Heater Tenders

Heater Tenders

Offizielle Bezeichnung Tender

Chemical Products
Germany
Closing Date2 Jan 2025
Tender AmountRefer Documents 
Description: Contract notice – General guideline, standard regulation Open procedure (construction work) Bau-085850_cn_zfe_ Lüftung Air conditioning systems (din 18 379); Bau-085850_cn_zfe_ Lüftung Ventilation systems 2 pieces partial air conditioning units 1 piece full air conditioning systems 3 double systems 6 exhaust air systems. Duct heaters/coolers 48 pieces Duct/molded duct, galvanized 1,115m² Duct/molded duct, stainless steel 240 m² Spiral seam duct 6,500m Volume flow controller Var. 124 pieces Volume flow controller Const. 136 pcs Motorized fire dampers 264 pcs Swirl diffusers 90 pcs Slotted rails 17m grilles Ventilation towers 14 pcs Air conditioning cabinets 1 pc Recirculating air cooling units 10 pcs Use of fairly traded products Ecologically sustainable products Innovatively oriented products and services

Airports Authority Of India - AAI Tender

Goods
Machinery and Tools...+2Electrical Goods and Equipments, Electrical and Electronics
GEM
Corrigendum : Corrigendum Added
India
Closing Date2 Jan 2025
Tender AmountINR 21.8 Million (USD 255.7 K)
Description: CATEGORY: Repairing of Three Phase 5 HP open well submersible pump motor , Repairing of Three Phase 20 HP open well submersible pump motor , Repairing of Three Phase 7.5 HP sewerage submersible pump motor , Detection of LT Cable fault by using LT Cable Fault locator , 9 to 10 Watt B22 LED lamp , 5 Watt B22 LED lamp , 10 to 12 Watt recess mounted round LED , 10 to 12 Watt surface mounted round LED , 36 Watt 2X2 ft LED Light , 18 to 22 watt LED tube , 9 or 10 Watt Tube light 2feet , 20 watt LED lights for Bollard , 50 watt LED Flood light , 70 watt LED Street Light , Polycarbonate Batten holder , BLDC ceiling Fan 1200 mm sweep , 400 mm sweep Wall Fan , 450 mm Pedestal fan , 200 mm Exhaust Fan non metallic body , 300 mm Exhaust Fan Metallic body , Exhaust Fan 300 mm sweep Metallic body Heavy Duty , Desert Cooler 70ltrs. , 100 watt mini fan electronic regulator , 5 or 6 A, 1 way piano switch , 5 or 6 A, Bell push switch , 15 or 16A, 1 way piano switch , 3 pin, 5 or 6 A, Piano Socket , 6 pin, 15 or 16 A, Piano Socket with safety Shutter , Ding dong door bell , Electronic Remote bell , 5 or 6 A, 1 way Modular switch , 5 or 6 A, Modular Bell push switch , 15 or 16A, 1 way Modular switch , 3 pin, 5 or 6 A, Modular Socket , 6 pin, 15 or 16 A, Modular Socket with safety Shutter , 16A, Extension board , 6A, Extension board , 6A, 3Pin Combined Switch Socket Box , 6 or 16A Combined Switch Socket Box with shutter , 3Pin, 5 or 6 A, Plug Top , 3Pin, 15 or 16 A, Plug Top , SP 6 to 32 A C Curve MCB , DP 32 A C Curve MCB , DP 40 to 63 A C Curve MCB , TPN 40 to 63 A C Curve MCB , 4P, 63A, 30KA, MCCB , 4P, 100A, 30KA, MCCB , 4P, 125A, 36KA, MCCB , 4P, 160A, 36KA, MCCB , 4P, 400A, 50KA, MCCB , 4P, 630A, 50KA, MCCB , 1.5sqmm, FRLS, Single core copper conductor , 2.5sqmm, FRLS, Single core copper conductor , 4sqmm, FRLS, Single core copper conductor , 3c X 1.5 sqmm copper conductor , 3c X 2.5 sqmm copper conductor , 2c X 0.75 sqmm copper conductor , 2c Flexible twin twisted copper wire , 2 c X 10 sqmm. Aluminium Conductor , 3.5 c X 35 sqmm. Aluminium Conductor , 3C x 4 sqmm. Cu. Submersible flat cable , 2.25 MFD Capacitor , 2.5 MFD Capacitor , 3.15 MFD Capacitor , 4 MFD Capacitor , 10.0 or 15.0 MFD Capacitor , Heat Convertor 2000W , Room Heater 800W Halogen , Hot case 108 Ltrs. , Centrifugal pump 1HP , Single Phase submesible pump controller 1.5HP , Three Phase submesible pump controller 7.5HP , 18Watt single submersible pump for desert Cooler , 3 phase energy meter , Single phase energy meter , 12volts, 25 plate 180 AH lead acid battery , Battery terminal , Battery Water , 20 mm PVC Channel , 25 mm PVC Channel , 32 mm PVC Channel , 1.5 inch gypsum screw , 2.5 inch gypsum screw , 6mm Dia, 6X19mm Stainless Steel wire rope , Water proof insulating rubber submersible tape , Wood wool Pads for Desert Cooler , Works as per DSR 2022

South Indian Bank - SIB Tender

Auction
India
Closing Date13 Jan 2025
Tender AmountINR 9.8 Million (USD 114.1 K)
Details: Others At Kottayam , (a) Tiles Nitco 45x15 Size 150, Nitco 60x15 Size 107, Nitco 60x30 Size 3766, Nitco 30x30 Size 2324, Nitco 38x25 Size 182, Samay 45x30 Size 26684, Nitco 20x30 Size 193, Nitco 30x30 Size 494, Nitco 45x30 Size 487, Nitco 33x45 Size 839.28, Nitco 122x30 Size 301, Nitco 48x30-size 774, Nitco 60x36-size 155686, Nitco 10x40-size 774, Nitco 120x60 Size 12000, Nitco 30x40 - Size 64, Nitco 60x60 Size 803, Nitco 60x40 Size 4626, Nitco 90x30 Size 882, Nitco 1x1 Size 3228, Nitco 80x80 Size 742, Nitco 120x80 Size 419, Nitco 60x60 Size 150, Nitco 50x50 Size 1120, Nitco 120x20 Size 161, Nitco 60x80. Size 1215, Granite Size 9070, Marble-size 6789(b) Urinal: Jaquar - Nos 33(c) Bidet: Jaquar - Nos 1(d) Flush: Jaquar - Nos 134, Hind Ware-nos 60 (e) Europian Closet: Jaquar - Nos 76, Hind Ware - Nos 10(f) Europian Cover Plate: Jaquar - Nos 44(g) Wb Corner Small - Nos 1 (h) Small Aluminium Grill - Nos 18 (1) Flush Tank Plastic - Nos 2(j) Wash Basin: Jaquar - Nos 214, Hind Ware - Nos 211, Hcl Nos 1(k) Ready Made Wash Basin Stand: Rak - Nos 13(l) Sink Duct 50x15-nos 30, Sink Duct 83x48 - Nos 12(m) Water Heater: Jaquar - Nos 63(n) Single Sink 55x45 - Nos 37,(o) Sink 150x60 - Nos 8(p) Jacuzzi - Nos 1(q) Full Set Shower Pipe - Nos 27(r) Heavy Duty Pipe - Nos 26

Border Roads Organisation - BRO Tender

Goods
GEM
Corrigendum : Corrigendum Added
India
Closing Date11 Jan 2025
Tender AmountRefer Documents 
Description: BOQ ITEMS: MS Hamam water heating tank 500 Ltr cap with complete accessories, Cold Weather Concreting Admixture (Super Plasticizer Admixture) as per IS 9103 1999 (Re affirmed 2004) Edition 2.2 (2007 08) and ASTM C494 Type G, Funnel Fuel Filter (Fuel Water Separator), Refrigerator vertical 220 Ltr cap / volume, Spiral binding ring white 50 mm, Spiral binding ring white 60 mm, Spiral binding ring white 40 mm, Spiral binding ring white 30 mm, Spiral binding ring white 25 mm, Table Plastic Moulded, Chair Plastic Moulded without armrest, Self Wringing Squeeze twist MOP for floor cleaning, Rotary Pump for Lifting of FOL from barrels standard, Water Pump with Electric Motor 1 HP cap single phase, Cartridge for Kyocera Taskalfa 2201 printer, Hydraulic Jack 100 Ton Cap, Geru ( Lal Mitti ) best quality, PVC Copper wire 6 Sqmm 2 core of 90 Mtr roll , PVC Copper wire 8 Sqmm 4 core of 90 Mtr roll , MCB 10 Amp 4 Pole, Change Over Switch 300 Amp 4 pole, Kerosene oil fired bukhari (Heat King) complete with exhaust pipes , Fevicol Merine, Fevicol SH, Tape for carpenter, Nails Size 3, 4 and 6 inch , Screw Size 1, 1.5, 2 and 3 inch , Harpic , Phenyl, Colin Spray 500 Ml bottles, Naphthalene Balls, UPVC pipe 20 feet long 0.5 inch dia, UPVC Tee 0.5 inch dia, UPVC Socket 0.5 inch dia, UPVC Elbow 0.5 inch dia, Coupler for water storage Tank, UPVC Valve 0.5 inch dia, CP Bib Cock 1 inch dia, CP Angle Cock 1 inch dia, CP Nipple 0.5 inch, UPVC Tank Nipple 1 inch, Reducer Socket 1 inch x 0.5 inch, Teflon tape, Solvent, Connecting Pipe, UPVC Brass Socket 0.5 inch, UPVC Brass Elbow 0.5 inch, PVC Elbow 4 inch, PVC Tee 4 inch, Wash basin complete set size 22 inch x 18 inch, Waste Pipe, Urinal Pot, Jet Spray for toilet, Exhaust fan 12 inch, Die For plumbing Works, Pipe Wrench 18 inch, Hacksaw Frame , Hacksaw Blade, Insulation / Plastic tape, PVC solution, Steel cutting blade 14 inch dia, Pliers, Nose Pliers, Concealed Wall Mixer, Electric Heat Pillar Room Heater 1500 W, Tee 1 inch for Casing Caping, Elbow 1 inch for Casing Caping, Casing Capping wall pin, Screw Size 1 inch , Screw Size 1.5 inch , Screw Size 2 inch , Screw Size 2.5 inch , Black Star Screw Size 1 inch , Change Over Switch 16 Amp 4 pole, Insulation Tape, LED Bulb 15W, LED Tube 4 feet long 20 / 40 W, Ceiling Rose, PVC Electric Board 4 inch x 6 inch, PVC Electric Board 6 inch x 8 inch, Electric Switch 16 Amp, Electric Socket 16 Amp, PVC Copper Wire 1.5 Sqmm single core 90 Mtr Roll, PVC Copper Wire 2.5 Sqmm single core 90 Mtr Roll, PVC Copper Wire 1.5 Sqmm double core 90 Mtr Roll, PVC Copper Wire 2.5 Sqmm double core 90 Mtr Roll, Electric wire wall pin for setting, Fuse Box 16 Amp, Fuse Box 32 Amp, MCB 06 Amp, PVC Board Cutter, Electronic weighing machine 100 Kgs cap platform type, Steel Jerricane 20 Ltrs cap, Steel Measuring cane 05 Ltrs cap, Grease gun 10 Kgs cap bucket type, Garden Umbrella, Flower Pot Plastic Hanging Type, Flower Pot Plastic Normal Type, 40W Acquarium Pump, Focus Light, Artificial Grass, Xerox Machine Multifunction printer all in one Model M438nda

Bureau Of Fisheries And Aquatic Resources Region Viii Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Philippines
Closing Date13 Jan 2025
Tender AmountPHP 141.3 K (USD 2.4 K)
Details: Description Please Quote Your Lowest Price Inclusive Of Vat On The Following Item/s Or Lot/s Listed Below, Subject To The Terms And Conditions Of This Rfq, And Submit Your Quotation Duly Signed By Your Representative Not Later Than January 13, 2025, At Bids And Awards Committee Of Bfar 8, 3rd Floor Mrgp Commercial Bldg, Marasbaras, Tacloban City. For More Information, Please Call The Bac Secretariat At Telephone Nos.: 888-0381 (local 1003) Or Browse The Philgeps Website. Item/ Job Description: Lot 1 1 1000 1ph Watts Water Heater Rod 4 Unit 19,200.00 2 Portable Water Analyzer ( Temperature, Salinity, Ph)battery Type 1 Unit 49,000.00 Lot 2 1 Electric Stand Fan; 16 Inches Plastic Blade; 220 Volts; Heavy Duty And Branded 3 Unit 5,985.00 Lot 3 1 24 Inches Ips Hd Monitor 1 Unit 7,000.00 2 4mp Wifi Ip Ptz Outdoor Camera With 64gb Sdcard 4 Unit 40,000.00 3 650va Ups 3 Unit 15,000.00 4 6u Data Cabinet With Glass Front Door, Brushless Motor Fan 1 Unit 5,198.00 Terms And Conditions: 1. Quality And Quantity Of Goods: The Winning Supplier Is Required To Provide The Goods/materials As Specified In The "purchase Order," Ensuring That They Meet The Required Quality, Condition, And Exact Quantity. 2. Delivery Schedule: The Winning Supplier Must Deliver The Specified Items Within 25 Days Of Receiving And Accepting The Purchase Order, To Bfar-gsu. 3. Return Of Items: The End User Reserves The Right To Return The Items If The Winning Supplier Fails To Meet The Specifications Outlined In The Contract. 4. Payment Terms: Payment Will Be Made Upon Completion Of Delivery/ies, Following Inspection And Acceptance By The Authorized Bfar Representative Or Personnel, And Upon Submission Of All Required Supporting Documents. All Necessary Documents Must Be Processed Before Payment Is Issued. 5. Payment Method: Payments Will Be Processed Through The Land Bank Of The Philippines’ Lddap (land Bank Disbursement Account Payment), An Electronic Payment System For The Government Bidders Must Submit The Following Documents: 1.) Philgeps Registration Number 2.) Mayor's Permit 3.) Request For Quotation (rfq) 4.) Omnibus Sworn Statement (oss)* *for Single Proprietorship – Special Power Of Attorney, In Case The Person Signing This Request For Quotation Is Not The Business Owner, In Its Original And Duly Notarized Form. *for Corporation – Board Resolution/secretary’s Certificate, In Its Original And Duly Notarized Form. *for One Person Corporation (opc) – President’s Certificate/secretary’s Certificate, In Its Original And Duly Notarized Form.

Offizielle Bezeichnung Tender

Others
Germany
Closing Date8 Jan 2025
Tender AmountRefer Documents 
Description: Contract notice - general guideline, standard regulation, open procedure (construction work) Air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small ... Multi-room air conditioning systems DIN 18379 Air conditioning systems (DIN 18 379); Air conditioning systems DIN 18379 Installation of the ventilation technology in the building for toilets and adjoining rooms, lecture halls and small laboratory areas. The listed building is being completely renovated and an extension is being added. The dismantling and pollutant remediation of the existing building has already taken place. Execution of ventilation installation consisting of air conditioning systems in the basement and on the roof including duct network, fire dampers and air outlets. The ventilation of the interior ancillary rooms and toilet areas is carried out by two air conditioning systems with heat recovery and heaters, each with approx. 1,000 m³/h, and smaller individual fans. The ventilation of the lecture hall is carried out by an air conditioning system with heat recovery and heating and cooling functions with approx. 4,000 m³/h. The laboratory areas are mechanically ventilated by two air conditioning systems with heat recovery and heating and cooling functions with approx. 5,500 m³/h and 6,80 m³/h. In addition, two special exhaust fans with approx. 1,000 m³/h and 1,500 m³/h with the associated plastic duct network are planned.

DEPARTMENT OF LABOR AND EMPLOYMENT REGION I Tender

Others
Philippines
Closing Date14 Jan 2025
Tender AmountPHP 340.2 K (USD 5.8 K)
Details: Description Wpfo-2025-01-88; Supply And Delivery Of Bakery Equipment, Supplies, And Ingredients For The Implementation Of Dilp Project Re: "community-based Bakery & Coffee Vending Store "tinapayan At Kapehan Sa Babuyan" Projects - Infanta (ro1-dilp-wpfo-2024-0052) Items: "gas Oven 6 Trays, Black Iron And Stainless With Fiber Glass Insulators: 57”l X 28”w X 30”h, Stand: 22”h" "filled Gas Tank W/ Complete Accessories 11 Kg Gas Tank With Hose And Regulator" "dough Roller Machine Metal 4x16 1.5 Hp" "pan Slicer 13x18, 30 Blades" "coffee Vending Machine 3 Flavor Coffee Vending Machine, Coin Operated, 305 X 550 X 700 Mm, 25 Kg, 800 Watts, 1.6 L Heater, 65 Cups, 3 Kls Powdered Coffee Flavor, 300 Pcs, 6.5 Paper Cups And Led Signage" "mixer (masahan) Stainless, Bangka Style 2x4 Ft" "table (stainless, 3x6 Ft)" "tray Rack 24 Baking Pans Capacity, Stainless" "measuring Cups & Measuring Spoons 10 Pcs, Measuring Cooking Tools For Baking And Cooking" "measuring Cup 500 Ml, 16 Oz, Stainless" "mixing Bowl 22 Cm Stainless Steel" "rolling Pin Wood" "cutter Stainless" "pastry Spatula Silicone, Small" "food Scraper Wooden Handle Stainless Steel" "baking Pan Size Tray 13 X 18, Steel" "plastic Tray Large" "tasty Pan Tray Size 11, Steel" "mamon Tray Medium, Steel" "bread Display Cabinet Aluminum With Glass, L4.5 Ft, W 2ft, H 2 Ft, 3 Layers" "display Rack Pure Metal, Powder Coated 5-layer, 142 Cm X 64 Cm X 33 Cm" "cling Wrap Plastic, 12 X 300 / 15 X 500 M" "plastic Sando Bag 50 Pcs/pack (micro)" "plastic Sando Bag 50 Psc/pack(mini)" "plastic Sando Bag 50 Pcs/pack (medium)" "plastic Sando Bag 50 Pcs/pack (large)" "kraft Paper Roll 30m X 18 M" "multi-purpose Packing Hd Roll Plastic Bag 8x11 (1000 Pcs)" "multi-purpose Packing Hd Roll Plastic Bag 10x114 (1000 Pcs)" Bread Flour (25 Kg Per Sack) All Purpose Flour (25 Kg Per Sack) Fresh Milk (1 L/pc) White Sugar (50 Kg Per Sack) Yeast (1kg/pack) Eggs (30 Pcs Per Tray, Size: Large) Margarine (11 Kg/pail) Vegetable Shortening (lard(6.5kg/pail)) Vanilla Extract Condensed Milk (360m/can) Salt (25kg/sack) Cheese (430 G) Vegetable Oil (1.5 Liters) Food Coloring (red)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Electrical Generators And Transformers...+1Electrical and Electronics
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents 
Details: This Sources Sought/market Survey Notice Is Being Conducted By Aleda E. Lutz Va Medical Center, 1500 Weiss Street, Saginaw Mi, 48602 To Identify All Sources That Are Capable Of Providing Maintenance Service For Emergency Generator For The Period Of April 5, 2025 April 4, 2026 At The Discretion Of The Government In Strict Accordance With All Schedules, Specifications, Terms, Conditions And Provisions Of This Contract. general Information visit #1 Furnish All Tools, Labor, Materials, Parts, And Laboratory Services To Perform The Following Specified Maintenance On The Five Generators Listed At The End Of This Document: all Maintenance, Service, Operational Checks, And Parts Shall Be Performed And Supplied Per The Manufacturer S Recommendations By Manufacturer Certified Technicians. contractor Shall Provide All Fluid Analysis Reports And Within 7 10 Days After Completion Of Maintenance. contractor Performance Shall Be Monitored Through Service Reports That Shall Be Submitted After Each Repair Has Been Conducted.â  Field Service Reports Must Be Submitted Within 7-10 Days And Will Be Reviewed For Accuracy And Timely Submission. contractor Shall Perform Services Within 60 Days Of Award. maintenance Checks: radiator Core For Air Flow antifreeze Protection coolant Level coolant Inhibitor Strength (add Conditioner If Required To Update Strength) radiator Cap And Seal coolant Leaks lube Oil Level fan Belt Tension condition Of All Hoses hose Clamps condition Of Flex Fuel Lines day Tank Float Controls, Solenoid, And Main Fuel Pump Operation fuel System For Leaks cranking Voltage Drop battery Electrolyte Level battery Voltage battery Charger Rate battery Cables And Connections flex Exhaust Couplings Rain Flashing turbo Wheel For Bearing Wear terminal Strip Connections loose Relays In Control Panel jacket Water Heater Operation governor Oil Level governor Linkage remote Governor Control Operation air Gap On Generator collector Rings And Brushes oil And Dirt Buildup In Generator system For Loose Bolts, Etc. crank Termination Time engine Instruments abnormal Noise Or Vibration exhaust Characteristics Louver Operation crankcase Blow By voltage And Frequency all Switches In Correct Position drain Water And Sediment From Day Tank lubricate Generator Bearing clean Engine Crankcase Breather lubricate Fan Pulley clean Primary Filter drain Exhaust Moisture Traps inspect The Turbocharger For End Play And Leaks maintenance Services: note: All Filters Shall Be Oem change Air Cleaner Elements, Check Seals, Air Cleaner Indicators And Air Induction System take Oil Sample And Perform Infrared Analysis (performed By A Fluid Analysis Lab) take Fuel And Coolant Samples And Perform Analysis (performed By A Fluid Analysis Lab) change Lube Oil And Filters, Lube Oil Is To Be Replaced With Fully-synthetic Oil In Accordance With Manufacturers Recommendations change Fuel Filters oil, Fuel, And Coolant Samples Taken Will Be Delivered To The Testing Laboratory In A Reasonable Time As To Not Compromise The Samples. Care Will Be Taken As To Storing The Samples As Recommended By The Testing Laboratory Until They Are Delivered. operational Checks: recheck Oil Level While Running recheck All Fluid Systems For Leaks used Oil Transportation And Recycling: transportation And Recycling Of Used Oil Shall Be Performed In Accordance With Federal, State And Local Regulations Including: michigan Natural Resources And Environmental Protection Act 451, Of 1994 As Amended, Part 121 Liquid Industrial By-product. prior To Transporting Used Oil From The Property, The Transporter Must Provide A Shipping Document Describing The Materials In Accordance With Above Regulation For Certification By The Detroit Vamc Gems Program Manager Or Designee. The Contractor Shall Arrange For The Designated Recycling Facility To Notify The Cor, In Writing, That The Shipment(s) Arrived At Its Destination Within 7 Days Of The Date The Shipment Left The Facility. michigan Hazardous Material Transportation Act 138. prior To Transporting Used Oil From The Property, The Contractor Shall Provide A Copy Of The Act 138 Transporter S Permit And Registration To The Cor For The Approval Of The Gems Program Manager. During Transport, The Transporter Must Also Be Able To Produce A Copy Of The Act 138 Permit And Registration, Either Via Electronic Record Or Hard Copy, To Deq Staff Or A Peace Officer When Requested. generator #1 cummins/onan Model: Dfeb-4955010 Sn: B010204440 kw: 400 Pf: .8 Volt: 120/208 Amp: 1387 generator #2 mtu Onsite Energy Model: 400pxc6dt3 Sn: 331914-1-1-0411 kw: 400 Pf: .8 Volt: 120/208 Amp: 1387 generator #3 cummins/onan Model: 350 Dfcc Sn: G920477586 kw: 350 Pf: .8 Volt: 277/480 Amp: 526 generator #6 mtu Onsite Energy Mod: 750rxc6dt2(g05) Sn: Wa-572596-0410 kw: 750 Pf: .8 Volt: 277/480 Amp: 1127 generator #7 mtu Onsite Energy Mod: Ds00500d6srah1583 Sn: 331787-1-1-0411 kw: 500 Pf: .8 Volt: 277/480 Amp: 751 If This Is A Service Your Business Can Provide, Respond To This Sources Sought By Friday, January 3, 2025; 3:00 P.m. Eastern Time. Responses Should Include: (1) Business Name And Address (2) Point Of Contact Name, Phone Number, And E-mail Address (3) Sam Uei And Naics Code (4) Business Size Small Or Large (5) Type Of Business Service Disabled Veteran Owned, Veteran Owned, 8a, Hubzone, Women-owned Etc. (6) Applicable Gsa/fss Contract Number (if Applies). All Businesses Eligible To Provide This Service Are Encouraged To Reply As This Information May Be Used To Determine Potential Set-asides For The Above Noted Service. E-mail Responses To: Ariel Bautista-lagares, At Ariel.bautista-lagares@va.gov (note: This Is Not A Request For Quote Or An Announcement Of A Solicitation.)

Correctional Service Canada Tender

Electrical Generators And Transformers...+1Electrical and Electronics
Canada
Closing Date7 Jan 2025
Tender AmountRefer Documents 
Details: Generator Radiator Replacement This Requirement Is For: The Correctional Service Of Canada, Ontario Region, Bath Institution. Trade Agreement: Canadian Free Trade Agreement (cfta). Tendering Procedures: All Interested Suppliers May Submit A Bid. Competitive Procurement Strategy: Lowest Priced Compliant Bid. Set-aside Under The Procurement Strategy For Indigenous Business: This Procurement Is Not Subject To Any Set-asides For Indigenous Suppliers. Comprehensive Land Claim Agreement: This Procurement Is Not Subject To A Comprehensive Land Claims Agreement. Security Requirements: This Contract Does Not Include Security Requirements. Nature Of Requirements: The Following Is A Summary Of The Statement Of Work For This Requirement. The Correctional Service Of Canada Requires The Services Of A Qualified Contractor To Supply And Install Two (2) New Radiators For A Cummins Qsk60-g6 Generator. Objectives: To Replace Two (2) Leaking Radiators With Two (2) New Compatible Cummins Radiators. Deliverables: The Contractor Must: • Drain The Engine Coolant From The Current Radiator Assemblies And Dispose Of It As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Remove Front End Enclosure Housing Panels To Permit Radiator Removal. • Remove The Two Leaking Radiators, Disposing Of Them Offsite As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Supply And Install Two (2) New Cummins Radiators, With Full Length Header Plates. • Replace All Gaskets (fibre) And Sealant. • Replace All Thermostats. • Replace All Radiator Hoses. • Supply And Fill Radiators With New Engine Coolant As Per All Federal And Provincial Environmental Safety Codes And Regulations. • Install Two (2) Radiator Heaters With Integral Pumps (to Reduce Thermal Expansion Shock). • Re-assemble Entire Enclosure Housing. • Supply, Connect And Fuel A Temporary, Two-point-two (2.2) Gigawatt Generator For The Entire Period That The Bath Generator Will Be Offline. • Ensure The Temporary Generator Automatically Starts And Provides Power To Both Bath And Millhaven Institutions Within Ten (10) Seconds In The Event Of Power Loss From The Distribution Grid. • Disconnect And Remove The Temporary Generator From The Site Once Replacement Of The New Radiators Is Complete. • Ensure The Cummins Qsk60-g6 Generator Is Reconnected And Functioning As Required. Any Conditions For Participation Of Suppliers Not Specified In Solicitation Documentation: None. Estimated Quantity Of Commodity: See Solicitation Document Statement Of Work And Basis Of Payment. Duration Of Contract And Time Frame For Delivery: Construction Time: The Contractor Must Perform And Complete The Work On Or Before March 31st, 2025. File Number: 21421-25-4942653 This Bid Solicitation Cancels And Supersedes Previous Bid Solicitation Numbers: 21423-23-4357694 Dated 2023/04/21 That Closed On 2023/05/25 At 10:00est And 21421-25-4883316 Dated 2024-10-29 That Closed On 2024-12-03 At 10:00est. Csc Will Provide A Debriefing Or Feedback Session Upon Request To Bidders Who Bid On The Previous Solicitations. Contracting Authority: Robin Riha Telephone Number: 613-328-9727 E-mail: Robin.riha@csc-scc.gc.ca Note To Bidders: Bidders Can Obtain The Complete Statement Of Work And Evaluation Criteria By Downloading The Solicitation Document And Associated Documents From The Canada Buys / Tender Opportunities Website. The Crown Reserves The Right To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada (english Or French). After Contract Award, Bidders May Request A Debriefing On The Results Of The Bid Solicitation Process. Bidders Should Make The Request To The Contracting Authority Within Fifteen (15) Working Days Of Receipt Of The Results Of The Bid Solicitation Process. The Debriefing May Be In Writing, By Telephone Or In Person. Procurement Assistance Canada (pac) Offers Seminars To Businesses Interested In Learning How To Sell Goods And Services To The Government Of Canada. The Seminars Are Free. Topics Include: ? Understand The Federal Procurement Process; ? Learn About Searching For Opportunities; ? Find Out How To Bid On Opportunities; ? Discover How To Prepare To Sell To The Government. The Full Schedule Of Seminars Can Be Found On The Procurement Assistance Canada Website, Under Find An Event (procurement Assistance Canada: Find An Event - Canada.ca).

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date14 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n743.40|wvl|717-605-1842|desiree.d.meyers.civ@us.navy.mil| item Unique Identification And Valuation (mar 2016)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|inspection: D Acceptance: D| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x|||x||||| variation In Quantity (apr 1984)|3|+10%|-10%|| time Of Delivery (june 1997)|20|50 Lbs|||||||||||||||||||| general Information-fob-destination|1|a| wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|n39040 Certification; S4306a Material|n50286 Portsmouth|tbd|133.2||n/a|certification N39040|||ss Dd1423 Or Specified By Block 14a|| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year From Date Of Delivery|365 Days After Acceptance Of Material||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (sep 2021)|13|333992|1,250|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| evaluation Criteria And Basis For Award-|1|| 1. The Offer Due Date Is Updated To 14 January 2025. \ 1. The Offer Due Date Is Updated To 2 December 2024. \ 1. The Offer Due Date Is Updated To 14 November 2024. \ 1. The Offer Due Date Is Updated To 21 October 2024. 2. The Poc Is Updated To Amanda Bailey Amanda.l.bailey50.civ@us.navy.mil. 3. The Small Business Set-aside Is Hereby Dissolved. 4. The Quantity Is Updated To 500. 5. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities. \ this Amendment Is Issued To Extend Closing To 28jul23. this Amendment Is Issued To Extend Closing Date To 05may23. \ this Amendment Is To Extend The Closing Date To 16dec22. \ this Amendment Is Issued To Extend The Closing Date To 09 Sep 2022. \ the Purpose Of This Amendment Is To Extend The Closing Date To 10aug22. \ amendment Issued To Extend Closing Date To 17jun22. this Amendment Is Issued To Extend The Closing Date To 13 May 22. \ this Amendment Is Issued To Extend The Closing Date To 15 Apr 22. this Amendment Is To Extend The Closing Date To 15 Mar 2022. this Amendment Is To Extend The Closing Date To 14 Feb 2022. poc Changed To Benjamin.t.spangler.civ@us.navy.mil all Prior Offers Shall Be Resubmitted To Above Poc Or Neco. \ 1. Dd1423 Data Item Aoo1 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286. 3.all Contractual Documents (i.e. Contracts,purchase Orders,task Order,delivery Order,& Modifications) Related To The Instant Procurement Considered To Be "issues" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 4. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offfers. See Clause 252.213-7000. 5. The Following Proposes Delivery Schedule Applies: submission Odf All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Workig Days After Receipt. 180 Actual Days To Manufacture Part final Delivery Of Material 365 Days delivery Days And Past Performance Will Be Evaluation Factors In Determining Awardee. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. document Ref Data=aws A5.01 | | | |930101|a| | | document Ref Data=aws A5.28 | | | |200630|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Aws-a5.28, Except As Amplified Or Modified Herein. Aws-a5.28 Ordering Data Information Is Provided Below: a. American Welding Society Specification Aws-a5.28; Low Alloy Steel Filler Metals For Gas Shielded Arc Welding. aws Classification - ;er70s-b2l; size, Diameter - ;1/16 Inch; spool Size, Weight - ;n/a; cut Length - ;36 Inches; b. American Welding Society Specification Aws-a5.01; Filler Metal Procurement Guidelines. lot Classification - Class S2 intensity Of Testing - Schedule J 3.2 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below. test - ;quality Conformance/compliance Inspection (includes Chemicals And Mechanicals); item - ;rod, Welding; performance - ;aws A5.01 And Aws A5.28; acceptance - ;aws A5.01 And Aws A5.28; 3.3 Container Size - Welding Electrodes Must Be Supplied In ;10; Pound Containers. 3.4 Welding Electrode Strip Heaters - Electrical Resistance Rod-type Or Pad-type Heaters (i.e. Strip Heaters) That Are Controlled Automatically By Thermocouples Or Manually By An On-off Switch Must Be Used To Maintain Preheat/interpass Temperatures Within The required Range Before And During Welding Of The Usability (i.e. Soundness) Test Plate And The Mechanical Property (when Required) Test Plate. The Test Plate Must Be Insulated Or Separated From The Work Bench. Oxy-fuel Heating Of Any Test Plate Is Not permitted. 3.5 Radiography - Radiography Is Required For Test Weldments And Must Be Performed In Accordance With T9074-as-gib-010/271 As Modified By Aws-a5.28. Acceptance Criteria Must Be Aws-a5.28. 3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The information Listed Below. a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product. d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/ 3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. b. A Complete Description Of The Change To Be Made And The Need For That Change. c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. d. Proposed Changes To Documents Controlled By The Government. e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. f. Recommendations About The Way A Retrofit Should Be Accomplished. g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct. h. Impacts To The Operational Use Of The Product. i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. j. Milestones Relating To The Processing And Implementation Of The Engineeringchange. 3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements established In The Contract/purchase Order. 3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities available For Audit By The Contracting Officer Or His Authorized Representative. 3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. 3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco. 3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The government. 3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate planning For Government Inspection Can Be Accomplished. 3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.12.2 Inspection For Completeness And Proper Type. 3.12.3 Verification Of Material Quality Received. 3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.12.6 Identification And Protection From Improper Use Or Disposition. 3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.12.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Unit Containers. This Traceability Marking Must Provide direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.14.1 Permanent Markings Are Not Required For Consumable Material (weld Filler Material, Etc.). Traceability Must Be By A Label Attached To Each Unit Container. The Unit Container Identification Label Must Include, In Addition To The Contract Number And The national Stock Number (nsn), All Markings Required For Identity And Traceability. Each Container In The Lot Must Contain Material From The Same Traceability Number Or Heat/lot, As Defined In The Applicable Specification. Identification Marking Must Be The Type designation In Accordance With The Applicable Detail Specification. 3.14.2 For Covered Welding Electrodes, The Type Designation Or Classification Number Must Also Be Applied To The Electrode Covering Within The Space 2 1/2 Inches From The Grip End Of The Electrode. The Marking Must Consist Of At Least One Complete Type designation Or Two Or More Partial Type Designations That Can Be Read Or Positively Interpreted As The Intended Designation. The Two Partial Type Designations Must Consist Of At Least The Top Portion And The Bottom Portion Of The Designation. 3.14.3 Individual Cut Length Bare Welding Rods Must Be Identified In Accordance With The Applicable Commodity Specification. In The Absence Of Specific Specification Marking Requirements, At Least One Legible Type Designation/classification Number Must Be applied To Each Rod, Either By Stamping Or By Tagging (i.e. Flag Tagging). 3.14.4 Spool And Coil Weld Filler Material Must Be Identified In Accordance With The Applicable Commodity Specification. 3.15 Material Certification - In Addition To The Certification Data Requirements Specified In The Detailed Specification Invoked In This Contract, The Following Material Certification Requirements Apply: 3.15.1 See Cdrl Di-misc-81020 (quality Conformance/required Tests) - Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications). 3.15.2 In Addition To Quantitative Chemical And Mechanical Properties, (as Required By The Applicable Specification), The Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type And Finish, As Applicable, Of The Material supplied. 3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.16 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance: 3.16.1 All Welding Electrodes/inserts Must Be Sample Inspected In Accordance With The Applicable Welding Electrode/insert Specification, Except The Unit Containers Must Be 100% Inspected For Traceability Marking And That The Markings Are Legible. 3.16.2 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material/unit Container Marking) And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The certification Test Reports Must Be 100% Inspected For Completeness And Legibility, And That There Is A Test Report For Each Heat Or Lot Of Material Being Shipped. 3.17 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To The Contractor - 4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And contract Number Must Be Submitted To The Pco. 4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied conforms To The Specified Requirements. 6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;10/20/2016 - Updated Ecds Url - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - May 16 2013 - Removed Gsi From This Material. - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq the Following Paragraphs Of Di-misc-81020 Must Be Modified As Shown Below: 10.1.1 - Add: Material Marking For Spooled Wire Must Be As Identified Within The Applicable Commodity Specification. 10.1.2 - Add: For Weld Materials, The Weld Material Manufacturer Is Considered The Original Mill. 10.2 - Replace The Entire Paragraph With: For Weld Materials, Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications) block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
251-260 of 265 archived Tenders