Electrical Tenders

Electrical Tenders

Rhein Sieg Kreis Tender

Others
Germany
Description: Delivery of electrically height-adjustable desks
Closing Date16 Mar 2025
Tender AmountRefer Documents 

awarding authority of the municipality of Holtgast Tender

Civil And Construction...+1Others
Germany
Description: To the tender 'multi-purpose building Fulkum: electrical installation'
Closing Date20 Feb 2025
Tender AmountRefer Documents 

Municipality of Detmold Specialty Area 5 Tender

Others
Germany
Description: To the tender 'electrical installation Realschule I'
Closing Date20 Feb 2025
Tender AmountRefer Documents 

Ormoc City Tender

Others...+1Electrical and Electronics
Philippines
Details: Description Admin-bac-form11-2 Revision 2, Effective January 1, 2024 Republic Of The Philippines City Government Of Ormoc 2nd/f New Ormoc City Hall Bldg., Ormoc City Tel. #(053) 255-2054 & 560-8050 Local # 1126, 1127 & 1123 ________________________________________ Invitation To Bid The City Of Government Of Ormoc, Through Its Bids And Awards Committee ( Bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Contract: Project Ref. No. : 14-pr#250233 Name Of Project : Supply And Installation Of Complete Vrf Airconditioning System For Various Offices In The New Ormoc City Hall Building, Ormoc City. Location : New Ormoc City Hall Building, Ormoc City Brief Description Of The Project : Includes Mechanical Works, Civil Works, Mechanical & Electrical Plan, Removal Of Old Units, Start Up, Commissioning, 30 Units In Various Type Inverters, Celling Cassette, Single Split Ceiling Cassette Approved Budget For The Contract : 9,614,000.00 2025 Office Equipment Cgso, Cswd, Bplo, Acctg. Delivery Period : 120 Calendar Days Prospective Bidders Must Have An Experience Of Having Completed A Similar Project Within The Last 3 Years With An Amount Of At Least 50% Of The Abc Or For Expendable Supplies At Least 25% Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents Particularly In Section Ii . Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra9184), Otherwise Known As The "government Procurement Reform Act". It Is Also Restricted To Filipino Citizens/sole Proprietorships, Partnerships Or Organization With At Least Sixty Percent (60%) Interest Or Outstanding Capital Share Belonging To Citizens Of The Philippines. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedules From To 1. Issuance And Availability Of Bidding Documents Friday, January 31, 2025 Monday, February 24, 2025 @ 9:30 A.m. 2. Pre-bid Conference Monday, February 10, 2025 @ 2:00 O' Clock P.m. 3. Deadline For Submission & Receipt Of Bids Monday, February 24, 2025 @ 10:00 O' Clock A.m. 4. Opening Of Bids Monday, February 24, 2025 @ 2:00 O'clock P.m. The Bac Will Issue A Complete Set Of Bidding Documents To Interested Bidders Or Their Duly Authorized Representative At The Bac Office, 2/f New Ormoc City Hall Building, Ormoc City, Upon Presentation Of Proper Identification, Special Power Of Attorney (spa), For Authorized Representative And Upon Payment Of A Non Refundable Fee In The Amount Of: Ten Thousand Pesos (10,000.00) Only To The City Treasurer's Office, Ormoc City. Pre-bid Conference Shall Be Open To All Interested Prospective Bidders Or Their Duly Authorized Representatives. Bids Will Be Opened In The Presence Of Bidder's Representatives Who Choose To Attend. Late Bids Shall Not Be Accepted. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The City Government Of Ormoc Reserves The Right To Accept Or Reject Any Bids, To Annul The Bidding Process, To Reject All Bids At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To Any Affected Bidder Or Bidders. Approved: Vincent L. Emnas Bac Chairman Dates Of Publication: Philgeps January 31, 2025 Newspaper: N/a Closing Date: February 24, 2025 For The Bac Chairman: (sgd) Albert Patrick B. Deen Bac Vice Chairman
Closing Date24 Feb 2025
Tender AmountPHP 9.6 Million (USD 164.4 K)

Samtgemeinde Fredenbeck Tender

Others
Germany
Description: Fire protection renovation of the Geestlandschule Fredenbeck House 2+3, 6th Ba - electrical installation work
Closing Date27 Feb 2025
Tender AmountRefer Documents 

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description A.contract Id : Antipolo-19february2025-14 B. Name Of Project :construction/ Completion Of School Building At Brgy. San Isidro, Antipolo City (2025-package 18) A. Construction Of Four (4) Storey-eight (8) Classrooms Ynares School Building At Bagong Nayon Ii National High School - Annex, Brgy. San Isidro, Antipolo City B. Completion Of Construction Of Four (4) Storey-eight (8) Classrooms Ynares School Building At Bagong Nayon Ii National High School - Annex, Brgy. San Isidro, Antipolo City C. Location : A.&b. Brgy. San Isidro, Antipolo City D. Brief Description : A. Construction Of School Building B. Completion Of School Building E. Major Item Of Works : A. Structural/ Concrete Works; Masonry Works; Steel Works; Carpentry Works B. Plumbing Works; Tile Works; Painting Works; Electrical Works F. Approved Budget For The Contract : Php 38,027,595.64 G. Duration : 240 C.d Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: January 31 - February 19, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: February 07, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: February 19, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: February 19, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date19 Feb 2025
Tender AmountPHP 38 Million (USD 650.4 K)

Sri Lanka Army Sri Lanka Electrical And Mechanical Engineers Base Workshop Colombo Tender

Goods
Electronics Equipment...+2Machinery and Tools, Electrical and Electronics
Sri Lanka
Purchaser Name: Sri Lanka Army Sri Lanka Electrical And Mechanical Engineers Base Workshop Colombo | Purchasing Spares For Toshiba 2809 Photocopy Machine Clim 20910 401/pco/25/024
Closing Soon7 Feb 2025
Tender AmountRefer Documents 

Stadt Rheinstetten Tender

Others
Germany
Description: Electrical engineering ventilation - transformer station
Closing Date19 Feb 2025
Tender AmountRefer Documents 

Stadt Liebenwalde Tender

Civil And Construction...+1Civil Works Others
Germany
Description: Renovation of the former train station in Liebenwalde - Lot 21 Electrical Incl. Locking System
Closing Date18 Feb 2025
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

Machinery and Tools
Corrigendum : Closing Date Modified
United States
Details: General Requirements   1. Scope     1.1 Intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.     2. References     coast Guard Drawings     none.     coast Guard Publications   surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements     other References     none.   3. Requirements     3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.     3.2 Period Of Performance. The Period Of Performance For This Work Is 24mar2025-05may2025   3.3 Location. The Contractor Must Perform The Work While The Uscgc Waesche Is Alongside The Pier At U.s. Coast Guard Base Alameda, Coast Guard Island, Alameda Ca 94501. 58310_mla_1124_418 item 1: Folding Boom Cranes, Biennial Maintenance, Perform 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Inspect, Perform Maintenance, And Test Folding Boom Cranes Listed In Table 1. table 1 – List Of Folding Boom Cranes crane location manufacturer / Model Number coast Guard Tech Pub crane No. 2 main Deck, Port Side, Aft Of Frame 95 appleton Marine Inc. / Fb90-28 7903 crane No. 4 main Deck, Port Side, Aft Of Frame 90 appleton Marine Inc. / Fb90-28 7903 crane No. 3 main Deck, Stbd Side appleton Marine Inc. / Fb90-28 7903 1.2 Government-furnished Property. mti item Description nsn/pn qty estimated Cost ($/unit) y *cb-oth Mark Iv (coast Guard Drawing 26b-cb-iv-801-001) n/a 1 Ea. n/a y *long Range Interceptor Ii (lri-ii) Cutter Boat (coast Guard Drawing 35-lri-ii-801-001) n/a 1 Ea. n/a 2. References coast Guard Drawings coast Guard Drawing 26b-cb-iv-801-001, Rev -, Booklet Of General Plans coast Guard Drawing 35-lri-ii-801-001, Rev -, General Arrangement coast Guard Drawing 418a-wmsl 801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes coast Guard Drawing 750-wmsl-583-508, Rev -, Installations Iwo Aft Folding Cranes coast Guard Fleet Drawing Fl-1702-11, Rev -, Inspection Of Sheaves coast Guard Publications coast Guard Technical Publication (tp) 7903, Swbs 583, Oct 2021, Aft Boat Handling System –model Fb90-28 surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 5000 (sflc Std Spec 5000), 2022, Auxiliary Machine Systems surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References the Society For Protective Coatings (sspc) Surface Preparation Specification No.11 (sspc-sp 11), 2020, Power Tool Cleaning To Bare Metal 3. Requirements 3.1 General. 3.1.1 Cir. The Contractor Must Submit A Cir For The Inspections Listed In The Following Paragraph(s): 3.3 Inspect And Repair Task Particulars (task #1, #2, #3 And #7) 3.1.2 Tech Rep. The Contractor Must Provide The Services Of A Qualified Technical Representative Who Is Familiar With The Folding Boom Cranes, Appleton Marine Inc. Model Fb90-28, To Accomplish The Following On Site: advise On Manufacturer's Proprietary Information Pertinent To The System. ensure Compliance With Manufacturer's Procedures And Standards During Inspections, Repairs, Calibration And Testing. 3.1.2.1 Ensure The Tech Rep Has Experience With The System/equipment Stated Above And Demonstrated On Their Résumé. 3.1.2.2 Submit The Name And Résumé Of The Tech Rep With The Contractors Bid. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.3.1 Protection Of Fine Surfaces. The Contractor Must Protect All Fine Surfaces In Accordance With Sflc Std. Spec 5000. 3.1.3.2 Hydraulic System Contamination Protection. The Contractor Must Maintain Existing Hydraulic Cleanliness In Accordance With Sflc Std. Spec 5000. 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: piping electrical Cables note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.3 Inspect And Repair Task Particulars. The Contractor With Tech Rep Support Must Perform Tasks Listed In Table 2 In Accordance With Sflc Std Spec 5000 And Tp 7903. See Applicable Drawings And Tech Pub In Section 2 For Technical Information And Installation Details. table 2 – Task List additional Requirements # task Type qty component Or Assembly appendix And Para. From Sflc Std Spec 5000 other tech Pub 7903 1 operate And Inspect 3 folding Boom Crane 3.2.1 submit A Cir. Document The Existing Software Program/version. note: There Is An Issue While Running Cranes #2 And #4 In Tandem (with A Load In Remote). While Hoisting, The Operator Receives Indication Crane #4 Is Overloading. Users Must Override To Operate The Cranes In Tandem. The Contractor Will Need To Conduct This “operate And Inspect” Task Under Load To Troubleshoot This Issue. 2 operate And Inspect 1 chest Pack (chest Pack Controls And Junction Boxes) 3.2.1 submit A Cir. note: There Is One Chest Pack. It Should Be Rotated Between All Three Cranes. 3 operate And Inspect 1 control Console 3.2.1 submit A Cir. 4 service & Inspect & groom & Lubricate 3 crane Assembly 3.2.2 perform All Preventive Maintenance Actions As Indicated On Table 4-1 Of Cg Tp 7903, Regardless Of Specified Interval. Inspect Hydraulic Hoses For Leaks, Abrasions, Swelling And Defects. Inspect Entire Folding Crane Assembly For Signs Of Leakage, Cracks, Structural Damage And Deformations. Submit A Cfr. note 1: Only Check The Torque Of 25% Of The Turntable Bearing Mounting Bolts (4-3.18.1) – Include A Diagram Of The Bolts That Were Checked In The Cfr For This Section. note 2: Take Off Removable Hose Sleeves And Hose Fitting Tape For Inspection, If Applicable. Reinstall Hose Sleeves And Fitting Tape Upon Completion Of Inspection 5 service And Inspect 3 cranes (mechanical/hydraulic) 3.2.2 inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection, Main Control Manifold, Wire Rope, Elr Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib And Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit A Cfr. 6 partially Preserve 3 folding Boom Crane Assembly 3.2.4, 3.2.4.3.2, 3.2.4.4, And 3.2.4.5.1 7 hydraulic Lube Oil Analysis 3 hydraulic System c2.1.3.1 submit A Cir. 8 service And Inspect 1 hydraulic Power Unit (hpu) 3.2.2 inspect Prime Mover/link Motor, Hpu Pumps, Hpu Reservoir, Hpu Tank Heaters, Oil Cooler, Hpu Manifold And Hoses. Hpu Temperature Transmitter, Hpu Display, Hpu Controls, Joysticks And Control Cabinet In Accordance With Tp 7903. 9 system Relief Valves, Switches And Indicators 1 hydraulic System in Accordance With Tp 7903, Verify Set Points, Adjustment And Calibration On: pump Compensator Relief Valve system Relief Valve. winch Limit Adjustment. load Monitor Indicators crane Position Indicators submit A Cfr. 10 disassemble And Inspect 1 hydraulic Oil Heat Exchanger 3.2.3 disassemble To The Minimum Extent Necessary To Clean The Heat Exchanger. 11 service And Inspect 2 hydraulic System crane Motor A And B 3.2.2 perform Insulation Resistance Test In Accordance With Ansi/easa Ar 100-2020.and Section 3 Of Tp 7903 Submit A Cfr. 12 service And Inspect 3 cranes (electrical) 3.2.2 inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood Lights And Electrical Cables 13 operational And Weight Test 3 folding Boom Crane Assembly perform In Accordance With Paragraph 3.5 Of This Work Item. 14 fabricate And Install 3 label Plate b2.9 name Plate Must Also Include Additional Information Of Dynamic Load Test, Brake Test And Wll Weights. 3.3.1 Materials. The Contractor Must Provide All Parts (i.e. All Greases, Lubricating Oils, Hydraulic Fluid, Hydraulic Oil Filters, Tank Breather Elements And Other Miscellaneous Materials) And Materials Including, But Not Limited To, The Items Listed In Table 3 Below, To Conduct The Required Maintenance Actions Listed Above. table 3 – List Of Parts quantity part Number description source Of Supply 1 ymd-8861-r hpu Hydraulic Return Filter appleton Marine Inc. 1 ymd-10416 hpu Hydraulic Return Filter 2 ymd-12209-r pressure Filters (for Crane No.2 & 4) 1 ymd-12234-r (0280d005bh4hc) pressure Filters (for Crane No.3) 1 ymd-12234-r (0060d005bh4hc) pressure Filters (for Crane No.3) 3.3.2 Hose Inspection. The Contractor Must Visually Inspect The Condition Of All Flexible Hoses; Tp7903 Has A Comprehensive List Of Hoses And Their Locations. Submit A Cfr With The Following: hose Number hose Physical Condition service Life Dates (date For Required Hose Renewal; If Not Specified, Add Twelve Years To Installation Date) 3.3.2.1 If Not Present, The Contractor Must Provide New Hose Tags, In Accordance With Sflc Std Spec 5000, Paragraph C2.2.1.4. Ensure Tag Color Coding Of Black On Natural Or Black On White. Ensure That Tags Must Be Attached Using Materials That Will Not Damage Hose Assembly In Any Way Or Interfere With The Normal Flexing Motion Of The Hose. 3.3.2.2 The Contractor Must Stamp, Engrave, Or Etch The Following Information On Each Tag. Handwritten Information On Each Tag Is Not Acceptable. Utilize The Cutter’s Hose Log For Information As Necessary. hose Log Item Number (serial Number) hydrostatic Test Pressure (psi) hydrostatic Test Date (dd/mm/yy) service Life (replacement Date) Date (qtr "q"/fy) 3.4 Preservation Requirements. The Contractor Must Perform The Following Work To Accomplish The First Bulleted Requirement Of Sflc Std Spec 5000 (para 3.2.4.3.2). 3.4.1 All Other Requirements As Specified From Sflc Std Spec 5000 Regarding “partially Preserve” Remain Applicable. 3.4.2 In Addition To Partial Preservation, Abrade Entire Crane Surface And Provide Aesthetic Topcoat. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. note certain Water Weight Bags May Be Too Large To Fit Within The Notch. Ensure Test Weights Are Able To Fit Within The Notch To Accomplish All Testing. caution do Not Exceed The Working Load Limit (wll) Of The Cranes For Any Of The Tests Listed In Appendix A, Cg Tp 7903. Exceeding The Wll Could Result In Equipment Damage And/or Personnel Injury. 3.5 Operational And Weight Testing. The Contractor Must Perform The Appleton Marine Inc. “start-up And Overhaul Test Procedure”, Appendix A Of Cg Tp 7903 Items 1-10. Static Load Test (item 2.1) Is Not Required. Perform All Testing With Cutter At Or Near 0-degree Trim And 0-degrees List. Record And Provide All Testing Data Of Appendix A, Cg Tp 7903 Via A Cfr. Utilize Test Weights That Will Ensure The Boom Can Be Extended Horizontal In The Notch. 3.5.1 The Contractor Must Supply Weights And A Certified Dynamometer To Conduct Load Testing, Submit Cfr With Certification Details. Perform All Testing In The Presence Of The Coast Guard Inspector And The Tech Rep. 3.5.2 Upon Successful Completion Of The Load Testing, Operational Testing Must Be Performed Using The Various Gfp Small Boats In Accordance With The Test Procedure Detailed In Appendix A, Cg Tp 7903. 3.6 Bearing Wear Inspection. The Contractor Must Conduct A Bearing Wear Inspection Of The Turntable Bearing, For All Cranes In Table 1, In Accordance With Cg Tp 7903 Appendix B. Submit A Cfr With Test Results As Compared With The Baseline Measurements In Table 4. table 4 – Cgc Waesche Turntable Bearing Baseline (15july2018) 3.7 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.8 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Exterior And Interior Surfaces To Match Existing Adjacent Surfaces, In Accordance With Sflc Std Spec 6310. Abide By All Touch-up Requirements Outlined In Sflc Std Spec 6310. 4. Notes this Section Is Not Applicable To This Work Item.
Closing Soon11 Feb 2025
Tender AmountRefer Documents 
3281-3290 of 9132 active Tenders