Fiber Tenders

Fiber Tenders

after Tender

Others
France
Details: The Works Include, For Information Only: 1-purges Of Sensitive Parts In Rockfill, 2-preliminary Purges Before Reinforcement By Sprayed Concrete, 3-support By Sprayed Concrete, Fiber Or Not. Installation Of Additional Ventilation For The Works..
Closing Date26 Jan 2025
Tender AmountRefer Documents 

Philippine National Oil Company - PNOC Tender

Environmental Service
Philippines
Details: Description Ii. Scope Of Works A. Quarterly Air Quality And Noise Level Monitoring 1. On-site Sampling And Laboratory Analysis Of The Following: Parameter No. Of Samples Per Quarter 1. Sulfur Dioxide (so2) 4 2. Nitrogen Dioxide (no2) 4 3. Particulate Matter 10 Microns (pm10) 4 4. Total Suspended Particulate (tsp) 4 5. Pb 4 2. Laboratory Technical Personnel Shall Conduct The Air Sampling Activity And The Collection Of Air Samples At Designated And/or Identified Sampling Stations. Sampling Points And Regulated Parameters May Vary When The Park Has New Locators And/or As Assessed And Approved By The Denr. 3. The Laboratory Shall Provide The Absorbing Solutions, 10 Ml Per Sample Before The Scheduled Sampling. The 10-ml Absorbing Solutions Shall Be Placed In Individual Clean And Closed Vials. Thus, The Laboratory Shall Prepare A Total Number Of 10 Vials (4x10ml Solutions For No2 And 4x10ml Solutions For So2). Note: Additional Vials Will Be For Blank Samples. 4. The Laboratory Shall Provide And Prepare The 8” X 10” Glass Fiber Filter Papers For The Tsp, Pb And Pm10 Parameters. The Preparation Includes Oven Drying, Desiccating For 24 Hours And Taking The Initial Weights Of Each Filter Papers. 5. The Laboratory Shall Reflect In Laboratory Results/report The Allowable Limit (denr Air Quality Standards For Tsp, Pm10, So2, Pb And No2) I.e. Results Vs. Denr Standards. Sampling Activity Must Be Photo Documented And Must Be Included In The Report. 6. Include In The Ambient Air Sampling Conduct Of Sound Level Monitoring (noise Level Monitoring) At The Designated Sampling Stations. 7. Laboratory Shall Cover All Associated Cost In The Conduct Of The Activity. 8. In Case Of Complaints On The Contractors’ Performance And Sampling Result, The Contractor Must Be Willing To Conduct Verification/confirmatory Test For The Parameters/sampling Procedures Being Questioned With No Additional Or Extra Charge. 9. Duly Signed Laboratory Results (including Photo Documentation And Copy Of Calibration Certificated Of Instruments Used) Must Be Strictly Provided To Pnoc 7-15 Calendar Days After The Sampling Activity. A Penalty Will Be Charged To The Contractor In An Amount Equal To One-tenth (1/10) Of One Percent (1%) Of The Cost Of Delayed Report Scheduled For Delivery For Everyday Of Delay Until Such Report Are Finally Delivered And Accepted By The Proponent. B. Quarterly Raw Water Quality Monitoring 1. Laboratory Analysis Of Five (5) Raw Water Deep Wells With The Following Parameters: A. Chloride B. Iron C. Bicarbonate As Caco3 D. Color E. Manganese F. Calcium G. Fecal Coliform H. Potassium I. Magnesium J. Nitrate As No3-n K. Sodium L. Sulfate M. Ph (range) N. Turbidity O. Silica P. Phosphate Q. Specific Conductivity R. Total Hardness S. Tss T. Tds U. Oil And Grease (2nd And 4th Quarter Only) 2. Laboratory Shall Provide Sampling Bottles And Take Samples Within Pnoc Industrial Park (with Pnoc Personnel Assistance); 3. Test Results Must Be Reported Versus The Allowable Limit Of The Denr For Raw Water And Philippine National Standards For Drinking Water And Must Be Duly Signed By Authorized Personnel. Sampling Activity Must Be Photo Documented And Must Be Included In The Report; 4. Laboratory Shall Cover All Associated Cost In The Conduct Of Sampling; 5. In Case Of Complaints On The Contractors’ Performance And Sampling Result, The Contractor Must Be Willing To Conduct Verification/confirmatory Test For The Parameters/sampling Procedures Being Questioned With No Additional Or Extra Charge; 6. Duly Signed Laboratory Results (including Photo Documentation And Copy Of Calibration Certificated Of Instruments Used) Must Be Strictly Provided To Pnoc 7-15 Working After The Sampling Activity. A Penalty Will Be Charged To The Contractor In An Amount Equal To One-tenth (1/10) Of One Percent (1%) Of The Cost Of Delayed Report Scheduled For Delivery For Everyday Of Delay Until Such Report Are Finally Delivered And Accepted By The Proponent. C. Quarterly Effluent And Marine Water Monitoring 1. Laboratory Analysis For The Following Shall Be Conducted: Effluent Marine E1 Pp Outfall E2 Prii (pvc) Outfall E3 Npca (pe) Outfall E5 Orica (explosives) Outfall Marine Water (sb) - 6 Stations Ammonia (nh3) Ammonia (nh3) Ammonia (nh3) Arsenic (as) Bod Arsenic (as) Arsenic (as) Arsenic (as) Bod Arsenic Benzene (c6h6) Benzene (c6h6) Benzene (c6h6) Cadmium (cd) Cadmium Benzo(a)pyrene (c20h12) Benzo(a)pyrene (c20h12) Benzo(a)pyrene (c20h12) Cod Chloride Bod Bod Bod Color Color Cadmium (cd) Cadmium (cd) Cadmium (cd) Dissolved Oxygen Dissolved Oxygen Chromium (cr+6) Chromium (cr+6) Chromium (cr+6) Hexavalent Chromium (cr +6) Fecal Coliform Cod Cod Cod Lead (pb) Hexavalent Chromium Color Color Color Mercury (hg) Lead Cyanide (cn-) Cyanide (cn-) Cyanide (cn-) Nitrate Mercury Dissolved Oxygen Dissolved Oxygen Dissolved Oxygen Oil And Grease Nitrate As No3-n Ethylbenzene (c8h10) Ethylbenzene (c8h10) Ethylbenzene (c8h10) Ph Oil And Grease Lead (pb) Lead (pb) Lead (pb) Phosphate Ph Mercury (hg) Mercury (hg) Mercury (hg) Sulfate Phenol & Phenol Substances Nitrate As No3-n Nitrate As No3-n Nitrate As No3-n Surfactants (mbas) Phosphate Oil And Grease Oil And Grease Oil And Grease Temperature Temperature Ph Ph Ph Tss Tss Phenol & Phenol Substances Phenol & Phenol Substances Phenol & Phenol Substances Phenol & Phenol Substances Cod Phosphate Phosphate Phosphate Fecal Coliform Sulfate Sulfate Sulfate Temperature Temperature Temperature Toluene (c7h8) Toluene (c7h8) Toluene (c7h8) Tss Tss Tss Xylene (c8h10) Xylene (c8h10) Xylene (c8h10) Zinc (zn) Zinc (zn) Zinc (zn) Fecal Coliform Fecal Coliform Fecal Coliform Surfactants (mbas) Surfactant (mbas) 2. Samples Will Be Taken From Ten (10) Sampling Stations: Four (4) Of Which Are Effluent Outfalls And Six (6) Marine Sampling Points Monitored Quarterly. Sampling Points And Regulated Parameters May Vary When The Park Has New Locators And/or As Assessed And Approved By The Denr. 3. The Laboratory Shall Provide The Sterilized Bottles For Bod5 And Wide-mouth Glass Bottles With Foil As Top Cover For Oil And Grease On The Scheduled Day Of The Sampling; 4. Laboratory Shall Reflect In The Tabulated Results Of Laboratory Analysis The Dao 34 & 35 Water Quality Standard And Dao 2016-08 Water Quality Guidelines And General Effluent Standards Of 2016 For Class Sb (i.e. Results And Test Methods). Sampling Activity Must Be Photo Documented And Must Be Included In The Report; 5. Rental Of Motorized Banca During Marine Sampling Will Be Charged To The Contractor; 6. Laboratory Shall Cover All Associated Cost In The Conduct Of Sampling; 7. In Case Of Complaints On The Contractors’ Performance And Sampling Result, The Contractor Must Be Willing To Conduct Verification/confirmatory Test For The Parameters/sampling Procedures Being Questioned With No Additional Or Extra Charge; 7. Duly Signed Laboratory Results (including Photo Documentation And Copy Of Calibration Certificated Of Instruments Used) Must Be Strictly Provided To Pnoc 7-15 Working Days After The Sampling Activity. A Penalty Will Be Charged To The Contractor In An Amount Equal To One-tenth (1/10) Of One Percent (1%) Of The Cost Of Delayed Report Scheduled For Delivery For Everyday Of Delay Until Such Report Are Finally Delivered And Accepted By The Proponent. Note: • New Contractors/bidders Are Required To Conduct Site Inspection In Pnoc Industrial Park Including All Sampling Points For Air And Water Quality Monitoring Prior To The Submission Of Final Quotation. • For Winning Bidders (new), A Process/methods Presentation (including Sampling Analysis And Calculations) Or A Scheduled Laboratory Visit Of Pnoc Personnel Must Be Conducted Prior To The Execution Of The Project. • Winning Bidders Are Required To Accomplish Pnoc Industrial Park’s Main Permit To Work And Raw Data Forms Prior To And On The Day Of Sampling Respectively. • Winning Bidder Will Undergo Pnoc Ims- Safety Orientation And Must Abide With The Policies Of The Industrial Park Including But Not Limited To The Compliance To Permitting Requirements. They Shall Provide Their Employees With Complete Personal Protective Equipment (ppe) • Only Actual Number Of Samples Collected And Analyzed Will Be Charged To Pnoc.
Closing Date30 Jan 2025
Tender AmountPHP 1 Million (USD 17.1 K)

ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY LEON CAMPUS Tender

Laboratory Equipment and Services
Corrigendum : Closing Date Modified
Philippines
Details: Description Lot 1: Agricultural Equipments - Php 350,850.00 (abc) 1 Digital Water Quality Tester "5 In 1 Water Quality Tester Includes: Ph, Ec, Tds, Salinity, And Thermometer; Battery Powered; Waterproof Rating: Ip67 Display Size: 33*24mm Item Size: 180 * 37mm / 7.1 * 1.5in Item Weight: 86g / 3.0ounce" 5 Set 2 Digital Refractometer 0-93% Digital Brix Refractometer Sugar Content Measuring 1 Set 3 Refractometer Handheld Refractometer (brix Refractometer); Inlusions Are Transport Case, Pipette, Calibration Screwer And Guide 3 Set 4 Current Meter River Current Water Velocity Portable Flow Meter For Open Channel; Measure Velociy, Flow Rate And Depth 1 Set 5 Turbidimeter Portable Turbidimeter Microcomputer Accuracy Testing With Range From 0-200 Ntu; Size:210*75*70mm/8.3*3.0*2.8in; Product Inclusions: Turbidimieter, Power Cable, Glass, Storage Box 1 Set 6 Dissolved Oxygen Analyzer Ph Meter And Dissolved Oxygen Tester Water Quality Tester Set 2 Set 7 Rain Gauge 8 In/200mm Diamter Rain Gauge Stainless Steel; Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow, Mountinf Tripod And Parts Can Are Detachable For Easy Cleaning 5 Set 8 Rain Gauge Capacity: 11"/280mm; Resolution: 0.01"/0.2mm; Diameter Size 4"*14h (102mm*356mm); Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow And Mounting Tripod/bracket And Parts Can Are Detachable For Easy Cleaning 5 Set 9 Rain Gauge Plastic Rain Gauge: Approx Size:25cm*4.5cm*2.7cm 5 Pc 10 Sling Psychrometer Slide Rule; Dimension 1" Dia * 7-1/2" Length; Non-mercury, Black Plastic 5 Unit 11 Soil Detector 6 In 1 Soil Detector (rotatable); With Sensitive Sensing Probe; Soil Ph, Soil Fertility, Soil Temperature, Soil Moisture, Environmental Illumination, Humidity; Battery Powered; Led Large Screen Display 5 Set Lot 2: Scientific Materials And Equipment - Php 249,400.00 (abc) 1 Digital Analytical Balance Capcity: 500g; Accuracy: 0.001g; Tray Size: Ø 120 Mm; Dimensions 320*195*280mm; With Screen Display; With Dual Power Supply; Stainless Steel Plate And Bubble Level 2 Unit 2 Digital Weighing Scale Capacity: 10kg; Resolution: 0.1g Digital Precision Electronic Weighing Balance W/ Counting Table Top Scale; Tare Function Stainless Steel Pan With Level Bubble; Dual Power Supply; Scale Pan Size: 180*180mm; Dimension: 260*180*64mm 2 Unit 3 Digital Food Weighing Scale Weigh Range: 0.1 G-3000g; Resolution:0.01g; Dimensions:4.1*5.0 In With Stainless Steel Plate Dimension Of 3.9*3.9 In; Battery Power Supply 3 Unit 4 Digital Food Thermometers "stainless Steel Probe; Weight: 36g; Size: 22.5*2cm Power Supply: Built-in Battery, Can Be Used Directly" 3 Unit 5 Digital Food Thermometers Digital Thermometer Infrared Laser Gun With Led Screen; Size: 75*50*145mm;battery Powered 2 Unit 6 Thermocouples Digital Thermocouple With Dual Channels 4 Probes Handheld; Battery Powered 2 Set 7 Sieves Standard Laboratory Test Sieves; 8 In/20cm Diameter And Height Of 5cm; Filter Mesh With Grit Size #10, #12, #14, #16, And #18 2 Set 8 Bulk Density Apparatus Astm 1895 Apparent Bulk Density Apparatus; Wieght = 9 Kg, Dimensions: 240x330x520mm (wxdxh) 2 Set 9 Tachometer Laser Digital Non-contact Tachometer; Measuring Range: 2.5-99999 Rpm; Lcd Screen With White Backlight, Meauring Distance:2-20in(50-500mm); Dimension 145*85*35mm; Auto Power Off; Battery Power Supply 3 Set 10 Tachometer Contact Digital Handheld Tachometer; Lcd Screen; Battery Powered; Item Size: Approx. 165*60*28mm; Set Inlcusion: Digital Tachometer, 2 Measurement Idler Wheels, 2 Measurement Touch Tips, Lengthening Bar, Portable Bag And User Manual 3 Set 11 Steel Cabinet Steel Cabinet: Dimension: 90*46*185cm; 2-door Locker With One Side For Long Tools Storage 2 Unit 12 Steel Cabinet Steel Cabinet Dimension: 90*46*185cm; 2-door Lock With 4 Adjustable Shelves 2 Unit 13 Digital Vernier Caliper Digital Vernier Caliper; 150 Mm Metal 60inch Pure Stainless; Withlcd 5 Pc 14 Digital Anemometer Digital Anemometer With Data Hold Backlight Function 3 Set 15 Sound Level Meter Digital Sound Level Meter Decibel Moinitoring; Measurement Range: 30-130db With Spongeball; Inclusions: Sound Level Meter, Operation Manual, 1 Spongeball 2 Set 16 Aluminum Tool Box Set "multiple Layered Tool Box With: Layer 1. 1x Multiprise Plier 250mm, 1x Diagonal Cutting Pliers 150mm, 1x Pliers 1/2 Long Round 150mm, 1x Universal Plier 150mm 1x All-rounder, 1x Thumb Wrench 250 Mm, 1x Box 6 Compartment Layer 2. 1x Magnetic Bimonthly Torpedo Level 25cm, 1x Measure 5m X 19mm Bimatiere Tylon, 8x Screwdriver - Bit Holder- Ph1-ph2- Pz1-pz2- Mechanic 6.5x1505.5x100-3x75, 1x Test Screwdriver, 9x Clés Males (1.5-2-2.5-3-4-5-6-8-10) Layer 3. 1x Hacksaw, 1x Pen Lamp, 1x Cutter 18mm, 1x Hammer Wooden Handle 300g Layer 4. 1x Ratchet 72 Teeth 1/4’’, 10x 1/4’’ (6-sided) Sockets: 5.5 – 6 – 7 – 8 – 9 – 10 – 11 – 12– 13 – 14 Mm, 2x 1/4’’ Extensions: 75 Mm – 150 Mm, 1x 1/4’’ Bit Holder, 1x 1/4’’ Universal Cardan, 1x Ratchet 72 Teeth 1/2’’, 16x 1/2’’ (6-piece) Sockets: 10 – 11 – 12 – 13 – 14 – 15 – 16 –17 – 18 – 19 – 21 – 22 – 24 – 27 – 30 – 32 Mm, 2x 1/2’’ Extensions: 75 Mm – 250 Mm, 1x Universal Cardan 1/2’’, 3x Sockets For 1/2’ Candle: 16 – 19 – 21 Mm, 12x Combination Wrenches: 8 – 9 – 10 – 11 – 12 – 13 – 14 –15 – 16 – 17 – 18 – 19 Mm, 1x 1/4"" 25mm Screw Bit Box – 61pcs In Pre-formed Foam" 1 Set Lot 3: Surveying Materials And Equipment - Php 199,750.00 (abc) 1 Total Station Theodolite Digital Theodolite Surveying Instrument High Accuracy 30x Electronic With Laser; Main Unit, Tool Kit, Plumb Bob, Rain Cover, Rechargeable Battery, Battery Charger, Aa Dry Battery Case, Operational Manual, Heavy Duty Carrying Case 1 Unit 2 Tripod Surveying Instrument Aluminum Tripod Double Lock With Extended Length Upto 1.7m; Head Diameter 160mm; 3kg Weight 1 Unit 3 Measuring Staff Stadia Rod Surveying Stadia Rod Extended Upto 5m; Retracted Length 0.5m 3 Pc 4 Range Pole Range Pole,3m-3 Section For Surveying 3 Pc 5 Marking Pins Surveying Color Scheme: Red And White; 50 Pc 6 Heavy Duty Measuring Tape 100m Tape Measure Fiber Glass, High Quality, Heavy Duty Meter Tape Ruler Wheel 5 Pc 7 Steel Tape 5m Steel Measuring Tape-heavy Duty 5 Pc
Closing Soon15 Jan 2025
Tender AmountPHP 800 K (USD 13.6 K)

FUNDACION P BLICA GALLEGA CENTRO TECNOLOGICO DE SUPERCOMPUTACION DE GALICIA CESGA Tender

Software and IT Solutions...+2Electronics Equipment, Electrical and Electronics
Spain
Spain-santiago De Compostela: Communications Network
Closing Date21 Jan 2025
Tender AmountEUR 312 K (USD 321.2 K)

Medizinische Universit T Lausitz Carl Thiem Tender

Others
Germany
Details: Adaptation of the data connection including fire protection requirements of the elevator systems 1-5 in building 0. 100 m fiber optic cable, 580 m data cable, building control technology, data sockets and patches
Closing Soon17 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Is A Sources Sought Notice Only. this Is Not A Solicitation For Bids, Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Sources Sought Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources To Perform The Potential Requirement. This Sources Sought Notice Is Part Of Market Research Effort And Invites Contractors Capable Of Fulfilling The Requirement In Accordance With The Statement Of Work And Salient Characteristics.â  The Responses Received From Interested Contractors Will Assist The Government In Determining The Appropriate Acquisition Method. the Department Of Veterans Affairs (va), Network Contracting Office (nco) 23, Is Conducting Market Research To Identify Potential Sources Which Can Provide The Following:â  statement Of Work mold Remediation Services introduction/background air Quality Testing In A Va Building, Revealed Levels Of Airborne Microbial Particles That Exceed An Acceptable Level For A Healthcare Facility. Due To This Hazard, The Building Has Been Vacated Of All Patients And Staff And Will Remain So Until It Is Safe To Occupy. project Objective remediation Services To Remove Or Clean All Surfaces And Materials Located Inside Building. Building To Be Placed Under Negative Pressure, With Additional Units To Be Used As Air Filtrations. Hvac System To Be Isolated, All Diffusers Removed, Cleaned, Then Set Aside, All Flex Ducting To Be Removed (to Later Be Replaced), And All Duct Openings To Be Sealed. All Carpet In The Building To Be Removed. All Ceiling Tiles In The Building To Be Removed. All Drywall (including Above The Drop Ceiling) That Has Microbial Growth Or Moisture Damage To Be Removed. All Pipe And Ductwork Insulation Showing Evidence Of Growth Or Moisture Damage To Be Removed. All Building Semi And Non-porous Surfaces - Such As But Not Limited To Cabinetry, Countertops, Metal, Glass, Rubber Baseboards, Lighting And Plumbing Fixtures - Needs To Be Thoroughly Disinfected Via Appropriate Cleaning Methods. specifications mold Remediation Technical Specifications part 1 General scope this Specification Covers The Remediation Of Mold Including Removal, Cleanup And Disposal Of Mold Contaminated Materials From A Va Building. The Methods And Procedures In This Specification Are Based On The Observations And Previously Collected Background Air Samples. an Estimate Of The Amount Of Material To Be Removed Or Cleaned Is Not Given. The Determination Of The Actual Amounts, For Bidding Purposes, Is The Responsibility Of The Contractor. By Submitting A Bid, The Contractor Acknowledges That He Has Investigated And Satisfied Himself As To: the Conditions Affecting The Work, Including, But Not Limited To, Physical Conditions Of The Site Which May Affect Site Access, Handling And Storage Of Tools And Materials, Access To Water, Electricity Or Other Utilities, Or Otherwise Affect Performance Of Required Activities. the Character And Quantity Of All Surface And Subsurface Materials Or Obstacles To Be Encountered As Far As This Information Is Reasonably Ascertainable From An Inspection Of The Site, Including Exploratory Work Done By The Building Owner Or A Designated Consultant, As Well As Information Presented In Drawings And Specifications Included With This Contract. Any Failure By The Contractor To Acquaint Himself With Available Information Will Not Relieve Him From The Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Building Owner Is Not Responsible For Any Conclusions Or Interpretations Made By The Contractor On The Basis Of The Information Made Available By The Building Owner. description the Work Specified Herein Shall Be The Remediation Of Mold By Competent Persons trained, Knowledgeable And Qualified In The Techniques Of Remediation, Handling And Disposal Of Mold Contaminated Materials And The Subsequent Cleaning Of Contaminated Areas, Who Comply With All Applicable Federal, State And Local Regulations And Are Capable Of, And Willing To Perform, The Work Of This Contract. the Contractor Shall Supply All Labor, Materials, Services, Insurance, Permits, licenses, Patents, And Equipment Necessary To Carry Out The Work In Accordance With All Applicable Federal, State And Local Regulations And These Specifications. the Contractor Is Responsible For Restoring The Work Area And Auxiliary Areas Utilized During The Remediation To Conditions At Least Equal To Original Conditions. (this Excludes Any Material Removed As Part Of Scope.) Any Damages Caused During The Performance Of Remediation Activities Shall Be Repaired By The Contractor (e.g., Paint Peeled Off By Barrier Tape, Nail Holes, Water Damage, Broken Glass) At No Additional Expense To The Owner. applicable Standards And Guidelines all Work Under This Contract Shall Be Done In Strict Accordance With All Applicable Federal, State, And Local Regulations, Standards, And Codes Governing Mold Remediation And Any Other Trade Work Done In Conjunction With The Remediation. the Most Recent Edition Of Any Relevant Regulation, Standard, Document Or Code Shall Be In Effect. Where Conflict Among The Requirements Or With These Specifications Exists, The Most Stringent Requirements Shall Be Utilized. specific Requirements: title 29, Code Of Federal Regulations, 1926. Occupational Safety And Health Administration (osha), U.s. Department Of Labor. quality Assurance bidders Must Be Licensed As Required By The Iowa Bureau Of Labor. bidders Shall Demonstrate Prior Experience On Mold Remediation Projects Of Similar Nature And Scope Through The Submission Of Letters Of Reference From The Owners Including The Name, Address, And Telephone Numbers Of Contact Person (someone Specifically Familiar With The Contractor's Work) For At Least Three (3) Previous Users Of Service If Requested By The Owners. the Owner Reserves The Right To Reject Bids For Any Reason That Serves The Best Interests Of The Owner Or Building Occupants. The Owner Also Reserves The Right To Waive Any Technicality Or Irregularity In A Bid. Failure To Submit Requested information/documentation Can Result In Automatic Disqualification Of Bid Package. submittals And Notices pre-remediation: submit The Location Of The Landfill To Be Used For Disposal Of The Mold Contaminated Material. submit A List Of All Personnel Who Will Be Involved In The Remediation Activity Including, Supervisors, Workers, And Any Other Personnel Or Agent Who May Be Responsible For Any Aspect Of The Remediation Activities. submit Documentation From A Physician That All Employees Or Agents Have Been Medically Monitored To Determine Whether They Are Physically Capable Of Working While Wearing The Respirator Required Without Suffering Adverse Health Effects. submit Documentation Of Respirator Fit Testing For All Employees And Agents Who Must Enter The Work Area. Document Niosh Approval Of All Respiratory Protective Devices Utilized On-site. submit A List Of Equipment For This Project. with The Owner Or Owner's Representative, Inspect The Premises Wherein All Remediation And Remediation Related Activities Will Occur And Submit A Statement Signed By Both, Agreeing On Building And Fixture Condition Prior To The Commencement Of The Work. submit Manufacturer's Certification That Hepa Vacuums, Negative Pressure Ventilation Units, And Other Local Exhaust Ventilation Equipment Conform To Ansi 29.2-79. when Rental Equipment Is To Be Used In Remediation Areas Or To Transport Mold Contaminated Waste, A Written Notification Concerning Intended Use Of The Rental Equipment Must Be Provided To The Rental Agency With A Copy Submitted To The Owner. during Remediation Activities: submit Weekly Job Progress Reports Detailing Remediation Activities And Progress. submit Copies Of All Transport Manifests, Trip Tickets And Disposal Receipts For All Mold Waste Materials Removed From The Work Area During The Remediation Process. post In The Clean Room Area Of The Worker Decontamination Enclosure: a List Containing The Names, Addresses, And Telephone Numbers Of The Contractor, The Owner, The Assessment Professional, The Testing Laboratory And Any Other Personnel Who May Be Required To Assist During Remediation Activities. a Logbook To Record Names Of All Personnel Who Enter The Work Area. a Copy Of Emergency Procedures. telephone Numbers Of All Emergency Personnel And Principals For This Remediation Project. the Project Will Not Be Considered Completed Until All Submittals Are Received By The Owner. This Will Affect Payment For The Project. site Security the Work Area Is To Be Restricted Only To Authorized, Trained, And Protected Personnel. These May Include The Contractor's Employees, Employees Of subcontractors, Owner Employees And Representatives, State And Local Inspectors And Any Other Designated Individuals. entry Into The Work Area By Unauthorized Individuals Shall Be Reported Immediately To The Owner By The Contractor. access To The Work Area Shall Be Through A Single Worker Decontamination System. All Other Means Of Access (doors, Windows, Hallways, Etc.) Shall Be Blocked Or Locked So As To Prevent Entry To Or Exit From The Work Area. The Only Exceptions For This Rule Are The Waste Pass Out Airlock Which Shall Be Sealed Except During The Removal Of Containerized Mold Waste From The Work Area, And Emergency Exits In Case Of Fire Or Accident. Emergency Exits Shall Not Be Locked From The Inside; However, They Shall Be Sealed With Polyethylene Sheeting And Tape Until Needed. the Contractor Shall Have Control Of Site Security During Remediation Operations Whenever Possible, In Order To Protect Work Efforts And Equipment. contractor Will Have Owner's Assistance In Notifying Building Occupants Of Impending Activity And Enforcement Of Restricted Access By Owner's Employees. emergency Planning emergency Planning Shall Be Developed Prior To Remediation Initiation And Agreed To By Contractor And Owner. emergency Planning Shall Include Considerations Of Fire, Explosion, Toxic Atmospheres, Electrical Hazards, Slips, Trips And Falls, Confined Spaces, And Heat Related Injury. Written Procedures Shall Be Developed And Employee Training In Procedures Shall Be Provided. employees Shall Be Trained In Evacuation Procedures In The Event Of Work Place Emergencies. part 2 Materials And Equipment materials general: deliver All Materials In The Original Packages, Containers, Or Bundles Bearing The Name Of The Manufacturer And The Brand Name. store All Materials Subject To Damage Off The Ground, Away From Wet Or Damp surfaces, And Under Cover Sufficient Enough To Prevent Damage Or Contamination. polyethylene Sheeting For Walls And Stationary Objects Shall Be A Minimum Of 4 Mil Thick. For Floors And All Other Sheeting Of At Least 6 Mil Thickness Shall Be Used In Widths Selected To Minimize The Frequency Of Joints. tape - Duct, Glass Fiber, Or Other Type Capable Of Sealing Adjacent Sheets Of Polyethylene And Capable Of Sealing Polyethylene To Dissimilar Finished Or Unfinished Surfaces Under Both Wet And Dry Conditions Including The Use Of Amended Water. polyethylene Sheeting Utilized For Worker Decontamination Enclosure Shall Be Opaque White Or Black In Color. disposal Bags Shall Be Of 6 Mil Polyethylene. disposal Drums Shall Be Metal Or Fiberboard With Locking Ring Tops. equipment general: a Sufficient Quantity Of Negative Pressure Ventilation Units Equipped With Hepa Filtration Shall Be Utilized To Provide One Workplace Air Change Every 15 Minutes Or A Static Pressure Within The Work Area Of At Least -0.02 Inches Of Water Column. These Ventilation Units Must Be Commercially Produced Units And Not Self-manufactured. Ventilation Units To Be Exhausted Outside.the Contractor Shall Furnish A Copy Of Their Calculations To Obtain This Air Flow Or Static Pressure If Requested By The Owner. air Purifying Respirators Equipped With Hepa Filters Will Be Required. A Sufficient Supply Of Filters Shall Be Available In The Clean Change Area. This Requirement May be Modified By The Assessment Professional If Air Sampling Results Indicate The Need For More Protection. air Purifying Respirators With Dual High Efficiency (hepa) Filters May Be Utilized During Work Area Preparation Activities. Spectacle Kits And Eyeglasses Must Be Provided For Employees Who Wear Glasses And Who Must Wear Full Face Piece Respirators. Respirators Shall Be Provided That Have Been Tested And Approved By The National institute Of Occupational Safety And Health For Use In Mold Contaminated Atmospheres. full Body Disposable Protective Clothing, Including Head, Body And Foot Coverings (unless Using Footwear As Described In Section 2.02 (a)(6) Consisting Of Material Impenetrable By Mold (tyvek Or Equivalent) Shall Be Provided To All Workers In Sizes Adequate To Accommodate Movement Without Tearing. additional Safety Equipment (e.g., Hard Hats, Eye Protection, Safety Shoes Meeting The Applicable Ansi Standard, Disposable Pvc Gloves) As Necessary, Shall Be Provided To All Workers And Authorized Visitors. nonskid Footwear Shall Be Provided To All Remediation Workers. Disposable Clothing Shall Be Adequately Sealed To The Footwear To Prevent Body Contamination. a Sufficient Supply Of Disposable Mops, Rags And Sponges For Work Area Decontamination Shall Be Available. mobile Radios, Telephones, Etc. As Required By The Project Will Be Provided By The Contractor. removal/cleaning Equipment: sufficient Supply Of Scaffolds, Ladders, Lifts And Hand Tools Shall Be Provided As Needed. sprayers With Pumps Capable Of Providing A Water Stream Or Mist For Dust Control. rubber Dustpans And Rubber Squeegees Shall Be Provided For Cleanup. brushes Utilized For Removing Loose Mold Containing Material Shall Have Nylon Or Fiber Bristles, Not Metal. a Sufficient Supply Of Hepa Filtered Vacuum Systems Shall Be Available During Cleanup. part 3 Execution preparation post Caution Signs At Any Location And Approaches To A Location Where Airborne Concentrations Of Mold May Exceed Ambient Background Levels. Additional Signs May Need To Be Posted Following Construction Of Workplace Enclosure Barriers. shut Down And Lock Out Electric Power To All Work Areas As Necessary If Wet Conditions Warrant. Provide Temporary Power And Lighting. Ensure Safe Installation (including Ground Faulting) Of Temporary Power Sources And Equipment By Compliance With All Applicable Electrical Code Requirements And Osha Requirements For Temporary Electrical Systems. shut Down And Lock Out All Heating, Cooling And Air Conditioning System (hvac) Components That Are In, Supply Or Pass Through The Work Area. Seal All Intake And Exhaust Vents In The Work Area With Tape And 6 Mil Polyethylene. Also Seal Any Seams In System Components That Pass Through The Work Area. Remove All Hvac System Filters And Place In Labeled 6 Mil Polyethylene Bags For Staging And Eventual Disposal As Mold Contaminated Waste. due To Hvac Being Offline During Winter Conditions, Contractor To Provide Temporary Heat To Maintain Indoor Temperature Of 60 Degrees Fahrenheit Throughout Building. the Contractor Shall Provide Sanitary Facilities For Remediation Personnel Outside Of The Enclosed Work Area And Maintain Them In A Clean And Sanitary Condition Throughout The Project. seal Off All Windows, Doorways, Elevator Openings, Corridor Entrances, Drains, Ducts, Grills, Grates, Diffusers, Skylights, And Any Other Openings Between The Work Area And Uncontaminated Areas Outside Of The Work Area With 4 Mil Polyethylene Sheeting And Tape. barrier Walls Will Be Constructed Of 4 Mil Polyethylene Sheeting Extending From The Ceiling To Floor. workplace Exits worker Decontamination Enclosure System: worker Decontamination Enclosure Systems Shall Be Provided At All Locations Where Workers Will Enter Or Exit The Work Area. worker Decontamination Enclosure Systems Constructed At The Work Site Shall Utilize 6 Mil Opaque White Or Black Polyethylene Sheeting Or Other Acceptable Materials For Privacy. Detailed Descriptions Of Portable, Prefabricated Units, If Used, Must Be submitted For The Owner's Approval. Plans Must Include Floor Plan With Dimensions, Materials, Size, Thickness, Plumbing, And Electrical Utilities. the Worker Decontamination Enclosure System Shall Consist Of At Least A Clean Room And An Airlock. entry And Exit From The Decontamination Enclosure System Chamber Shall Be Through Curtained Doorways Consisting Of Two Sheets Of Overlapping Polyethylene Sheeting. One Sheet Shall Be Secured At The Top And Left Side, The Other Sheet At The Top And Right Side. Both Sheets Shall Have Weights Attached To The Bottom To Ensure That They Hang Straight And Maintain A Seal Over The Doorway When Not In Use. the Clean Room Shall Be Sized To Adequately Accommodate The Work Crew. Benches Shall Be Provided As Well As Hooks For Hanging Up Street Clothes. Shelves For Storing Respirators Shall Also Be Provided In This Area. Clean Work Clothes: Clean Disposable Clothing, Replacement Filters For Respirators, Towels, And Other Necessary Items Shall Be Provided In Adequate Supply In The Clean Room. A Location For Postings Shall Also Be Provided In This Area. Whenever Possible, A Lockable Door Shall Be Used To Permit Access Into The Clean Room From Outside The Work Area. Lighting, Heat, And Electricity Shall Be Provided As Necessary For Comfort. This Space Shall Not Be Used For Storage Of Tools, Equipment Or Materials, Or As An Office Space. waste Container Pass Out Airlock: the Waste Container Pass Out Airlock Shall Be The Same As The Exit Entry Airlock. emergency Exits: emergency Exits Shall Be Established And Clearly Marked With Duct Tape Arrows Or Other Effective Designations To Permit Easy Identification From Anywhere Within The Work Area. They Shall Be Secured To Prevent Access From Uncontaminated Areas And Still Permit Emergency Exiting. These Exits Shall Be Properly Sealed With Polyethylene Sheeting Which Can Be Cut To Permit Egress If Needed. These Exits May Be The Worker Decontamination Enclosure, The Waste Pass Out Airlock And/or Other Alternative Exits Satisfactory To Fire Officials. isolation Of The Workplace maintenance Of Enclosure Systems: following Completion Of The Construction Of All Polyethylene Barriers And Decontamination System Enclosures, Allow Overnight Settling To Ensure That Barriers Will Remain Intact And Secured To Walls And Fixtures Before Beginning Actual Remediation Activities. all Polyethylene Barriers Inside The Workplace, In The Worker Decontamination Enclosure System, In The Waste Container Pass Out Airlock And At Partitions constructed To Isolate The Work Area From Occupied Areas Shall Be Inspected At Least Twice Daily, Once Prior To The Start Of Each Day's Remediation Activities. Document Inspections And Observations In The Daily Project Log. damage And Defects In The Enclosure System Are To Be Repaired Immediately Upon Discovery. negative Pressure To Be Monitored With A Continuous Reading Device. A Record Of This Shall Be Furnished To The Owner. Use Smoke Tubes To Test The Effectiveness Of The Barrier System When Directed By The Owner. at Any Time During The Remediation Activities After Barriers Have Been Erected, If Visible Material Is Observed Outside Of The Work Area Or If Damage Occurs To Barriers, Work Shall Immediately Stop, Repairs Be Made To Barriers, And Debris/residue Cleaned Up Using Appropriate Hepa Vacuuming And Wet Mopping Procedures. install And Initiate Operation Of Negative Pressure Ventilation Equipment As Needed To Provide One Air Change In The Work Area Every 15 Minutes Or Produce A Static Pressure Of -0.02 Inches Of Water Column. (see Section 2.02 (a)) Openings Made In The Enclosure System To Accommodate These Units Shall Be Made Airtight With Tape And/or Caulking As Needed. If More Than One Unit Is Installed, They Should Be Turned On One At A Time, Checking The Integrity Of Wall Barriers For Secure Attachment And The Need For Additional Reinforcement. Ensure That Adequate Power Supply Is Available To Satisfy The Requirements Of The Ventilating Units. Negative Pressure Ventilation Units Shall Be Exhausted To The Outside Of The Building Whenever Feasible. Additional Negative Pressure Ventilation Units May Be Exhausted Inside The Work Area To Provide Continuous Air Cleaning. They Shall Not Be Exhausted Into Occupied Areas Of The building. Twelve-inch Extension Ducting Shall Be Used To Reach From The Work Area To The Outside When Required. Careful Installation, Air Monitoring And Daily Inspections Shall Be Done To Ensure That The Ducting Does Not Release Fibers Into Uncontaminated Building Areas. once Constructed And Reinforced As Necessary, With Negative Pressure Ventilation Units In Operation As Required, Test Enclosure For Leakage Utilizing Smoke Tubes. Repair Or Reconstruct As Needed. workplace Entry And Exit Procedures personnel Entry And Exit: all Workers And Authorized Personnel Shall Enter The Work Area Through The Worker Decontamination Enclosure System. Workers Shall Not Eat, Chew, Or Smoke Once They Have Entered The Work Area. Eating May Take Place Just Outside The Clean Room. Smoking, At Any Time During The Project, Is Prohibited On The Campus. all Personnel, Before Entering The Work Area, Shall Read And Be Familiar With All Posted Regulations, Personal Protection Requirements (including Workplace Entry And Exit Procedures) And Emergency Procedures. A Sign Off Sheet Shall Be Used To Acknowledge That These Procedures Have Been Reviewed And Understood By All Personnel Prior To Entry. all Personnel Shall Proceed First To The Clean Room And Appropriately Don Respiratory Protection And Launderable And/or Disposable Coveralls, Head Covering, And Foot Covering. Hard Hats, Eye Protection, And Gloves Shall Also Be Utilized If Required. Clean Respirators And Protective Clothing Shall Be Provided And Utilized By Each Person For Each Separate Entry Into The Work Area. personnel Wearing Designated Personal Protective Equipment Shall Proceed From The Clean Room Through The Airlock Into The Main Work Area. before Leaving The Work Area All Personnel Shall Remove Gross Contamination From The Outside Of Respirators And The Outer Protective Clothing By Brushing And/or Wet Wiping Procedures. Each Person Shall Clean Bottoms Of Protective Footwear Just Prior To Entering The Airlock. personnel Shall Proceed To The Airlock Where They Remove The Outer Protective equipment Except Respirators. Deposit Disposable And/or Launderable Clothing Back Into The Work Area Into Appropriately Labeled Containers For Disposal And/or laundering. reusable, Contaminated Footwear Shall Be Stored In The Airlock When Not In Use In The Work Area. Upon Completion Of Remediation, It Shall Be Disposed Of As Mold Contaminated Waste. Rubber Boots May Be Decontaminated At The Completion Of The Remediation Project For Reuse. still Wearing Respirators, Personnel Shall Proceed To The Clean Room, Clean The Outside Of The Respirators And The Exposed Face Area Under Running Water Prior To Removal Of Respirator. Various Types Of Respirators Will Require Slight Modification Of These Procedures. don Clean Disposable And/or Launderable Clothing If There Will Be Later Reentry Into The Work Area Or Street Clothes If It Is The End Of The Work Shift. these Procedures Shall Be Posted In The Clean Room And Equipment Room. waste Container Pass Out Procedures: mold Contaminated Waste That Has Been Containerized Shall Be Transported Out Of The Work Area Through The Waste Container Pass Out Airlock Or Through The Worker Decontamination Enclosure If A Separate Airlock Has Not Been Construction. waste Pass Out Procedures Shall Utilize Two Teams Of Workers, An "inside" Team And An "outside" Team. the Inside Team Wearing Appropriate Protective Clothing And Respirators For Inside The Work Area Shall Clean The Outside, Including Bottoms, Containers (bags, Drums, Or Wrapped Components) Using Hepa Vacuums And Wet Wiping Techniques And transport Them Into The Waste Container Pass Out Airlock. the Outside Team, Wearing Appropriately Assigned Respirators, Shall Enter The Airlock From The Outside Of The Work Area, Remove Them From The Airlock To The Outside. No Worker From The Outside Team Shall Further Enter The Work Area Through This Airlock. The Exit From This Airlock Shall Be Secured When Not In Use To Prevent Unauthorized Entry. personnel Protection Requirements training: prior To Commencement Of Remediation Activities, The Contractor Shall Have One Person Designated As A Competent Supervisor. This Person Shall Be On-site At All Times. special On-site Training On Equipment And Procedures Unique To This Job Site Shall Be Performed As Required. training In Emergency Response And Evaluation Procedures Shall Be Provided. respiratory Protection: all Respiratory Protection Shall Be Provided To Workers In Accordance With The Written Respiratory Protection Program, Which Includes All Items In osha 29 Cfr 1910.134 (b)(1-11). This Program Shall Be Posted In The Clean Room Of The Worker Decontamination Enclosure System. workers Shall Be Provided With Personally Issued, Individually Identified Respirators. respirator Types Shall Be Utilized According To The Following Schedule: full Face Air Purifying Respirators With Dual Hepa Filters Shall Be Utilized By Workers During Remediation Operations. full Face Powered Air Purifying Respirators Equipped With Hepa Filters May Be Used During Remediation Activities. fit Testing: workers Must Perform Positive And Negative Air Pressure Fit Tests Each Time A Respirator Is Put On, Wherever The Respirator Design So Permits. Powered Air Purifying Respirators Shall Be Tested For Adequate Flow As Specified By The manufacturer. workers Shall Be Given A Qualitative Fit Test In Accordance With Procedures Detailed In The Osha Lead Standard (29 Cfr 1910.1025, Appendix D, Qualitative Fit Test Protocols) For All Respirators To Be Used On This Remediation Project. An Appropriate administered Quantitative Fit Test May Be Substituted For The Qualitative Fit Test. documentation Of Adequate Respirator Fit Must Be Provided To The Owner. no One Wearing A Beard Shall Be Permitted To Don A Respirator And Enter The Work Area. protective Clothing: disposable Clothing Including Head, Foot, And Full Body Protection Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors. launderable Clothing, If Required, Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors. hard Hats, Protective Eyewear, Gloves, Rubber Boots, And/or Other Footwear Shall Be Provided As Required For Workers And Authorized Visitors. Safety Shoes May Be Required For Some Activities. commencement Of Work enclosure Systems Have Been Constructed And Tested. negative Pressure Ventilation Systems Are Functioning Adequately. all Pre-remediation Submissions, Notifications, Postings, And Permits Have Been Provided And Are Satisfactory To The Owner. all Equipment For Remediation, Cleanup, And Disposal Are On Hand. all Worker Training Is Completed. contractor Receives Written Permission From The Owner To Commence Remediation. removal/cleaning Procedures protection Of Materials Not Being Removed: materials That Are Not Being Removed Are To Be Protected From Any Damage That May Occur During Work. The Acoustic Ceiling Tile Suspension Grid Is To Be Cleaned Yet Remain In Place And Is Not To Be Damaged During The Removal Of The Tiles. level One: clean And Isolate Active Work Areas In Accordance With Section 3.01. wet All Mold Containing Materials With An Approved Biocide Solution Using Equipment Capable Of Providing A Fine Spray Mist, To Reduce Airborne Concentrations When The Material Is Disturbed. Keep All Removed Material Wet Enough To Prevent Release Until It Can Be Containerized For Disposal. removal And Cleaning: all Acoustic Ceiling Tiles, All Carpet Throughout The Entire Building Are To Be Removed And Properly Disposed Of. non-porous Materials - All Non-porous Surfaces Are To Be Cleaned Using A detergent Solution Or Solution Of Contractor's Choice That Will Re Move Mold. Hepa Vacuums May Be Used Along With The Solution For Cleaning. all Materials Need To Be Dried. Examples Of Non-porous Materials Include: metal glass hard Plastics plumbing Fixtures all Hvac Diffusers Are To Be Removed, Thoroughly Cleaned (as Detailed Above) And Set Aside Per Owner S Direction To Be Re-installed Later. semi-porous (e.g. Wood Doors, Unsealed Concrete) All Semi-porous Surfaces Are To Be Cleaned Using A Detergent Solution Or Solution Of Contractor's Choice That Will Remove Mold. This Solution Must Be Approved By Owner. Hepa Vacuums May Be Used Along With The Solution For Cleaning. All Materials Need To Be Dried. Examples Of Semi-porous Materials Include: wood concrete porous Materials - Remove All Porous Materials Where Visible Mold Growth Or Evidence Of Moisture Is Present. The Materials Should Be Removed, Bagged And Discarded. Examples Of Porous Materials Include: drywall insulation Of All Types carpet (all Being Removed, Regardless Of Evidence) acoustic Ceiling Tiles (all Being Removed, Regardless Of Evidence) containers (6 Mil Polyethylene Bags) Shall Be Sealed When Full. Bags Shall Not Be Overfilled. They Should Be Securely Sealed To Prevent Accidental Opening And Leakage By Tying Tops Of Bags In An Overhead Knot Or By Taping In gooseneck Fashion. Do Not Seal Bags With Wire Or Cord. Bags Shall Be Decontaminated On Exterior Surfaces By Wet Cleaning And Hepa Vacuuming. large Components Removed Intact May Be Wrapped In 2 Layers Of 6 Mil Polyethylene Sheeting Secured With Tape For Transport To The Landfill. mold Containing Waste With Sharp Edged Components (e.g., Nails, Screws, Metal Lath, Tin Sheeting) Will Tear The Polyethylene Bags And Sheet And Shall Be Reinforces With Extra Bags Or Wrapping. cleanup Procedure remove And Containerize All Visible Accumulations Of Mold Containing Material And Mold Contaminated Debris Utilizing Rubber Dust Pans, Rubber Squeegees, Hepa vacuums, Etc. remove All Containerized Waste From The Work Area And Waste Container Pass Out Airlock. decontaminate All Tools And Equipment And Remove At The Appropriate Time In The Cleaning Sequence. inspect The Work Area For Visible Residue. If Any Accumulation Of Residue Is Observed, It Will Be Assumed To Be Mold And The Work Area Must Be Re-cleaned. the Work Area Shall Be Cleaned Until It In Compliance With Criteria Agreed Upon By The Contractor And Owner Prior To Initiation Of Remediation Activities. following The Satisfactory Completion Of Clearance Criteria Remaining Barriers May Be Removed And Properly Disposed Of. A Final Visual Inspection By The Owner Shall Ensure That No Contamination Remains In The Work Area. Unsatisfactory Conditions May Require Additional Cleaning And Air Monitoring (see Section 3.11, Reestablishment Of The Work Area). clearance Testing following The Completion Of Cleanup Operations, The Remediation Contractor Shall Notify The Owner (or Industrial Hygiene Consultant Selected By Owner) When The Building Area Is Ready For Clearance Testing. Remediation Contractor Will Not Be Responsible For Performing Clearance Testing. The Owner (via Contracted Industrial Hygienist) Shall Arrange For Collecting Samples. 3.10 Disposal Procedures general: as The Work Progresses, To Prevent Exceeding Available Storage Capacity Onsite, Sealed And Labeled Containers Of Mold Containing Waste Shall Be Removed And Stored In The Dumpster On-site Until It Is Transported To The Prearranged Disposal Location. all Waste Shipment Records Shall Be Delivered To The Owner. A Recommended Record Keeping Format Utilizes The Waste Shipment Record (wsr) Which Includes The Names And Addresses Of The Generator (owner), Contractor, Transporter, And Disposal Site, The Estimated Quantity Of The Mold Waste And The Type Of Containers Used. transportation To The Landfill: once Drums, Bags And Wrapped Components Have Been Removed From The Work Area, They Shall Be Loaded Into An Enclosed Truck Or Dumpster For Transportation. any Debris Or Residue Observed On Containers Or Surfaces Outside Of The Work Area Resulting From Cleanup Or Disposal Activities Shall Be Immediately Cleaned Up Using Hepa Filtered Vacuum Equipment And/or Wet Methods As Appropriate. large Metal Dumpsters Are Sometimes Used For Mold Waste Disposal. These Should Have Doors Or Tops That Can Be Closed And Locked To Prevent Vandalism Or Other Disturbance Of The Bagged Mold Debris And Wind Dispersion Of Mold Fibers. Bags Shall Be Placed, Not Thrown, Into These Containers To Avoid Splitting. disposal At The Landfill: upon Reaching The Landfill, Trucks Are To Approach The Dump Location As Closely As Possible For Unloading Of The Mold Containing Waste. bags, Drums, And Components Shall Be Inspected As They Are Off Loaded At The Disposal Site. Waste Containers Shall Be Placed On The Ground At The Disposal Site, Not Pushed Or Thrown Out Of The Trucks. following The Removal Of All Containerized Waste, The Truck Cargo Area Shall Be Decontaminated Using Hepa Vacuums And/or Wet Methods To Meet The No Visible Residue Criteria. 3.11 Re-establishment Of The Work Area And Systems re-establishment Of The Work Area Shall Only Occur Following The Completion Of Cleanup Procedures And After Clearance Criteria Have Been Met And Documented To The Satisfaction Of The Owner. the Contractor And Owner Shall Visually Inspect The Work Area For Any Remaining Visible Residue. Evidence Of Contamination Will Necessitate Additional Cleaning Requirements In Accordance With Section 3.07. following Satisfactory Clearance Of The Work Area, Remaining Polyethylene Barriers May Be Removed And Disposed Of As Mold Contaminated Waste. at The Discretion Of The Contractor, Mandatory Requirements For Personal Protective Equipment May Be Waived Following The Removal Of All Barriers. re-secure Mounted Objects Removed From Their Former Positions During Area Preparation Activities. relocate Objects That Were Removed To Temporary Locations Back To Their Original Positions. reestablish Hvac, Mechanical And Electrical Systems In Proper Working Order. Remove Contaminated Hvac System Filters And Dispose Of As Mold Contaminated Waste. Decontaminate Filter Assembly Using Hepa Vacuums And Wet Cleaning Techniques. Install New Filters In Hvac Systems. Dispose Of Old Filters. repair All Areas Of Damage That Occurred Because Of Remediation Activities. period Of Performance upon Notice To Proceed, Contractor Shall Have 30 Calendar Days To Complete The Scope Detailed In This Document.
Closing Soon14 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

United States
Details: Solicitation Notice - There Are No Funds Against This Baa Solicitation W911qy-20-r-0022. Solicitation W911qy-20-r-0022is Available As Of 29 February 2020 And Is Open Until 28 February 2025. ***proposal Checklist Has Been Updated And Uploaded.*** ***baa Solicitation (updated 31 Mar 2021)and Associated Baa Templates For Submission Are Attached.*** the U.s. Armycombat Capabilities Development Command - Soldier Centerbroad Agency Announcement (baa) Identifies Scientific And Technical Areas Of Interest For Research And/or Exploratory Development. This Baa Is Conducted Using Full And Open Competition. In An Effort To Minimize Proposal Preparation Cost, This Baa Utilizes A Two-step Process. The First Step Will Be The Submission Of A Concept Paper. Offerors That Submit Concept Papers That Are Consistent With The Intent Of The Baa, And Are Of Interest To The Government Will Be Invited To Submit A Proposal (step Two). Such An Invitation Does Not Assure That The Submitting Organization Will Be Awarded A Contract. Instructions For The Submission Of A Concept Paper Are Required Prior To The Submission Of A Proposal. Failure To Follow This Two-step Process May Preclude The Chance For Award. Proposals Submitted In Response To The Baa Will Be Evaluated In Accordance With The Evaluation Criteria Set Forth In The Baa. Technical Evaluations Will Employ A Peer Or Scientific Review Process. A Proposal's Technical Evaluation And Its Importance To Agency Programs, Along With Funding Availability Are Primary Bases For Contract Award. Cost Realism And Reasonableness Shall Also Be Considered To The Extent Appropriate. Concept Papers Will Be Accepted Continuously Through 28 February 2025. This Baa Will Remain Open Continuously Through 28 February 2025. The Baa Technical Areas Of Interest Are Divided Into The Following Groups: a. Combat Feeding combat Feeding Equipment And Systems combat Ration Research And Development b. Soldier Protection And Survivability warfighter Systems Technologies 1. Integrated Protective Headborne Equipment And Injury Diagnostic/assessment Tools 2. Modular Personal Protection Equipment (mppe) And Injury Diagnostic/assessment Tools 3. Chemical/biological Protection For Individuals 4. Flame And Thermal Protection For The Individual Soldier 5. Counter Surveillance 6. Body Worn Interactive Materials 7. Materials Nanotechnology 8. Advanced Protection, Integration Technologies/systems And Assessment Methods 9. Integrated Sound, Light And Blast Management For The Ears And Eyes textile Technologies 1. Multi‐functional Materials 2. High Performance Multi‐component Fibers modeling And Simulation 1. Individual Ground Soldier And Small Unit Operational Effectiveness And Survivability c. Soldier Performance Optimization 1. Body‐worn Systems, Hand Held Devices, Smart‐lightweight Electronic Components, And Information processing To Increase Soldier Maneuverability And Protection Through On‐soldier Sensing, Remote Sensing, and Knowledge Management 2. Biomechanics 3. Anthropometry 4. Warrior Performance 5. Soldier Power Sources, Power & Data Distribution And Management 6. Future Warrior Technology Integration 7. Technology Assessment And Simulation Tools 8. Ecological Approach To Warfighter Survivability; Perception‐action‐cognition 9. Soldier Centric Sensors, Information Portrayal, & Data Management Technologies 10. Soldier/squad Performance Optimization 11. Human Factors d. Expeditionary Maneuver Support And Field Service Technologies 1. Research And Development 1.2 Chemical Biological Radiological Nuclear (cbrn) Protection 1.3 Electromagnetic Interference/electromagnetic Pulse (emi/emp) Protection 1.4 Environmental Protection And Energy Efficiency 1.5 Detection Avoidance 2. Maneuver And Movement/sustainment: Deployment/durability 3. Functional Integration Of Multiple Technologies 4. Miscellaneous 5. Unit/organization Equipment e. Aerial Delivery advanced Personnel And Cargo Airdrop Systems f. Simulation And Training Technology embedded Training (et) live Training Simulation Of Tactical Weapon System Lethality medical Simulation And Training advanced Interactive Simulation cyber Warfare For Training (cywar‐t) adaptive Instructional Systems battlespace Visualization And Interaction synthetic Environments dismounted Soldier Research contracting Office Address: acc-apg- Natick, Natick Contracting Division, Building 1, General Greene Avenue, Natick, Ma 01760-5011
Closing Date28 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a|||||| inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45| federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12||||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|314999|550|||||||||||| annual Representations And Certifications (may 2024)|13|314999|550|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The number Of Days Pricing Is Valid. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. the Following Applies If Reports Of Test And Inspection (roti) Are Required: the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). A Dedicated Roti Fax Has Been Added For Your Submittal Convenience. mark Packaging Label With The Nomenclature Cited On The Irpod. the Requirements To Comply With Mil-std-45662 Apply To This Item. Addition Tomil-std-129 Markings:mil-i-24244 Markings Apply. also, Mark Each Unit, Intermediate & Shipping Container Clearly With: "insulation Free Of Asbestos And Ceramic(refractory) Fibers. 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May be Made Only With Prior Approval Of The Naval Sea Systems Command. 3. Requirements 3.1 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. 6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. 6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. mark Packaging Label With The Nomenclature Cited On The Irpod. the Requirements To Comply With Mil-std-45662 Apply To This Item.addition To Mil-std-129 Markings:mil-i-24244 Markings Apply. Also, Markeach Unit, Intermediate & Shipping Container Clearly With: "insulation Freeof Asbestos And Ceramic(refractory) Fibers. date Of First Submission=045 Dac submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev). date Of First Submission=eoc submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired. the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Date23 Jan 2025
Tender AmountRefer Documents 

DIVISORIA NATIONAL HIGH SCHOOL BONTOC, SOUTHERN LEYTE Tender

Civil And Construction...+2Construction Material, Machinery and Tools
Philippines
Details: Description Select Item No Product/service Name Description Quantity Uom Budget 1 Construction Of Temporary Wash Facility Mobilization/temporary Structures 3 Lot 4947.27 2 Construction Of Temporary Wash Facility Safety And Health 3 Lot 4947.27 3 Construction Of Temporary Wash Facility Earthworks 56 Square Meter 1112.72 4 Construction Of Temporary Wash Facility Earthworks 27 Cubic Meter 5082.78 5 Construction Of Temporary Wash Facility Concreting Works-wall Footing-portland Cement 24 Bag 6469.68 6 Construction Of Temporary Wash Facility Wall Footing-crushed Gravel 3/4" 3 Cubic Meter 4914.69 7 Construction Of Temporary Wash Facility Wall Footing-washed Sand 2 Cubic Meter 2741.25 8 Construction Of Temporary Wash Facility Column-portland Cement 21 Bag 5660.97 9 Construction Of Temporary Wash Facility Column-crushed Gravel 1" 2 Cubic Meter 3739.50 10 Construction Of Temporary Wash Facility Column-washed Sand 2 Cubic Meter 2741.25 11 Construction Of Temporary Wash Facility Beam-portland Cement 12 Bag 3234.84 12 Construction Of Temporary Wash Facility Beam-crushed Sand 3/4" 2 Cubic Meter 2493 13 Construction Of Temporary Wash Facility Beam-washed Sand 1 Cubic Meter 1370.63 14 Construction Of Temporary Wash Facility Slab On Grade-portland Cement 27 Bag 7278.39 15 Construction Of Temporary Wash Facility Slab On Grade-crushed Gravel 3/4" 3 Cubic Meter 4914 16 Construction Of Temporary Wash Facility Slab On Grade-washed Sand 2 Cubic Meter 2741.25 17 Construction Of Temporary Wash Facility Handwashing-portland Cement 6 Bag 1617.42 18 Construction Of Temporary Wash Facility Handwashing-crushed Gravel 3/4" 1 Cubic Meter 1246.50 19 Construction Of Temporary Wash Facility Handwashing-washed Sand 1 Cubic Meter 1370.63 20 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 12mmx6m, Grade 40 690 Kilo 31473.58 21 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 10mmx6m, Grade 40 129 Kilo 5866.98 22 Construction Of Temporary Wash Facility Rebar Works-g.i. Tie Wire 18 Kilo 1489.50 23 Construction Of Temporary Wash Facility Rebar Works-coco Lumber, 2"x3"x12" 216 Board Feet 4903.20 24 Construction Of Temporary Wash Facility Rebar Works-plywood Ordinary, 1/4", 4'x8' 6 Piece 2922 25 Construction Of Temporary Wash Facility Rebar Works-cwn, Assorted 3 Kilo 240 26 Construction Of Temporary Wash Facility Beams-coco Lumber, 2"x2"x12" 60 Board Feet 1362 27 Construction Of Temporary Wash Facility Beams-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 28 Construction Of Temporary Wash Facility Beams-cwn, Assorted 3 Kilo 240 29 Construction Of Temporary Wash Facility Handwashing-coco Lumber, 2"x2"x12" 24 Board Feet 544.80 30 Construction Of Temporary Wash Facility Handwashing-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 31 Construction Of Temporary Wash Facility Handwashing-cwn, Assorted 3 Kilo 240 32 Construction Of Temporary Wash Facility Masonry Works-masonry Wall-chb 6" Thk 906 Piece 27352.14 33 Construction Of Temporary Wash Facility Masonry Wall-portland Cement 24 Bag 6480 34 Construction Of Temporary Wash Facility Masonry Wall-washed Sand 3 Cubic Meter 5754 35 Construction Of Temporary Wash Facility Masonry Wall-10mm X 6m Rsb 96 Kilo 4587.84 36 Construction Of Temporary Wash Facility Masonry Wall-g.i. Tie Wire 3 Kilo 255 37 Construction Of Temporary Wash Facility Plastering-portland Cement 30 Bag 8100 38 Construction Of Temporary Wash Facility Plastering-washed Sand 3 Cubic Meter 5754 39 Construction Of Temporary Wash Facility Doors And Windows-d-3 Flush Door O 70m X 2.10m On 150mm Wooden Jamb Complete With Accessories 6 Set 24507 40 Construction Of Temporary Wash Facility Steel Works-lc 75x38x15x2.0mm 272 Kilo 13837.81 41 Construction Of Temporary Wash Facility Steel Works-l 50 X 50 X 6mm 55 Kilo 5556.98 42 Construction Of Temporary Wash Facility Steel Works-g I Pipe 75mm Sch 40 6 Piece 12432 43 Construction Of Temporary Wash Facility Steel Works-tubular 50mm X 100mm X 1.5mm 6 Piece 8227.50 44 Construction Of Temporary Wash Facility Steel Works-50mm X 75mm X 1.2mm Tubular Pipe 15 Piece 9375 45 Construction Of Temporary Wash Facility Steel Works-welding Rod 9 Kilo 1012.50 46 Construction Of Temporary Wash Facility Roofing Works-long Span Roofing, Corrugated, Pre-painted, 1220mm X 0.4mm Thick 26 Meter 10313.22 47 Construction Of Temporary Wash Facility Roofing Works-flashing Ga 26, 24"x8" 6 Piece 2988 48 Construction Of Temporary Wash Facility Roofing Works-teckscrew 2-1/2" 207 Piece 517.50 49 Construction Of Temporary Wash Facility Roofing Works-roof Sealant 6 Liter 1800 50 Construction Of Temporary Wash Facility Roofing Works-polycarbonated Sheets Twin Wall 6mm Thick Including Accessories 20 Square Meter 35006.40 51 Construction Of Temporary Wash Facility Carpentry Works-ceiling-rough Lumber, Sun Dried, Tanguile, 2"x2"x12" 84 Board Feet 4121.88 52 Construction Of Temporary Wash Facility Ceiling-plywood Marine 1/4" X 4'x8' 9 Piece 5435.10 53 Construction Of Temporary Wash Facility Ceiling-finishing Nails 3 Kilo 256.20 54 Construction Of Temporary Wash Facility Ceiling-common Wire Nails 3 Kilo 292.80 55 Construction Of Temporary Wash Facility Ceiling-fascia Board, Fiber Cement 10" X 12' 12 Piece 5160.60 56 Construction Of Temporary Wash Facility Ceiling-ceiling Vent 1" X 12" X 4' With Screen 3 Piece 896.70 57 Construction Of Temporary Wash Facility Electrical Works-roughing-ins-electrical Conduit Upvc, 15mm 15 Piece 2085 58 Construction Of Temporary Wash Facility Junction Box, 4"x4" G.i. 3 Piece 120 59 Construction Of Temporary Wash Facility Utility Box, 2"x4" G.i. Wires & Fixtures 6 Piece 201.60 60 Construction Of Temporary Wash Facility 3.5 Mm2 Thw Wire, Stranded 144 Meter 6422.40 61 Construction Of Temporary Wash Facility Single Switch With Plate 9 Piece 1620 62 Construction Of Temporary Wash Facility Ceiling Receptacle 3-1/2" 9 Piece 342 63 Construction Of Temporary Wash Facility Incandescent Bulb 50w 9 Set 1847.25 64 Construction Of Temporary Wash Facility Electrical Tape 3 Piece 162.39 65 Construction Of Temporary Wash Facility Plumbing Works-water Closet 1.6gpf With Accessories 6 Set 26,220.00 66 Construction Of Temporary Wash Facility Plumbing Works-water Closet Flange 6 Set 1,809.00 67 Construction Of Temporary Wash Facility Plumbing Works-faucet, Plain Bibb, Brass 1/2" 9 Piece 1,591.20 68 Construction Of Temporary Wash Facility Plumbing Works-s S Floor Drain 4'x4" 15 Piece 1,681.95 69 Construction Of Temporary Wash Facility Plumbing Works-gate Valve, 1/2" 3 Piece 975.00 70 Construction Of Temporary Wash Facility Plumbing Works-pp-r Pipe 1/2" 15 Piece 4,350.00 71 Construction Of Temporary Wash Facility Plumbing Works-pp-r Elbow 90o X 1/2" 15 Piece 235.50 72 Construction Of Temporary Wash Facility Plumbing Works-pp-r Tee, 1/2" 9 Piece 171.90 73 Construction Of Temporary Wash Facility Plumbing Works-pp-r Coupling Reducer, 1/2" X 3/4" 3 Piece 45.90 74 Construction Of Temporary Wash Facility Plumbing Works-pp-r Adapter Female Thread 1/2" 15 Piece 1,702.35 75 Construction Of Temporary Wash Facility Plumbing Works-teflon Tape 3 Roll 86.40 76 Construction Of Temporary Wash Facility Sanitary Works-upvc Sanitary Pipe 4" 6 Piece 6,034.80 77 Construction Of Temporary Wash Facility Upvc Sanitary Pipe 2" 15 Piece 7,186.50 78 Construction Of Temporary Wash Facility Upvc Elbow 90o X 2" 9 Piece 499.50 79 Construction Of Temporary Wash Facility Upvc Tee 2"x2" 9 Piece 502.20 80 Construction Of Temporary Wash Facility Upvc Elbow 90o X 4" 9 Piece 1,114.20 81 Construction Of Temporary Wash Facility Upvc P-trap 2" 15 Piece 1,872.00 82 Construction Of Temporary Wash Facility Brass Cleanout 4"x4" 3 Piece 1,365.00 83 Construction Of Temporary Wash Facility Pvc Cement 3 Can 630.00 84 Construction Of Temporary Wash Facility Chb, 4"x8"x16", Standard 600 Piece 16974 85 Construction Of Temporary Wash Facility Deformed Round Bars, 10mmx6m, Grade 40 534 Kilo 25519.86 86 Construction Of Temporary Wash Facility Portland Cement 30 Bag 8100 87 Construction Of Temporary Wash Facility Washed Sand 6 Cubic Meter 11509.98 88 Construction Of Temporary Wash Facility G.i. Tie Wire 9 Kilo 738 89 Construction Of Temporary Wash Facility Painting Works-concrete Surface-neutralizer 1 Gallon 348.30 90 Construction Of Temporary Wash Facility Concrete Surface-latex, Flat 3 Gallon 2926.11 91 Construction Of Temporary Wash Facility Concrete Surface-latex, Semi Gloss 3 Gallon 3279 92 Construction Of Temporary Wash Facility Concrete Surface-acri Color 3 Quart 343.20 93 Construction Of Temporary Wash Facility Wood Surface-enamel Flatwall 1 Gallon 1708.50 94 Construction Of Temporary Wash Facility Wood Surface-enamel Semi Gloss 1 Gallon 1738.50 95 Construction Of Temporary Wash Facility Wood Surface-paint Thinner 1 Gallon 753 96 Construction Of Temporary Wash Facility Tile Works-wall-glazed Wall Tiles 20cm X 20cm 1092 Piece 21294 97 Construction Of Temporary Wash Facility Wall-tile Adhesive 25kg/bag 9 Bag 2621.97 98 Construction Of Temporary Wash Facility Wall-tile Trim 6mm 12 Piece 1476 99 Construction Of Temporary Wash Facility Wall-tile Grout 5 Kg/bag 6 Bag 1170 100 Construction Of Temporary Wash Facility Flooring-unglazed Floor Tiles 20cm X 20cm 291 Piece 5674.50 101 Construction Of Temporary Wash Facility Flooring-tile Adhesive 25kg/bag 3 Bag 873.60 102 Construction Of Temporary Wash Facility Flooring-tile Grout 5kg/bag 3 Bag 585 103 Construction Of Temporary Wash Facility Handwashing-unglazed Floor Tiles 20cm X 20cm 195 Piece 3802.50 104 Construction Of Temporary Wash Facility Handwashing-tile Adhesive 25kg/bag 3 Bag 872.99 105 Construction Of Temporary Wash Facility Handwashing-tile Grout 5kg/bag 3 Bag 585
Closing Date21 Jan 2025
Tender AmountPHP 504.6 K (USD 8.6 K)

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 10- Arts And Crafts Support Service Area: Skills Development) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 597,951.44 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 10- Arts And Crafts Support Service Area: Skills Development) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 1,000.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Sewing Machine Singer,15ch 179 Sewmaster, Automatic Bobbin Winder, Variable Stitch Length Control, Forward And Reverse Function, Numbered Dial Tension, Threadle Or Motor Options, Drop Feed Knob 5 Piece Utility Shelf, 1713s Utility Shelf 2 Pieces Table, Folding Table Ft-02 1200mm L X 400mm D X 750mm Ht., Structure: Melamine 3 Pieces Chairs, Cod Armchair Backrest Wood Horn Chair, 43x48x74, Material: High Quality Iron Wood, Max:150kg 6 Pieces Storage Cabinet, Dimension: 48*30*83cm, Material: Plastic, 3 Pieces Cork Bulletin Board, Wooden Frame, 30x40cm 1 Piece Glue Gun, Mitsushi Mit-gl40 40w, 100-240v, Hot Melt Glue Gun 2 Pieces Acrylic Color, Faber Castell, 12ml, 12 Colors 3 Pieces Scissors, Maped Reflex 3d Vivo Scissors, 16cm 4 Pieces Cutters, Ida Wallpaper Blade Cutter, Length 15cm, Width: 15cm 3 Pieces Watercolors, Prang 16 Watercolor Set 3 Sets Art Paper (multiple Colors), Avia Colors Assorted Colored Paper, 250 Sheets, 80 Gsm, Size: 8.5" X 11" 3 Reams Paint Brushes, Deli 73885 Brush Set 3 Pieces Yarn, Color, Dmc Natura Happy Cotton, 100% Cotton Yarnfor Crochet, Knitting And Yarn Crafts, Thickness: Light (8 Ply), Weight: 20 Grams, Length:43 Meters 10 Pieces Glue, Elmer's Glue, White 225 Grams 5 Pieces Colored Pencils, Staedtler Colored Pencil 136 C36 Luna Permanent 36 Colors 3 Sets Colored Pens, Faber-castell Coloring Pen, 12 Colors 3 Sets Sewing Pins, 40 Pieces 3 Pieces Sewing Needles, 16 Pcs Set Hand Sewing Needle, Size: S: 4cm (8pcs), M:4.5cm (6pcs)* L:5cm (2pcs), Mateial;stainless 10 Pieces Rotary Cutter, 45mm Fabric Rotary Cutter, Length:45m, Material:stainless Steel Blade+abs Handle, Color: Orange. Length: 165mm, Blade Diameter:45mm, Suitable For:leather Fabric Vinl Fiber Paper 2 Pieces Tape Measure, Deli 79650 Measuring Tape 150cm/60 Inches (1.5m*7mm) 10 Pieces Crochet Hooks, 100pcs Crochet Hook Set,perfect Round Point, Material: Plastic+metal, Size:18*13*3cm, Hook Size: 2mm,2.5mm,3.0mm,3.5mm,4.0mm,4.5mm,5.00mm,5.5mm,6.0mm,6.5mm 2 Pieces Knitting Needles, Sizes: 4,5,6 And 8 2 Pieces Crochet Thread, 5 Ply Monaco 100% Mercerized Cotton, Assorted Colors, Length:105 Meters, 50 Grams 20 Pieces Sewing Thread, Apple Spun Polyester Sewing Thread, Assorted Colors, 100 Meters, Polyester Material, 10pcs/box 2 Boxes Convertible Drawing And Drafting Table, Size: 24”x36” ▪color:raw Sienna / Brown ▪weight: 10-11kg 1 Piece Studio/painting Easel, Sizes: 85" - 120" Tall 2 Pieces Table/desk Painting Easel, Could Be An H Or An A Easel Type, For A Easel 38" To 75", For H Easel 84" To 96" 5 Pieces Manual And/or Electric Pencil Sharpener, Pencil Sharpener Hand Crank Manual Mechanical Pencil Sharpener,aluminum Alloy Knife Structure,cutting Outer Diameter Of 6.5-8mm Pencil 4 Pieces Wooden Mannequin, With Stand 11.5/14/21/30cm Wooden Human Mannequin Model Artist Movable Limbs Doll 2 Pieces Transparent Edge T-square, Hardwood Blade Dimensions: 30x13.5x0.2 Inches Weight: 14.4 Ounces Color: Wood Size: 36’’ 2 Pieces Carpentry Tools, Tool Set Includes: 1 – 9” Plastic Torpedo Level 1- Magnetic Bit Holder 1” Cr-v Bits Nut Drivers: 3/16”,1/4”,9/32”,5/16”, 11/32”,3/8” 10ft/3m Tape Measure 150mm Mini Saw 7” Locking Pliers 7-12” Diagonal Cutting Pliers 8” Long Nose Pliers 8” Adjustable Wrench 8” Water Pump Pliers Zinc-alloy Utility Knife Utility Knife Blade Black Cable Ties 160oz Claw Hammer Combination Wrench: ¼”, 5/16”, 3/8”, 7/16”. ½”, 9/16” Precision Screwdrivers:ph1, Ph0, Slotted:1/4, 2.0, 2.4, 3.0mm Metric Hex Keys: 1.5, 2, 2.5, 3, 4,5,5.5, 6mm Sae Hex Keys: 1/16”, 5/65”, 3/32”, 1/8”, 5/32”, 3/16”, 7/32”, ¼” 16” Zipper Tool Bag Item Weight; 8.8 Pounds 17.7x9x9 Inches 2 Sets T50 Staple Gun, Size: 7x9x3 Inches 5/16” Staples 3 Pieces Slop Sink, Size: 30.2x18.4x10.0inch Color: 30”m Style: Single Bowl Material: Stainless Steel Thickness: 3.0-1.2mm 1 Piece Roofing Square Dual Marking Right Angle Picture Framing Carpenter Ruler, Steel 90 Degrees Roofing Square Measuring Size: 20x 30cm/8x12” Rustproof Size: 30x20.5x 20.5 Weight: 0.16kg 3 Pieces Professional Compound Mitre Box & Saw, Adjustable Angle 20x8x9 Inches Miter Box 22 Inches Back Saw 2 Pieces Drawing Lamp, Overall Dimensions: 1.5 “w X 3.5 “d X 29.5 “h Long, Bendable Neck 21” (53 Cm) 28 Led Bulbs Stainless Steel Wattage: 1 Can Be Mounted To Table, Desk Or Easel Usb Plug 2 Pieces Artists Taboret Made Of Beechwood. Measures 35-1/2"h X 17-1/2"w X 14-1/2"d 1 Piece Open Shelves Utility Rack, 72" Height X 48" Width X 18" Depth Five Adjustable Shelves 4,000 Lb. Capacity Steel Frame Particle Board For Shelves Rivet Lock Design With Nuts And Bolts 2 Pieces Chisel Rack For Wood Carving, 3/4″ Thick, And 2 Pieces 3/8″ Tall Plywood Number Of Slots May Vary 2 Pieces Corner Clamp, Maximum Clamping Range 7.5cm, Generally 4 Right-angle Clamp All Together To Use. Material: Aluminum Type: 4 -inch 20.00 X 10.00 X 10.00 8 Pieces Decorative Realistic Artificial Fruits, Assorted Plastic Fruits And/or Eco-friendly Foam Material 2 Sets Geometric Shapes Set, 8-12 Shapes/forms Wood And/or Non-toxic Plastic Shapes Include Sphere, Square, Cylinder, Round Cylinder, Cone, Cube, Hexagonal Prism, Triangular Prism, Square Based Pyramid, Octagonal Prism, Pentagonal Prism, And 1/2 Sphere 2 Sets Geometric Designer Templates, Scale: 0-20 Cm/0-24 Cm Size : 8-1/4" X 5.1" (l*w) Plastic And/or Steel Material 4 Pieces Stack Rack, Dimension: 30 In H X 21 In W X 17 In L At Least 6 Shelves May Be Wooden Or Metal Materials Devised With Rollers To Roll The Rack In Any Location 4 Pieces Picture Frame And Miter Clamp, Weight: 2.5 Pounds Dimensions: 23.9 X 9 X 1.6 Inches Wood Material 4 Pieces Heat Gun, Power: 2,000 Watts Temperature: 50 / 380 / 570 Celcius Steps: 3 Steps Air Flow: 500 / 300 / 500 L/min 4 Pcs Nozzles (air Blast, Reducing, Reflector, Paint Scraper) 1 Pc Scraper 4 Pieces Hot Plate Single Electric Stove, Power:1000w Non-stick Coating Auto-thermostat Various Heat Operations Operating On/off Indicator Light 2 Pieces Tape Dispenser, Weight: 1 Kg Hard Durable Plastic Material 2 Pieces Multi-function Three-hole Puncher, 11.75 X 2.75 X 2.75 Inches High Quality Metal Construction With Clip-in Rings 2 Pieces Metric Scale, 30 Centimeters In Length Scale: 1:1, 1:10, 1:2, 1:20, 1:5, 1:50, 1:100, 1:200, 1:500, 1:1000, 1:1250 And 1:2500 4 Pieces Steel Tape Measure, Tape Rule With First 6 Feet Reinforced With Bladearmor Coating For Maximum Durability 11-inch Tape Standout; 16-inch And 19.2-inch Stud Center Markings Simplify Framing Jobs Mylar Polyester Film Extends The Life Of The Entire Blade Heat-treated Spring Provides Long Life And Smooth Blade Recoil Stanley's Limited Lifetime ; Measures 1-1/4-inch-by-25-feet 3 Pieces Heavy Duty Circular Saw, Corded Or Cordless Adjustable Depth Diameter: 4 1/2 In. With Electric Brake Maximum Cutting Depth At 45 Degrees: 1 In. Maximum Cutting Depth At 90 Degrees: 1-9/16 In. Maximum Speed: 4500 Rpm Spindle Lock 20 Volt 5.5 Lb. 4 Pieces Abrasive Disc Cutter Machine, Electric Powered 18.5” H X 12.2” W X 21.25” D 2200w 14” Blade Diameter 15 Amps Motor (3600 Rpm) Cutting Capacity Of 4.5” At 90˚ And 45˚ 2 Pieces Manual Canvas Pliers, Specifically Designed For Electrical And Mechanical Works 3 Pcs. In 1 Set 1 Combination Plier 6" 1 Cutter Plier 6" 1 Long Nose 6" Offers Comfortable Hand Grip 3 Set Jet-bow Compass Set, Set Includes 6" Speed Compass With Inter-changeable Pen, Pencil, Divider Parts, And Replaceable Needle Points. 4½" Bow Compass With Inter-changeable Pen, Pencil, And Divider Parts. 6" Beam Bar And Slide Coupling For Circles Up To 28" In Diameter And 6" Friction Divider With Self Centering Gear Head And Replaceable Needle Points. Set Also Includes Mechanical Lead Holder, Slip Handle For Spare Ruling Pen, Lead Pointer, Center Tack, And Screwdriver. Packaged In See-through, Hard Plastic Case. 2 Sets Human Head Model, Plastic, Life-size Anatomical Cast With Removable Jaw And 3 Removable Lower Teeth Type: Skull Model Material: Pvc Dimension: App.21x15x19cm/8.27x5.91x7.48in Color: As The Picture Shown Quantity: 1 Set 1 Set Screw Drivers Set, Philips Or Slotted Sl 3/16 In. X 3 In. (x2), 3/16 In. X 6 In., Sl 1/4 In. 1.5 In., Sl 1/4 In. X 4 In. (x2), Sl 1/4 In. X 6 In. Ph1 X 4 In. (x 2), Ph2 X 1.5 In., Ph2 X 4 In. (x2) 2 Offset Screwdrivers 6 Precision Screwdrivers: Ph0, Ph1, Sl 1.4 Mm, Sl 2 Mm, Sl 2.4 Mm, Sl 3 Mm 2 Sets Pliers And Grip Set, 10 Piece Tray Set Includes 1 Each Of The Following: 10r, 10wr, 7wr, 7r, 7cr, 6ln, 9ln, 5wr, 6r, 11r Weight: 11.80 Lb 28.00 X 11.80 X 1.30 Inches 2 Sets Artist Stool With Wheels, Height Adjustable & 360° Swivel Soft Pu Leather Cushion Detachable Design Dimension: Seat Diameter: 16.2" Seat Height: 25.6"-35.8" Full Height: 37.4"-47.6" Max Weight Capacity: 300lbs 6 Pieces Screen Print Squeegee, Material: Natural Rubber, Wood, Stainless Hardness: 70 Durometer Length: 25cm/10" Width: 10cm/3.9" Thickness: 2.3cm/0.9'' 8 Pieces Mixing Paint Palette, Material: Stainless Color: Silver Size: Approx 6.75" X 5.5"compact 12 Pieces Carving Chisels For Wood, Material: 45# Steel And Wood Color: Wood Color + Silver Quantity: 12 Pcs Total Weight : 892 Kg Wooden Handle Length Of Each Chisel: 95mm/3.74” Total Length Pf Each Chisel: 20.5mm / 8.07” Size: 1x V-straight Parting Tool: 14.6mm / 0.57” 1x Round Nose Chisel: 7.8 / 0.31 1x Skew Wood Turning Chisel: 7.8mm / 0.31” 1x Bent Chisel: 7.8mm / 0.31” 1x Wood Chisel: 7.8mm / 0.31” 1x Skew Wood Turning Chisel: 8mm / 0.31” 1x Pointed Wood Chisel: 8mm / 0.31” 2x Straight Chisel: 7.8mm 13.7mm”/ 0.31” 0.54” 3x Straight Gouge: 12.8” 16.1mm 11.7mm/ 0.50” 0.63” 0.46” 2 Sets Files Set For Jeweler, Wood Carving, Craft Metal And Glass Stone, 10 Pcs / Set 5x180mm Stone Precision Needle Files Tool Woodworking Carving The Craft Metal Rasp Wood Hand Tools Material: Metal Color: Gray/ Silver Model: Needle Files Size : 14.5x1x1 Weight: 0.05 Kg 2 Sets Heavy Duty Multi-purpose Bench Vise, Jaw Width: 5", Opening: 4-1/4" Durable Cast Steel Construction Head Swivel 360 Degree Full 360-degree Rotational Jaws Unique "v" Jaws Provide 4 Point Holding Power 2 Pieces Anvil, Weight: 55 Lbs. (sculpture) 9 Lbs. (jewelry Works) Metalsmith, Jewelers Forming Tool, Essential For Jewelry Repair, Shaping, Flattening, Hardening Metals Material: Iron Surface Size: (l X W X H): Approx. 6 X 3.3 X 9cm/2.36 X 1.3 X 3.54inch, Height: Approx. 5.5cm/2.17inch 1 Piece Welding Protective Suite, Made Of High-quality Denim Material, It Can Be Worn Many Times, It Will Not Fade For A Long Time. Unique And Comfortable Design, Wear-resistance And Dirty Resistance. Reinforced And Stitched The Crotch, Cuffs, Pockets To Prevent Accidental Tearing. The Highly Elastic Cuffs Make It Comfortable And Convenient To Wear. Size: 170 Height: 168-173cm Waist: 76-84cm/29.9-33 Inches Weight: 57.5-135kg 5 Pieces Welding Apron, Features: Material: Constructed With Artificial Cow Suede Which Is Not Only Durable But Also Flexible, And The Apron Offer Puncture Resistance, Tear Resistance And Cut Resistance. Size: (approx) (lxw) 90x60cm/35.4x23.6inch, Long Full Coverage Apron Protects You Until The Knee When You Are Working. Friendly: The Straps On The Waist Can Be Adjusted To Fit Your Body Better. They Are Designed To Hang Over The Shoulder Which Means That Weight Is Distributed Evenly Over The Shoulders. Never Suffer Neck And Back Pain Again. Pockets: 6 Pockets For Tools And Work Accessories, Include One Cell Phone Pocket And One Pencil Pocket. You Can Put Everything You Need Close To Hand In It Instead Of Constantly Search For Them. The Cell Phone Pocket Is Deep To Prevent The Phone From Falling Out. Application: Not Only For Woodworking And Welding But Also Useful For Many Other Work And Home Tasks Like Bbq And Gardening, Unique Gift Apron For Men, Women, Mothers, Fathers. Specifications: Material: Artificial Cow Suede Color: Yellow Size: (approx) (lxw) 90x60cm/35.4x23.6inch Package Included: 1 Pc X Apron 5 Pieces Welding Hood Caps, Flame Retardant Cloth Full Protection This Welding Hood Offers An Essential Mix Of Durability, Comfort And Protection. The Hood Features A Mesh Lining To Allow Sweat Vapour To Quickly Evaporate The Presoftened, Lightweight, Air Cushioned Fabric For Maximum Comfort. This Hood Can Protect Your Neck, Face And Head From Welding Fire Flash, Splash Very Well. Wear-resistant, Fire-retardant, Spark-proof, Double Protection Of Personal Safety And Sweat Absorption Specification: - Long :approx. 45cm/ 17.72inch - Shoulder Width: Approx. 43cm/16.93inch(xl) 5 Pieces Welding Gloves 10.5" Welding Leather Gloves Hgvc01 *winland* Product Description • Size: 10.5" • Use For Driver, Machining Operator Etc. • All Applications Which Require A High Level Of Anti-skid And Abrasion-resistant • Applying Universally To The Transporting And Cargo Handling Workers, Recycling Work, And Horticulture Workers, Drivers And Etc. • Cow Split Leather Gloves • Full Palm, Full Lining • Made With Top Quality Material For Industrial And Commercial Use 5 Pieces Welding Protective Visitor Glasses, Protective Visitor Glasses: Anti-fog With Uv Protection Glasses Product Name:safety Eyewear Glasses Color:clear, Dark Grey Feature:protective Glasses Lens Color:clear, Dark Grey Style:work Safety Glasses Package:blister Size: 17*17*7cm 5 Pieces Welding Helmet, Ingco Auto Darkening Welding Helmet Ahm009 Viewing Area:90×35mm Cartridge Size:110×90×10mm Arc Sensor:2 Light State:din 4 Dark State:fixed Shade 10 Shade Control:unadjustable Power On/off:fully Automatic Sensitivity Control:unadjustable,auto Uv/ir Protection:din 16 Power Supply:solar Cells. Re-chargeable Battery .no Battery Change Required Switching Time:1/5000s,from Light To Dark Dark To Light:0.15-0.45s Auto Low Amperage Tig:≥20amps(dc), ≥20amps(ac) Operating Tep:-5°c~+55°c Storing Tep:-20°c~+70°c 5 Pieces Welding Mask, Product Details Of Heavy Duty Welding Mask (108x50x3mm) Movable Glass Impacted Resistant Shell Anti Wear Moveable Type Glass Packing: Polybag With Color Sticker 5 Pieces Hard Hat, Hard Safety Helmet With Chin Strap Color: Blue, Orange, White, Yellow Material: Acrylonitrile Butadiene Styrene (abs) Shell, With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap Tough, Lightweight, Durable With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap. A Hard Hat Is A Type Of Helmet Predominantly Used In Workplace Environments Such As Industrial Or Construction Sites To Protect The Head From Injury Due To Falling Objects, Impact With Other Objects, Debris, Rain, And Electric Shock. Durable, Lightweight And Comfortable 12 Pieces Compact Electric Kilns, Degree F (max): 2300°f Cone: 6 Firebrick: 3" Volt: 240 / 208 Watt: 3,600 Ampere: 15 Recommended Breaker (amp): 20 Receptacle: 6-20 Size Interior (wide X High X Deep): 13.5 X 13.25" Size Exterior Including Stand (wide X High X Deep): 22 X 28 X 25.5" Volume (cu Ft.): 1.22 1 Piece Heat Press Transfer Machine, Electric Powered 21.2 X 20.2 X 19.2 In. 220v 1800w 0-400˚f (0-220˚c) 0-999 Sec. 1 Piece Rubber Mallet, Rubber Hammerhead Fiberglass Handle Packing: Color Label Weight: 32oz 4 Pieces Ball Peen Hammer, Material: Fiberglass Handle & Steel Head Size: 16 Ounce Weight: 3.7 Pound 4 Pieces Cutting Mat, Flexible Cutting Mat A2 Size (24 X 18 Inch) Self-healing 5 Layered Double Sided With Marked Pattern And Grids (green) Material: Polyvinyl Chloride Color: Green Item Dimensions: 15 X 15 X 15 Centimeters Shape: Hexagonal Weight: 200 Grams 6 Pieces Heavy Duty Extension Wire, Heavy Duty Extension Power Strip With Safety Switch Protection Socket 4 Meters, Extension 3 Pieces 36” Smart Led Tv, Width 96.74cm, Gross Weight: 10.8 Kg, Net Weight 7.9kg, Height 57.18, Length 7.99cm, Screen Size: 43-inch, Tv Resolution: Full Hd 2 Piece Laptop Computer, Laptop Screen Size: 15 Inches, Graphics Chipset: Integrated, Storage Capacity:512gb, Storage Type: Ssd, Ports/interface: Usb 2.0, Usb 3.0, Vga, Processor Type: Intel Core I7, Number Of Cores: Dual-core, Os:windows, Weight:3 Kg, Battery Capacity 4910mah, Cpu Frequency: 2.9ghz 1 Piece Photo Printer, Wireless Photo All-in-one With Auto Duplex Printing Print, Scan, Copy Auto Duplex Printing Wireless, Wireless Pictbridge, Mopria, Airprint, Direct Wireless Recommended Monthly Print Volume: 30 - 100 Pages Operating System: Win 8 / Win 7 / Vista / Xp, Mac Os X 10.7.5 And Later Borderless Printing: A4 / Letter / 4 X 6" / 5 X 7" / 8 X 10") Standard Paper Input (front Tray): 100 Sheets (a4/ Ltr) / 20 Sheets ( 4 X 6 “ ) Paper Weight: 64 To 105 G/m2 Up To 300 G/m2 Dimension (w X D X H): 449 X 304 X 152 Mm Weight: 5.4 Kg Interface / Connectivity: Usb 2.0 Hi-speed / Wireless Lan /wireless Pictbridge, Direct Wireless Scanner Type: Flatbed 1 Piece Portable Sound System With Microphone, Led Lights 2 Wireless Microphone Wired Microphone / Guitar / Line In Mic Priority Over Voice On/off Line Out Remote Control Usb / Bluetooth / Nfc / Fm Capabilities Frequency Response: 50hz-20khz Power System: Ac Adaptor / 12vdc In / Internal Rechargeable Battery 100v-240v, 60hz Power Supply Adaptor 1 Set 50” Led Tv, Height: 64.42 Cm, Width:111.68cm, Length:5.99cm, Gross Weight:16kg. Screen Size: 50-inch Led, Net Weight: 11.6kg, Tv Resolution: 4k Ultra Hd, Connectivity: Wireless Lan Built-in (wi-fi), Hdmi Ports: 3, Usb Ports:1 2 Piece Soft Box With Stand, 2 Pcs Studio Lighting Softbox 50*70cm, 2 Pcs 2m Light Stand, 2 Pcs 45w Light Bulb, Photography Kit 100-240v, Maximum Height: 200cm/78", Collapsible Height:65cm/32" 2 Pieces Display Panel Board, Product Weight:8kg, Choose Type:fabric,number Of Panels:4,type: Pole And Panel,graphic Type: Loop Nylon, 900x600mm Or 1000x700mm 6 X 900mm Poles 25 Mm Diameter With Clips Weight Approx 11-14kg 1 Piece Magnetic Whiteboard, Size:4x8 (48x96 Inches) Feet, Aluminum Frame,with Sliding Whiteboard Marker/eraser Tray,protective Plastic Rubber Corners 1 Piece Chalkboard, Length: 60.5", Height: 36.5",unit Weight: 24.00 Lbs Per Unit Color: Black Duro-slate Over ¼”hardboard Backing, Full Length Chalk Tray 1 Piece Offline Mini Compressor, 220v 60hz, Type: Single Cylinder Piston Compressor With Air Tank, Power: 1/6hp, Speed: 1700r.p.m, Air Output Per Min/lit.:20-23l/min, Auto Stop, Start At 3bar (43 Psi) Stop At 4bar (57psi), Working Pressure:0-4 Bar, Air Tank:3.0l, Suitable For Airbrush With Nozzle 0.2mm-1.0mm, Weight: 5kg, Dimension: 31x13x31cm 1 Pieces Styrofoam Cutter, Material:plastic, Size:approx. 190x90mm, Power: 2xc Size Battery (not Included), Feature: Electric Wire Needle Shap, Stainless Steel Wire, Hardness And Diameter Of 0.19mm 1 Piece Potter’s Wheel/electric Potter’s Wheel, Detachable Abs Basin, Advanced High-quality Brushless Motor, Rotary Speed:0-300 Rpm, Pottery Wheel: 25cm, Pottery Forming Machine:350w,electric Pottery Wheel With Foot Pedal And Detachable Basin, Rated Voltage: Ac 110v, Wheel Diameter: 25cm (9.8"), Speed: 0-300r/min, Working Noise:,60 Db, Gross Weight: 14kg (31.1 Lb), Package Dimensions (lxwxh) 53x42x35cm (20.8"x16.53"x13.78") 2 Pieces Weather-proof Safety Box Circuit Breaker, Metal Enclosure Panel Box, Weatherproof, Height:300mm, Depth:150mm, Door: 0.8mm, Body: 0.8mm, Plate: 0.8mm, Metal Body,width:400mm 1 Piece Fire Blanket, 120x99x4cm (l X W X H) Woven Glass Fiber 2 Pieces Exhaust Fan, Size: 12" 9" 6" Rpm: 1350, 1320, 1290 Finish: Power Coated 2 Pieces Medicine Cabinet, Stainless 20x26x5 Inch Single Door Medicine Cabinet 1 Piece Smoke Detector, 120 Volts Ionization Sensor, Clamshell Packaging 1 Piece Disposal Bins, 50 Cubic Movable Bins 2 Pieces Abc = 597,951.44
Closing Date28 Jan 2025
Tender AmountPHP 597.9 K (USD 10.2 K)
731-740 of 761 active Tenders