Electrical Tenders
Electrical Tenders
Caraga Regional Hospital Tender
Healthcare and Medicine
Philippines
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2024-01-15 (114) Supply And Delivery Of Various Cartridges And Filtering Materials For Hemodialysis Under Single-year Framework Agreement ( Early Procurement Activity ) Approved Budget For The Contract: Php 6,166,500.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Six Million One Hundred Sixty Six Thousand Five Hundred Pesos Only ( Php 6,166,500.00 ) As To Payment Under The Contract For Supply And Delivery Of Medicines And Fluids For Hemodialysis Under Single-year Framework Agreement (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding As Framework Agreement List. This Is A Lot Bid. Item No Description Qty Unit Of Measure Unit Cost Total Cost Lot 1 Hemodialysis Supplies 1 Bicarbonate Cartridge 12,000 Pcs 324 ₱3,888,000.00 650gm 36 Months Shelf Compatible For B-bruan Machine Total ₱3,888,000.00 Lot 2 Ro Supplies 2.1 Ro Membrane 4021 10 Pcs 15,000.00 ₱150,000.00 Size (approximate): 4" Dia. X 21"l Flow Rate: 900 Gpd (3.41 M³/d) Applied Pressure: 225 Psig (15.5 Bar) Stabilized Salt Rejection: 99.5% Active Surface Area: 36 Sq. Ft. Single Element Recovery: 8% Exterior: Tape-wrapped Membrane Type: Polyamide Thin-film Composite Maximum Operating Temperature: 113°f (45°c) Maximum Operating Pressure:600 Psig (41 Bar) Maximum Pressure Drop:13 Psig (0.9 Bar) Maximum Feed Flow Rate:14 Gpm (3.2m³/h) Ph Range, Continuous Operation*:2-11 Ph Range, Short-term Cleaning**:1-13 Maximum Feed Silt Density Index:5 Fere Clorine Tolerance***: <0.1ppm 2.2 Ro Membrane 4040 10 Pcs 15,000.00 ₱150,000.00 Size 100*100*1000mm Membrane Type: T.f.c Effctive Membrane Area: 7.2m2 Test Pressure: 15.5bar Capacity 2500gpd Part Number Dry (wet) 356603 / (356602) Feed Spacer Thickness (mil) 28 Active Area – Ft2 (m2) 94 (8.7) Permeate Flow Rate Gpd (m3/d) 2500 (9.5) Min. Salt Rejection (%) 99.1 Stabilized Salt Rejection (%) 99.2 2.3 Uv Lamp 2gpm 10 Pcs 4,000 ₱40,000.00 2gpm Approximate Flow Rate: 453 Liters / Hour. Input / Output: 1/2 “npt Male. Maximum Pressure: 8,61 Bar. Average Life Of Use: 8,000 Hours Or 1 Year. Material: Stainless Steel Aisi-304. Includes Transformer 220-240v 50/60 Hz 0.13a. 2.4 Uv Lamp 12gpm 10 Pcs 6,000 ₱60,000.00 12gmp Dimension 3"x40" Flow Rate (gpm) 12 Electrical 110-130v/50-60 Hz Maximum Operating Pressure 125 Psi Lamp Life 9000 Hrs ( Approx. 1 Year Of Use) Audible Lamp Failure Yes Led "power-on" Indicator Yes 2.5 Industrial Salt 250 Sack 600 ₱150,000.00 Moisture 0.6-1.5 % Purity (nacl) Min. 98.5-99 % Water Insoluble Matter 0.33 % So4 0.23 % Ca 0.06 % Mg 0.11 % Cu 0.01 % K 0.02 % Caso4 0.2 % Mgso4 0.11 % Mgcl2 0.36 % 5-6mm Max. 3 % 3-5mm 20-40 % 1-3mm 20-40 % +0.8mm 10-15 % -0.8mm Max. 3 % Yps Anti-caking Agent 80-100 Ppm Granulation 0-3, 0-5, 3-12, 0-12mm 2.6 Sediment Filter Sl 10” 1 Micron 200 Pcs 264 ₱52,800.00 Material: Food-grade Polypropylene Fibers Size: 10sl Filter Fineness 1mm Length 10" Width: 2.7cm 2.7 Sediment Filter Sl 10” 5.0 Micron 200 Pcs 216 ₱43,200.00 Filter Micron: 10 Material: Polypropylene (pp) Length: 10" (25.4 Cm) Diameter: 2.35" (6 Cm) 2.8 Sediment Filter 5 Micron Bb20 200 Pcs 660 ₱132,000.00 Dia:4.5inch Height: 20inch 2.9 Sediment Filter 1 Micron Sl20 200 Pcs 660 ₱132,000.00 Filter Micron: 1 Material: Polypropylene (pp) Length: 20" Diameter: 2.5 2.10 Sediment Filter 0.2 Micron Sl20 200 Pcs 660 ₱132,000.00 Filter Micron: 0.2 Material: Polypropylene (pp) Length: 20" Diameter: 2.5 2.11 Carbon Block Filter Cartridge Sl20 200 Pcs 1,740.00 ₱348,000.00 Filter Media:100 % Coconut Shell Carbon Dimensions: Standard Type: 28 X 1 Mm Id, 67 X 1.5 Mm Od:20” L 2.12 Water Softener Cartridge Sl20 200 Pcs 1,740.00 ₱348,000.00 Reduced By Ion Exchange Water Hardness Scale Removal Make Hard Water Into Soft Water To Avoid Drinking Hard Water Body With Stones Material: Resin Size: 20” 2.13 Absolute Filter Sl 10 0.2 Micron 200 Pcs 1,620.00 ₱324,000.00 0.2 Micron Absolute Pleated Filter Cartridge To Fit All Sl10 Standard-size Housing (2.5" X 10") Total ₱1,390,000.00 Lot 3 Hemoperf Cartridge 3.1 Hemoperfusion Cartridge Ha 130 30 Pcs 8,950.00 ₱268,500.00 Ha130 Disposable Hemoperfusion Cartridge Adsorbentvolume(ml) : 130 Biocompatibility : Tested Required In Iso10993 Adsorbent Material: Double Cross-linked Styrene-divinylbenzene Compolymers Housing Material: Polycarbonate Sterilization Method: Lrradiation Sterilization Unit Package: 195+2mm(l)*110+2mm(w)*110.5+2mm(h) 3,2 Hemoperfusion Cartridge Ha 230 5 Pcs 22,000.00 ₱110,000.00 Ha230 Disposable Hemoperfusion Cartridge Adsorbentvolume(ml) : 130 Biocompatibility : Tested Required In Iso10993 Adsorbent Material: Double Cross-linked Styrene-divinylbenzene Compolymers Housing Material: Polycarbonate Sterilization Method: Lrradiation Sterilization Unit Package: 232+2mm(l)*114+2mm(w)*114+2mm(h) 3.3 Hemoperfusion Cartridge Ha 330 15 Pcs 34,000.00 ₱510,000.00 Ha330 Disposable Hemoperfusion Cartridge Adsorbentvolume(ml) : 130 Biocompatibility : Tested Required In Iso10993 Adsorbent Material: Double Cross-linked Styrene-divinylbenzene Compolymers Housing Material: Polycarbonate Sterilization Method: Lrradiation Sterilization Unit Package: 285+2mm(l)*117+2mm(w)*108+2mm(h) Total ₱888,500.00 Grand Total ₱6,166,500.00 Terms Of Reference Bidders Must Submit The Following During Post-qualification: 1 Samples If Offered Item Is Not Previously Procured Or If Required By The Procuring Entity 2 Brochures Indicating Specification 3 Terms Of Delivery: 15 Calendar Days Upon Receipt Of Call-off 4 Delivery Schedule: Upon Call Off 5 This Procurement Is Under Framework Agreement -single Year Framework Agreement 6 Terms Of Payment. Payment Shall Be Made Upon Complete Delivery Per Call – Off. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. 7 This Procurement Is Lot Bid – Single Lot And Awarded In One Contract. Bidder Shall Bid All The Items In A Lot. 8 Product Expiration Date Must Be At Least 6 Months To 1 Year From Date Of Delivery 9 Validity Of The Contract / Contract Termination 10 Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: 11 A. When The Total Quantity Specified In The Contract Has Been Exhausted Within A Single Year 12 B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. 13 Repeat Order: 14 1. No Repeat Order For An Item In Contract Being Awarded Shall Be Allowed Until After The Procuring Entity Has Exhausted The Estimated Quantity For The Same Item Specified Therein Or After The Contract Has Expired, Whichever Comes First, And Subject To The Conditions Provided In Section 51 Of Ra 9184 And Its Irr. For This Purpose, The Repeat Order Shall Be Availed Of Only Within Six (6) Months From The Date Of The Last Of Final Delivery Order Contract For A Specific Item Where The Estimated Quantity Has Been Exhausted, Or The Expiration Of The Contract. 15 2. In Case Repeat Order Is Allowed And Resorted To, The Twenty-five (25%) Maximum Allowable Quantity Shall Be Based On The Aggregate Quantity Of Actual Items Ordered And Delivered. 16 General Conditions 17 All Other Rules Governing Contract Implementation And Termination Under Ra 9184 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3.(ra 9184). The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent ( 25% ) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Must Pertain To Hemodialysis Supplies Or Medical Supplies Or A Similar In Nature, As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 29, 2024 To January 15. 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference December 9, 2024 At 2:00 P.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/86588532546?pwd=z6l92bxp5um395pdgzmejhiz1thly9.1 Meeting Id: 865 8853 2546 Passcode: 188233 Deadline Of Submission Of Bids January 15, 2025 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids January 15, 2025 At 2:00 P.m. Via Zoom Platform Join Zoom Meeting Https://us06web.zoom.us/j/82209192664?pwd=ofzrjrf2nipkrnbna9ziqj6xqjea6l.1 Meeting Id: 822 0919 2664 Passcode: 481797 Complete Philippine Bidding Documents Please Click The Link Below: Https://drive.google.com/drive/folders/1pt6urjgywj9uetpvfbbyig7x0stk0sxl?usp=sharing Amount Of Bidding Documents: Lot 1: Php 5,000.00 Lot 2: Php 5, 000.00 Lot 3: Php 1,000.00 This Bidding Document Fee Is Only Applicable If A Bidder Will Only Bid One Lot. However, Bidder Who May Participate All The Lots, Bidding Documents Is Amounting To Php 10,000.00. Payment Of The Bidding Documents Is Non-refundable It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Framework Agreement Guidelines F. Framework Agreement Lists G. Other Documents Essential Documents Required By This Procuring Entity And Ra 9184 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before January 15, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On January 15, 2025 At 2:00 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 Direct Line: (086) 826-9058 Mobile Nos. 09850508783 (smart/tnt) 09539212832 (globe/tm) E-mail Address: Crhprocurement.bac@gmail.com Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee
Closing Date15 Jan 2025
Tender AmountPHP 6.1 Million (USD 106.4 K)
Handwerkskammer Ostmecklenburg Vorpommern Tender
Others
Germany
Details: Description of the procurement (type and scope of the service or information on needs and requirements) House 1000: - Repair work in the sanitary and toilet rooms or in the bakery and confectionery area after the wall tiles were removed, approx. 1,650 m² - Repair work after closing the door opening, approx. 40 m² - Repair work after wall demolition, approx. 40 m² - Renewal of plaster on damp wall surfaces, approx. 500 m² Houses 2200-2400: - Repair work after installing new glass facades, approx. 200 m² - Repair work after closing the door/wall opening, approx. 290 m² - Repair work after wall demolition, approx. 40 m² - Rapp plaster on sand-lime brick walls and concrete surfaces, approx. 35 m³ House 4000: - Repair work after laying electrical cables for sun protection, approx. 200 M - Repair work after making a new door opening - Repair work after resealing wall openings for technical installations
Closing Date31 Mar 2025
Tender AmountEUR 6.5 Million (USD 6.7 Million)
The City Government Of Baguio Tender
Others...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 1 Lot Various Materials For Smart City Command Center 15,500,000.00 22 Unit 16 Port Poe Switch - 16 Port Poe Switch - Cpu Core Count 1 Cpu Nominal Frequency 800 Mhz Size Of Ram 256 Mb Storage Size 16 Mb Storage Type Flash Mtbf Approximately 200'000 Hours At 25c Cooling Type Passive Poe-out Ports Ether1-ether16 Poe Out 802.3af/at Max Out Per Port Output (input 18-30 V) 1.1 A Max Out Per Port Output (input 30-57 V) 0.6 A Max Total Out (a) 2.8a (18v-30v) & 1.4a (48v-57v) X2 10/100/1000 Ethernet Ports 16 Number Of 1g Ethernet Ports With Poe-out 16 Sfp+ Ports 2 Certification Ce, Eac, Rohs Ip Ip54 Warranty :1 Year 88 Unit Adjustable Stainless Steel Strapping Band - Adjustable Stainless Steel Strapping Band - Material: Stainless Steel 304 Width: 1/2 Inch Thickness: 0.5 Mm Length: 30 Meters 44 Unit Cable Loop Holder - Cable Loop Holder - Galvanized Steel Pole Mountable 4 Branches At Least 400mmx400mm 1 Box Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable 40 Unit Cctv Channel License - Cctv Channel License - Single Anpr Camera Connection For Use With Central Software Warranty :perpetual Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 1 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Unit Cctv Lpr Camera - Cctv Lpr Camera - Camera Image Sensor 1/1.8″ Progressive Scan Cmos Max. Resolution 2688 × 1520 Min. Illumination Color: 0.001 Lux @ (f1.2, Agc On) Shutter Time 1/25 S To 1/100,000 S Day & Night Ir Cut Filter Lens Focal Length & Fov 2.8-12 Mm: Horizontal: 113.5° To 39°, Vertical: 58.4° To 22.7°, Diagonal: 141.3° To 44.3° Aperture 2.8-12 Mm: F1.38, 8-32 Mm: F1.7, 10-50 Mm: F1.7 Illuminator Built-in Supplement Light Type Ir Light Built-in Supplement Light Range Up To 40 M Ir Wavelength 850 Nm Video Main Stream 50 Hz: 25 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Sub-stream 50 Hz: 25 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Video Compression H.264 And H.265 Encoding Main Stream: H.265/h.264/mjpeg Sub-stream: H.265/h.264/mjpeg Video Bit Rate 32 Kbps To 16 Mbps Protocols Tcp/ip,icmp,http,https,ftp,sftp,dhcp,dns,ddns,rtp,rtsp,rtcp,ntp,smtp,snmp,igmp,qos,ipv4/ipv6,udp,ssl/tls,isup,arp,802.1x Simultaneous Live View Up To 6 Channels Road Traffic And Vehicle Detection Coverage Up To 3 Lane(s) Smart Function Traffic Flow Detection:average Speed, Traffic Flow, Queuing Length, And Traffic Status Incident Detection: Congestion, Stopped Vehicle, Lane Change, Wrong-way Driving, Speeding, Low-speed Driving Capture Speed Range 5 To 120 Km/h Blocklist And Allowlist Max. 50000 Records Warranty :2 Years Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 2 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 5 Unit Cctv Nvr - Cctv Nvr - Supports Redundant Power Supply To Improve The System Stability Supports Hdd Hot Swap With Raid0, Raid1, Raid5, Raid 6, And Raid10 Storage Scheme Configurable. Either Normal Or Hot Spare Working Mode Is Configurable To Constitute An N+1 Hot Spare System. Supports Some Specialist Cameras, Including People Counting Camera/anpr (automatic Number Plate Recognition) Camera/fisheye Camera Supports Video Analytic Functions Such As Vehicle Detection, License Plate Recognition --video & Audio Input -ip Video Input 128-ch -incoming/outgoing Bandwidth 576 Mbps/512 Mbps -incoming/outgoing Bandwidth (raid Mode) 576 Mbps/512 Mbps -tls Outgoing Bandwidth 128 Mbps, Or 64 Mbps (when Raid Is Enabled) --video & Audio Output -protocol Hikvision, Acti, Arecont, Axis, Bosch, Brickcom, Canon, Hunt, Onvif (version 2.5), Panasonic, Pelco, Rtsp, Samsung, Sony, Vivotek, Zavio --video & Audio Output -hdmi Output Two Independent Hdmi Outputs Of 4k Resolution. Resolution: 4k (4096 × 2160), 4k (3840 × 2160)/30hz, 2k (2560 × 1440)/60hz, 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz -vga Output 1-ch. Resolution: 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz --video & Audio Decoding -decoding Format H.265, H.265+, H.264, H.264+, Mpeg4, Mjpeg (for Hikvision Ip Camera Only) -video Resolution 32 Mp/24 Mp/12 Mp/8 Mp/7 Mp/6 Mp/5 Mp/4 Mp/3 Mp/1080p/uxga/720p/vga/4cif/dcif/2cif/cif/qcif *: 32 Mp And 24 Mp Is Only Available For Channel 1 To 4 When Ultra Hd Resolution Mode Is Enabled -synchronous Playback Up To 16 Channels -capability 1-ch@32 Mp (8160 × 3616, 30 Fps)/5-ch@8 Mp(30 Fps)/10-ch@4 Mp(30fps)/20-ch@1080p(30 Fps)/40-ch@720p(30 Fps) *: The Length Or Width Of Camera Resolution (each Track) Cannot Exceed 4096 Pixels --hdd -interface 16 Sata Interfaces Supporting Hot-plug -capacity Up To 10 Tb For Each Hdd -storage Extension 1 × Esata Interface, 2 × Mini Sas Interface (optional) --raid Raid Type Raid0, Raid1, Raid5, Raid 6, And Raid10 --network Management -protocol Ipv6, Https, Upnp, Snmp, Ntp, Sadp, Smtp, Nfs, Iscsi, Pppoe, Ddns Network Interface 4, Rj45 10m/100m/1000m Self-adaptive Ethernet Interface --external Interface -usb Interface Front Panel: 2 × Usb 2.0; Rear Panel: 2 × Usb 3.0 Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 3 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) -alarm Input/output 16/8 --general -power Supply 100 To 240 Vac, 50 To 60hz, 5 A -fan Redundant Dual Ball Bearing Fan; Speed Adjustable -consumption (without Hdd) ≤ 140w -warranty :2 Years 1. Responsibility Of The Supplier 1.1 Supply And Delivery Of Ict Equipment 1.2 Inventory Of The Items Deliverd With The Following Details 1.2.1 Brand 1.2.2 Model 1.2.3 Serial Number 1.2.4 Quantity 1.3 The Bidder Must Ensure That All Components Delivered Will Be Brand New 1.4 All Equipment Provided Must Be Compatible And Working With The Cctv System As A Whole 1.5 Materials And Equipment Delivery Within 90 Days 1.6 Cctv Contractor Should Have Manufacture Authorization And Certification. 1.7 Contractor Must Have A Valid Iso 9001:2015 Certificate 1.8 All Equipment Provided Must Be Capable/compatible To Interconnect With The Existing Systems Located At The Smart City Command Center (sc3) To Be Viewable And Configurable In The Sc3. 80 Unit Cctv Nvr Surveillance Hard Drive - Designed And Built To Handle Heavy Surveillance Workloads Advanced Vibration Management Capacity 10tb Interface Sata 6 Gb/s Max. Sustained Transfer Rate Od (mb/s) 250mb/s Cache (mb) 256 Tarnish Resistant Yes Mtbf 1,500,000 Hr Warranty :2 Years 15 Set Command Center Desktop Computer - Minimum Specifications: Operating System: Microsoft Windows 11 Pro 64bit Processor: Intel Core I5 14600k Turbo Frequency 5.3ghz 14 Cores/20 Threads, 24mb Cache, Socket Lga1700 Cpu Air Cooler: Twin Tower Cpu Air Cooler, With 6x6mm Sintered Copper Heatpipes, With 2x140mm Fans Motherboard: B760 Chipset, Lga1700 Socket, Ddr5 4xdimm Matx Form Factor Ram: Ddr5 5600mhz, 32gb (dual 2x16gb) Memory Modules Gpu: Rtx 4070, 12gb Gddr6/gddr6x Ssd: 512gb Capacity R/w 560/520 Mb/s 3d Tlc Ssd 2.5 Inch Form Factor Hdd: Capacity 2tb, 7200 Rpm, 256mb Cache, 3.5 Inch Form Factor Power Supply: 1000 Watts, 80 Plus Gold Certified, Fully Modular, With 120mm Smart Hydraulic Bearing (hyb) Fan, With Active Pfc, Mtbf: >100,000 Hours Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 4 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Case: Tempered Glass Mid Tower Atx Case With At Least 3 Fans Monitor: 2 Units, 24 Inches, Resolution: Fhd 1920 X1080, Aspect Ratio:16:9, Brightness: 250cd, Color Gamut Ntsc 72%, Refresh Rate: 100hz, Response Time: 5ms(gtg), Connectivity: 1x Hdmi 1x Displayport Keyboard: Usb Connectivity, With Backlight, Rubber Dome, Usb Connectivity, Multi-key Anti-ghosting, Polling Rate: 1000hz, Cable Type: Attached, Braided, Cable Length: 5.9ft Mouse: Usb Connectivity, Optical Sensor, Mouse Button Durability: 30m L/r Click, Cable: 1.8m Tangle Free Rubber, Dpi: 12,400 Dpi Ups: Max Configurable Power (watts) 650 Watts / 1.2kva, At Least 3 Universal Socket Warranty :2 Years 2 Unit Command Center Field Laptop - Command Center Field Laptop - Intel Core I7-13700hx Processor (30 Mb Smart Cache, 2.1 Ghz Performance-core With Turbo Boost Max Technology 3.0 Up To 5.0 Ghz, Overclock Capable) 1x 16gb Of Ddr5 4800mhz System Memory, Upgradable To 32 Gb Using Two Sodimm Modules 2x 512gb Nvme Ssd; Total Of 1tb 16 Display With Ips (in-plane Switching) Technology, Wqxga 2560 X 1600, High-brightness (500 Nits) Nvidia® Geforce Rtx 4060 With 8 Gb Of Dedicated Vram Warranty :2 Years 2 Unit Command Center Printer - Command Center Printer - A3 Wi-fi Duplex All-in-one Ink Tank Printer Print Speed Of Up To 25.0 Ipm Prints Up To A3+ (for Simplex) Automatic Duplex Printing Ultra-high Page Yield Of 7,500 Pages (black) And 6,000 Pages (colour) Wi-fi, Wi-fi Direct, Ethernet Printer Type: Print, Scan, Copy, Fax With Adf Minimum Ink Droplet Volume: 3.8 Pl Print Direction: Bi-directional Printing Nozzle Configuration:800 X 1 Nozzles Black, 256 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 4800 X 2400 Dpi Automatic 2-sided Printing: Yes (up To A3) Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 43 Sec Per Photo (border) / 52 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 32.0 Ppm / 22.0 Ppm *2 Iso 24734, A4 Simplex (black / Colour): Up To 25.0 Ipm / 12.0 Ipm *2 Iso 24734, A4 Duplex (black / Colour): Up To 16.0 Ipm / 9.0 Ipm *2 Iso 24734, A3 Simplex (black / Colour): Up To 13.5 Ipm / 6.0 Ipm *2 Iso 24734, A3 Duplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm *2 Warranty :1 Year Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 5 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 Unit Command Center Video Wall Controller - Command Center Video Wall Controller - Interface Alarm In Alarm Out 8-ch Alarm Out 8-ch Alarm In Serial Interface Rs-232 (rj45) × 1, Rs-485 × 1 Usb Interface Usb 2.0 × 2 Network Interface Rj45 × 2, 10 M/100 M/1000 Mbps Self-adaptive Ethernet Interface Optic Interface × 2 100 Base-fx/1000 Base-x Supports Optoelectronic Self-adaptation Video Walls 1 Video Wall Size <= 8 Layers Per Screen 1080p × 3 Or 4k × 1.5 Layers Layers Per Screen × Output Interface(s) Split Window Yes Scene Auto-switch Delay 3s Auto-switching Plans Support 256 Auto-switching Plans Max. Input Resolution 4k Audio Encoding Format G722.1, G711u, G711a, Aac-lc Video Output Interface Type Hdmi 1.4 Video Output Interface(s) 8 Video Decoding Resolution Up To 32 Mp Warranty:2 Years 8 Unit Command Center Video Wall Display - Command Center Video Wall Display - Display Panel Diagonal Size Class 55 Measured 54.6 Resolution 3,840 X 2,160 (16:9) Brightness (typ.) 700 Nit Orientation Landscape/portrait Haze 25% Contrast Ratio (typ.) 4,000:1 Type Va Active Display Area 1,209.6 (h) X 680.4 (v) Pixel Pitch (mm) 0.315 X 0.315 Color Gamut Ntsc 72% Operation Hour 24/7 Connectivity / Sound Input Video Dp 1.2 (1), Hdmi 2.0 (3) Audio N/a Usb Usb 2.0 X 2 Tuner N/a Output Audio Stereo Mini Jack Wifi / Bt O/o External Control Rs232c (in/out), Rj45 Speaker 10w 2ch Mechanical Spec Dimension (mm / In.) With Heavy Duty Full Motion Tv Wall Mount Warranty :3 Year 44 Unit Din Rail Mount - Din Rail Mount - 35mm At Least 7.5mm Depth Aluminum 22 Unit Electrical Box Enclosure - Electrical Box Enclosure - Electricalbox Panel Box Metal Enclosure(ip66, Nema 4 & 12) 300x250x150 Mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Molded Case Circuit Breaker Mccb30a 220v 2 Pole Din Rail Mount Type X1 Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Rail Mount Type X1 Grounding Bus Bar With Insulator X1 Din Rail Mount Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 6 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Roll Fiber Optic Connectivity - Fiber Optic Connectivity - Fiber Optic Connectivity 2.0 Kms 4 Core Fiber Optic Cable Maintenance Of Outside And Inside Plant Equipment To Smart City Command Center For 1 Year 1 Unit Fiber Optic Fusion Equipment - Fiber Optic Fusion Equipment - Fiber Alignment Core/cladding Motor Number 6 Motors Splicing Time 5s Heating Mode 15s, Can Be Customized According To The External Environment Fiber Type Single-mode Fiber (smf/g.652), Bif/g.657); Suitable For Single Mode, Multi-mode, Bare Fiber, Tail Fiber, Drop Cable, Jumper, Invisible Fiber Fusion; The Cladding Diameter 80-150μm Splicing Loss 0.02db(sm)、0.01db(mm)0.04db(ds/nzds) Splicing Mode Automatic Focusing Core Alignment, Conventional/high Precision Welding Splicing Way Automatic, Semi-automatic Opm Wavelength: 850nm、1300nm、1310nm、1490nm、1550nm、1625nm、980nm、1270nm、1577nm、1650nm/measurement Range: -50+26dbm Absolute Error: <0.3db (-50dbm ~+3dbm Range) Battery Capacity 7800mah Large Capacity Lithium Battery Charging Time ≤3.5; It Can Continuously Weld And Heat About 260 Cores Magnification 320x (x Or Y Axis Single Display) 200x (x And Y Axis Dual Display) Fiber Diameter Coating Diameter: 80-150μm/coating Diameter: 100-1000μm Cutting Length Coating Layer 250μm Below: 8-16mm/coating Layer 250-1000μm: 16mm Heat Shrink Tube 60mm、50mm、40mm、25mm Tensile Testing Standard 2n Display 5 Inch Tft Color Display Screen Return Loss Better Than 60 Db Product Protection Waterproof, Dustproof And Fall Proof Warranty :1 Year 44 Unit Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upcto Lc/upc3 Meter 44 Unit Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upcto Sc/upc3 Meter 45 Unit Gigabit Rj-45 Surge Protector Arrester - Gigabit Rj-45 Surge Protector Arrester - Protects Your Ethernet Device From The Damage Of Lightning & Surge Gigabit 10/100/1000 Specification: Connectors: Rj-45 Material: Shielded Aluminum Alloy 44 Unit Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulatorat Least 8 Way At Least 8x12mm² 2 Roll Grounding Cable Pure Copper Wire - Grounding Cable 4mm Pure Copper Wire Round Solid 100m Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 7 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Grounding Rod And Clamp Copper Plated - Grounding Rod And Clamp Copper Plated - "grounding Rod Full Set - (1pc Grounding Rod + 1 Pc Grounding Clamp) Size: Approximately 50cm Length X 0.9cm Diameter" 22 Unit Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang 15 Amperes Capacity/ Maximum 3,750watts 1 Lot Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of All Outside Plant Project Equipment In Outside Project Sites Outside Of The Smart City Command Center 1 Lot Installation, System Integrations And Configuration Of All Inside Plant Project Equipment - Installation, System Integrations And Configuration Of All Inside Plant Project Equipment In The Smart City Command Center Such As The Hikcentral Camera License, Integration To Existing Hikcentral Software And Integration Of Existing Cctv Cameras Into New Nvr 22 Unit Iot Box Panelbox Metal Enclosure (ip66,nema4 & 12) 500x300x200mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Heavy Duty Surface Type Extension Outlet 4 Gang Terminal Block Distribution 2 Input 4 Output Push-in Type 40 Unit Lpr Camera Arm Mount - Gi Pipe Extension Arm 1.5-3 Meters 40 Unit Lpr Camera Memory Card - Product Capacity Covering 128g The Storage Mediumis Tlc Particles Long Reading And Writing Times, Which Can Meet More Than 1000 Cycles Optimized For Long Time On-board Video Recording, Offering More Stable Reading And Writing Experience Operating Voltage 2.7v~3.6v Compatibility Sd 6.1 Working Life 1,000 Cycles Storage Medium Tlc Speed Class Write/read Speed 64gb:up To 35/100mb/s 128gb:up To 70/100mb/s256gb:up To 90/100mb/s Durability 10,000 Insertion/removal Cycles Uhs-i Sdr104 Type Sdxc 40 Unit Lpr Camera Vertical Pole Mount - Vertical Pole Mounting Bracket Installed On The Cross Bar Galvanized Steel Sheet And Steel Material With Surface Spray Treatment Can Be Used For New Bullet Camera Outdoor Greycolo Must Be Compatible With Cctv Camera 22 Roll Metal Flexible Conduit 1 Inch - Metal Flexible Conduit 1 Inch 30 Meters Per Roll 44 Unit Molded Case Circuit Breaker Mccb 30a - Molded Case Circuit Breaker Mccb 30a 220v 2 Pole Din Rail Mount Type 22 Unit Molded Case Circuit Breaker Mccb 63a - Molded Case Circuit Breaker Mccb 63a 220v 2 Pole Din Rail Mount Type 22 Unit Poe Switch Power Supply - Power Supply 48v 2a 96w With Us Plug Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 8 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Residual Current Circuit Breaker 63a 220v - Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Railmount Type 44 Unit Sfp+ Module Lc Connector Type - Gigabit Single-mode Wdm Bi-directional Sfp Module Spec: Lc Connector, Tx:1550nm/rx:1310nm, Single-mode, 20 Km 7 Roll Solidwire Awg#12 - Solidwire Awg#12 75m Per Roll Use For Termination Inside Iot Box 7 Roll Solidwire Awg#16 - Solid Wire Awg#16 75m Per Roll Use For Termination Inside Iot Box 66 Unit Terminal Block Distribution 2 Input 4 Output - Terminal Block Distribution 2 Input 4 Output Push-in Type This Is A Lot Bidding, Partial Bids Are Not Allowed Please Indicate Brands Of Offers And Attach Complete Technical Brochures In The Eligibility And Technical Proposal Please Indicate Unit Prices Of Offers In The Financial Proposal Bidders Must Possess Valid Mayor's/business Permit With A Relevant Line Of Business For Use Of Cmo Mitd Under Pr No. 1 Please Refer To Attached Terms Of Reference In The Associated Components Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature
Closing Soon10 Jan 2025
Tender AmountPHP 15.5 Million (USD 267.4 K)
City Of Canlaon Tender
Civil And Construction...+2Building Construction, Construction Material
Philippines
Details: Description Republic Of The Philippines City Of Canlaon Office Of The Bids And Awards Committee Invitation To Bid For The Improvement Of Multi-purpose Building Into 2 Stories Building The Local Government Of Canlaon City, Through The Aip 2024 Intends To Apply The Sum One Million, Two Hundred Seventy-six Thousand, One Hundred Fifty-seven (p1,276,157.00) Being The Abc To Payments Under The Contract For The Supply And Delivery Of Various Construction Materials For Use In The Improvement Of Multi-purpose Building Into 2 Stories Building, Brgy. Linothangan, Canlaon City. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Local Government Of Canlaon City, Now Invites Bids For The Supply And Delivery Of Various Construction Materials For Use In The Improvement Of Multi-purpose Building Into 2 Stories Building, Brgy. Linothangan, Canlaon City. Delivery Of The Goods Is Required 7 Calendar Days After Issuance And Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Ten Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184 Interested Bidders May Obtain Information For The City Government Of Canlaon City Thru The Office Of The Bids And Awards Committee And Inspect Bidding Documents During Office Hours (8:00am To 5:00pm), Monday To Friday. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On December 19, 2024 To January 8, 2025 Until 10:00 Am At The Office Of The Bids And Awards Committee, Canlaon City, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand (p5,000.00) Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Facsimile. The Local Government Of Canlaon City Will Hold A Pre-bid Conference On December 26, 2024 – 11:00 Am At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City, Which Shall Be Open To Prospective Bidders Bids Must Be Received By The Bac Secretariat Through Manual Submission On Or Before January 8, 2025, 10:00 Am At The Office Of The Bids And Awards Committee, 2nd Floor, City Hall Building, Canlaon City. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On January 8, 2025, 10:00 Am At The At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. For The Purpose Of Constituting A Quorum, Either The Physical And Virtual Presence Of The Bac Member Shall Be Considered Pursuant To Gppb Resolution No. 09-2020. The Local Government Unit Of Canlaon Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Alice D. Mcguiggan Bac Secretariat Mobile No. 0917-561-7931 Email Address: Bacofficelgucanlaon@yahoo.com Date Of Posting: December 18, 2024 Zosilito A. Ongco Bac Vice-chairman Republic Of The Philippines City Of Canlaon Bids And Awards Committee Control No.: #1 Bid Form Name Of Project: Improvement Of Multi-purpose Building Into 2 Stories Building Brief Description: Supply And Delivery Of Various Construction Materials Location: Brgy. Linothangan, Canlaon City Bill Of Quantities Stock No. Quantity Unit Of Issue Item Description Unit Cost Unit Cost Total Cost 1. 2 Kgs. 1 1/2" Concrete Nails 126.00 2. 50 Lgth. 1 1/2" X 1/4" (6mm) Angle Bar 1,219.00 3. 50 Pcs. 1" Gypsum Screw 4.00 4. 6 Lgth. 1" X 3/16" (4.5mm) Angle Bar 472.00 5. 2 Pcs. 1/2"ø Gate Valve 383.00 6. 2 Pcs. 1/2"ø Hdpe Coupling 125.00 7. 4 Pcs. 1/2"ø Hdpe Elbow 125.00 8. 30 Mtrs. 1/2"ø Hdpe Pipe 30.00 9. 8 Lgth. 1/2"ø Pvc Blue Pipe 120.00 10. 8 Pcs. 1/2"ø Pvc Blue Tee 20.00 11. 18 Pcs. 1/2"øx90° Bend Pvc Blue Elbow 15.00 12. 8 Pcs. 1/2"øx90° Bend Pvc Blue Elbow With 1 Side Threaded 20.00 13. 2 Shts. 1/4"x 4' X 8' Opw 580.00 14. 25 Shts. 1/4"x4'x8' Fiber Cement Board 908.00 15. 10 Pcs. 1/8" Ø Drill Bit For Steel 115.00 16. 5 Boxes 1/8" Ø X 1/2" Blind Rivets, 1,000 Pcs/box 552.00 17. 350 Lgth. 10mmø X 6.0m Dsb, G-33 239.00 18. 6 Lgth. 10mmø X 6m Plain Round Bar 239.00 19. 20 Lgth. 11mm X 37mm X 11mm X 1.6mm X 5m Carrying Channel 279.00 20. 60 Pcs. 120 Grit Sand Paper 38.00 21. 4 Pcs. 16" X 8' X 0.4mm Pre-painted Fascia Cover, White 467.00 22. 20 Lgth. 17mm X 49mm X 17mm X 0.6mm X 5m Double Furring 217.00 23. 200 Lgth. 17mm X 49mm X 17mm X 0.6mm X 5m Double Furring 217.00 24. 530 Pcs. 2 1/2" Tekscrew 5.00 25. 2 Pcs. 2" Paint Brush 60.00 26. 6 Lgth. 2"ø Pvc Sanitary Pipe S-1000 420.00 27. 5 Pcs. 2"ø Pvc Sanitary Tee 110.00 28. 16 Pcs. 2"øx90° Bend Pvc Elbow 90.00 29. 25 Lgth. 2"x2"x8ftx0.50mm Thk Wall Angle, Woodgrain Design 250.00 30. 8 Lgth. 2"x3"x6m G.i. Square Tube, G-16 931.00 31. 2 Lgth. 2"x4"x6m (4.5mm) Channel Bar 3,510.00 32. 25 Lgth. 2"x4"x6m G.i. C-purlins, G-16 875.00 33. 4 Pcs. 24" X 8' X 0.4mm Pre-painted Fascia Cover, Brown 700.00 34. 12 Pcs. 24" X 8' X 0.4mm Pre-painted Wall Capping 700.00 35. 2 Kgs. 3" Cwn 95.00 36. 3 Lgth. 3" Ø X 6m G.i. Pipe, Sched 40 3,804.00 37. 3100 Pcs. 4" Chb 18.00 38. 2 Kgs. 4" Cwn 90.00 39. 1 Pc. 4" Diamond Cutting Disc, Tatara 800.00 40. 5 Pcs. 4" Grinding Stone 90.00 41. 5 Pcs. 4" Ø Clean Out With Plug 110.00 42. 6 Pcs. 4" Paint Brush 90.00 43. 2 Pcs. 4" Stainless Steel Floor Drain 500.00 44. 25 Pcs. 4"ø Cutting Disc For Steel 129.00 45. 6 Lgth. 4"ø Pvc Sanitary Pipe S-1000 1,127.00 46. 6 Pcs. 4"ø Pvc Sanitary Tee 204.00 47. 2 Pcs. 4"ø Pvc Sanitary Wye 204.00 48. 8 Pcs. 4"øx90° Bend Pvc Elbow 80.00 49. 2 Pcs. 4"x2"ø Pvc Bushing Reducer 50.00 50. 2 Pcs. 4"x2"ø Pvc Sanitary Tee 204.00 51. 4 Pcs. 5" Putty Knife 150.00 52. 5 Pcs. 5/32 Ø Drill Bit For Steel 115.00 53. 2 Boxes 5/32 Ø X 1/2" Blind Rivets, 1000 Pcs 552.00 54. 10 Pcs. 5/32" Ø Drill Bit For Steel 115.00 55. 5 Boxes 5/32" Ø X 3/4" Blind Rivets, 1,000 Pcs/box 552.00 56. 68.80 Lm. 6 Shts - 10.50m X 1092mm X 25mm X 0.50mm Thk. Dn Rib 25 Straight Panel, Brown 600.00 57. 6 Pcs. 7" Paint Roller With Tray 210.00 58. 6 Pcs. 7" Paint Roller With Tray 210.00 59. 60 Pcs. 80 Grit Sand Paper 50.00 60. 20 Pack Abc Tile Grout, 2kg./pack, Grey 165.00 61. 4 Sets Acu Outlet With Ground, 1 Gang 350.00 62. 3 Lgth. Aluminum Stair Nosing Step Trim, Silver 620.00 63. 4 Pcs. Bolt, 1/2"ɸ X 6", B.i., Full Thread With Nut And Washer 85.00 64. 15 Tubes Builders Bond Construction Adhessive, 300ml Cartridge 300.00 65. 24 Gals. Buildrite, Sapal Rtu, Grey 1,840.00 66. 4 Gals. Buildrite, Sapal Rtu, White 1,840.00 67. 100 Pcs Cable Ties, 8 X 300 Mm 12.00 68. 1 Pc. Caulking Gun 320.00 69. 2 Sets Cluster Hanger 2,000.00 70. 15 M. Conductor Wire, 22.0 Mm² Tw, For Grounding 50.00 71. 400 M. Conductor Wire, 3.5mm² Thw, Cu. 52.00 72. 40 M. Conductor Wire, 30.0mm² Thw, Cu. 150.00 73. 100 M. Conductor Wire, 5.5mm² Thw, Cu. 101.00 74. 10 Pcs Conduit Clamp, 40mmɸ Upvc, Orange Color W/ Concrete Nail 6.00 75. 15 Pcs Conduit Elbow, 20mm ɸ Upvc 90 Deg Long Radius, Thick Walled, Orange Color 29.00 76. 10 Pcs Conduit Elbow, 32mm ɸ Upvc 90 Deg Long Radius, Thick Walled, Orange Color 38.00 77. 25 Lgths Conduit Pipe 20mm ɸ X 10' Upvc, Thick Walled, Orange Color 149.50 78. 5 Lgths Conduit Pipe 32mm ɸ X 10' Upvc, Thick Walled, Orange Color 201.50 79. 1 Lngth Conduit Pipe, 40mm ɸ X 3m', Rsc 1,150.00 80. 1 Pc. Connector Ground Rod For ⅝"ɸ, Galv. 102.00 81. 5 Pcs Connector, Compression, Parallel #100 150.00 82. 1 Pc Connector, Hot Line Clamp, 3/0-6 550.00 83. 14 Sets Convenience Outlet, Duplex, Universal, Flush Type 197.00 84. 1 Set Convenience Outlet, Duplex, Universal, Flush Type, Floor Type, Pop-out 3,500.00 85. 4 Cu.m. Crushed Stone, G-¾ 2,378.00 86. 1 Set Cut-out And Arrester Combination, H.d.,100a With Mounting Bracket 9,000.00 87. 2 Sets Duplex Switch, Flush Type 350.00 88. 80 Kgs. E6013 Welding Electrode 175.00 89. 6 Tubes Elasto Seal Pioneer, 300ml 450.00 90. 5 Rolls Electrical Tape, (0.16mm X 19mm X 16yrds), Plastic 75.00 91. 1 Pc Entrance Cap, 40mm ɸ, Rsc 190.00 92. 36 Pcs. Espana Premium 30x60 Rcm Gray 140.00 93. 6 Rolls Fibergalss Mesh Tape 2"x30m 50.00 94. 23 Cu.m. Fined Sand 1,350.00 95. 100 M. Flexible Conduit Pipe, 20mmɸ Upvc, Coilable, Orange Color 25.00 96. 10 M. Flexible Conduit Pipe, 40mm ɸ Upvc, Orange Color, Coilable 113.00 97. 53 Kgs. G.i. Tie Wire G.a. 16 103.00 98. 1 Lngth Ground Rod, ⅝" ɸ X 10' , Galv. Steel 933.00 99. 60 Bags Heavy Duty Tile Adhesive, 25kg./bag 550.00 100. 50 Kgs. Island Patching Compound 50.00 101. 15 Bags Island Super Kinis Skim Coat, 20kg, White 580.00 102. 25 Bags Island Super Kinis Skim Coat, 20kg, White 580.00 103. 48 Pcs. Italgres Premium 60x60 Marble Dk. Brown 250.00 104. 134 Pcs. Italgres Premium 60x60 Terrazo Gray 250.00 105. 40 Pcs. Junction Box, 4" X 4" Upvc, Orange Color W/ Cover And Screws 54.00 106. 1 Assy. Kwh-meter, Socket Connected, Ringless Tupe, Class 200, Fm 1s, 2-wire, Kv2c, 240 With Meter Base 30,000.00 107. 6 Gals. Lacquer Thinner 782.00 108. 30 Pcs Led Bulb (12w) 250.00 109. 2 Pcs Led Wall Mounted Outdoor Lamp, 8w 1,500.00 110. 1 Pc. Lenox Blade 125.00 111. 12 Lgth. Master Tile Trim, 10mm X 2.5m Aluminum, Silver 185.00 112. 24 Gals. Mcs-6101 Cloudy Gray, Semi-gloss 1,050.00 113. 6 Pcs Modern Ceiling/center Lamp, Dimmable Completw With Remote, 30w 3,500.00 114. 27 Lgth. Moulding Polywood 15x70x2400mm, Oakwood Design 450.00 115. 2 Pcs Outdoor Celing Surfaced Lamp For Balcony/terrace 1,500.00 116. 1 Assy. Panel Board, 100at/125af, Bolt-on, 240v, Complete With 2-15at, 2-20at, 5-30at, 10 Holes Bolt-on Branch Circuits 35,000.00 117. 8 Gals. Pioneer Epoxy Primer With Catalyst, Gray 1,500.00 118. 4 Gals. Pioneer Epoxy Primer With Catalyst, White 1,500.00 119. 2 Liters Pioneer Pro Concrete Epoxy A & B 1,800.00 120. 128 Pcs. Platinum Thomson 30x60 Grey 140.00 121. 100 Pcs Polyflex Hose Connector For Flexible Pipe 20mm ɸ 12.00 122. 320 Bags Portland Cement, 40kg/bag, Type I 287.00 123. 29 Gals. Prima Primer 301, White 1,050.00 124. 2 Pcs. Pull Box, 12" X 12" X 6" Depth, Melamine Coated W/ Cover 1,100.00 125. 1 Pc Pvc Pipe Cement, 100cc 100.00 126. 7 Cans Pvc Solvent, 200ml 110.00 127. 1 Gal. Qde, Black 1,251.00 128. 4 Gals. Qde, Dv-470 Silver Aluminum 1,251.00 129. 14 Lm. Rib Type Spandrel, 84 Pcs. 0.15m X 1.10m X 0.40mm Thk., Woodgrain Design 160.00 130. 1 Pc. Rubber Mallet 350.00 131. 6 Gals. Rust Converter 948.00 132. 2 Sets Secondary Rack With Sool Insulator 1-3/4" Dia, Groove, Brown Porcelain Hd 400.00 133. 7 Gals. Semi-gloss Paint, Prima Sg 300sg White 1,050.00 134. 50 M. Service Drop Wire, 22.0mm², Duplex, All Aluminum 48.00 135. 4 Sets Single Pole Switch, Flush Type, Anam Or Equivalent 148.00 136. 1 Pc. Spurtar 6" Stainless Steel Vernier Caliper 2,000.00 137. 5 Pcs Square Box 5x5, Wut-005, 12.5x12.5x5.2 Cm 150.00 138. 2 Pcs. Stainlees Steel Faucet (shark) 500.00 139. 1 Gal. Stickwell Glue 980.00 140. 2 Gals. Super Thoroseal 1,000.00 141. 15 Pcs Surface Mounted Round Downlight Light Fixture, 4'' Dia X 220mm Height, E27 Holder, Black, Recessed Type 350.00 142. 15 Pcs Surface Mounted Round Downlight Light Fixture, 4'' Dia X 220mm Height, E27 Holder, Black, Surfaced Type 350.00 143. 3 Pcs. Terminal Lug, Sa 135, Solderless 196.00 144. 1 Kg Tie Wire #4 Solid 102.00 145. 1 Pc Transformer, Distribution, 7620/240v., 25 Kva Single Phase 130,000.00 146. 2 Sets Triplex Switch, Flush Type 369.00 147. 5 Pcs Utility Box, 2"x 4" Metal, Heavy Duty 65.00 148. 20 Pcs. Utility Box, 2"x 4" Upvc, Orange Color 32.00 149. 3 Cu.m. Washed Sand 1,750.00 150. 2 Units Water Closet & Wall Hung Lavatory W/ Complete Accessories (lafonza Salerno Package "b") 18,000.00 151. 200 Pcs. W-clip / Double Furring Clip 18.00 Total Brand Model:_____________ Delivery Period:______________________ Warranty: After Having Carefully Read & Accepted Your General Conditions. I/we Quote On The Item/s Price/s Noted Above. Total Bid Price (in Words) Bid Security: Amount: Submitted By: Bidder/supplier Date:_________________________
Closing Soon8 Jan 2025
Tender AmountPHP 1.2 Million (USD 22 K)
EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Tender
Others
United States
Description: 12/31/2024-the Purpose Of This Amendment A0001 Are As Follows: Attach Questions And Answers For Rfq #45310025q0011- Excel Conference; Revision Of Sample Of Lodging Nights (2025 & 2026); And Added Language To The Clin 0005 - Audio/visual (a/v) Requirements (rental) , A/v For Breakout Rooms , "the Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Projector Screen...." See Attachment Sf30_amendment_45310025q0011_a0001_rfq Excel Conference_jdaiisigned
______________________________________
statement Of Work (sow)
examining Conflicts In Employment Laws (excel) Training Conference Fy 2025 & Fy 2026
the U.s. Equal Employment Opportunity Commission (eeoc), Revolving Fund Division, Eeoc Training Institute (hereinafter Referred To As The Institute) Has A Requirement For A Contractor To Provide A Full-service Training Facility To Include Lodging, Meeting And Exhibitor Space, Food And Beverage Service, Audio/visual Equipment, Limited Audio/visual Support Services And Business Center Support To Conduct The Annual Examining Conflicts In Employment Laws (excel) Training Conference (hereinafter Referred To As The Conference). This Annual Conference Provides Training To Federal Agencies And Private Employers On The Laws Enforced By The Eeoc. The Institute Anticipates A Minimum Of 600 Registrants With A Maximum Of 1,000 Registrants, Plus An Additional 100 Attendees Consisting Of Other Staff, Presenters, And Exhibitors Who Provide Support For The Conference.
the Excel Training Conference Will Be Held For Four (4) Days. The Preferred Schedule Is Pre- Conference Registration Will Be Held On Sunday And The Pre-conference Sessions On Monday. Full Conference Registration Will Be Held On Sunday And Monday. Pre-conference Sessions Will Be Held On Monday (day 1) From 8:00am – 5:00pm. The Full Conference Will Be Held From Tuesday (day 2) At 8:00am, Ending On Thursday (day 4) At 5:00pm. The Plenary Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4).
breakout Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4) After The Plenary Sessions Until 5:00pm. Food And Beverage Service Is Required For Continental Breakfast And For A Light Lunch For Three (3) Days, Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). The Institute Also Requires Morning And Afternoon Breaks Each Day (tuesday-thursday), And A Conference Reception On One Day During The Conference (the Exact Date And Time Will Be Determined Later By The Institute). The Institute May Offer Six (6) Pre- Conference And Post-conference Workshops For Up To 300 People Outside Of The Tuesday - Thursday Conference.
requirments For Location And Dates
the Contract Must Be Able To Provide A Facility For The Entire Scope Of The Contract. The Eeoc Will Only Accept Quotations For Following Dates And Locations.
the Preferred Dates And Locations For The 2025 Excel Training Conference In Each Fiscal Year As Follows:
the Preferred Dates And Location For The 2025 Excel Training Conference Are:
location:
atlanta, Georgia
dates:
july 12 - July 17, 2025
august 9 - August 15, 2025
august 16 - August 21, 2025
august 23 - August 28, 2025
august 30 - September 4, 2025
the Preferred Dates And Locations For The 2026 Excel Training Conference Are:
locations:
detroit, Michigan (1st Preference)
minneapolis, Minnesota (2nd Preference)
chicago, Illinois (3rd Preference)
denver, Colorado (4th Preference)
phoenix, Arizona (5th Preference)
san Diego, California (6th Preference)
palm Springs, California (7th Preference)
dates:
june 6 - June 11, 2026
june 13 - June 18, 2026
june 20 - June 25, 2026
june 27 - July 2, 2026
july 11 - July 16, 2026
july 18 - July 23, 2026
august 22 – August 27
august 29 - September 3, 2026
the Pre-conference And Full Conference Will Be Held From 8:00am – 5:00pm. We Will Require The Use Of The Registration Area For The Pre-conference And Assembling Of Materials One Day Prior To The Pre-conference From The Hours Of 8:00am – 5:00pm.
please Indicate Availability For Each Date In The Technical Portion Of The Quotation. No Other Dates Or Combination Of Dates Will Be Considered By The Government.
the Government Contemplates The Award Of A Firm-fixed Price (ffp) Contract.
the Following Requirements For The Training Facility Are Specified In Terms Of Minimum Requirements. The Contractor Must Meet The Following Minimum Requirements:
the Quotation Package Shall Include The Following Line Items In A Written Quotation:
schedule Of Supplies And Services Fy 2025:
clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $ , Total For Clin 0001 $ .
clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ ,
$ , Total For Clin 0002 $ .
clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $ .
clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ , Per Person Per Day, Total For Clin 0004 $ .
clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $ .
total Price For Clins 0001 Through 0005: $ . Fy 2026:
clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $, Total For Clin 0001 $
clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ , Total For Clin 0002 $
clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $
clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ Per Person Per Day, Total For Clin 0004 $
clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $
total Price For Clins 0001 Through 0005: $ .
a Contract Will Be Awarded To The Responsible Quoter Whose Quotation Represents The Best Value To The Government. The Quoter Must Be Registered In The System For Award Management (sam) Database At The Time The Quotation Is Submitted. Registration Is Free And Can Be Completed On-line Http://www.sam.gov. Each Quotation Must Clearly Indicate The Capability Of The Quoter To Meet The Requirements Specified In This Combined Synopsis/solicitation.
conference General Requirements
the Contractor Shall Be A High Quality “full-service” Provider With A Past Performance History That Includes A Minimum Of 3 Years Of Experience As A Primary Contractor With A Professional Staff To Execute The Requirements Specified In This Statement Of Work. All Staff Provided By The Contractor Shall Be Either Direct Employees Of The Contractor Or Employees Of An Approved Subcontractor. The Primary Contractor Shall Have Full Responsibility For The Contractor And Subcontractor Staff And Shall Make Direct Contact With The Contracting Officer’s Representative (cor) To Ensure That All Arrangements Are Mutually Understood Concerning Any Logical And/or Financial Arrangements That May Impact The Eeoc.
the Contractor Shall Provide Meeting Space, Food And Beverage And Lodging To Serve 600 To 1,000 Registrants And To Provide Business Services.
the Contractor Shall Provide Professional Staff To Organize, Coordinate, And Handle Any Last- Minute Requests, As Well As Execute All Logistical Requirements As Specified In This Sow. The Contractor Shall Make Direct Contact With The Host To Ensure That All Arrangements Are Mutually Understood Concerning Arrival Times, Accommodations, Official Functions, Financial Arrangements, And Any Other Special Information That May Impact This Event. The Contractor Or Their Approved Subcontractors Shall Coordinate And Implement All Logistical Arrangements For This Event.
logistical Support May Include, But Is Not Limited To, Coordination Of Meeting Accommodations, Customer Service Or Front Desk Information Service, Conference Rooms, Meal Arrangement/catering, Dedicated Internet, And Audio/visual Equipment.
americans With Disabilities Act (ada) Requirements
all Facilities, Including Restrooms, Recreational Areas, Dining Space, Registration Area, Meeting Space, Hotel Rooms, Exhibitor Space, Office Space, And Audio/visual Equipment Must Meet Ada Requirements For Accessibility. Accommodations For Individuals With Disabilities May Include, But Are Not Limited To Accessible Hotel Rooms, Parking Spaces, Elevators, And Sound Systems, Wide Aisles, And Wheelchair Ramps. Eeoc Will Perform Site Visits Prior To The Award Of The Contract. The Site Visit Will Include An Ada Assessment Of The Property By The Disability Business And Technical Assistance Centers (dbtac) Prior To Award Of The Contract.
clin 0001 – Lodging Requirements
the Contractor Shall Provide A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Working The Event. Space Must Be Available Friday Prior To The Conference Through Friday After The Conference. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. The Contractor Will Be Paid For A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Directly Under This Contract.
the Contractor Shall Provide A Room Block For Up To 2000 Hotel Room Nights For Registrants And Exhibitors. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. These Individuals Will Be Responsible For Direct Payment To The Contractor.
the Institute Will Manage The Hotel Room Block And Will Turn Back Any Unused Rooms To The Contractor, Without Penalty, By A Cutoff Date To Be Determined Upon Award Of The Contract. The Institute Will Provide The Contractor With A List Of Registrants, Exhibitors, Speakers And Eeoc Staff.
the Institute Requires The Contractor To Block Up To 400 Room Nights At Or Below The
federal Government Per Diem Rate For Lodging During The Week Before And After The Conference For Seminar Registrants And Other Conference Personnel. These Individuals Are Responsible For Paying The Contractor Directly For Lodging Costs. All Room Nights Booked By The Institute Or Conference Registrants Will Be Credited To The Conference’s Sole Account.
clin 0002 – Conference Meeting, Exhibitor And Office Space Requirements
all Meeting Space Must Be Set Up In Classroom Style With 6' Tables, No More Than 2 People Per Table, Or Round Tables With No More Than 10 People Per Table, Mints, One (1) Pitcher Of Water And
a Glasses Per Person At The Table Or Set Up Using Classroom Style. A Podium And Two (2) Tables Located In The Front Of The Classroom Are Required For The Presenters. Rooms Must Have Additional Space To Accommodate A/v Equipment.
plenary Room: A Plenary Room That Can Accommodate A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff In Classroom Style Seating Or Can Accommodate Up To 1,000 Registrants And 100 Presenters/staff Using Round Tables That Seat 10 People And 2 To 4 Comfortable Chairs For The Eeoc’s Chair And Keynote Speakers (large/high Back Chairs) Is Required On Tuesday (day 2) From 8:00am To 12:00pm, On Wednesday (day 3), And On Thursday (day 4) From 8:00am To 10:00am. The Plenary Room Must Have Additional Space To Accommodate A Raised Platform That Is Ada Accessible. This Includes A Platform Which Is No More Than 24” High And Is Wheelchair Accessible On At Least One Side. If A Wheelchair Ramp Is Used, The Ramp Must Have Railings On Both Sides And The Rise Over Run Cannot Be More Than 8.3%. The A/v Requirements Will Be Discussed Below.
dining Space (ballroom): A Dining Space Area Within A Separate Ballroom Or Event Space That Can Accommodate Speakers As Well As A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff. Exhibitor Floor Room Are Not Acceptable Unless Approved. The Ballroom Will Be Set Up In Banquet Rounds Of Ten (10) With An Appropriately Sized Riser To Hold A Podium With Podium Microphone. This Space Is Required On Tuesday (day 2) - Thursday (day 4) From 12:00pm To 1:30pm. Please See The Internet And A/v Sections For Additional Specific Requirements. The Plenary Room And Dining Space (ballroom) Functions Cannot Be Held In The Same Room.
breakout Session Rooms: The Breakout Session Rooms Are Required For Monday (day 1), Pre- Conference From 8:00am - 5:00pm Is Six (6) Breakout Rooms As Follows: Four (4) Rooms To Accommodate Up To 100 Registrants, And Two (2) Rooms To Accommodate Up To 75 Registrants. On Tuesday (day 2) From 1:30pm - 5:00pm, On Wednesday (day 3), And On Thursday (day 4) From 10:30am - 5:00pm, The Following Breakout Rooms For The Full Conference Are Required: Two (2) Rooms To Accommodate Up To 300 Registrants; Two (2) Rooms To Accommodate Up To 200 Registrants, And Five (5) Rooms To Accommodate Up To 150 Registrants, And One (1) Room To Accommodate 75 People. The Plenary Session Room Can Also Serve As A Breakout Session Room If Space Is Configured With Air Walls And The Necessary A/v Equipment Is Functional To Accommodate The Full Agenda.
speaker-ready Room
the Speaker Ready Room Will Be Used By Institute Speakers To Prepare For Their Respective Presentations From 8:00am-5:00pm On Monday – Thursday. The Room Should Be Equipped With
2 Small Tables With Chairs, Lounge Chairs, And Comfortable Seating. The Area Should Be Stocked With Coffee, Tea, And Water Pitchers With Glasses. In Addition, The Speaker Ready Room Should Have A Small Refrigerator And Microwave For Use By The Speakers.
exhibitor Space
exhibitors Will Be At The Excel Training Conference. Exhibitor Space For Up To 20 Exhibitors Is Required For Monday – Thursday In A Foyer Area Near The Plenary Session, Registration Area Or Dining Space (ballroom) That Accommodate The Am/pm Break Services. Ten (10) Exhibitor Spaces Shall Be Equipped With Two (2) 6’ Tables, Two (2) Chairs And Ten (10) Exhibitor Spaces Shall Be Equipped With One (1) 6’ Table, Two (2) Chairs. The Contractor Will Furnish Tablecloth And Drape For The Front Of The Tables And A Wastebasket Per Exhibitor. The Exhibitors Will Be Responsible For All Additional Equipment And Booth Requirements And Will Work Directly With The Hotel.
pre-function Room
the Pre-function Room Will Be Used To Assemble Up To Ten (10) Pallets Of Conference Materials And Supplies. This Room Needs To Be Available From 8:00am On The Friday Before The Start Of The Conference Through Friday At 5:00pm The Day After The Conference Ends. The Room Needs To Be Equipped With Carts To Transport Completed Conference Materials To The Registration Areas For The Conference. The Contractor Also Needs To Provide A Secured Office That Can Be Used To Store Laptops, A/v Equipment, And Conference Materials During The Same Time. Only Eeoc Staff Should Have Access To The Secured Office. The Pre-function Room And Secured Office Shall Be Adjoining And Shall Have At Least Eight (8) Tables, Twenty (20) Chairs, Wastebaskets, And Water Pitchers With Glasses.
registration And Office Areas
the Contractor Needs To Provide Two (2) Registration Areas. One Registration Area Must Be Available From Sunday Afternoon 12:00pm – 6:00pm To Accommodate Pre-conference Registration And From Monday 7:30am – Thursday 6:00pm To Accommodate Registrants, And The Other Registration Area Is Needed From Tuesday – Thursday 7:30am – 6:00pm To Register Staff, Presenters And Exhibitors. Each Area Shall Have Six (6) Tables With Four (4) Chairs Per Table.
directional Signage Will Be Provided By The Contractor To The Registration Area.
clin 0003 – Business Center Requirements
the Contractor Must Be Able To Handle Mailing, Copying, And Faxing Limited Course Materials On- Site. The Institute Typically Receives Four (4) Pallets Of Course Materials, 25 To 30 Packages And A/v Equipment, And Sends Out 50 Packages At The Completion Of The Conference. Contractor Must Provide A List Of All Business Center Charges To Include Labor Charges.
clin 0004 – Food And Beverage Requirements
the Contractor Shall Provide A Copy Of The Final Price List As Submitted In Response To The Solicitation Food And Beverages For The Conference As Follows: Continental Breakfast, Light Lunch, Breaks (am And Pm) On Tuesday (day Two), Wednesday (day Three) And Thursday (day Four) And One (1) Evening Reception. Pricing For Food And
beverage Shall Include The Price For The Item, Plus The Gratuity (service Charge), And A Statement From The Contractor Indicating Whether, And Under What Conditions The U.s. Government Is Exempt From State Tax.
tuesday Evening Kick-off Reception: The Food At The Reception Will Consist Of Hors D’oeuvres, Carving Stations, And Finger Foods. The Space Designated For The Reception Must Accommodate Approximately 800 People With Social Seating Available Throughout The Area And The Duration Of The Reception Will Be Approximately 1 Hour, From 5:30pm - 6:30pm. A Cash Bar Will Be Available For All Drinks.
continental Breakfast Is Served For 1 Hour From 7:00am - 8:00am Tuesday Through Thursday. The Contractor Must Provide Table Rounds To Accommodate Up To 1,000 People On Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). A Typical Continental Breakfast Shall Consist Of Juice, Fruit, Yogurt, Assorted Breakfast Pastries, Protein, Bagels, Or Croissants, Regular And Decaffeinated Coffee, Tea Bags And Hot Water For Tea, Iced Tea, And Large Containers Of Water.
lunch Is Served For 1½ Hours From 12:00pm – 1:30pm. The Contractor Must Provide Table Rounds For Ten (10) And Accommodate 1,000 People. The Dining Space Can Be Used For Breakout Room And/or Meeting Space. A Light Lunch Is Provided On Tuesday (day 2), Wednesday (day 3) And Thursday (day 4). This Can Be Plated, Buffet Or Salad Bar Type Lunch Which Provides A Protein- Based Entrée, A Fruit Or Vegetable, Dessert, Lemonade And Iced Tea. The Entrée Must Not Include Pork, Beef Or Shellfish.
30-minute Am And Pm Breaks Is Required For A Maximum Of 1,000 People. The Am Break Menu Shall Consist Of The Following Beverages (regular And Decaf Coffee, Hot And Iced Tea, And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Pm Break Menu Shall Consist Of The Following Beverages And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Am And Pm Breaks Are Scheduled For 30 Minutes Each, Tuesday (day 2) - Thursday (day 4).
the Institute Will Pay The Contractor For Meals, Breaks, And Reception Based On The Actual Number Of Meals Served.
clin 0005 – Audio/visual (a/v) Requirements (rental)
a/v For Plenary Sessions: The Contractor Shall Provide The Following Items To Support The Plenary Session: Lcd Projectors, Projection Screens, Scan Converters, Video Cameras, A/v Mixers, A/v Drops, Vcr -1, Vgada And Voa Splitter, Cables To Run Two Projectors And Laptops Provided By The Institute, Projection Carts, Pipe And Drape, Stage Wash, Lighting, Podium With Wired Microphones, Wired Table Microphones W/stands, Wireless Floor Microphones W/stands. The Institute Requires Internet Access In Plenary Sessions And All Breakout Sessions. The Contractor Must Provide Internet Service In The Plenary Room. The Contractor Must Setup, Breakdown And Provide Technical Support Of The A/v Equipment During The Plenary Sessions.
a/v For Breakout Rooms: The Institute Will Provide All Laptops And In-focus Projectors Used In The Breakout Rooms. The Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Flip Chart/ Paper And Markers, Gender Adapters, Electronic Signage Or Tripods Outside Breakout Sessions, And Projection Cart With A/v Connection. The Institute Requires Internet Access Throughout The Entire Breakout Rooms. The Contractor Must
provide Projected Cost For The Internet Service In The Breakout Rooms.
registration Area: The Institute Requires An Internet Connection Which Will Be Used With A Hub Throughout The Conference To Include Registration, A/v Connection, And Phone For Local Calls Within The Conference Space. In Addition, The Institute Requires A Multifunction-colored Printer To Be Used Through The Conference To Include Registration.
common Registration Area: The Institute Requires An Internet Connection Near Registration To Be Used With A Hub For The Completion Of Conference Evaluations. This Will Be Set Up To Support At Least (6) To (8) Laptops Which Will Be Provided By The Institute.
reporting Requirements
pre-conference Reporting: The Contractor Will Provide The Institute’s Contracting Officer’s Representative (cor) With An Electronic List Of All Hotel Confirmation Numbers For All Participants, Staff And Presenters On A Weekly Basis Starting Eight (8) Weeks Prior To The Conference. The Institute Cor Will Manage The Conference Room Block Up To 15 Calendar Days Prior To The Conference. From Fourteen (14) Calendar Days Before The Conference Through The Duration Of The Conference, The Contractor Will Manage The Conference Room Block.
during The Conference Requirements
a Pre-conference Meeting Will Be Conducted With The Contractor And Key Institute Staff Within Five (5) Business Days Prior To The Conference.
daily Event Meeting Will Be Conducted With The Contractor And Key Institute Staff Daily As Agreed.
signature Authority: All On-site Charges Must Be Approved And Signed Only By The Institute’s Cor And/or The Eeoc Contracting Officer.
daily Reconciliation: The Contractor Shall Provide A Daily Reconciliation List To The Institute Cor By 9:00am The Following Business Day After The Charges Are Incurred. These Charges Include Lodging Paid By Eeoc, Food And Beverage, A/v Equipment And Labor, And Business Center.
post-conference: The Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After The Completion Of The Conference. A Detailed Report Should Be Submitted With The Invoice And Should Consist Of A Detailed Banquet/event Order (beo) Form. The Beo Must Provide The Following Information: Room Usage By Date; Detailed Lodging Charges For All Registrants, Staff And Presenters For The Conference; Detailed Breakdown, By Day, For All Food And Beverage Charges; A Detailed Breakdown By Day And Room Number, For All A/v Equipment Rental Charges And A/v Support Charges; All Business Center Cost; And All Miscellaneous Costs To Include But Not Limited To Internet Connections, Re-keying Charges, Electrical Hook-ups, Etc.
general Requirements
transportation: The Contractor Shall Provide A Price List Of All Local Transportation Options To And From The Airport And Rail Station, If Applicable. The Contractor Shall Indicate In Its Quotation Whether It Provides Free Or Low-cost Shuttle Services. The Contractor Shall List All Facility Parking Discounts And Cost Options. The Contractor Shall Provide A List Of All Local Restaurants Located Within A Ten (10) Minute Walk From The Contractor’s Facility.
security: The Contractor Should Identify If They Have Paid Security Within The Facility And Provide A List Of Additional Security Measures Taken By The Contractor To Provide For The Safety Of Conference Registrants, Staff, Presenters And Equipment.
list Of Deliverables
logistical Support Plan: Within Seven (7) Business Days Of The Contract Award, The Contractor Shall Comprise A Detailed Logistical Support Plan For Provision Of All Required Support. The Plan Will Include A Proposed Budget And Detailed Schedule As Applicable. The Eeoc Shall Review The Logistical Support Plan And Provide Acceptance And/or Comments To The Contractor. The Contractor Shall Be Available To Eeoc For Weekly Status Reports To Facilitate The Coordination Of Evolving Operational And Logistical Issues Regarding The Tasks Outlined In The Sow.
account Reconciliation: Eeoc Requests That The Hotel Bill Be Prepared In A Logical And Chronological Sequence And That Backup Data Accompany The Bill. The Contractor Shall Complete Its Accounting Of The Conference Within Five (5) Days Of The Conclusion Of The Conference.
invoicing: The Contractor Shall Invoice The Eeoc At The Agreed Upon Rates For Lodging, Conference Space, Rental Of Audio/visual Equipment And Technical Support, Food And Beverage Service, And Business Center Services. Charges For Food And Beverage Service Shall Be Reflected On The Invoice As The Cost Incurred Per Person.
the Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After Completion Of The Conference To The Cor And The Cor Shall Be Provided At Least Five Business Days To Review The Invoice Charges And Services Provided For Acceptance.
contract Administration
contracting Officer’s Representative (cor) – Tbd Method Of Payment
pursuant To Far Clause 52.232-33 Entitled, “payment By Electronic Funds Transfer – System For Award Management (oct 2018)”, The Government Intends To Make A Payment Via Electronic Funds Transfer Using Information Provided In The System For Award Management (sam) Database.
cancellation
should Eeoc Elect To Cancel This Contract, Eeoc Will Provide A Written Notification To The
contractor No Later Than Sixty (60) Calendar Days Prior To The Scheduled Event. By Receipt Of This Cancellation Notice, The Contractor Agrees To Release Eeoc From Any Cancellation Penalties Or Charges. If There Is A Cancellation Within Sixty (60) Calendar Days Of The Scheduled Event Date, Paragraph (l) Termination For The Government’s Convenience Or (m) Termination For Cause Of Far Clause 52.212-4, Contract Terms And Conditions – Commercial Products And Commercial Services Will Govern.
submission Of Quotation: All Interested Parties Shall Submit With Their Quotation A Detailed Breakdown Of All Costs To Include Conference Space, Rental Of Audiovisual Equipment And Technical Support, Food And Beverage Service, Business Services, And Any Other Miscellaneous Services And Equipment Which Are Necessary For The Success Of The Conference.
quotations Shall Be Submitted In Three (3) Separate Volumes As Follows: Volume 1 - Technical Capability; Volume 2 - Past Performance; And Volume 3 - Price. Pricing Must Be Submitted Using The Line-item Structure In The Above Schedule Of Supplies And Services Of This Rfq. A Separate Attachment May Be Included In Volume 3 For Pricing Information On Menu Items, Transportation, Parking, Applicable Tax Rates, And Sleeping Room Rates. Your Quotation In Response To Solicitation Number 45310025q0011 Is Due January 15, 2025, At 10:00 A.m. Et (washington, D.c. Local Time). Quotations Will Be Accepted Via E-mail. One (1) Electronic Copy Of The Quotation May Be Submitted Via E-mail, Addressed To John.adams@eeoc.gov And R.rashelle.anderson@eeoc.gov.
questions: Questions Regarding This Request For Quotation Should Be Submitted To John Adams, Contract Specialist Via E-mail At John.adams@eeoc.gov And Gov Contracting Officer At R.rashelle.anderson@eeoc.gov Telephone Inquiries Or Responses Are Not Acceptable. The Deadline For Submission Of Questions Regarding Solicitation Number 45310025q0011 Is Due December 20, 2024, 10:00 A.m. Et (washington, D.c. Local Time). Any Questions Received After The Above- Mentioned Date And Time Will Not Be Considered. The Government Will Not Reimburse Interested Parties For Any Cost Associated With Responding To This Business Opportunity. All Responsible Sources May Submit A Quotation Which Shall Be Considered By The Agency. The Anticipated Contract Award Date Is On Or Before March 18, 2025.
basis For Award: The Government Intends To Award A Firm Fixed-price Contract To The Responsible Quoter Whose Quotation Is Responsive To The Solicitation And Is Determined To Be The Best Value To The Government, Using The Tradeoff Approach. Selection Of The Best Value To The Government Will Be Achieved Through A Process Of Evaluating The Strengths And Weaknesses Of Each Quoter’s Quotation Against The Below Described Evaluation Criteria. In Determining The Best Value To The Government, The Technical Capability And Past Performance Evaluation Criteria, When Combined, Are More Important Than The Evaluated Price. The Government Is More Concerned About Obtaining A Superior Technical Capability Quotation Than Making An Award At The Lowest Evaluated Price. However, The Government Will Not Make An Award At A Price Premium It Considers Disproportionate To The Benefits Associated With The Evaluated Superiority Of One Technical And Management Quotation Over Another. Thus, To The Extent That Quoter’s Technical And Past Performance Quotations Are Evaluated As Close Or Similar In Merit, The Evaluated Price Is More Likely To Be A Determining Factor.
evaluation Factors For Award: The Following Factors Shall Be Used To Evaluate Quotations. These Factors Are Listed In Their Relative Order Of Importance: Technical Capability, Past Performance, And Price.
factor I – Technical Capability:
contract Requirements: Quotations Will Be Evaluated On The Quoter’s Ability To Provide All The Contract Requirements Relating To Lodging, Meeting Space, Food And Beverage, Av Support And Equipment, Business Center, And Comply With The Reporting Requirements. Quotations Must Address The Quoter’s Ability To Comply With The Americans With Disability Act (ada) As It Relates To Lodging And Meeting Space. Quotations Will Be Evaluated On The Quality Of The Customer Services Provided And The Quality Of The Facilities Reflected In Maintenance And Upkeep Of The Facilities.
location: Quotations Will Be Evaluated On The Ability Of Quoter To Provide A Centrally Located Facility With Inexpensive Transportation Options To And From The Airport. Additionally, Restaurants Must Be Within A Short Walking Distance Of (ten (10) Minutes Or Less) Of The Proposed Facility.
quotations Must Address Safety And Security Issues Both Within The Hotel Complex And The Surrounding Area.
availability Of Dates: Quotations Will Be Evaluated On The Ability Of The Quoter To Provide The Required Services On The Dates Requested. Additional Consideration Will Be Given To Quotations Which Demonstrate Availability Of Facilities On The Preferred Dates In Order Of Preference (i.e., 1st Choice Date, 2nd Choice Date, 3rd Choice Date, Etc.)
factor Ii – Past Performance:
the Quoter Must Provide References For A Minimum Of Three (3) Government Or Non-government Contracts Which Provide The Same Or Similar Services; Contracts Must Have Been Awarded Within The Past (3) Years. The Information For Each Reference Shall Include The Following:
name And Address Of Government Agency And Other Non-government Client;
name, Title, Email And Telephone Number Of Contracting Officer Or Other Point Of Contact;
name, Title, Email, And Telephone Number Of Client’s Program Manager, If Applicable;
contract Number, Period Of Performance, And Total Dollar Value Of Contract; And
description Of Services Provided.
list Any Problems Encountered On Each Contract And The Quoter’s Corrective Actions. Eeoc Will Evaluate Past Performance Based On Timeliness, Customer Service And Corrective Actions Taken (if Necessary).
a Quoter Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Will Not Be Evaluated Favorably Or Unfavorably On Past Performance.
factor Iii – Price:
the Price Quotation Will Be Evaluated Against The Independent Government Price Estimate. Evaluations Of Quotations Will Consider The Following Pricing Information: Pricing Provided For All Line Items Listed In The Schedule Of Supplies And Services Of This Rfq In The Units And Format Provided.
site Visits: The Eeoc Will Conduct A Site Visit Of All Quoters Who Are Rated To Be Technically Acceptable. The Site Visit Will Review And Evaluate The Same Technical Items Identified In The Technical Capabilities Portion Of The Technical Evaluation Factor.
supplemental Agreements
if Any Hotel Submitting A Quotation Has Any Supplemental Agreements, Those Agreements Must Be Submitted With Their Quotation. If The Hotel Requires Signature Of A Supplemental Agreement That Was Not Submitted With The Quotation, The Quotation Will Be Rejected.
notice: The Government Intends To Evaluate Quotations And Make Award Without Discussions (except Clarifications As Described In Far 15.306(a)). Therefore, The Quoter’s Initial Quote Should Contain The Vendor’s Best Terms From A Price And Technical Standpoint. The Government Reserves The Right To Conduct Discussions If The Contracting Officer Later Determines Them To Be Necessary.
period Of Performance
the Base Period Is From The Date Of The Award Through The Execution Of The Fy 2025 Excel Training Conference.
the Eeoc Is An Agency Of The U.s. Government. Contracts With The Eeoc Are Governed By The Federal Acquisition Regulation (far). To The Extent That Any Provision Of This Agreement Conflicts With The Far, The Far Must Control.
applicable Provisions And Clauses: The Provisions At 52.212-1, Instructions To Offerors - Commercial Products And Commercial Services Applies To This Acquisition. The Vendor Shall Include A Completed Copy Of The Provisions At 52.212-3, Offeror Representations And Certifications - Commercial Products And Commercial Services, With Your Quote.
the Contracting Officer Has Determined That Paragraph 52.212-3(k)(2) Which Pertains To Exemption From The Application Of The Service Contract Labor Standards Applies. The Clause 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services And Clause And 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Order-commercial Products And Commercial Services Are Incorporated By Reference.
clause 52.203-6 Restrictions On Subcontractor Sales To The Government Alternate I, Clause 52.203-17 Contractor Employee Whistleblower Rights
clause 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements, Clause 52.204-10 Reporting Executive Compensation And First –tier Subcontract Awards, Clause 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities,
clause 52.204-12 Unique Entity Identifier Maintenance
clause 52.204-13 System For Award Management Maintenance
clause 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment,
clause 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment,
clause 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations,
clause 52.217-9 Option To Extend The Term Of The Contract, (a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 30 Days Prior To The Contract Expiration Date, Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 60 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension. (b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause. (c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed 36 Months.
(end Of Clause)
clause 52.222-3 Convict Labor,
clause 52.222-19 Child Labor – Cooperation With Authorities And Remedies, Clause 52.222-21, Prohibition Of Segregated Facilities
clause 52.222-26, Equal Opportunity,
clause 52.222-35 Equal Opportunity For Veterans,
clause 52.222-36 Equal Opportunity For Workers With Disabilities, Clause 52.222-37 Employment Reports On Veterans,
clause 52.222-40 Notification Of Employee Rights Under The National Labor Relations Acts,
clause 52.222-41 Service Contact Labor Standards, Clause 52.222-50 Combating Trafficking In Persons,
clause 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving,
clause 52.225-13 Restrictions On Certain Foreign Purchases, Clause 52.232-1 Payments
clause 52.232-33, Payment By Electronic Funds Transfer – System For Award Management Clause 52.232-40, Providing Accelerated Payments To Small Business Subcontractors, Clause 52.233-3 Protest After Award,
clause 52.233-4 Applicable Law For Breach Of Contract Claim, And
clause 52.222-53 Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements.
to Obtain The Above Provision/clauses In Full Text, Please Visit Https://www.acquisition.gov/far
see Attachment- Custom Clause For Electronic Invoicing
Closing Date15 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.40|wvl|717-605-1842|desiree.d.meyers.civ@us.navy.mil|
item Unique Identification And Valuation (mar 2016)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|inspection: D Acceptance: D|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x|||x|||||
variation In Quantity (apr 1984)|3|+10%|-10%||
time Of Delivery (june 1997)|20|50 Lbs||||||||||||||||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|n39040 Certification; S4306a Material|n50286 Portsmouth|tbd|133.2||n/a|certification N39040|||ss Dd1423 Or Specified By Block 14a||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year From Date Of Delivery|365 Days After Acceptance Of Material|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (sep 2021)|13|333992|1,250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
evaluation Criteria And Basis For Award-|1||
1. The Offer Due Date Is Updated To 14 January 2025.
\
1. The Offer Due Date Is Updated To 2 December 2024.
\
1. The Offer Due Date Is Updated To 14 November 2024.
\
1. The Offer Due Date Is Updated To 21 October 2024.
2. The Poc Is Updated To Amanda Bailey Amanda.l.bailey50.civ@us.navy.mil.
3. The Small Business Set-aside Is Hereby Dissolved.
4. The Quantity Is Updated To 500.
5. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
\
this Amendment Is Issued To Extend Closing To 28jul23.
this Amendment Is Issued To Extend Closing Date To 05may23.
\
this Amendment Is To Extend The Closing Date To 16dec22.
\
this Amendment Is Issued To Extend The Closing Date To 09 Sep 2022.
\
the Purpose Of This Amendment Is To Extend The Closing Date To 10aug22.
\
amendment Issued To Extend Closing Date To 17jun22.
this Amendment Is Issued To Extend The Closing Date To 13 May 22.
\
this Amendment Is Issued To Extend The Closing Date To 15 Apr 22.
this Amendment Is To Extend The Closing Date To 15 Mar 2022.
this Amendment Is To Extend The Closing Date To 14 Feb 2022.
poc Changed To Benjamin.t.spangler.civ@us.navy.mil
all Prior Offers Shall Be Resubmitted To Above Poc Or Neco.
\
1. Dd1423 Data Item Aoo1 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286.
3.all Contractual Documents (i.e. Contracts,purchase Orders,task Order,delivery Order,& Modifications) Related To The Instant Procurement Considered To Be "issues" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In.
4. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offfers. See Clause 252.213-7000.
5. The Following Proposes Delivery Schedule Applies:
submission Odf All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Workig Days After Receipt.
180 Actual Days To Manufacture Part
final Delivery Of Material 365 Days
delivery Days And Past Performance Will Be Evaluation Factors In Determining Awardee.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=aws A5.01 | | | |930101|a| | |
document Ref Data=aws A5.28 | | | |200630|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Aws-a5.28, Except As Amplified Or Modified Herein. Aws-a5.28 Ordering Data Information Is Provided Below:
a. American Welding Society Specification Aws-a5.28; Low Alloy Steel Filler Metals For Gas Shielded Arc Welding.
aws Classification - ;er70s-b2l;
size, Diameter - ;1/16 Inch;
spool Size, Weight - ;n/a;
cut Length - ;36 Inches;
b. American Welding Society Specification Aws-a5.01; Filler Metal Procurement Guidelines.
lot Classification - Class S2
intensity Of Testing - Schedule J
3.2 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;quality Conformance/compliance Inspection (includes Chemicals And Mechanicals);
item - ;rod, Welding;
performance - ;aws A5.01 And Aws A5.28;
acceptance - ;aws A5.01 And Aws A5.28;
3.3 Container Size - Welding Electrodes Must Be Supplied In ;10; Pound Containers.
3.4 Welding Electrode Strip Heaters - Electrical Resistance Rod-type Or Pad-type Heaters (i.e. Strip Heaters) That Are Controlled Automatically By Thermocouples Or Manually By An On-off Switch Must Be Used To Maintain Preheat/interpass Temperatures Within The
required Range Before And During Welding Of The Usability (i.e. Soundness) Test Plate And The Mechanical Property (when Required) Test Plate. The Test Plate Must Be Insulated Or Separated From The Work Bench. Oxy-fuel Heating Of Any Test Plate Is Not
permitted.
3.5 Radiography - Radiography Is Required For Test Weldments And Must Be Performed In Accordance With T9074-as-gib-010/271 As Modified By Aws-a5.28. Acceptance Criteria Must Be Aws-a5.28.
3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The
information Listed Below.
a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor.
b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration.
c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product.
d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification.
b. A Complete Description Of The Change To Be Made And The Need For That Change.
c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis.
d. Proposed Changes To Documents Controlled By The Government.
e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration.
f. Recommendations About The Way A Retrofit Should Be Accomplished.
g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct.
h. Impacts To The Operational Use Of The Product.
i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
j. Milestones Relating To The Processing And Implementation Of The Engineeringchange.
3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements
established In The Contract/purchase Order.
3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities
available For Audit By The Contracting Officer Or His Authorized Representative.
3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer.
3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco.
3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For
operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The
government.
3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The
applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility,
applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate
planning For Government Inspection Can Be Accomplished.
3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.12.2 Inspection For Completeness And Proper Type.
3.12.3 Verification Of Material Quality Received.
3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.12.6 Identification And Protection From Improper Use Or Disposition.
3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity
for Withholding The Material From Use.
3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.12.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Unit Containers. This Traceability Marking Must Provide
direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14.1 Permanent Markings Are Not Required For Consumable Material (weld Filler Material, Etc.). Traceability Must Be By A Label Attached To Each Unit Container. The Unit Container Identification Label Must Include, In Addition To The Contract Number And The
national Stock Number (nsn), All Markings Required For Identity And Traceability. Each Container In The Lot Must Contain Material From The Same Traceability Number Or Heat/lot, As Defined In The Applicable Specification. Identification Marking Must Be The Type
designation In Accordance With The Applicable Detail Specification.
3.14.2 For Covered Welding Electrodes, The Type Designation Or Classification Number Must Also Be Applied To The Electrode Covering Within The Space 2 1/2 Inches From The Grip End Of The Electrode. The Marking Must Consist Of At Least One Complete Type
designation Or Two Or More Partial Type Designations That Can Be Read Or Positively Interpreted As The Intended Designation. The Two Partial Type Designations Must Consist Of At Least The Top Portion And The Bottom Portion Of The Designation.
3.14.3 Individual Cut Length Bare Welding Rods Must Be Identified In Accordance With The Applicable Commodity Specification. In The Absence Of Specific Specification Marking Requirements, At Least One Legible Type Designation/classification Number Must Be
applied To Each Rod, Either By Stamping Or By Tagging (i.e. Flag Tagging).
3.14.4 Spool And Coil Weld Filler Material Must Be Identified In Accordance With The Applicable Commodity Specification.
3.15 Material Certification - In Addition To The Certification Data Requirements Specified In The Detailed Specification Invoked In This Contract, The Following Material Certification Requirements Apply:
3.15.1 See Cdrl Di-misc-81020 (quality Conformance/required Tests) - Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications).
3.15.2 In Addition To Quantitative Chemical And Mechanical Properties, (as Required By The Applicable Specification), The Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type And Finish, As Applicable, Of The Material
supplied.
3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.16 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance:
3.16.1 All Welding Electrodes/inserts Must Be Sample Inspected In Accordance With The Applicable Welding Electrode/insert Specification, Except The Unit Containers Must Be 100% Inspected For Traceability Marking And That The Markings Are Legible.
3.16.2 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material/unit Container Marking) And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The
certification Test Reports Must Be 100% Inspected For Completeness And Legibility, And That There Is A Test Report For Each Heat Or Lot Of Material Being Shipped.
3.17 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To The Contractor -
4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be
considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And
contract Number Must Be Submitted To The Pco.
4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied
conforms To The Specified Requirements.
6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability,
Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;10/20/2016 - Updated Ecds Url
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- May 16 2013 - Removed Gsi From This Material.
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
the Following Paragraphs Of Di-misc-81020 Must Be Modified As Shown Below:
10.1.1 - Add: Material Marking For Spooled Wire Must Be As Identified Within The Applicable Commodity Specification.
10.1.2 - Add: For Weld Materials, The Weld Material Manufacturer Is Considered The Original Mill.
10.2 - Replace The Entire Paragraph With: For Weld Materials, Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications)
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date14 Jan 2025
Tender AmountRefer Documents
City of Seč Tender
Others
Corrigendum : Closing Date Modified
Czech Republic
Details: The subject of the Public Contract is the Reconstruction and Construction Modification of the Sdh Seč Armory, Including Connections, Electrical Shifts, Pits and Paved Areas. Construction Modifications of the Existing Single-Storied Building with No Basement No. 112 On the plot of St. P. 672 In the Cadastral Territory Sec. The shape solution of the new building is based on the existing condition - there will be demolition of structures above the plane of the ceiling structure of the lower part, the construction of extensions from the east side with a floor plan of 8.20 X 12.0 MA Superstructures above the existing part and extensions with a floor plan of 21.3 X 8.2 M, The superstructure will be covered with a gable roof with a slope of 40° And Made Extensions To The Higher Part Of The Building On The North Side With A Floor Plan Of 3.20 X 4.90 M, Covered With A Countertop Roof. In connection with the construction modifications, demolition work will be carried out, such as the removal of the asphalt coating in the place of the superstructure, including the composition of the roof, demolition of the floors, the demolition of new openings, the removal of existing windows, some installations, the plating of attics, and also the addition and walling will be carried out. As a whole, the building will be insulated with Eps insulation.
Closing Soon8 Jan 2025
Tender AmountCZK 25 Million (USD 1 Million)
Landkreis Havelland Der Landrat Tender
Others
Germany
Details: The Havelland district is planning to build an extension at the site of the cooperation school in Friesack. The construction work is to take place during ongoing school operations. The extension will have 3 floors. In preparation for this work, the building site must be cleared. The work advertised here is part of the overall construction work. There will be 7 contract packages for this construction work. In these award packages, the following services are awarded according to the 80/20 rule within the framework of national procedures: Vp 0 - Clearance of construction site HLS (heating, plumbing) - Clearance of construction site ELT (electrical) - Clearance of construction site other (dismantling and relocation) - Felling and clearing work - Infiltration work Vp 1 - Elevator - Construction power system - Lightning protection and earthing Vp 3 - Interior plastering - Screed work - PV system - Kitchen technology systems Vp 4 - Painting work Vp 5 - Tiling work - Floor covering work - Carpentry work Vp 6 - Building cleaning - Locking system Vp 7 - Extended shell of existing elevator shaft - Existing elevator shaft shell - Existing extension (extension of elevator shaft + relocation of student cafe)
Closing Date14 Jan 2025
Tender AmountRefer Documents
Slots Og Kulturstyrelsen - DENMARK Tender
Others
Denmark
Details: Title: Service And Cleaning Of Kongens Have And Frederiksberg Garden Type: Eu Tender Expected Contract Period: 5 Years With The Possibility Of Extension Of 3 Times 1 Year Expected Publication Of Tender: 3rd Quarter 2024 Contact: Center For Group It And Tenders, Kui@ Slks.dk Title: Garden Management Of Koldinghus, Aalborghus, Frederiksberg, Sorgenfri, Marienborg And Frilandsmuseet Type: Eu-tender Expected Contract Period: 5 Years With The Possibility Of Extension Of 3 Times 1 Year Expected Publication Of Tender: 2nd Quarter 2024 Contact: Center For Koncern It Og Udbud, Kui@slks.dk Title: Forest Management Of Fredensborg And Frederiksborg Type: Eu-tender Expected Contract Period: 5 Years With The Possibility Of Extension Of 3 Times 1 Year Expected Publication Of Tender: 2nd Quarter 2024 Contact: Center For Koncern It Og Udbud, Kui@slks.dk Title: Purchase Of Electrical Charging Points And Parking Control Type: Advertising Expected Contract Period: 5 Years Expected Publication: 2nd Quarter 2024 Contact: Center For Group It Og Udbud, Kui@slks.dk Title: Development , Maintenance And Support Of It Support In The Cultural Heritage Area Type: Eu Tender Expected Publication Of Tender: 2nd Quarter 2024 Contact: Center For Group It And Tenders, Kui@slks.dk
Closing Date26 Jan 2025
Tender AmountRefer Documents
Kofola ČeskoSlovensko as Tender
Others
Corrigendum : Closing Date Modified
Czech Republic
Details: The subject of the Public Contract is the realization of the Building So 101 - Building Modifications and Extension of the Existing Building Nkp New Bathroom. The New Bathrooms Building Will Mainly Have An Administrative Function Complemented By An Exhibition Circuit And A Publicly Accessible Exhibition Space. The exterior brickwork will be restored and new windows will be made according to the original layout. Luxfer fillings will be preserved, some windows on the ground floor will be raised to the height of the demolished parapets, thereby creating entrances and landings. The original 6 X 6 M skeleton will be rehabilitated (vertical and horizontal elements will be strengthened). Free Spaces of Open Offices Will Be Created, Two-Storied Space of Chain Wardrobes Will Be Divided Horizontally by an Inserted Wall, While the Chain Wardrobe System Will Remain. The Original Stairs In The Vertical Towers Will Be Removed And Replaced With New Stairs. As part of the Building Modifications, New Wall Structures, New Surface Modifications, and New Furnishings will be installed, incl. Connection to new water and sewage distribution systems, new electrical installation, air conditioning and air conditioning will also be carried out. The source of heat for heating and air conditioning needs is the hot water transfer station, located in 1. Pp. The source of cooling is a compressor cold water generator for summer operation and a direct cooling device for winter operation. See Tender Documentation for details.
Closing Date17 Jan 2025
Tender AmountRefer Documents
7251-7260 of 7664 active Tenders