsite Energy Model: 400pxc6dt3 Sn: 331914-1-1-0411
kw: 400 Pf: .8 Volt: 120/208 Amp: 1387
generator #3
cummins/onan Model: 350 Dfcc Sn: G920477586
kw: 350 Pf: .8 Volt: 277/480 Amp: 526
generator #6
mtu Onsite Energy Mod: 750rxc6dt2(g05) Sn: Wa-572596-0410
kw: 750 Pf: .8 Volt: 277/480 Amp: 1127
generator #7
mtu Onsite Energy Mod: Ds00500d6srah1583 Sn: 331787-1-1-0411
kw: 500 Pf: .8 Volt: 277/480 Amp: 751
If This Is A Service Your Business Can Provide, Respond To This Sources Sought By Friday, January 3, 2025; 3:00 P.m. Eastern Time. Responses Should Include: (1) Business Name And Address (2) Point Of Contact Name, Phone Number, And E-mail Address (3) Sam Uei And Naics Code (4) Business Size Small Or Large (5) Type Of Business Service Disabled Veteran Owned, Veteran Owned, 8a, Hubzone, Women-owned Etc. (6) Applicable Gsa/fss Contract Number (if Applies). All Businesses Eligible To Provide This Service Are Encouraged To Reply As This Information May Be Used To Determine Potential Set-asides For The Above Noted Service. E-mail Responses To: Ariel Bautista-lagares, At Ariel.bautista-lagares@va.gov (note: This Is Not A Request For Quote Or An Announcement Of A Solicitation.)
Closing Date3 Jan 2025
Tender AmountRefer Documents
Correctional Service Canada Tender
Electrical Generators And Transformers...+1Electrical and Electronics
Canada
Details: Generator Radiator Replacement This Requirement Is For: The Correctional Service Of Canada, Ontario Region, Bath Institution. Trade Agreement: Canadian Free Trade Agreement (cfta). Tendering Procedures: All Interested Suppliers May Submit A Bid. Competitive Procurement Strategy: Lowest Priced Compliant Bid. Set-aside Under The Procurement Strategy For Indigenous Business: This Procurement Is Not Subject To Any Set-asides For Indigenous Suppliers. Comprehensive Land Claim Agreement: This Procurement Is Not Subject To A Comprehensive Land Claims Agreement. Security Requirements: This Contract Does Not Include Security Requirements. Nature Of Requirements: The Following Is A Summary Of The Statement Of Work For This Requirement. The Correctional Service Of Canada Requires The Services Of A Qualified Contractor To Supply And Install Two (2) New Radiators For A Cummins Qsk60-g6 Generator. Objectives: To Replace Two (2) Leaking Radiators With Two (2) New Compatible Cummins Radiators. Deliverables: The Contractor Must: • Drain The Engine Coolant From The Current Radiator Assemblies And Dispose Of It As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Remove Front End Enclosure Housing Panels To Permit Radiator Removal. • Remove The Two Leaking Radiators, Disposing Of Them Offsite As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Supply And Install Two (2) New Cummins Radiators, With Full Length Header Plates. • Replace All Gaskets (fibre) And Sealant. • Replace All Thermostats. • Replace All Radiator Hoses. • Supply And Fill Radiators With New Engine Coolant As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Install Two (2) Radiator Heaters With Integral Pumps (to Reduce Thermal Expansion Shock). • Re-assemble Entire Enclosure Housing. • Supply, Connect And Fuel A Temporary, Two-point-two (2.2) Gigawatt Generator For The Entire Period That The Bath Generator Will Be Offline. • Ensure The Temporary Generator Automatically Starts And Provides Power To Both Bath And Millhaven Institutions Within Ten (10) Seconds In The Event Of Power Loss From The Distribution Grid. • Disconnect And Remove The Temporary Generator From The Site Once Replacement Of The New Radiators Is Complete. • Ensure The Cummins Qsk60-g6 Generator Is Reconnected And Functioning As Required. Any Conditions For Participation Of Suppliers Not Specified In Solicitation Documentation: None. Estimated Quantity Of Commodity: See Solicitation Document Statement Of Work And Basis Of Payment. Duration Of Contract And Time Frame For Delivery: Construction Time: The Contractor Must Perform And Complete The Work On Or Before March 31st, 2025. File Number: 21421-25-4942653 This Bid Solicitation Cancels And Supersedes Previous Bid Solicitation Numbers: 21423-23-4357694 Dated 2023/04/21 That Closed On 2023/05/25 At 10:00est And 21421-25-4883316 Dated 2024-10-29 That Closed On 2024-12-03 At 10:00est. Csc Will Provide A Debriefing Or Feedback Session Upon Request To Bidders Who Bid On The Previous Solicitations. Contracting Authority: Robin Riha Telephone Number: 613-328-9727 E-mail: Robin.riha@csc-scc.gc.ca Note To Bidders: Bidders Can Obtain The Complete Statement Of Work And Evaluation Criteria By Downloading The Solicitation Document And Associated Documents From The Canada Buys / Tender Opportunities Website. The Crown Reserves The Right To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada (english Or French). After Contract Award, Bidders May Request A Debriefing On The Results Of The Bid Solicitation Process. Bidders Should Make The Request To The Contracting Authority Within Fifteen (15) Working Days Of Receipt Of The Results Of The Bid Solicitation Process. The Debriefing May Be In Writing, By Telephone Or In Person. Procurement Assistance Canada (pac) Offers Seminars To Businesses Interested In Learning How To Sell Goods And Services To The Government Of Canada. The Seminars Are Free. Topics Include: ? Understand The Federal Procurement Process; ? Learn About Searching For Opportunities; ? Find Out How To Bid On Opportunities; ? Discover How To Prepare To Sell To The Government. The Full Schedule Of Seminars Can Be Found On The Procurement Assistance Canada Website, Under Find An Event (procurement Assistance Canada: Find An Event - Canada.ca).
Closing Date7 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.40|wvl|717-605-1842|desiree.d.meyers.civ@us.navy.mil|
item Unique Identification And Valuation (mar 2016)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|inspection: D Acceptance: D|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x|||x|||||
variation In Quantity (apr 1984)|3|+10%|-10%||
time Of Delivery (june 1997)|20|50 Lbs||||||||||||||||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|n39040 Certification; S4306a Material|n50286 Portsmouth|tbd|133.2||n/a|certification N39040|||ss Dd1423 Or Specified By Block 14a||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year From Date Of Delivery|365 Days After Acceptance Of Material|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (sep 2021)|13|333992|1,250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
evaluation Criteria And Basis For Award-|1||
1. The Offer Due Date Is Updated To 14 January 2025.
\
1. The Offer Due Date Is Updated To 2 December 2024.
\
1. The Offer Due Date Is Updated To 14 November 2024.
\
1. The Offer Due Date Is Updated To 21 October 2024.
2. The Poc Is Updated To Amanda Bailey Amanda.l.bailey50.civ@us.navy.mil.
3. The Small Business Set-aside Is Hereby Dissolved.
4. The Quantity Is Updated To 500.
5. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
\
this Amendment Is Issued To Extend Closing To 28jul23.
this Amendment Is Issued To Extend Closing Date To 05may23.
\
this Amendment Is To Extend The Closing Date To 16dec22.
\
this Amendment Is Issued To Extend The Closing Date To 09 Sep 2022.
\
the Purpose Of This Amendment Is To Extend The Closing Date To 10aug22.
\
amendment Issued To Extend Closing Date To 17jun22.
this Amendment Is Issued To Extend The Closing Date To 13 May 22.
\
this Amendment Is Issued To Extend The Closing Date To 15 Apr 22.
this Amendment Is To Extend The Closing Date To 15 Mar 2022.
this Amendment Is To Extend The Closing Date To 14 Feb 2022.
poc Changed To Benjamin.t.spangler.civ@us.navy.mil
all Prior Offers Shall Be Resubmitted To Above Poc Or Neco.
\
1. Dd1423 Data Item Aoo1 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286.
3.all Contractual Documents (i.e. Contracts,purchase Orders,task Order,delivery Order,& Modifications) Related To The Instant Procurement Considered To Be "issues" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In.
4. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offfers. See Clause 252.213-7000.
5. The Following Proposes Delivery Schedule Applies:
submission Odf All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Workig Days After Receipt.
180 Actual Days To Manufacture Part
final Delivery Of Material 365 Days
delivery Days And Past Performance Will Be Evaluation Factors In Determining Awardee.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=aws A5.01 | | | |930101|a| | |
document Ref Data=aws A5.28 | | | |200630|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Aws-a5.28, Except As Amplified Or Modified Herein. Aws-a5.28 Ordering Data Information Is Provided Below:
a. American Welding Society Specification Aws-a5.28; Low Alloy Steel Filler Metals For Gas Shielded Arc Welding.
aws Classification - ;er70s-b2l;
size, Diameter - ;1/16 Inch;
spool Size, Weight - ;n/a;
cut Length - ;36 Inches;
b. American Welding Society Specification Aws-a5.01; Filler Metal Procurement Guidelines.
lot Classification - Class S2
intensity Of Testing - Schedule J
3.2 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;quality Conformance/compliance Inspection (includes Chemicals And Mechanicals);
item - ;rod, Welding;
performance - ;aws A5.01 And Aws A5.28;
acceptance - ;aws A5.01 And Aws A5.28;
3.3 Container Size - Welding Electrodes Must Be Supplied In ;10; Pound Containers.
3.4 Welding Electrode Strip Heaters - Electrical Resistance Rod-type Or Pad-type Heaters (i.e. Strip Heaters) That Are Controlled Automatically By Thermocouples Or Manually By An On-off Switch Must Be Used To Maintain Preheat/interpass Temperatures Within The
required Range Before And During Welding Of The Usability (i.e. Soundness) Test Plate And The Mechanical Property (when Required) Test Plate. The Test Plate Must Be Insulated Or Separated From The Work Bench. Oxy-fuel Heating Of Any Test Plate Is Not
permitted.
3.5 Radiography - Radiography Is Required For Test Weldments And Must Be Performed In Accordance With T9074-as-gib-010/271 As Modified By Aws-a5.28. Acceptance Criteria Must Be Aws-a5.28.
3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The
information Listed Below.
a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor.
b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration.
c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product.
d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification.
b. A Complete Description Of The Change To Be Made And The Need For That Change.
c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis.
d. Proposed Changes To Documents Controlled By The Government.
e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration.
f. Recommendations About The Way A Retrofit Should Be Accomplished.
g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct.
h. Impacts To The Operational Use Of The Product.
i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
j. Milestones Relating To The Processing And Implementation Of The Engineeringchange.
3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements
established In The Contract/purchase Order.
3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities
available For Audit By The Contracting Officer Or His Authorized Representative.
3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer.
3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco.
3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For
operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The
government.
3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The
applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility,
applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate
planning For Government Inspection Can Be Accomplished.
3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.12.2 Inspection For Completeness And Proper Type.
3.12.3 Verification Of Material Quality Received.
3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.12.6 Identification And Protection From Improper Use Or Disposition.
3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity
for Withholding The Material From Use.
3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.12.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Unit Containers. This Traceability Marking Must Provide
direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14.1 Permanent Markings Are Not Required For Consumable Material (weld Filler Material, Etc.). Traceability Must Be By A Label Attached To Each Unit Container. The Unit Container Identification Label Must Include, In Addition To The Contract Number And The
national Stock Number (nsn), All Markings Required For Identity And Traceability. Each Container In The Lot Must Contain Material From The Same Traceability Number Or Heat/lot, As Defined In The Applicable Specification. Identification Marking Must Be The Type
designation In Accordance With The Applicable Detail Specification.
3.14.2 For Covered Welding Electrodes, The Type Designation Or Classification Number Must Also Be Applied To The Electrode Covering Within The Space 2 1/2 Inches From The Grip End Of The Electrode. The Marking Must Consist Of At Least One Complete Type
designation Or Two Or More Partial Type Designations That Can Be Read Or Positively Interpreted As The Intended Designation. The Two Partial Type Designations Must Consist Of At Least The Top Portion And The Bottom Portion Of The Designation.
3.14.3 Individual Cut Length Bare Welding Rods Must Be Identified In Accordance With The Applicable Commodity Specification. In The Absence Of Specific Specification Marking Requirements, At Least One Legible Type Designation/classification Number Must Be
applied To Each Rod, Either By Stamping Or By Tagging (i.e. Flag Tagging).
3.14.4 Spool And Coil Weld Filler Material Must Be Identified In Accordance With The Applicable Commodity Specification.
3.15 Material Certification - In Addition To The Certification Data Requirements Specified In The Detailed Specification Invoked In This Contract, The Following Material Certification Requirements Apply:
3.15.1 See Cdrl Di-misc-81020 (quality Conformance/required Tests) - Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications).
3.15.2 In Addition To Quantitative Chemical And Mechanical Properties, (as Required By The Applicable Specification), The Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type And Finish, As Applicable, Of The Material
supplied.
3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.16 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance:
3.16.1 All Welding Electrodes/inserts Must Be Sample Inspected In Accordance With The Applicable Welding Electrode/insert Specification, Except The Unit Containers Must Be 100% Inspected For Traceability Marking And That The Markings Are Legible.
3.16.2 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material/unit Container Marking) And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The
certification Test Reports Must Be 100% Inspected For Completeness And Legibility, And That There Is A Test Report For Each Heat Or Lot Of Material Being Shipped.
3.17 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To The Contractor -
4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be
considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And
contract Number Must Be Submitted To The Pco.
4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied
conforms To The Specified Requirements.
6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability,
Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;10/20/2016 - Updated Ecds Url
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- May 16 2013 - Removed Gsi From This Material.
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
the Following Paragraphs Of Di-misc-81020 Must Be Modified As Shown Below:
10.1.1 - Add: Material Marking For Spooled Wire Must Be As Identified Within The Applicable Commodity Specification.
10.1.2 - Add: For Weld Materials, The Weld Material Manufacturer Is Considered The Original Mill.
10.2 - Replace The Entire Paragraph With: For Weld Materials, Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications)
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date14 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand wash basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand wash basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with piping made of PPs, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler piping for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date13 Jan 2025
Tender AmountRefer Documents
DEPT OF THE AIR FORCE USA Tender
Electrical Generators And Transformers...+2Machinery and Tools, Electrical and Electronics
United States
Details: Request For Information (rfi) – Steam Generator Installation At Area 1-42
this Request For Information (rfi) Is Issued As Market Research. All Requirements Identified In This Rfi Are Tentative And Will Be Finalized Prior To The Release Of Any Request For Proposal (rfp). This Rfi Is For Planning Purposes Only And Shall Not Be Considered A Request For Proposal (rfp), Request For Quote (rfq), Or As An Obligation On The Part Of The Government To Acquire Any Products Or Services. The Information Provided May Be Utilized By The Air Force Research Laboratory (afrl) In Developing Its Acquisition Strategy Should A Decision Be Made To Proceed With Acquiring The Items/services Listed In This Rfi. The Information Received In Response To This Rfi May Be Included In One Or More Future Solicitations. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Synopsis Or Any Follow-up Information Requests. The Purpose Of This Rfi Is To Gain Knowledge Of Potentially Qualified Sources And Their Size Classifications (small Business, Large Business, Etc.). The Information Provided Is Entirely Voluntary And Will Not Impact The Ability To Bid On Future Requirements.
requested Information.
the Government Requests Interested Offerors Who Believe They Can Fully Support This Requirement Furnish The Following Information:
1. Company Name, Cage Code And Uei Number, Address, Points Of Contact, Phone Numbers And E-mail Addresses.
2. Information Should Include A Brief Description Of Experience In Providing The Type Of Support Described In The Requirements. The Information Package Must Be Clear, Concise, And Complete. The Air Force Is Under No Obligation To Provide Feedback To The Company, Or To Contact The Company For Clarification Of Any Information Submitted In Response To This Request.
3. Identification Of Business Size (small Or Large) And Identify The Socioeconomic Disadvantaged Category, As Defined The Federal Acquisition Regulation Far Part 19 And Also Currently Listed In The System For Award Management (sam). Small Business Size Standards Are Published By The U.s. Small Business Administration (sba) And May Be Found At Www.sba.gov/size/sizetable2002.html.
the Potential North American Industry Classification System (naics) Codes Assigned To This Procurement Is 335312 “motor And Generator Manufacturing” And The Small Business Size Standard Is 1,250 Employees. The Potential Product Service Code Assigned To This Procurement Is 6115 “generators And Generator Sets.”
4. Details Regarding The Requirements Your Company Is Able To Provide And Any Applicable Restrictions.
5. An Industry Day Will Be Held 22 January 2025 For Interested Contractors To View The Site. If You Would Like To Participate, Please Complete The Document Entitled “afrl Visitor Pre-announcement” For Each Individual Who Will Attend In Order To Gain Access To Edwards Air Force Base.
- Requirements – Steam Generator Installation
*** Please Review Both Attached Statement Of Work Documents For Complete Requirement Information. Please Note The Document Titled Single Steam Generator-sow Covers The Specifications For The Current Requirement Of The Single Steam Generator, While The Document Titled Complete Steam Generator Project-sow Is For The Entire Anticipated Project. The Contractor Shall Reference And Work The Documents Together To Understand The Scope Of Work. ***
the Government Is Seeking To Identify Qualified, Experienced, And Interested Firms, Who Can Perform In Accordance With The Requirements Described In The Attached Statement(s) Of Work For The Installation Of One (1) Steam Generator Which Will Be Used To Replace An Aging Steam Generation System In Use At Area 1-42 That Includes Large Spherical Saturated Steam Storage Vessels, Heat Exchangers, Process Heaters, Pumps, Supply And Return Piping And Other Hardware To Generate And Provide The Required Mass Quantity Of Steam At Specified Pressure And Temperature. The Intent Of This Project Is For The Contractor To Provide The Air Force Project Manager One (1) Safe, Complete, Fully Functional And Operable Steam Generator To Be Used To Supply Saturated Steam For The Afrl Area 1-42 Steam Plant.
note: The Air Force Is Planning To Install A Total Of Three (3) Identical Steam Generators, Starting With The Single Generator Being Acquired With This Requirement And The Other Two (2) Steam Generators Which Will Be Installed As Part Of The Overall System In The Future. The Scope Of Work For This Acquisition Includes Only The First, Single Steam Generator At This Time. The Air Force Project Manager Has Made A Good Faith Effort To Update All Relative Project Documents To Address The Inclusion Of Only The Single Steam Generator And Clearly Identify Other Two (2) Steam Generators Are Intended For Installation In The Future But Are Not Included As Part Of The Current Scope Of Work. Likewise, The Air Force Project Manager Has Endeavored To Identify Interface Points On Piping, Platforms, Conduit And Other Systems Where Connections To Provide Service To The Future Steam Generators Will Be Required. If The Contractor Identifies Any Scope, Interfaces Or Other Items That Are Not Clear As To The Intent Of What Is To Be Included In The Current Scope Of Work And What Is Intended Future Installation, The Contractor Shall Bring This To The Attention Of The Air Force Project Manager Immediately.
technical Requirements:
built In Accordance With Asme B&pvc Section I, 2023
volume: Approx. 12,400 Cubic Feet
pressure: Maximum Working Pressure: 600 Psi; Maximum Design Pressure: 620 Psi
temperature: Maximum Working Temperature: 500f
steam Generation And Pressure: 110 Lbm/sec @ Initial Temperature 500f For 12 Min Total
o Yields 79,200 Lbs Of Steam At ~600 Psig
minimum Pressure After Release Is 100 Psig
minimum 3 Runs Before Make-up Water Is Required
steam Reheats At Maximum 20 Hrs
the Steam Generator Shall Be Designed, Fabricated, Tested, Inspected And Stamped In Accordance With The Requirements Of The Asme B&pvc Section I, Rules For Construction Of Power Boilers, Latest Edition. The Steam Generator Shall Be Stamped With An Asme B&pvc Section I. “asme” And “s” Certification Mark As Noted In Pg-105 Of Asme B&pvc Section I. The Contractor Shall Be Authorized By Asme To Perform The Identified Code Construction And Shall Have The Appropriate “s” Stamp.
the Steam Generator Shall Be A Fire Tube Type Boiler And Meet Requirements For The Same.
the Contractor Shall Provide A Manufacturer’s Data Report Form, Form P-2 For The Steam Generator. All Required Documentation, Including, But Not Limited To, Calculations, Welding Certifications, Non-destructive Testing (nde) Records, Certified Material Test Reports (cmtrs), Pressure Testing, Master Data Report Form And All Other Documentation As Required By Asme B&pvc Section I For The Design, Fabrication, Welding, Inspection, Nde, Testing And Any Other Activities Shall Be Furnished As Part Of The Code Package For The Steam Generator.
the Steam Generator Shall Meet The Requirements Of Asme B&pvc Section I, Part Pg General Requirements For All Methods Of Construction, Part Pw Requirements For Boiler Fabricated By Welding, Pft Requirements For Fire Tube Boilers. The Contractor Shall Determine, Depending On The Specific Design And Methods Selected To Design And Fabricate The Steam Generator, Other Parts And Appendices Of Asme B&pvc Section I That Are Applicable To The Scope Of This Project.
all Pressure Boundary Materials Used In The Fabrication Of The Steam Generator Shall Be Provided With Certified Material Test Reports (cmtrs) As Required In Asme B&pvc Section Ii. All Pressure Boundary Materials Shall Be Clearly Stamped Or Otherwise Marked With The Corresponding Heat Number From The Cmtr. Any Requirements For Marking Or Stamping Plates Or Other Pressure Boundary Materials Identified In Asme B&pvc Section I That Are In Addition To Any Marking Or Identification Of Materials Noted In Asme B&pvc Section Ii Shall Be Met. The Contractor’s Quality Control Plan Shall Address Transfer Of Heat Numbers And Traceability For Individual Pieces And Parts Cut Or Altered.
six Major Tasks Include:
design And Engineering
procurement Of Materials, Parts, Equipment For Fabrication
fabrication Of Steam Generator At Afrl Staging Area
transport And Placement Of The Steam Generator
final Installation Of Generator And Periphery Systems, Piping, Insulation, Blowers And Other Parts And Equipment
final Acceptance Testing And Training
anticipated Period Of Performance: 1 June 2025 – 31 May 2027
fob Destination: Edwards Afb, Ca 93524.
responses.
afrl Is Seeking U.s. Sources With The Capability To Provide The Items/services Listed In This
rfi. All Replies Are To Be Provided To The Contracting Officer, Tyler Pittmon Tyler.pittmon@us.af.mil And Contract Specialist, Suzanna Kussman, Suzanna.kussman@us.af.mil
all Responses To This Rfi Must Be Received No Later Than 10 January 2025 At 4:00 P.m. Pst.
Closing Date11 Jan 2025
Tender AmountRefer Documents
City Government Of Navotas Tender
Automobiles and Auto Parts
Philippines
Details: Description Request For Quotations: Please Quote Your Best Offer For The Item/s Described Below, Subject To The Terms And Conditions Provided At The Dorsal Portion Of This Request For Quotation. Submit Your Quotation Duly Signed By You Or Your Duly Representative And Copies Of Eligibility Requirements (business Permit, Local/national Tax Clearance And Philgeps Certificate Of Registration) Not Later Than The Deadline For Submission. Items: Procurement For The Repair & Maintenance Of Transportation Equipment: Motor Vehicle Under The Repair & Maintenance Fund Of The City General Services Office Lot 1-repair & Maintenance Of Transportation Equipment: Motor Vehicle Unit Qty "item Description " Unit Cost " Lot 1 Repair And Maintenance Of Transportation Equipment : Motor Vehicle 1,000,000.00 Ordering Agreement - Supply Of Vehicle Parts For Minor Repairs And Maintenance At The Navotas Motorpool For 4 - Wheel Vehicles Pc/s 50 Battery Lug 150.00 Mtr/s 50 Wire-#10,16,18 290.00 Pc/s 50 Switches- 2gang,3gang,6gang 950.00 Pc/s 50 Handle Switch 1,200.00 Pc/s 100 Oil Seal 950.00 Pc/s 100 Battery Terminal Ci Brass 260.00 Pc/s 50 Brake Master 4,700.00 Pc/s 100 Repair Kit 1,200.00 Set/s 100 Brake Pads 2,500.00 Set/s 100 Brake Shoe 3,500.00 Pc/s 100 Drum Brake 6,900.00 Pc/s 100 Brake Hose 950.00 Pc/s 100 Bleeder Valve 1,250.00 Pc/s 100 Return Spring 950.00 Pc/s 150 Lug Nuts 95.00 Pc/s 150 Bolt/nut 65.00 Pc/s 300 Clips 75.00 Pc/s 150 Wheel Cap 95.00 Pc/s 150 Wheel Boot 95.00 Pc/s 50 Rotor Disk Brake 1,900.00 Pc/s 100 Headlight Bulb 850.00 Pc/s 100 Bulb Socket 150.00 Pc/s 100 Brake Light 250.00 Pc/s 100 Signal Light Bulb 150.00 Pc/s 100 Clutch Cable 3,900.00 Pc/s 100 Gas Cable 2,500.00 Mtr/s 50 Copper Tube 250.00 Pc/s 100 Hand Brake Cable 2,500.00 Pc/s 50 Lever 650.00 Pc/s 150 Air Filter 1,200.00 Pc/s 50 Hose-radiator Inlet 3,600.00 Pc/s 50 Hose-radiator Outlet "b" 3,100.00 Pc/s 50 Hose-radiator Outlet "c" 3,800.00 Pc/s 50 Hose-radiator Outlet 1,900.00 Pc/s 50 Hose-fill Line 1,350.00 Pc/s 50 Hose-heater 1,315.00 Pc/s 100 Hose Clamp 95.00 Pc/s 50 Belt "v" 3,700.00 Pc/s 50 Ribbed Belt-v 3,400.00 Pc/s 100 Radiator Hose 1,700.00 Pc/s 100 Radiator Cap 1,200.00 Pc/s 100 Fan Belt 1,600.00 Pc/s 150 Spark Plug 650.00 Pc/s 150 Spark Plug Terminal 380.00 Ltr/s 150 Radiator Coolant 550.00 Pc/s 100 Wheel Hub 1,600.00 Pc/s 100 Wheel Bearing 1,450.00 Pc/s 50 Wheel Cylinder 1,650.00 Pc/s 150 Seal 350.00 Box/s 30 Automotive Fuse 5a,10a,15a,20a,25a,30a 350.00 Assy/s 50 Horn 2,400.00 Pc/s 100 Relay 950.00 Ltr/s 150 Gear Oil 375.00 Pc/s 150 Tire Valve 150.00 Pc/s 150 Tire Selant 325.00 Pc/s 100 Throttle Controller 2,450.00 Pc/s 100 Tube 750.00 Pc/s 100 Truck Tubes 1,200.00 Pc/s 100 Flap 550.00 Ltr/s 150 High Performance Gear Oil 700.00 Assy/s 50 Clutch Master 3,100.00 Assy/s 50 Secondary Master 2,500.00 Set/s 50 Fender Liner 2,500.00 Pc/s 50 Floor Guard Rubber 3,000.00 Pc/s 50 Steering Wheel Cover 2,200.00 Pc/s 50 Side Mirror 1,200.00 Pc/s 50 Side Mirror Glass Only 350.00 Pc/s 50 Oil Filter 850.00 Pc/s 50 Coil 1,500.00 Unit 20 Radiator Assy. 5,200.00 Bottle/s 50 Coolant 3l 750.00 Bottle/s 100 Engine Oil 800ml 650.00 Assy. 30 Starter Motor Assy 10,990.00 Assy. 30 Alternator Assy 11,500.00 Pc/s 20 Alternator Pulley 950.00 Assy. 30 Fan Motor Assy. 3,800.00 Bottle/s 100 Brake Fluid 3l 340.00 Assy. 20 Fuel Pump Assy. 1,750.00 Pc/s 20 Clutch Disc 4,700.00 Pc/s 20 Clutch Cover 4,450.00 Pc/s 20 Pressure Plate 4,650.00 Pc/s 20 Release Bearing 2,150.00 Pc/s 30 Timing Belt 3,500.00 Pc/s 30 Tensioner Bearing 2,250.00 Pc/s 30 Tensioner Adjuster 950.00 Pc/s 30 Camshaft Oil Seal 1,350.00 Pc/s 50 Fuel Filter 980.00 Pc/s 20 Hydrovac Brake Booster 9,500.00 Pc/s 20 Ignition Switch 3,800.00 Pc/s 20 Intake Manifold Gasket 1,200.00 Pc/s 20 Intake/exhaust Valve 850.00 Pc/s 20 Knucle Bearing 1,200.00 Set/s 20 Leaf Spring Set 4,350.00 Pc/s 20 Main Bearing 3,500.00 Pc/s 20 Connecting Rod 3,800.00 Pc/s 20 Thrust Washer 1,450.00 Pc/s 20 Regulator 2,500.00 Pc/s 50 Car Charger Cigar Port 490.00 Pc/s 20 Steering Bearing 2,500.00 Pc/s 50 Ignition Coil 1,950.00 Pc/s 50 U-bolt 350.00 Pc/s 20 Power Steering Fluid Reservoir 1,350.00 Pc/s 20 Rotor Disc 4,950.00 Pc/s 20 Ball Joint 1,950.00 Set/s 20 Stabilizer Link 2,450.00 Pc/s 20 Bearing 1,350.00 Assy. 20 Shock Absorber 4,500.00 Set/s 30 Coil Spring 3,500.00 Pc/s 50 Battery Lug 150.00 Mtr/s 50 Wire-#10,16,18 290.00 Pc/s 50 Switches- 2gang,3gang,6gang 650.00 Pc/s 100 Oil Seal 350.00 Pc/s 100 Oil Filter 180.00 Pc/s 100 Engine Oil 550.00 Pc/s 100 Battery Terminal Ci Brass 100.00 Pc/s 50 Brake Master 950.00 Pc/s 100 Repair Kit 1,200.00 Set/s 100 Brake Pads 850.00 Set/s 100 Brake Shoe 950.00 Pc/s 100 Drum Brake 950.00 Pc/s 100 Brake Hose 650.00 Pc/s 150 Lug Nuts 95.00 Pc/s 150 Bolt/nut 65.00 Pc/s 150 Wheel Cap 95.00 Pc/s 150 Wheel Boot 95.00 Pc/s 50 Rotor Disk Brake 1,750.00 Pc/s 100 Headlight Bulb 250.00 Pc/s 100 Bulb Socket 150.00 Pc/s 100 Clutch Cable 550.00 Pc/s 100 Gas Cable 750.00 Pc/s 100 Hand Brake Cable 890.00 Pc/s 50 Lever 650.00 Pc/s 150 Air Filter 550.00 Pc/s 100 Hose Clamp 95.00 Pc/s 50 Belt "v" 1,200.00 Pc/s 150 Flyball 140.00 Pc/s 150 Slider 140.00 Pc/s 100 Pulley 950.00 Pc/s 100 Radiator Hose 650.00 Pc/s 100 Radiator Cap 490.00 Pc/s 150 Spark Plug 650.00 Pc/s 150 Spark Plug Terminal 650.00 Pc/s 5 E-cab 1000 Battery Charger 10,500.00 Pc/s 10 Wiper Motor 2,200.00 Pc/s 10 Meter Assy. 1,500.00 Pc/s 10 E-cab Braker 350.00 Ltr/s 150 Radiator Coolant 550.00 Pc/s 100 Wheel Hub 1,600.00 Pc/s 100 Wheel Bearing 750.00 Pc/s 50 Wheel Cylinder 850.00 Pc/s 150 Automotive Fuse 65.00 Assy/s 50 Horn 950.00 Pc/s 100 Relay 320.00 Ltr/s 150 Gear Oil 375.00 Pc/s 20 Breaker 450.00 Pc/s 150 Tire Valve 150.00 Pc/s 150 Tire Selant 325.00 Pc/s 100 Throttle Controller 350.00 Pc/s 50 Fun350 395.00 Set/s 50 Sprocket & Chain Set 6,800.00 Pc/s 50 Ecargo 375.00 Pc/s 100 Tube 280.00 Ltr/s 150 High Performance Gear Oil 700.00 Assy/s 50 Clutch Master 2,500.00 Pc/s 30 Side Stand 650.00 Pc/s 30 Center Stand 1,500.00 Pc/s 50 Wiper Arm 1,500.00 Assy/s 30 Exhaust Pipe 2,500.00 Pc/s 50 Stand Spring 150.00 Pc/s 50 Side Mirror 450.00 Pc/s 50 Chain 3,000.00 Pc/s 50 Front Sprocket 1,450.00 Pc/s 50 Rear Sprocket 2,800.00 Pc/s 50 Fender 980.00 Assy/s 50 Shock Absorber 2,500.00 Set/s 50 Sprocket & Chain Set 6,800.00 -tires Pc/s 10 10.00r20 18,500.00 Pc/s 10 11r22.5 25,500.00 Pc/s 10 165/80r13 5,400.00 Pc/s 30 185/60r15 5,700.00 Pc/s 50 185/70r14 6,000.00 Pc/s 30 185/70r15 8,600.00 Pc/s 30 185/80r14 7,100.00 Pc/s 40 185r-14c 6,700.00 Pc/s 10 195/70r15c 7,250.00 Pc/s 20 195r14c 8ply 7,600.00 Pc/s 50 195r15 7,680.00 Pc/s 30 205/65r16 8,600.00 Pc/s 20 205/85r16 13,100.00 Pc/s 50 205/65r15 8,400.00 Pc/s 30 215/70r - 16c 9,570.00 Pc/s 20 235/75r17.5 15,100.00 Pc/s 10 235/70r15 9,900.00 Pc/s 10 295/70r17 39,500.00 Pc/s 30 750/16 14,600.00 Pc/s 30 700/16 11,100.00 Pc/s 20 7.00/15 13,500.00 Pc/s 30 R(3.25-17) 3,100.00 Pc/s 30 F(2.75 - 17) 3,000.00 Pc/s 30 70-90-14 4,100.00 Pc/s 30 F(80-90-14) 4,100.00 Pc/s 30 (2.75-18) 2,850.00 Pc/s 30 (2.75-17) 2,500.00 Pc/s 30 (3.75-17) 2,800.00 Pc/s 30 (3.75 - 12) 2,900.00 Pc/s 30 (3.50 - 12) 2,750.00 Pc/s 30 (4.10-18) 3,600.00 Pc/s 30 (2.75-21) 4,300.00 Pc/s 30 (80/80-14) 3,800.00 Pc/s 30 (90/80-14) 4,100.00 Pc/s 30 2.75 – 17 2,650.00 Pc/s 30 3.00 – 17 2,850.00 -batteries Pc/s 30 Mg7l 4,000.00 Pc/s 30 Yb7bl 2,200.00 Pc/s 30 Ytx4l 2,200.00 Pc/s 30 12n9-4b-1 2,200.00 Pc/s 30 2sm 8,600.00 Pc/s 50 3sm 9,900.00 Pc/s 30 6sm 11,800.00 Pc/s 30 B24l 8,300.00 Pc/s 30 Ln3 11,000.00 Pc/s 20 2d 14,500.00 Pc/s 20 4d 16,200.00 Pc/s 20 8d 21,800.00 Pc/s 30 Ns60 8,300.00 Pc/s 15 E-cab Battery 11,200.00 -wiper Blades Pc/s 50 12" 500.00 Pc/s 50 14" 550.00 Pc/s 50 16" 600.00 Pc/s 50 17" 650.00 Pc/s 50 18" 700.00 Pc/s 50 19" 700.00 Pc/s 50 20" 750.00 Pc/s 50 21" 800.00 Pc/s 50 24" 850.00 Pc/s 50 26" 900.00 -lot 1 Navotas Motorpool Vehicle Repair And Maintenance Tools & Other Supplies Navotas Motorpool Vehicle Repair And Maintenance Tools & Other Supplies 200,000.00 Gal. 100 Car Wash And Wax Shampoo 330.00 Bottle/s 100 Car Wax, Wax And Dry, 769ml 880.00 Oz. 100 Carnauba Cleaner Paste Wax 14 Fl 850.00 Bottle/s 100 High Gloss Tire Black, 250ml 330.00 Pc/s 150 Chamois Towel 380.00 Pack/s 150 Microfiber Absorbent Square Towel 40*40cm 250.00 Set/s 10 6-32mm Combination Wrench Set 4,500.00 Set/s 10 Professional Car Tools Socket Wrench Complete Set 7,800.00 Set/s 10 Diagonal Combination Long Nose Pump Plier Pliers Set 2,000.00 Set/s 10 Tools Original Rapid Cross Wrench 17,19,21,23mm 2,140.00 Set/s 10 Vise Grip Set 5wr And 10wr (set) 2,500.00 Pc/s 10 Adjustable Wrenches Set (6", 8", 10") 1,500.00 Pc/s 10 High Pressure Washer Water Spray Gun 726.00 Pc/s 10 High Pressure Hose 20meters 2,915.00 Set/s 10 Power Sprayer Repair Kit - V-packing And Valve Seal 600.00 Pc/s 10 Lengthened Squeegee Cleaner Brush Shower Car Wiper Sponge 450.00 Pc/s 10 Industrial Multi-function Grease Gun (500g - 8500psi) 1,500.00 Unit 10 Electric Car Polisher Machine Auto Polishing Buffing 2,200.00 Pc/s 10 Soft Wool Clean Polishing Buffing Bonnet Pad For Car Auto 180mm/7" 420.00 Unit/s 1 Hydraulic Press 10 Ton 39,200.00 Unit/s 3 Bottle Jack 20tons 6,000.00 Unit/s 10 3 Tons Industrial Jack Stand 2pcs / Pair Iht 3,100.00 Unit/s 10 70mai Car Jump Starte Portable 70mai Car Jump Starte Portable 4,100.00 Pc/s 10 High Pressure Washer Brass Quick Coupler Connectors 600.00 Pack/s 50 Tubeless Tire Seal Strip Repair Plug 250.00 Pack/s 50 Tire Patches 50mm 1,000.00 Set/s 20 Auto Tire Repair Kit Tool 650.00 Can 50 Vulcanizing Solution 400.00 Pc/s 10 Car Tire Repair Kit Roller Auto Patch Roller 850.00 Gallon/s 20 Bac-to-zero Solution 4,000.00 Gallon/s 20 Disinfectant Solution 1,100.00 Set/s 10 Booster Cable 800amp Heavy Duty 5.0m 12/24v With Plastic Case 4,500.00 Pc/s 10 Heavy Duty Plastic Tool Box 980.00 Unit 2 Original Industrial (empty) Roller Cabinet With 7pcs Drawers 29,000.00 Set/s 10 Spark Plug Wrench Set 16" And 21" 1,700.00 Set/s 10 8pcs Screwdriver Set - Heavy Duty 1,545.00 Unit 10 6t/8t/12t Hydraulic Crimper Tool Kit Tube Terminals Lugs Battery Wire Crimping Force 3,800.00 Set/s 10 18pcs Hex Key And Torx Key Set(allen) 914.00 Pc/s 10 Philip Screw 200mm 310.00 Pc/s 10 Screw Driver 200mm 310.00 Set/s 1 Mini Obd2 Scanner Car Diagnostic Tools 25,000.00 Can 100 Brake Cleaner 650.00 Can 100 Electronic Contact Cleaner 650.00 Can 100 Anti Rust Lubricant 277ml 550.00 Pc/s 100 Epoxy Steel 210.00 Pc/s 100 Electrical Tape, Big 90.00 Pc/s 50 Tapelon 30.00 Unit 1 3 Jawed Puller 1,500.00 Set/s 1 Inner Bearing Puller 1,500.00 Set/s 1 Car Steering Wheel Puller Removal Tool 1,200.00 Set/s 1 Caliper Piston Compressor Press Tool Kit 1,200.00 Set/s 1 Snapring Plier Set 1,500.00 30 Can Grease 350.00 30 Can Chain Lube 950.00 50 Pc/s Electrical Tape, Small 60.00 20 Pc/s Boat Battery 3sm 9,900.00 50 Pc/s Floor Matting 1,600.00 50 Pc/s Seat Cover 2,800.00 60 Pc/s Dashboard Matting 650.00 150 Pc/s Car Headlight Cleaner 350.00 150 Pc/s Car Glass Cleaner 350.00 2 Set/s High Pressure Washer 1700w, 220v 6,000.00 20 Assy./s Car Key Duplicate 800.00 50 Unit/s Bottle Jack 4tons 3,000.00 100 Pc/s Car Air Freshener 210.00 1 Unit/s 2hp Air Compressor, Cylinder: 2, Phase: 1, Pressure: 115, Psi Capacity: 88liters 32,500.00 100 Btls Acid Rain Remover (250ml) 450.00 1 Unit Water Dispenser 8,000.00 1 Unit Dc Inverter Mma-300 Welding Machine 20,000.00 1 Unit " Oxy-acetylene Cutting Outfit W/complete Accessories Oxygen Cylinder, Acetylene Cylinder W/content 28,000.00 2 Unit Heavy Duty Soldering Iron 300a/200a 6,300.00 10 Kilos " Stainless Steel Electrode 308-1/16 1,500.00 20 Kilos Bronze Rod 1/8" 150.00 20 Can Soldering Paste Soldering Paste 300.00 20 Roll Lead Soldering Wire (250g) 500.00 20 Pound Borax 1 350.00 1 Unit Cordless Impact Wrench 18v 12,500.00 1 Unit Hydraulic Floor Jack (double Pump, Low Profile), Model:asj-5l Max Lifting Cap: 5tons, Lifting Height: 75-500mm, Net Weight: 45kgs 20,000.00 2 Unit 40" Car Creeper 2,100.00 1 Unit Automatic Wire Stripper Cutting Crimper 8 1/4" Detection Cutter 4in1 1,800.00 5 Set/s T- Handle Socket Wrench #8,10,12,14,17,19 1,500.00 10 Set/s Wrench 8-32mm 2,000.00 3 Unit Air Blow Gun / Air Duster 16mm 350.00 5 Unit Vice Grip 1,000.00 5 Unit Hammer 650.00 5 Unit Voltage Tester Car Truck Circuit Tester Pen Automotive 450.00 5 Unit Battery Load Tester 100amp Load 1,100.00 5 Unit Spout Funnel For Oil 1,600.00 5 Unit Car Repair Inspection Lamp Work Light 450.00 5 Set/s Torque Wrech 1/2drive Click Type 2,000.00 Unit 5 Jack Stand 6 Tons, Min Height: 382mm, Max Height: 600mm 5,600.00 Set/s 5 Steel Toe Rubber Boots 1,200.00 Set/s 10 Mechanical Heavy Duty Working Gloves 200.00 Set/s 5 Safety Shoes High Cut Sewed And Vulcanized Leather Safety Shoes Boots 650.00 Pc/s 5 Leather Long-sleeved Apron Waterproof Oil-proof 900.00 Set/s 10 Arm Band Heat Protector 450.00 Pc/s 5 Cover All Safety Suits 1,100.00 Pc/s 5 Hard Hat Safety Helmet 500.00 Gallon/s 20 Water Soluble Oil Degreaser 400.00 Pc/s 300 Rags 3.00 Pc/s 300 Sand Paper- #600,#1000,#1,200 10.00 Set/s 10 Wire Brushes Set Nylon,steel,stainless 100.00 Pc/s 10 Top Box Alloy, 45l 10,800.00 Set/s 10 Top Box Bracket 2,200.00 Abc:php1,000,000.00 Delivery Schedule: By Ordering Agreement (terms Of Reference Attached To The Pr) -spare Parts Must Be Deliver Within 3 Calendar Days -tools & Supplies Within 15 Calendar Days Upon Receipt Of The Delivery Ordering Contract Note: For Other Information, Queries And Specifications Pertaining To The Said Request Please Coordinate With Our Canvasser (please Secure Complete List And/or Rfq Form From Ms. Maricar E. Pablo, At 09676781263 Pauline Anne S. Sioco At 09338100230, And Roxette May P. Poblete At 0936-493-5632 Or Email Address: Procurement@navotas.gov.ph) Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required. 2. Bidders May Quote For All The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Days Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Delivery Period Expressed Merely In Days Or Working Days Shall Be Rejected. 7. Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 8. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. 9. The Item/s Shall Be Delivered As Indicated In The Approved Bac Resolution/purchase Order. 10. The Procuring Entity Concerned Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 11. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The City Government Of Navotas Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. For The Committee Original Signed Atty. Joel Joselito D. Parong Bac Chairperson
Closing Date13 Jan 2025
Tender AmountPHP 1 Million (USD 17.1 K)
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Building Construction
United States
Details: Sources Sought: W9128f25sm009
general. This Is A Sources Sought Notification For Informational/market Research Purposes Only. This Is Not A Request For Proposal, Quotation Or Bid, Nor A Synopsis Of A Proposed Contract Action Under Far Subpart 5.2.
notice Details. The U.s. Army Corps Of Engineers (usace), Northwestern Division, Omaha District (cenwo) Has Been Tasked To Identify Interest In A Design-build Contract For Construction Services As Defined Below In Support Of Cenwo’s Design And Construction Effort At The Fort Harrison Veteran’s Affairs Medical Center (vamc), Ft Harrison, Mt. Responses To This Sources Sought Announcement Will Be Used By The Government To Determine The Appropriate Level Of Small Business Participation And To Develop The Acquisition Strategy. The North American Industrial Classification Code (naics) For This Requirement Is: 236220, “commercial And Institutional Building Construction”. The Related Size Standard Is: $45m.
the Purpose Of This Sources Sought Notice Is To Gather Information On The Interest, Capabilities, And Qualifications Of Small And Large Businesses In The Industry, Alongside Collecting Data On The Recent History Of Construction Projects Within The Local Labor Market. This Notice Supersedes All Previous Requests For Cenwo’s Design And Construction Efforts At Fort Harrison. This Effort Targets:
small Businesses (sb
small Disadvantaged Businesses, Including 8(a) Firms
historically Underutilized Business Zones (hubzone)
economically Disadvantaged Women-owned Small Businesses (edwosb)
service-disabled Veteran-owned Small Businesses (sdvosb)
other Than Small Businesses (otsb)
all Potentially Interested Parties Are Strongly Encouraged To Submit Responses.
project Scope. Cenwo Intends To Procure Design-build Services For The Construction Of A New Central Utility Plant (cup) At The Fort Harrison, Mt Veterans Affairs Medical Center (vamc), Enhancing Campus Utility Services. This Initiative Represents A Significant Upgrade To The Vamc's Infrastructure, Promising Improved Efficiency, Reliability, And Sustainability Of Utility Services Across The Campus.
current Status: Design And Planning Activities Are In Progress To Refine The Design-build Request For Proposal (rfp).
new Construction: The Project Involves Building A New Cup With An Approximate Gross Square Footage (gsf) Of 15,300, Located North Of The Main Hospital Building.
utility System: Establishment Of A Comprehensive Utilities Distribution System.
demolition And Modifications:
demolition Or Modification Of Existing Campus Heating, Hot Water, And Chilled Water Systems.
demolition Of The Old Boiler Plant And Associated Backup Generator Buildings To Clear Space For New Developments.
project Magnitude: The Construction Cost Is Projected To Range Between $25,000,000 And $100,000,000.
timeline: The Estimated Duration From The Notice To Proceed (ntp) For Construction Is 1,277 Calendar Days.
general Site Conditions: This Site Offers Both Challenges And Opportunities For Development, Given Its Proximity To Key Campus Facilities, Existing Infrastructure, And The Natural Slope Of The Land Which Must Be Considered For Effective Water Management And Site Planning.
location: The Site Is Positioned Near The Property Line Abutting The National Guard Installation To The North, With The Existing B170 Warehouse Building To The West, And An Anticipated Parking Garage And Outpatient Mental Health Facility (to Be Constructed By Others) To The East.
land Use: The Site Partially Overlaps With An Existing Parking Lot And Extends Into Undeveloped, Naturally Vegetated Land.
topography: The Terrain Slopes From West To East, With Surface Water Runoff Characterized Predominantly By Sheet Flow; There Are No Significant Concentrated Flow Paths Within The Project Area.
storage And Temporary Structures: The Area May Occasionally Host Shipping Containers, Either On Or Near The Site, Influencing Site Planning And Access Considerations.
drainage And Roadways: Most Of The Campus Features Open-section Roadways Without Curbs Or Gutters, Except Around The Main Hospital Where Traditional Curb And Gutter Systems Are In Place.
utilities:
existing Infrastructure: The Site Is Crossed By Several Utility Services Including Sanitary Sewer, Signal/telecom, And Water Lines, Which Could Support Further Development.
lighting: There Are Light Poles Along The Parking Lot's Perimeter, Potentially Affecting Lighting Design For New Constructions.
landscaping: While The Hospital Area Is Characterized By Irrigated Turfgrass, This Feature Does Not Extend To The Project Site, Maintaining A More Natural Landscape.
central Utility Plant: The Building's Design For The (cup Shall Focus On:
accessibility: The Structural Engineering Of The Cup Emphasizes Accessibility, Providing Easy Access For Maintenance Of Overhead Piping And Duct Systems, And Accommodating Future Equipment Installations Or Removals.
dimensions: The Structure Is Assumed To Be Approximately 30 Feet In Height And 15,300 Gross Square Feet In Area.
construction Materials: Utilizes Load-bearing Concrete Masonry Unit (cmu) Walls, Finished With An Exterior Face Brick That Aligns With The Campus's Architectural Style.
rain-screen System: Employed Across All Exterior Walls To Effectively Control Moisture:
components: Includes An Outer Brick Veneer, An Intermediate Air Space For Drainage, Rigid Insulation For Thermal Resistance, And A Vapor Barrier Directly On The Cmu To Prevent Moisture Ingress.
composite Metal Panels: Strategically Placed To Offer Visual Distinction Or Meet Specific Functional Requirements, These Panels Also Incorporate A Rain-screen System For Moisture Management.
aesthetic And Functional Integration: The Building's Design Shall Not Only Blend With The Existing Campus Architecture But Also Support Operational Efficiency.
durability And Maintenance: The Use Of Modern Construction Techniques And Materials Ensures The Structure's Longevity And Ease Of Maintenance, Adhering To Contemporary Standards For Energy Efficiency And Building Performance.
utilities Distribution System: The Distribution System For The New Cup Shall Be Engineered To Integrate With Both The Future Hospital Complex And The Existing Steam And Chilled Water Systems. The Main Connection From The Cup To The Main Hospital (building 154) Will Occur Via The Primary Utilidor, Terminating At Mechanical Room B100 In The Building's Basement. From Here, Utility Piping Will Connect To Final Equipment Points Either Through Secondary Utilidors, The Crawl Space Beneath Building 154, Or By Routing Through Other Existing Buildings. The Bulk Oxygen Tank And Distribution System Must Also Be Relocated From Its Current Location On Patriot’s Way, To A New Slab Located Near Building 170 (warehouse), And New Connections To And Through The Primary Utilidor Must Be Made To Building 154. This System Is Primarily Routed Through New Underground Utility Corridors, Approximately 8 Feet By 8 Feet, And Extends Into Existing Structures To Serve The Heating, Cooling, And Domestic Hot Water Requirements Of Several Buildings:
building 141, Including The Hydronic Plant
building 154
building 154a
building 169
future Building 173
in Addition To The Main Utility Conduits For Steam, Steam Condensate, And Chilled Water, The Utilidors Will Be Equipped With:
lighting: To Ensure Safe Working Conditions.
ventilation: To Maintain Air Quality Within The Corridors.
drainage: As Mandated By Building Codes To Handle Potential Leaks Or Moisture.
the Design Of The Utilidors Will Prioritize Safety, Providing Adequate Space For Maintenance And Operations Personnel.
building System Connection And Demolition: This Approach Ensures That The New Utility Systems Are Effectively Integrated While Maintaining Or Improving The Operational Capabilities Of The Existing Infrastructure.
steam Utility Connections: New Steam Utilities From The Cup Will Be Integrated With The Existing Steam Systems Within The Buildings, Ensuring A Seamless Transition.
hydronic System Upgrade:
building 141: The Current Hydronic Heating Boilers Will Be Replaced By Shell And Tube Heat Exchangers. This Upgrade Will Convert Steam Into Heating Hot Water, Preserving The Functionality Of The Existing Hydronic Hot Water Distribution System.
chilled Water System Integration:
utility Linkage: New Chilled Water Utilities From The Cup Will Connect To The Existing Chilled Water Systems Across The Campus.
connections: The New Chilled Water Connections To Each Existing Chilled Water Distribution System Requires A Transition From The New Chilled Water Only System To The Existing Glycol-based System.
backup Preservation: The Existing Chillers And Distribution Systems Will Be Kept Operational As A Backup Measure.
control Systems For Chilled Water:
operational Flexibility: Each Connection Point In The Chilled Water Systems Will Feature:
flow Metering: To Accurately Measure Water Flow.
temperature Monitoring: For Precise Control Of Cooling Capacity.
motorized Valving: Enabling The Selection Between Using The Cup's Chilled Water Or Operating Individual Building Chillers, Enhancing System Flexibility And Efficiency.
building 141 (existing Hydronic Plant):
current Equipment: The Facility Currently Houses Two Superior Fire Tube Hot Water Boilers From 2010, Each With A Maximum Allowable Working Pressure (mawp) Of 60 Psig, Rated At 200 Boiler Horsepower (bhp) Or 6,700,000 Btu/h (mbh), And Two Patterson Kelly Hot Water Boilers From 2015, Boasting An Mawp Of 160 Psig, Rated At Approximately 60 Bhp Or 2,000,000 Btu/h (mbh).
upgrade Plan: These Boilers Will Be Substituted With Shell And Tube Heat Exchangers, Supported By The New Central Utility Plant (cup). The Old Equipment Will Be Salvaged, With The Value Recaptured In The Project Cost.
building 169 Extension: The Hydronic Heating Boilers And Domestic Water Heaters In Building 169 Will Also Transition To Shell And Tube Heat Exchangers, While Preserving The Existing Heating Hot Water And Domestic Hot Water Distribution Systems.
building 169 (residential Rehabilitation):
boiler Replacement: This Building Features Three Unitary Boilers, All Slated For Replacement By Heat Exchangers Connected To The New Cup. The Old Equipment Will Be Salvaged Off-site With Value Recaptured In The Project Cost. Service Must Be Maintained To The Existing Distribution System During The Transition, With Only Limited Disruptions During Cutover.
building 171 (operational Boiler Plant):
operational Continuity: Must Remain Active Until The Requirements For Commissioning And Stable Operation Of The New Cup Are Complete..
current Setup: Equipped With Three Low-pressure Superior Fire Tube Steam Boilers From 2012 (30 Psig Mawp, 8,625 Lb/hr Steam Capacity) And Two High-pressure Counterparts (150 Psig Mawp, 5,175 Lb/hr Steam Capacity).
post-cup Operation: Building 171 Will Be Gutted And Maintained In An Environmentally Controlled State Following The Transition. This Equipment Is To Be Disposed Of Off-site And Salvaged With Value Recaptured In The Project Cost. The New Cup Is To Be Operational For A Full Warranty Period Prior To Decommissioning This Plant. Continuity Of Operations Is Required During The Transition To The New Cup. Provisions For Temporary Plant Operations Must Be Provided That Meet This Requirement During Transition.
tank Removal: The Existing Approximately 10,000-gallon Underground Storage Tank Must Be Removed In Adherence To Montana Department Of Environmental Quality Standards, Followed By Site Restoration.
service Access Road. Design And Build An Access Road Loop By Extending Devil’s Brigade Way Around The North End Of Campus To Allow For Service Access To B170 Once The Existing Devil’s Brigade Paralleling Patriot’s Way Is Closed For Construction.
communications With Industry.
cenwo Scheduled Teleconference For Project Information:
date And Time: The Teleconference Is Scheduled For Thursday, 23 January 2025, At 1400 Cst.
objective: This Session Will Provide Additional Project Details And Offer An Opportunity For Interested Parties To Ask Questions. Please Be Aware That The Information Shared During This Teleconference Is Provisional And Subject To Updates As The Project Progresses.
how To Join:
contact: To Obtain The Teleconference Access Information And Any Accompanying Exhibits, Please Reach Out To Adam Beaver, The Contract Specialist, Via Email At: Adam.l.beaver@usace.army.mil (mailto:adam.l.beaver@usace.army.mil).
email Content:
subject: Sources Sought W9128f25sm009 - Design-build Central Utility Plant (cup) At Ft. Harrison, Mt Vamc – Teleconference Info Request
body:
firm Details: Include Your Firm's Name And Cage (commercial And Government Entity) Code.
participants: List The Names Of All Individuals From Your Firm Who Will Be Participating In The Teleconference.
dial-ins: Specify The Expected Number Of Dial-ins From Your Organization.
input For Acquisition Strategy: Provide Any Questions, Recommendations, Or Concerns That Could Impact The Acquisition Strategy For This Project.
acquisition Input: This Is Your Opportunity To Influence The Project's Direction By Addressing Potential Issues Or Suggesting Improvements At An Early Stage. We Encourage All Interested Parties To Participate To Gain A Deeper Understanding Of The Project Scope And To Clarify Any Queries.
project Labor Agreement Survey. As Part Of This Notice, Cenwo Is Also Soliciting Input From The Construction Community Regarding The Potential Application Of Project Labor Agreements (plas) For This Construction Project At The Veterans Administration Medical Center In Fort Harrison, Mt. A Pla Is Described As A Pre-hire Collective Bargaining Agreement Between A Prime Contractor And Labor Organizations, Setting Employment Terms For A Specific Construction Project Under 29 U.s.c. 158(f). A Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects.
federal Acquisition Regulation (far 22.503) Policy: Plas Are Recognized As Tools To Promote Economy And Efficiency In Federal Procurement. Per Executive Order 13502, Agencies Are Encouraged To Consider Mandating Plas For Large-scale Construction Projects To Enhance Project Management And Outcomes. An Agency May Mandate That Contractors And Subcontractors On The Project Negotiate Or Become Party To A Pla With Labor Organizations If It Is Deemed That Such Agreements Will:
advance The Federal Governments Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards And Other Matters; And
be Consistent With Law. Reference: Far 52.222-33 Notice Of Requirement For Project Labor Agreement; Far 52.222-34 Project Labor Agreement
please Provide Your Feedback On The Following:
do You Have Knowledge Of Plas Being Used On Similar Local Projects? If So, Please Provide Supporting Documentation.
are There Known Skilled Labor Shortages For The Crafts Required For This Project In The Area? Elaborate And Provide Documentation If Possible.
are There Any Time-sensitive Constraints Or Scheduling Concerns That Could Impact The Project Timeline? Elaborate And Provide Documentation If Possible.
specify Reasons How A Pla Might Advance The Federal Government's Interest In Economy And Efficiency In Procurement.
specify Reasons Why You Believe A Pla Might Not Advance The Federal Government's Interest In Economy And Efficiency In Procurement.
additional Information You Believe Should Be Considered On The Use Of A Pla On This Project.
additional Information You Believe Should Be Considered On The Non-use Of A Pla On This Project.
the Information Gathered In This Survey Should Include The Following Information On Projects Completed In The Last 2 – 5 Years:
project Name And Location
detailed Project Description
initial Cost Estimate Vs. Actual Final Cost
was The Project Completed On Time?
number Of Craft Trades Present On The Project
was A Pla Used?
were There Any Challenges Experienced During The Project?
submission Instructions. Formal Responses To This Sources Sought Notice Must Be Submitted Electronically (via Email) With:
subject: “sources Sought W9128f25sm009 –design-build Central Utility Plant At The Ft. Harrison Va Contract”.
please Email To Adam.l.beaver@usace.army.mil And Jeffrey.w.wyant@usacea.army.mil. Responses Must Be Received By 1400 On 13 January 2025, To Be Considered. Responses To This Sources Sought Shall Be Limited To Fifteen (15) Pages And Include The Following Information:
firm's Name, Address, Point Of Contact, Phone Number, E-mail Address, Cage And Uei Number.
firm's Business Category And Size To Include Any Official Teaming Arrangements As A Partnership Or Joint Venture. The Categories Include Large Business (include Summary Of Small Business Participation Metrics), Small Business, Small Disadvantaged Business, 8(a) Firm, Historically Underutilized Business Zones (hubzone), Economically Disadvantaged Women-owned Small Business (edwosb), Women-owned Small Business (wosb), And Service-disabled Veteran-owned Small Business (sdvosb).
provide A Maximum Of Three D-b Project Examples, Similar In Size, Scope And Complexity To The Work Described In This Notice. Provide Details Of The Project(s) Including The Scope, Contract Number If Available, The Project’s Final Price, Start And End Dates Of The Construction Work, Complexity Of The Job, And Small Business Participation, If Applicable. Additionally, Identify Whether You Were The Prime Or A Subcontractor On The Project. Finally, Please Provide Any Project References Including Owner With Phone Number And Email Address. This Ensures Clarity And Brevity In The Analysis Process. The Government May Verify Information In Cpars Or Ppirs.
provide Information On Your Bonding Capability. Specifically Identify Capacity Of Performance And Payment Bonds, Both Single And Aggregate.
in Addition To The Submission For The Sources Sought Above, The Responses To The Project Labor Agreement Survey Shall Be Limited To Five (5) Pages, And Include The Following Information:
responses To Project Labor Agreement Survey, 2., Items1. Through 7.
substantiating Project Information As Outlined In Project Labor Agreement Survey, 3., Items1. Through 7.
disclaimer And Important Notes.
responses Will Be Shared With Government Personnel With A Need-to-know Basis, But Otherwise Will Be Held In Strict Confidence.
this Notice Does Not Obligate The Government To Award A Contract. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Sources Sought Or Any Follow Up Information. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization's Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or To Provide Feedback To Respondents With Respect To Any Information Submitted.
all Interested Firms Must Be Registered In The System For Award Management (sam) At Https://www.sam.gov And Remain Current For The Duration Of The Source Selection Process To Be Eligible For Award Of A Government Contract.
cenwo Intends To Synopsize A Requirement For Design-build Construction Services In Support Of The Cup Project At The Ft Harrison, Mt Vamc. A Fully Developed Request For Proposal Is Currently Anticipated To Be Issued During The Spring/summer Of 2025.
Closing Date13 Jan 2025
Tender AmountRefer Documents
GOVERNOR CELESTINO GALLARES MULTI SPECIALTY MEDICAL CENTER Tender
Healthcare and Medicine
Philippines
Details: Description Gov. Celestino Gallares Multi-specialty Medical Center Invitation To Bid For Supply, Delivery, Installation, Testing And Commissioning Of 2 Lots Various Medical Equipment Batch 3 (re-bid) For Gov. Celestino Gallares Multi-specialty Medical Center 1. The Gov. Celestino Gallares Multi-specialty Medical Center (gcgmsmc), Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Sixty Million Three Hundred Forty-four Thousand Nine Hundred Seventy-five Pesos Only (php60,344,975.00) Being The Abc To Payments Under The Contract For Cb:2024-12-0007. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Gcgmsmc, Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Sixty Million Three Hundred Forty-four Thousand Nine Hundred Seventy-five Pesos Only (php60,344,975.00) Being The Abc To Payments Under The Contract For Each Lot/item.et Al. Lot No. Item/description Quantity Unit Cost Total Cost 1 Infusion & Monitoring System 1 37,344,975.00 37,344,975.00 2 Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device 1 23,000,000.00 23,000,000.00 Grand Total 60,344,975.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Gcgmsmc, Now Invites Bids For The Above Procurement Project. Delivery And Installation Of The Goods Is Required Within 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Bidders Should Have Completed, Within 3 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Gcgmsmc Through Electronic Mail Via Procurement@cpspecialtycenter.org Or Through The Cellular Number 09209437250. 5. A Complete Set Of Bidding Documents May Be Acquired And Downloaded By Interested Bidders From Gcgmsmc Google Drive From (procurement@cpspecialtycenter.org) On December 08, 2024– January 03, 2025 And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Indicated Below In Accordance With The Following Schedule: Lot No. Item/description Total Cost Bidding Documents Fee (in Philippine Peso) 1 Infusion & Monitoring System 37,344,975.00 25,000.00 2 Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device 23,000,000.00 25,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Online Banking Or Online Deposit With The Following Bank Details: Bank Name: Development Bank Of The Philippines Account Name: Gcg Multi-specialty Medical Complex Account Number: 00-0-15490-780-5 "for Bidders Choosing To Pay Via Online Transfer Or Bank Deposit, Please Ensure That Proof Of Your Successful Transaction Is Promptly Sent To The Procurement Email Address: Procurement@cpspecialtycenter.org. In Compliance With Coa Circular Number 2021-014, Clause 5.2, An Acknowledgement Receipt Will Be Issued As Proof Of Verified And Received Payment. Access To Bidding Documents Will Be Granted Only Upon Presentation Of This Acknowledgement Receipt. 6. The Gcgmsmc Will Hold A Pre-bid Conference On The 17th Day Of December 2024 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before The 3rd Day Of January 2025 At 0900h At Gcgmsmc Procurement Office Room 3c-w327 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur, Cortes, Bohol. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On The 3rd Day Of January 2025 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Together With Their Company Id. 10. The Gcgmsmc Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Submission Of Hardcopies: Bidders Shall Submit Their Original Eligibility And Technical Documents Described In Itb Clause 10 In One Sealed Envelope Marked "original - Technical Component", And The Original Of Their Financial Component In Another Sealed Envelope Marked "original Financial Component", Sealing Them All In An Outer Envelope Marked "original Bid". Each Copy Of The First And Second Envelopes Shall Have 2 Copies And Similarly Sealed Duly Marking The Inner Envelopes As "copy No. 1 Technical Component" And "copy No. 1- Financial Component” And "copy No. 2- Technical Component" And "copy No. 2- Financial Component" And The Outer Envelope As "copy No. 1" And "copy No. 2" Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. Please Take Note That All Notarized Documents Must Be Treated As Original Copies For All The Submitted Documents (original, Copy 1, And Copy 2). It Is Imperative That Each Copy Retains Its Original Notarization To Ensure Legal Validity And Compliance. The Original And The Number Of Copies Of The Bid As Indicated In The Itb Clause 15 Shall Be Typed Or Written In Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. All Envelopes Shall: A. Contain The Name Of The Contract To Be Bid In Capital Letters; B. Bear The Name And Address Of The Bidder In Capital Letters; C. Be Addressed To The Procuring Entity's Bac In Accordance With Itb Clause 1; D. Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1 12. For Further Information, Please Refer To: Mary Grace L. Simbajon Jessa O. Quiñal Procurement Office Procurement Office Malayo Sur, Cortes, Bohol Malayo Sur, Cortes, Bohol Procurement@cpspecialtycenter.org Procurement@cpspecialtycenter.org +639209437250 +639452478632 December 06, 2024 Approved By: (signed) Doreen A. Lugo, Lpt Bac Chairperson Noted By: (signed) Laurence Elliot R. Tirol, Md, Fpcp Medical Center Chief ------------------------------------------------------------------------------------------------------------ Item: 1 Unit: Lot Qty: 1 Unit Cost: 37,344,975.00 Total Cost: 37,344,975.00 Description: Supply, Delivery, Installation, Testing & Commissioning Of Infusion & Monitoring System 150 Pump, Volumetric Infusion 40 Docking Station/s 1 Central Monitoring System 1 Mri-compatible Infusion System 1 Oximetry Monitoring System, Non-invasive Pump, Infusion Volumetric, 150 Units Size Less Than Or Equal To 210 (l) X 140 (w) X 73 (h) Millimeters (mm) Weight Less Than Or Equal To 1700 Grams (g) Screen Must Be At Least Three (3) Inches, Touchscreen, Thin Film Transistor (tft) Color Liquid Crystal Display (lcd), At Least 200 X 400 Pixel/s, Adjustable Brightness Levels Display Must Show The Following Information At Least: Infusion Status With Drug/s Name, Infusion Parameter/s, Real-time In-line Pressure; System Status Information With Infusion Mode, Intravenous Set Brand Or Bed Number, Alarm Symbol/s, Battery Status, Network Status, Relayed Status, And System Time; Must Show Infusion Status Indicator On The Door Accuracy: ≤ ± 4.5% Mode/s: Rate Mode, Dose Mode, Dose Time Mode, Time Mode, Sequential Mode, Intermittent Mode, Loading Dose Mode, Ramp Mode, Micro-infusion Mode And/or Drip Mode Must Support The Following Application/s : Intravenous Drug Infusion, Enteral Nutrition Feeding, And/or Blood Transfusion Flow Rate/s: 0.10-2300 Milliliter/s (ml) Per Hour (hr) And/or 0.10-2000 Ml/hr Increment/s: 0.01 Ml/hr (0.10-99.99 Ml/hr), 0.1 Ml/hr (100-999.9 Ml/hr), 1 Ml/hr (1000-2300 Ml/hr) Preset Time/s: 00:00:01-99:59:59 Preset Volume: 0.10-9999.99 Ml With Increments Of 0.01 Ml Accumulated Volume: 0.00-99999.99 Ml “keep Vein Open”: (kvo): 0.1-5.0 Ml/hr With Increment/s Of 0.01 Ml/hr Purge Rate: 0.1-2300 Ml/hr Bolus Rate: 0.1-2300 Ml/hr, Automatic Or Manual Occlusion Detection: 50-1125 Millimeters Mercury (mmhg) With At Least 15 Selectable Levels Such As 50, 150, 225, 300, 375, 450, 525, 600, 675, 750, 825, 900, 975, 1050, 1125 Mmhg); With Default Of 450 Mmhg; Pre Alarm Pops Up While Pressure Is Increasing; Auto-restart Capability Where On/off And Restart The Infusion When Occlusion Pressure Is Reduced; Pressure Unit/s Available Such As, Millimeters Mercury (mmhg), Kilo Pascal/s (kpa), Bar, And/or Pounds Per Square Inch (psi) Air Bubble Detection, With At Least Six (6) Level/s, 15, 50, 100, 250, 500, 800 Microliter/s; Air Accumulation 0.1-1.0 Ml Per 15 Minutes Dose Rate Unit/s Must Include The Following: Ng/kg/min, Ng/kg/hr, Ng/kg/24h; Ug/kg/min, Ug/kg/h, Ug/kg/24h, Mg/kg/min, Mg/kg/h, Mg/kg/24h; Mu/kg/min, Mu/kg/h, Mu/kg/24h; U/kg/min, U/kg/h,u/kg/24h; Ku/kg/min, Ku/kg/h, Ku/kg/24h; Eu/kg/min, Eu/kg/h, Eu/kg/24h; Mmol/kg/min,mmol/kg/h, Mmol/kg/24h; Mol/kg/min, Mol/kg/h, Mol/kg/24h; Mcal/kg/min, Mcal/kg/h, Mcal/kg/24h; Cal/kg/min, Cal/kg/h, Cal/kg/24h; Kcal/kg/min, Kcal/kg/h, Kcal/kg/24h; Meq/kg/min, Meq/kg/h, Meq/kg/24h; Auto Lock Time: 1-5 Minute/s Range With On/off Switch Drug Library Up To 5000 Drug/s, 30 Categories, Support For Color-coding History Log Up To 3500 Event/s Volume Collection Available In At Least 4 Method/s Including, 24 Hour Total, Current Total, Period, Timing Volume, Support History Rate Review Dose Error Reduction System Available Definition Of Dose Limit/s Automatic Alarm/s When Reaching Dose Limit/s Intravenous (iv) Administration Set Must Be Able To Accept Universal Iv Set/s Alarm/s Audible And Visual Alarm/s; Sound Volume Adjustable At Least Eight (8) Level/s 2 Level/s: High: Air In Line, Accumulated Air, Empty, Drop Error, Upstream Occlusion, Downstream Occlusion, Infusion Set Disengaged, No Infusion Tube, Infusion Set Error, No Drop Sensor, Battery Depleted, Volume To Be Infused (vtbi) Complete, Kvo Finish, Relay Invalid And/or System Error Low: Kvo Running, Battery In Use, Battery Error, Cms/egw Disconnected, Standby Time Expired, Dock Connection Interrupted, System Time Error, Relay Invalid Soon, Time Near End, Reminder And/or Low Battery Reminder: 1-5 Minute/s, On/off Switchable Connectivity Communication Wired And Wireless Usb Support Drug Library Import, Patient Data Import/export, History Record Export, Calibration Date Import/export; Multifunction Connector: Rs232, Nurse Call Connector, Dc Adapter Integration: Connect With Infusion Central Station, Connect With Central Monitoring System Battery Operating Time: More Than Or Equal To Five (5) Hour/s At 25 Ml/hr Charging Time: Less Than Or Equal To Five (5) Hour/s To Full Capacity Power Supply Voltage 100-240 Volt/s, Frequency 50-60 Hertz, (hz), Current 0.5-0.21 Ampere/s (a) Work Environment Level Of Resistance To Water And Dust At Least Ingress Protection Rating 33 (ip33) Classification Type Cf, Class 1, Ip33 Docking Station, 40 Units Size: Atleast270 (l) X 170 (w) X 390 (h) Millimeters (mm) Weight: Less Than Or Equal To 3900 Grams Display Screen At Least Three (3) Inches Organic Light Emitting Diode (oled) At Least 265 X 64 Pixels Resolution Showing The Following Information: Bed Number, Patient Name, Battery Status, Network Status, Total Volume For 24 Hours; Must Be Able To Connect Via Hl7 Protocol And Integrate With Hospital Information System/s And/or Electronic Medical Record/s Via Wired Or Wireless Protocol; Usb Support For Drug Library Importation, Patient Information Loading, Patient Data Export, History Record And/or Barcode Reader Connection Multifunctional Connector Rs232 And/or Nurse Call Connector Integration Capability To Synergise/connect With Patient Monitor, Connect With Infusion Central Station, And/or Connect With Central Monitoring System Night Mode Capability With On/off, Start Time, End Time And Sound Volume Adjustable History Record Up To 2500 Mounting Type For Horizontal And Vertical Pole Clamp: Horizontal Diameter Range 10 To 25 Mm; Vertical Diameter Range 15 To 40 Mm; One Pole Clamp Per Shelf Module Programmable Mode: Support Automatic Multi-channel Relay Maintenance: Support 2 To 24 Pumps Tool Free Assembly, Support Batch Calibration, Drug Library Import, And Software Upgrade/s Classification: Type Cf, Class 1, Ip33 Power Supply Battery: Lithium-ion 2500mah Operating Time Of At Least 2 Hours Charging Time At Most 6 Hours Ac Power: 100 To 240 V, 50 To 60 Hertz, 8 To 3.4 A Alarm/s Audible And Visual Alarm/s 2 Level/s: High: Battery Depleted, System Error : Low: Slave Controller Abnormal, Battery In Use, Low Battery, Battery Error, Local Area Network (lan) Internet Protocol (ip) Address Conflict, Wireless Lan Ip Address Conflict, Cms, Egw Disconnect Central Monitoring System System Component/s: Central Station System Center Which Connects Bedside Device/s Hardware: Display/s At Least 24 Inch Tft Lcd Screen/s Medical Grade, At Least Dicom 14, At Least Ip54 Rating Iec 60601, Touch Screen; Must Include Printer/s, Keyboard/s, Mouse/s And Speaker/s Main System Software Specification/s: Number Of Device Up To 64 Patient Monitor/s And Infusion Pump/s Per Station Alarm: Category: Physiological Alarm, Technical Alarm And System Prompt Remote Control: Alarm Switch, Alarm Limits, Alarm Priority, Alarm Pause And Alarm Reset Alarm Analysis: Support Alarm Statistics Trend Review: At Least 240 Hours; Full Disclosure At Least 240 Hours; Data Interface Connection Interface Integrated Egateway Or Standalone Egateway Mri Compatible Infusion System, 1 Unit Size Less Than Or Equal To 560 (l) X 540 (w) X 1540 (h) Mm Including Trolley, Excluding Iv Pole Weight Less Than Or Equal To 50 Kilograms Without Pump/s Display Screen At Least 3 Inches, Oled, 256 X 64 Pixels, Showing The Following Information: Bed Number, Patient Name, Battery Status, Network Status, Total Volume For The Past 24 Hours Infusion Of The Pump; Compatible Pumps At Least 4 Infusion Or Syringe Pumps Mri Scanner Compatibility For Both 1.5 And/or 3.0 Tesla Model/s Alarm/s Audible And Visual Alarm/s 2 Level/s: High: Battery Depleted, Magnet Indicator Battery Depleted, System Error : Low: Low Battery, Magnet Indicator, Battery Low, Battery Error, Lan Ip Address Conflict, Wlan Ip Address Conflict, Network Disconnected Magnet Indicator: Magnetic Field To Be Used In Magnetic Fields Up To 20 Mt; < 20 Mt Green; 20-40 Mt Yellow; > 40 Mt Red; Connectivity Communication Wired Or Wireless Usb Support Drug Library Import, Patient Data Import/export, History Record Export, System Upgrade Integration: Synergy With Patient Monitor, Connect With Infusion Central Station, Connect With Central Monitoring System Material: Ingress Protection Level Ip33 Safety Standards En 60601-1:2006 / A1:2013; En 60601-1-2:2015; En 60601-1-8:2007/a11:2017; F2025-15; F2182-19; F2213-17; F2503-20; Classification Type Cf Class Power Supply Battery: Lithium-ion At Least 3400mah; Ac Power: 100 To 240 V, 50 To 60 Hertz Dock: Operating Time At Least 10 Hours; Charging Time At Most 6 Hours Magnet Indicator: Operating Time Of At Least 720 Hours; Recharging Time At Most 8 Hours Oximetry Monitoring And Connectivity System, 1 Unit Expandable Patient Monitoring And Connectivity Hub That Integrates An Array Of Technologies, Devices, And Systems To Provide Multimodal Monitoring And Connectivity Solutions In A Single Clinician-centric Platform Regional Oximetry, Non-invasive Pulse Oximetry Display Resolution At Least 1280 X 800 Pixels, At Least 10 Inches Diagonal Size, Multi-touch Touchscreen; Customizable Multiple Screen Views To Feature The Most Applicable Data; Can Display Tissue Oxygen Saturation Of Specific Area; Can Display The Difference Between Current Rso2 And User Defined Baseline; Can Display The Difference Between Rso2 And Spo2; Pulse Rate; Perfusion Index; Pleat Variability Index; High-resolution Plethysmograph Waveform And/or Can Display Spectrogram Representing Activity For Both Sides Of The Brain; Must Have Ports Or Docks That Are Compatible To Plug And Play Modules For The Measurement Of Brain Function Monitoring, Regional Oximetry, And Non-invasive Pulse Oximetry Battery Capacity Is At Least Four Hours Module/s: Cerebral Oximetry At Least One, Pulse Co-oximetry At Least One Can Be Used As Bedside, Handheld And/or Transport Monitor Configurable Parameter And Alarm Settings By Patient Population Audible And Visual Alarms For Quick Identification Of Alarming Parameters With Redundant Speaker System. Particulars Vendor Shall Warrant That The Product Supplied Shall Equal The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On The System/equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair The System During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Vendor Must Conduct Quarterly Preventive Maintenance Program Or Frequently As Recommended By Principal / Manufacturer. Vendor Agrees To Add Equipment Down-time (in Number Of Days) To Total Warranty Period. Vendor Must Respond With Technical Support Staff, Either Remotely 2 Hours Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; And Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; System/equipment Shall Be Delivered With At Least One (1) Copy Of All Service Manuals And At Least One (1) Copy Of All User Manuals. System/equipment Shall Be Delivered Complete With All Cabling, Connectors, Junction Boxes, Mounting Hardware, And All Other Accessories Necessary For Full Operation Of The System/equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid Any And All Software Necessary To Technically Support The System Shall Be Included Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Devices Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than Five (5) Years After The Warranty Period Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or Engineer And/or End-user. Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimates For Major Spare Part/s Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s, Training And Other Sundries Necessary For The Complete Installation Of The Equipment Vendor Must Have Available Technical Staff And/or Office/s Within The Region Principal/manufacturer May Preferably Have An Existing / Active Quality Management System Certification E.g. Iso 13485 And/or Iso 9001 Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. -------------------------------------------------------------------------------------------------------------------- Item: 2 Unit: Lot Qty: 1 Unit Cost: 23,000,000.00 Total Cost: 23,000,000.00 Description: Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device Heart & Lung Machine With Integrated Centrifugal Pump Built In Centrifugal Pump With The Following Specifications: Controls And Monitor Must Be Mounted To The Machine Drive Unit Must Allow For Interchangeable Components (must Have Flexible Drive Unit For Better Handling) Remote Control Display Panel Must Include The Centrifugal Status And Alarms Flow Sensor Must Be Non-invasive Type One (1) Integrated Centrifugal Pump Plus Either (a) Three (3) Singular Large Pumps + Two (2) Single Small Roller Pump Or (b) A Total Of Five (5) Roller Pumps With Flat Screen Monitor For Heart & Lung Machine Functionality Display Roller Pump Must Have Tubing Clamp Assembly Must Be A Rotatable Pump Head. With Hand Crank Intended For Manual Use In The Event Of Power Failure For Both Roller And Centrifugal Pump With Complete Safety Mechanism Device. Dual Pressure Module Sensor With Two (2) Cable Pressure Intended For Arterial Cardioplegia Digital Pressure Monitoring And Two (2) Manometer For Manual Monitoring. One (1) Temperature Module With At Least Two (2) Channels Level Sensor And Air Bubbles Sensor Intended For Adult And Pedia Circuits That Will Trigger The Machine To Temporarily Stop Avoiding Air Introduction To Patient With Mechanical Gas Blender For Oxygen And Compressed Air With Hose And Accessory Connectors Inclusion Of Vacuum Regulator Device Halogen Or Led Console Lamp With Flexible Arms Back-up Battery Which Can Provide Power For At Least 1 Hour Must Provide At Least Six (6) Pieces Of Tubing Clamp With Guard Can Be Powered By 230v ±10, 60hz With Four Heavy Duty Rolling Wheels And Non-scratching With Lock System Included In-line Blood Gas Monitoring Device The Machine Must Be Capable Of A Continuous Determination Of The Following Tests While On Cardiopulmonary Bypass (cpb): Blood Gas (ph, Pco2, Po2, Hco3, Be, So2) Electrolytes & Hematology (k+, Hgb, Hct) Patient Temperature Oxygen Deliver (do2) Inclusion Of Battery Pack To Ensure Uninterrupted Operation. Capable Of Displaying Alert/alarm Indicator When Parameters Fall Outside The Normal Values Must Be Lcd Or Led Screen Machine Must Be Portable And Fit With The Provided Pole Clamps/bracket For Monitoring In The Heart Lung Machine Cable Head Sensor For Testing Must Be Capable For Arterial Or Venous Sampling Monitoring Must Include Printer For Documentation Of Displayed Values 60 Hertz Machine Electrical Requirement Heater Cooler Machine, At Least Two (2) Unit/s Must Have At Least Two (2) Independent Circuits Intended Either For: A. Oxygenator Heat Exchangers And B. Patient Blankets One (1) Pair Of Hose With Corresponding Connectors For Each Independent Circuit Per Unit Can Be Powered By 230v ±10, 60hz Particulars Vendor Shall Warrant That The Product Supplied Shall Equal The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On The System/equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair The System During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Vendor Must Conduct Quarterly Preventive Maintenance Program Or Frequently As Recommended By Principal / Manufacturer. Vendor Agrees To Add Equipment Down-time (in Number Of Days) To Total Warranty Period. Must Provide Back-up Immediately Upon Notification Where Applicable. Vendor Must Respond With Technical Support Staff, Either Remotely (2 Hours) Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; And Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; System/equipment Shall Be Delivered With At Least One (1) Copy Of All Service Manuals And At Least One (1) Copy Of All User Manuals. System/equipment Shall Be Delivered Complete With All Cabling, Connectors, Junction Boxes, Mounting Hardware, And All Other Accessories Necessary For Full Operation Of The System/equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products And Model/s Nearing And/or At The End-of-cycle Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid; Any And All Software Necessary To Technically Support The System Shall Be Included Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Devices Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than Five (5) Years After The Warranty Period Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or Engineer And Other Technical Staff (end-user/s); Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimates For Major Spare Part/s Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s, Training And Other Sundries Necessary For The Complete Installation Of The Equipment Vendor Must Have Available Technical Staff And/or Office/s Within The Region Principal’s/ Manufacturer Products May Preferably Have An Existing/active Quality Management System Certification E.g. Iso 13485 And/or Iso 9001 Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years, May Provide Certification Where Applicable Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances.
Closing Date3 Jan 2025
Tender AmountPHP 60.3 Million (USD 1 Million)
261-270 of 270 archived Tenders