Gujarat Energy Transmission Corporation Limited Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Gujarat Energy Transmission Corporation Limited - GETCO Tender
Works
Energy, Oil and Gas
Opening Date17 Feb 2025
Closing Soon11 Mar 2025
Tender AmountINR 3,15,25,700.96 (USD 3,60,870)
AI Insights
AI Insights
Technical
Financial
Bid Capacity
The bid capacity required in the given tender includes the following:
1. Minimum Average Annual Turnover (MAAT):
Formula: MAAT = (Revenue from operation of best three years) / 3
MAAT ≥ 0.5 * Estimated amount of the tender
2. Last quarter’s Liquid Assets:
Formula: Liquid Assets = Current Assets - Inventories
Liquid Assets ≥ 0.2 * Estimated amount of the tender
3. Bidder’s Net Worth for the last three financial years should be positive:
Formula: Net Worth = Paid-up share capital + Share Application Money pending allotment + Reserves - Accumulated losses - Deferred expenditure
Net Worth > 0
Note: The estimated amount of the tender is required to calculate the values for MAAT and Liquid Assets. However, the actual estimated amount is not provided.
Technical Capacity
The required prior work experience for the bidder is specified, detailing experience for Turnkey contract in the last eight years from the due date of tender. The bidder needs to provide information about the name of the client, order reference number and date, order value, length of line, date of completion, and whether the order was fully executed. However, specific values and percentages of similar works completed are not mentioned. The focus is on the bidder's experience and the details of the works they have carried out. Items or materials proposed to be supplied by the bidder of similar or higher rating shall be in service for a period of minimum 3 years, with supporting documents or certificates from the original customer to be submitted. No specific details on the required amount and percentage of similar works completed are provided.
Costs
EMD
INR 2,50,000 (USD 2,862)
Description
Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
150580Tender No
ACE(P&C)/Contract/FB/132KV/Tender Authority
Gujarat Energy Transmission Corporation Limited ViewPurchaser Address
-Website
http://www.getcogujarat.com/
Unlock the Tender details for free
Documents
26.TS OPGW (24F) specs final-R8-06.06.2023 final 1.pdf
23.TS 400 220 132 kV DB Tandem Isolator R6 June 22.pdf
40.TS -SAS Equipments - R8 Nov 2024.pdf
Public Procurement Circular of GOI.pdf
03.DRW R4 LAYOUT 220KV RUPAKHEDA SS 05.10.24.pdf
49.EP EARTHING NOTES-Model-3.pdf
20.TS 220 132 KV 66kV CB (R5) with FDN plan .pdf
50.EP EARTHING NOTES-Model-4.pdf
01.DRW R1-LAYOUT SECTION OF RUPAKHEDA SS-DT 051024.pdf
21.TS 400 220 132 66 KV BPI R4 June-22.pdf
22.TS 400 220 132 kV LA R6 June 22.pdf
17.TS WEDGE CONNECTORS R1 July-22.pdf
27.TS Static Meter-specification-R3 July 2022.pdf
25.TS 132 KV CVT with HPI- Final R4 Jun 2022.pdf
11.TS LT Control Power Cable.PDF
69.EP TYPICAL EARTHING ARRANGEMENT FOR LM.pdf
60.EP TYPICAL ARRANGE OF EARTH TEST PIT(CHEAK PIT).pdf
28.DRW (AC) POWER CABLE BLOCK DIAGRAM DT. 04.12.24.pdf
29.DRW (DC) POWER CABLE BLOCK DIAGRAM DT. 04.12.24.pdf
68.EP TYPICAL EARTHING ARRANGEMENT FOR ISO.pdf
62.EP Typical Arrangement of Welding Joint(NEW).pdf
71.EP TYPICAL EARTHING ARRANGEMENT FOR TOWER PEAK.pdf
47.EP DETAILS OF EARTHING FOR D.P.STRUCTURE-Model.pdf
36.TS - Bay MK - R2 June 22.pdf
16.TS SS HW 220KV 400KV SS.PDF
14.TS R5-ACSR MOOSE ZEBRA PANTHER DOG.pdf
65.EP Typical Earthing Arrangement for Circuit Breaker.pdf
39.TS -Technical Requirement of YARD KIOSK-R2 June 22.pdf
64.EP TYPICAL EARTHING ARRANGEMENT FOR BPI.pdf
61.EP Typical Arrangement of Riser for Earthing System.pdf
67.EP TYPICAL EARTHING ARRANGEMENT FOR CAP BANK.pdf
31.DRW R0-PSLD OF 220KV RUPAKHEDA SS DT.01.01.2025.pdf
10.TS HW ACCS AL59 CONDUCTOR R2 JULY 2022.pdf
66.EP TYPICAL EARTHING ARRANGEMENT FOR CT.pdf
74.EP TYPICAL EARTHING ARRANGEMENT OF SLIDING GATE.pdf
15.TS R5-Silicon Rubber Insulator.pdf
35.TS - AC System for Kiosk - R1 June 22.pdf
07.TS EARTH WIRE ACCESSORIES 7-3.15.PDF
05.TS AL59 ZEBRA MOOSE GETCO- R3.pdf
08.TS EARTH WIRE ACCESSORIES 7-3.66.PDF
30.DRW Panel Arrangement in Yard Kiosk DT. 04.12.2024.pdf
73.EP TYPICAL EARTHING ARRANGEMENT OF CABLE TRENCH.pdf
37.TS - Cable Sealing System Specification.pdf
32.DRW SCADA FO NETWORK R0 DT. 03.01.2025.pdf
56.EP R1 Earthing Arrangement for Power Tran DT 070916.pdf
72.EP TYPICAL EARTHING ARRANGEMENT FOR TOWER WO PEAK.pdf
09.TS G.I. EARTHING STRIPS.PDF
70.EP Typical Earthing Arrangement for Switch Yard Gate.pdf
33.DRW TYP.CABLE BLOCK DIAGRAM (132 KV )-Model.pdf
63.EP TYPICAL EARTHING ARRANGEMENT FOR BMK.pdf
48.EP DETAILS OF PANEL EARTHING-Model.pdf
04.TS SS STR R11 22.06.2022.pdf
05.ANNEXURE -5 BOQ E-280.pdf
53.EP MEASUREMENT OF EARTH RESISTIVITY-Model.pdf
55.EP R1 EARTHING ARRANGEMENT FOR CVT-PT DT 070916 .pdf
54.EP R1 Lightning Arrestor DT 070916.pdf
38.TS - FOC - R2 June 22.pdf
43.TS General Erection R1.pdf
46.EP Four Electrode Method Of Measuring Soil Resist.pdf
58.EP Guideline for Earthing of EHV SS- GETCO R3 250517.pdf
45.TS-Insulating Mat 270312.pdf
59.EP TS-Maintenance Free Earthpit 040615.pdf
41.TS-Maintenance Free Earthpit 040615.pdf
57.EP Earthing Philosophy of GETCO R1 010708.pdf
Report Missing Document