Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Mar 2025
Closing Date25 Mar 2025
Tender AmountINR 2,73,15,646 (USD 3,12,678)
AI Insights
AI Insights
Technical
Financial
Additional Eligibility
Bid Capacity
The bid capacity required can be calculated using the formula: Assessed Available Bid capacity = (A x N x 2 - B), where A is the maximum value of engineering works, N is the number of years prescribed for completion, and B is the financial liability of the bidder.
To determine the bid capacity, one must consider the financial criteria specified for bidders, including completed works of a similar nature with specific minimum values or completion percentages relative to the estimated amount put to tender.
For the First Call, the bid capacity can be inferred as at least 40% of the estimated amount put to tender, or two works of 30% each, or one work of 80% completion with a value not less than 40% of the estimated amount.
Formulas for calculating bid capacity can be represented as:
1. Single work: 0.4E (40% of the estimated amount)
2. Two works: 2 * 0.3E (2 works, each 30% of the estimated amount)
3. Running work: 0.4E with 80% completion.
For subsequent calls, the requirements adjust, with the Second Call requiring at least 30% for a single work, 25% for each of two works, or one running work with 75% completion and a value of at least 30%. The Third Call requires a single work of at least 20% or a running work with 70% completion and a value of at least 20% of the estimated amount.
Thus, the bid capacity formulas based on the estimated amount put to tender (E) are:
- First Call: 0.4E, 2 * 0.3E, or 0.4E with 80% completion
- Second Call: 0.3E, 2 * 0.25E, or 0.3E with 75% completion
- Third Call: 0.2E, or 0.2E with 70% completion.
Technical Capacity
The required prior work experience for the bidder varies depending on the call of NIT.
For the first call of NIT, the bidder should have:
- Completed work of a similar nature with a minimum value of 40% of the estimated amount put to tender during 5 years prior to the date of issue of the tender notice.
- Completed 2 similar nature works, each with a minimum value of 30% of the estimated amount put to tender during 5 years prior to the date of issue of the tender notice.
- A single running work of similar nature that has been completed to the extent of 80% or more, with a value not less than the desired value at (i) above.
For the 2nd call of NIT, the bidder should have:
- Completed work of a similar nature with a minimum value of 30% of the estimated amount put to tender during 5 years prior to the date of issue of the tender notice.
- Completed 2 similar nature works, each with a minimum value of 25% of the estimated amount put to tender during 5 years prior to the date of issue of the tender notice.
- A single running work of similar nature that has been completed to the extent of 75% or more, with a value not less than the desired value at (i) above.
For the 3rd call of NIT, the bidder should have:
- Completed work of a similar nature with a minimum value of 20% of the estimated amount put to tender during 5 years prior to the date of issue of the tender notice.
- A single running work of similar nature that has been completed to the extent of 70% or more, with a value not less than the desired value at (i) above.
The bidder should also have prior work experience with the prospective bidders having in their full-time engagement experienced technical personnel, the minimum being one Civil Engineering Degree holder and one Civil Engineering Diploma holder.
Credential certificate issued by the Executive Engineer or equivalent or competent authority will be taken as credential, indicating the value of the work (equal to booked expenditure).
No specific percentage of similar works completed is mentioned for some cases, but the bidder's available Bid Capacity should be more than the Estimated amount put to tender.
Costs
EMD
INR 5,46,313 (USD 6,254)
Summary
58/ee/aed/kpg/gta/2020-21 (2nd Call)
Description
Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GTA_822128_1Tender No
58/EE/AED/KPG/GTA/2020-21 (2nd Call)Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
wbtenders.gov.in
Unlock the Tender details for free
Documents
Construction including widening of road from Bhangey Fatak to Marching Jhora under 39th Constituency Rampoo-Munsong.
Report Missing Document