- Home/
- United States/
- DEPT OF THE NAVY USA/
- Overview
DEPT OF THE NAVY USA Tender
DEPT OF THE NAVY USA Tender
Costs
Description
Contact Information|4|n&$!|gds|564-226-3005|kimberly.m.myers.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208| inspection Of Supplies--fixed-price (aug 1996)|2||| production Lot Testing|1|| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|tbd|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| qualification Requirements (feb 1995)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|336611|1,300 Employees|||||||||||| instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| evaluation Of First Article Testing|3|||| 1. This Solicitation Is For The Following Procurement: a. Fairing Strip, Nsn 2090 012244911. this Part Requires Engineering Source Approval By The Design Control Activity In Order To Maintain The Quality Of The Part. Existing Unique Capability, Engineering Skills, And Manufacturing Knowledge By The Qualified Source(s)require Acquisition Of The Part From the Approved Source(s). The Approved Source(s) Retain Data Rights, Manufacturing Knowledge, Or Technical Data Thatare Not Economically Available To The Government, And The Data Or Knowledge Is Essential To Maintaining The Quality Of The Part. An Alternative Source Must Qualify In Accordance With The Design Control Activity's Procedures, Asapproved By The Government Engineering Activity Having Jurisdiction Over Thepart In The Intended Application. 2. Government-source Inspection And Acceptance (i&a) Is Required. If I&a Will Occur At A Different Cage From The Award Cage, Provide The Facility Cage And/or Packaging Cage With The Quote. 3. Mil-std Packaging Is Required And It Will Not Be Waived. 4. Provide The Following Information In The Procurement Quote: a. Your Cage (used As The Awardee Cage):___________________ b. The Unit Procurement Price: $__________________________(firm Fixed Price). c. The Facility Cage __________ And/or Packaging Cage_______ (if Applicable, As Described In #2). d. Procurement Acquisition Time, Delivered In _____ Days. offerors Must Have A Valid U.s. Security Clearance Of Classified Or Higher In Order To Respond To This Rfp (announcement), Because The Rfp (announcement)includes An Annex (information) Classified At The Confidential Level Which Will Be Released Only To Offerors possessing The Appropriate Clearance. Allclassified Material Must Be Handled In Accordance With The National Industrial Security Program Operating Manual (nispom) (dod 5220-22-m) And Industrialsecurity Regulation (dod 5220.22-r) . 5. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. 6. Please Submit A Procurement Quote To Kim Myers Via Email: Kimberly.m.myers.civ@us.navy.mil. 7. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 8. This Is A Rated Order Certified For National Defense Use, And The Contract Will Follow All The Requirements Of The Defense Priorities And Allocations System Regulation (15 Cfr 700). 9. This Order Will Be Issued Pursuant To Emergency Acquisition Authority (eaf). \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Fairing Strip , Part Of The ;special Hull Treatment Program. This Specification Covers One Class Of Fairing Strip, Identified As Type aa-18; . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. drawing Data=5808330 |53711| F| |d|0001 | F|49998|0045902 drawing Data=5808330 |53711| F| |d|0002 | F|49998|0019660 drawing Data=5808330 |53711| F| |d|0003 | F|49998|0025272 drawing Data=5808330 |53711| F| |d|0004 | F|49998|0036564 drawing Data=5808330 |53711| F| |d|0005 | F|49998|0018631 drawing Data=5808330 |53711| F| |d|0006 | F|49998|0015546 drawing Data=5808330 |53711| F| |d|0007 | F|49998|0040875 drawing Data=5808330 |53711| F| |d|0008 | F|49998|0044057 drawing Data=5808330 |53711| F| |d|0009 | F|49998|0032826 drawing Data=5808330 |53711| F| |d|0010 | F|49998|0042058 drawing Data=5808330 |53711| F| |d|0011 | F|49998|0033656 drawing Data=5808330 |53711| F| |d|0012 | F|49998|0047437 drawing Data=5808330 |53711| F| |d|0013 | F|49998|0054665 drawing Data=5808330 |53711| F| |d|0014 | F|49998|0047151 drawing Data=5808330 |53711| F| |d|0015 | F|49998|0044573 drawing Data=5808330 |53711| F| |d|0016 | F|49998|0038625 drawing Data=5808330 |53711| F| |d|0017 | F|49998|0038609 drawing Data=5808330 |53711| F| |d|0018 | F|49998|0040537 drawing Data=5808330 |53711| F| |d|0019 | F|49998|0034235 drawing Data=5808330 |53711| F| |d|0020 | F|49998|0014423 drawing Data=5808330 |53711| F| |d|0021 | F|49998|0036894 drawing Data=5808330 |53711| F| |d|0022 | F|49998|0032810 document Ref Data=mil-std-105 | | |e |950227|a| | | document Ref Data=mil-std-129 | | |p |041029|a| |03| document Ref Data=mil-std-177 | | |a |880531|a| | | document Ref Data=fed-std-313 | | |d |000321|a| |01| document Ref Data=mil-std-407 | | | |910321|a| | | document Ref Data=mil-std-2073 |0001| |d |020510|a| |01| document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=s6360-ad-hbk-010 | | | |940930|e| | | document Ref Data=astm-d1974 | | | |940301|a| | | document Ref Data=astm-d2240 | | | |920622|a| | | document Ref Data=astm-d297 | | | |930915|a| | | document Ref Data=astm-d3767 | | | |920417|a| | | document Ref Data=astm-d3951 | | | |901221|a| | | document Ref Data=astm-d412 | | | |921115|a| | | document Ref Data=astm-d4615 | | | |941003|a| | | document Ref Data=astm-d471 | | | |980911|a| | | document Ref Data=astm-d5118/d5118m | | | |940301|a| | | document Ref Data=astm-d573 | | | |880527|a| | | document Ref Data=astm-d635 | | | |910715|a| | | document Ref Data=mil-hdbk-774 | | |a |040830|a| | | document Ref Data=iso9001 | | |94 |940701|a| | | document Ref Data=iso9002 | | | |940701|a| | | document Ref Data=mil-std-973 | | | |920417|a| | | document Ref Data=mil-std-973 | | | |950113|a| |03| document Change Data=mil-p-116 |mil-std-2073/1 document Change Data=mil-std-147 |mil-hdbk-774 document Change Data=ppp-b-636 |astmd5118 Astmd1974 3. Requirements 3.1 Design, Manufacture, And Performance - Except As Modified Herein, the Fairing Strip Furnished Under This Contract/purchase Order Shall Meet The design, Manufacture, And Performance Requirements Specified On Drawing ;5808330; cage ;53711; . 3.1.1 ;part Number : 5808330 Type Aa-18; 3.2 ; Source Control Item - Previous Delivery Of This Specified National Stock Number Or Similar Item Manufactured To Technical Procurement Specifications And/or Drawings Supplied By A Government Activity Or Price Contractor Does Not In Itself Qualify a Supplier As A Government Approved Source. Only Those Sources For This Item Currently Approved By The Government Will Be Considered For This Award. The Time Required For Approval Of A New Supplier Is Normally Such That Award Cannot Be Delayed Pending Approval Of The New Source. Qualification And Testing Requirements Are Extensive And Time Consuming. To Maintain Appropriate Stock Levels And Prevent work Stoppage, A Prospective Contractor Must Be Determined To Be Qualified By The Engineering Activity Prior To Submitting Offer. If You Have Not Been Solicited And You Can Furnish Either (a) Proof Of Your Prior Approval As A Supplier Of This Item, Or (b) Data Showing You Have Produced The Same Or Similar Items Satisfactorily For The Government Or A Commercial Source, Or (c) test Data Indicating Your Product Can Meet Service Operating Requirements, Or (d) Other Pertinent Data Concerning Your Qualification To Produce The Required Item, Notify The Procurement Contracting Officer In Writing, Furnishing Said Proof Of Data for Evaluation, Possibly Leading To Your Firm Being Authorized As An Approved Source For This Procurement Or Subsequent Procurements. Your Interest Will Be Forwarded To The In-service Engineering Agent (isea) Responsible For This Item.; 3.2.1 ;isea Qualified And Approved Source(s) At This Time Are The Following: 0sx38, Westland Technologies; 3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 3.5 ;molds - The Contractor Is Responsible For Designing Molds To Produce The Fairing Strips As Specified In Paragraph 3.3, 6.3 And Table Ii Of 53711 Drawing 5808330. The Government Reserves The Right To Examine Mold Drawings And Molds To Accept Or Reject plan Tolerances.; 3.6 ;material Safety Data Sheets (msds) - Material Safety Data Sheets Shall Be In Accordance With Paragraph 3.3.6 Of 53711 Drawing 5808330 And The Requirements Of Mil-std-313.; 3.7 ;responsibility For Inspection - The Contractor Is Responsible For The Performance And Certification Of All Inspection Requirements As Specified In Paragraph 4.1 Of 53711 Drawing 5808330 And This Specification. Unless Specified Elsewhere In This specification.; 3.8 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required. note - After Receipt Of Contract And Prior To Production, (production Will Not Be Authorized Until First Article Test Has Been Approved) Material Which The Supplier Proposes To Furnish Shall Be Tested For Conformity To The Requirements Of Paragraph 4.2 And table I And Ii Of 53711 Drawing 5808330. 3.9 ;samples For First Article Test - Samples Required For First Article Test Shall Be In Accordance With Paragraph 4.2.1 Of 53711 Drawing 5808330 And Shall Be Certified To Have The Same Composition, Construction And Manufacturing Process As The Material To be Supplied On Subsequent Production Lots.; 3.10 ;adhesion Of Fairing Strips - "sht" Epoxy Paint Hull Perservation Dtnsrdc 2844- 1109 (navsea Drawing 53711,5808333) And Epoxy Adhesive Dtnsrdc 2844-1102 (navsea Drawing 53711,5808332) Will Be The Only Paint And Adhesive To Be Used For "sht" Material "adhesion Of Fairing Strips" Testing.; 3.11 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-129 And Paragraph 5.2.3 Of 53711 Drawing 5808330; . 3.12 ;special Marking - Special Marking Shall Be In Accordance With Paragraph 5.2.3.1 And 6.5 Of 53711 Drawing 5808330.; in Addition, All Outside Containers Are To Be Marked With Black Letters A Minium Of One (1) Inch High In Non-fading, Water Resistant Ink, With The Designation "sht". 3.13 ;production Lot Test/quality Conformance Inspection Approval (government Testing) - Productin Lot Test (plt)/quality Conformance Inspection (qci) And Approval Is Required.; production Lot Test Quality/conformance Inspection - If The Fairing Strips From A Supplier Have Passed The First Article Inspection, The Supplier May Commence Production. The Production Of Fairing Strips Is Subject To The Requirements For Batch Acceptance And lot Acceptance As Required By Paragraph 4.3 Of 53711 Drawing 5808330. Material Submitted For Production Lot Test/quality Conformance Inspection Shall Be Certified To Have The Same Composition, Construction And Manufacturing Process As The Material Supplied For first Article Test. 3.14 ;sampling And Rating For Lot Acceptance - Sampling And Rating For Lot Acceptance Shall Be In Accordance With The Requirements Of Paragraph 4.3.2.3 And Table Iv Of 53711 Drawing 5808330. note: lot Acceptance Test Shall Be In Accordancewith The Requirements Of Paragraph 4.3.2.2. Of 53711 Drawing 5808331. a Lot Shall Be As Specified In Paragraph 4.3.2.1 Of 53711 Drawing 5808331.; 3.15 ;cleaning Procedure - See Section 6 (notes) Of This Specification For Cleaning Procedures.; 3.16 ;the Supplier Shall Provide A Certificate Of Conformance (coc) Or Certificate Of Acceptance (coa) With Each Sht Material. Package One Coc/coa Per Item. See Cdrl A0001 For More Information. ; 3.17 Security Clearance Required - This Contract/purchase Order Requires The Contractor To Have A Government Security Clearance In Accordance With The Attached Contract Security Classification Specification (dd Form 254). 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Inspection System Requirements - The Supplier Shall Provide And Maintain An Inspection/quality System Acceptable To The Government. The Inspection System Requirements For This Contract/purchase Order Shall Be In Accordance With Mil-i-45208. Suppliers certified To Perform Under Iso 9001 Or Iso 9002 Are Granted Permission To Utilize The One Desired In Lieu Of Mil-i-45208. 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies. 4.5 ;material Safety Data Sheet (msds) - The Contractor Shall Prepare And Submit Material Safety Data Sheets In Accordance With The Contract Data Requirements List (dd Form 1423).; 4.5.1 Units That Undergo Destructive Testing Are Rendered Unusable And Shall Not Be Considered In The Quantity Listed For The "ship To" On The Schedule Page Of This Contract/purchase Order. The Number Of Units That Will Be Destroyed Under The Destructive testing Shall Be Inaddition To The Quantity Required On The Schedule Page. 4.6 ;certification/data Report (samples For First Article Test) - The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).; 4.7 ;first Article Test/inspection (government) - The Contractor Shall Deliver Samples In Accordance With Paragraph 4.2.1 Of 53711 Drawing 5808330 To The Government Testing Facility For First Article Test. Government First Article Test Shall Consist Of All testing/inspections Specified In Paragraph 4.2 Of 53711 Drawing 5808330. Test Samples That Are Consumed Or Destroyed In Testing Will Not Be Returned To The Contractor By The Government Testing Facility. note:production Will Not Be Authorized Until First Article Test Has Been Approved.; 4.8 ;contractor Test/inspection - The Contractor Shall Inspect The Fairing Stripsin Accordance With The Requirements Of Paragraph 3.3.1, 3.3.2, 3.3.3, 3.3.4 And 3.3.5 Of 53711 Drawing 5808330. the Contractor Shall Comply With The Requirements Of Paragraph 4.2.1.3 (rubber Compound Test) And 4.3.1 (batch Acceptance) Of 53711 Drawing 5808331.; 4.9 ;certification Data Report (material For Production Lot Test/quality Conformance Inspection) - The Contractor Prepare And Submit A Report In Accordance With The Contract Data Requirements (dd Form 1423).; 4.10 ;changes To Drawing 5808330 - Drawing 5808330 Shall Be Revised As Stated Below: (a) Sheet 9, Paragraph 4.3.2.3 Sampling And Rating For Lot Acceptance. Random Samples From each Lot Of Fairing Strips Shall Be Selected And Rated In Accordance With Mil-std-105 Normal Inspection Level Ii Single Sampling Plan (n-ii-s). An Acceptable Quality Level (aql) Of 1.5 For The Major Defects And 6.5 For The Minor Defects Shall Be Used. the Non-destructive And Destructive Sample Sizes Shall Be Determined By Table Iv. Fairing Strips Selected For Destructive Testing Comming From Those That Have Passed The Non-destructive Inspection. Defects Are Defined In Paragraph 4.4. Table Iv Summerizes The information From Mil-std-105 For Inspection Level N-ii-s. Guidance For Altering The Table Iv Schedule For Either Tightened Or Reduced Inspection Leveles Is Detailed In Mil-std-105. (b) Sheet 11, Notes: Table Iv Provides Composite Information From Mil-std-105 When A Normal Inspection Level Of N-ii-s Is Used To Determine The (acc-rej) Criteria For Both The Non-destructive And destructive Inspection While Using An Acceptable Quality Level (aql) Of 1.5 For The Major Defects And 6.5 For The Minor Defects.the Non-destructive And Destructive Sample Sizes Shall Be Determined By Table Iv. Fairing Strips Selected For Destructive testing Comming From Those That Have Passed The Non-destructive Inspection. Guidance For Altering The Table Iv Schedule For Either Tightened Or Reduced Inspection Levels Is Detailed In Mil-std-105. ; 4.11 ;production Lot Test/quality Conformance Inspection (government) - The Contractor Shall Deliver Test Samples To The Government Test Facility For Production Lot Test/quality Conformance Inspection In Accordance With The Requirements Specified In paragraph 4.3 Of 53711 Drawing 5808330. The Test/ Inspections Shall Consist Of The Requirements Of Paragraph 4.3.2.2 Of 53711 Drawing 5808330. note - The Contractor Shall Comply With The Requirements Of Paragraph 4.3.1 (batch Acceptance) Of 53711 Drawing 5808330.; production Lot Test/quality Conformance Inspection Test Samples Shall Be Shipped To: commander naval Surface Warfare Center Carderock Division 5001 South Broad Street Attn Code 332 Paul Lampazzi 215-897-1612 Philadelphia Pa 19112 4.12 ;responsibility For Inspection - The Contractor Shall Prepar And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).; 4.13 ;a Certificate Of Conformance (coc) Or Certificate Of Acceptance (coa) Shall Accompany Each Sht Material, As Stated Within Pns Ltr 9110 Ser 250/009 Of 1 Mar 23. Package One Coc/coa Per Item. Supplier Format Is Acceptable. As Indicated In Cdrl A0001.; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. 6.2 ;note: All Special Hull Treatment Operations Previously Requiring 1,1,1-trichloroethane Shall Use Butyl Acetate As A Direct Replacement. Butyl Acetate Shall Conform To The Requirements Of Astm D 4615. ; sht Tile Cleaning Procedure For The Tile And Fairing Strip Manufacturing Process Material Requirements A.butyl Acetate (astm D 4615) B.clean, White Cotton Rags Warning Consult The Msds For Butyl Acetate Prior To Initiating The Cleaning Process To Determine The Proper Ppe And Environmental Controls Required By Your Site. Additionally, Be Sure That Use of This Solvent Does Not Violate, State, Or Federal Environmental Regulations. Note This Procedure Shall Be Used Before And After The Etching Process. Before Etching, Only The Molded Side Shall Be Cleaned. After Etching, Both Sides Of The Tile Shall Be Cleaned With This Procedure. Procedure: 1. place Tile On A Clean Surface. 2. Scrub Surface Of The Tile With A Rag Moistened With Butyl Acetate. Note Butyl Acetate Shall Be Poured Onto The Rag To Prevent Contamination Of The Cleaning Solvent-do Not Dip Rag Into solvent. Change Rags Frequently. 3. Repeat The Cleaning Of The Tile Surface 2 To 3 Times As Necessary To Eliminate Contamination On The Tile. Note The White Cotten Rag Will Be Blackened Somewhat By The Cleaning Process. continue The Scrubbing The Tile Surface Until The Rag Does Not Get Any Lighter With Successive Washes. 4. Allow The Solvent To Flash Off (evapporate) For At Least One Half Hour Prior to Stacking Or Packaging The Tile. Note Do Not Recontaminate The Tile After The Cleaning By Placing It In Contact With Unclean Surfaces. 6.3 ;initial (first Time) Testing (first Article Test And Production Lot Test/ Quality Conformance Inspection) For Each Lot Or Sub Lot Shall Be At The Expense Of The Government. Second Time Testing Or Retesting Will Be At The Expense Of The Contractor. ; 6.4 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navicp Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navicp Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, F Or X Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Defense Logistics Service Center (dlsc) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Forign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Ar To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offerer Is To Enter The Appropriate Price Group. The Price Group Are Defines As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered Inpricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Becoded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. 6.5 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.6 Note To Government Testing Facility - Upon Completion Of The Government Tests Cited Under Section 4, Quality Assurance, A Letter Stating Approval/disapproval Of The Testing Performed Shall Be Mailed Within 5 Days To The Naval Inventory Control Point, attention: Procurement Contracting Officer, Identified In This Contract/purchase Order, 5450 Carlisle Pike, P.o. Box 2020, Mechanicsburg, Pa. 17055-0788. 6.7 ;first Article Test And Production Lot Test/quality Conformance Inspection - Samples Submitted To The Govertment Testing Facility For Test/inspection That Are Consumed Or Destroyed In Testing Will Not Be Returned To The Contractor.; 6.8 ;isea Poc:commander, Naval Surface Warfare Center; 5001 Broad Street Philadelphia, Pa 19112 ; Attn: Paul Lampazzi, 215-897-1612, Code 332; 6.9 ;"250.009 Cui Request For Naval Sea Systems Command Consideration For Reduction In Receipt Inspection Requirements For Submarine Special Hull Treatment Material" & "9690 Ltr Ser 05u7_039 - Sht Reciept Inspection Reduction Distro (004).pdf Are Available upon Request. Documents Cover Noise Reduction And Whether Or Not Plt Can Be Waived In Lieu Of A Coc/coa.; p/n: 5808330 Type Aa-18 Fairing Strip these Fairing Strips Are Shelf Life Code 9 (type 2, Extendable, 60 Months). item Required To Be Labeled To Show A 5 Year (60 Month) Shelf Life. upon Expiration, Item Shelf Life Is Capable Of Being Extended Only After Program Management Approval And/or Engineering Evaluation. \ date Of First Submission=asreq ;material Safety Data Sheets (msds) - Msds Shall Be In Accordance With Paragraph 3.3.6 Of 53711 Drawing 5808330 And Fed-std-313. In The Event Of Conflict Fed-std-313 Shall Take Precedence Over Di-misc-80678.; ;block 14a - Contractor Shall Submit One (1) Dcmc Approved Copy To Navicp-mech Pco At The Time Of First Article Test Submission.; ;block 14a - Submit One (1) Dcmc Approved Copy To The Government Testing Facility With The Samples For First Article Test.; ;block 14a - Package One (1) Dcmc Approved Copy Inside Each Shipping Container For All Shipments.; block 14a - Isea Information Copy To ;carderock Division Naval Surface Wrfare Center (cdnswc), Code 6244, Philadelphia Naval Base, Philadelphia Pa. 19112-5083.; . block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". date Of First Submission=asreq ;certification/data Report - Samples For First Article Test/ Inspection Shall Be Certified To Be In Accordance With The Requirements Of Paragraph 4.2.1 Of 53711 Drawing 5808330.; ;production Will Not Be Authorized Until First Article Test Has Been Approved.; ;block 14a - Submit One (1) Dcmc Approved Copy To Navicp-mech Pco Prior To First Article Testing.; ;block 14a - Submit One (1) Dcmc Approved Copy To The Government Testing Facility With The Samples For First Article Test.; block 14a - Isea Information Copy To ;carderock Division Naval Warfare Center (cdnswc), Code 6244, Philadelphia Naval Base, Philadelphia Pa. 19112-5083.; . block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". date Of First Submission=asreq ;certification/data Report - Samples For Production Lot Test/quality Conformance Inspection Shall Be Certified To Have The Same Composition, Construction And Manufacturing Process As The Material Supplied For First Article Test.; ;block 14a - Submit One (1) Dcmc Approved Copy To The Government Testing Facility With The Samples For Production Lot Test/quality Conformance Inspection.; ;block 14a - Submit One (1) Dcmc Approved Copy To Navicp-mech Pco Prior To Production Lot Test/quality Conformance Inspection.; block 14a - Isea Information Copy To ;carderock Division Naval Surface Warfare Center (cdnswc), Code 6244, Philadelphia Naval Base, Philadelphia Pa. 19112-5083.; . block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". date Of First Submission=asreq ;certification/data Report Shall Be In Accordance With The Requirements Of Paragraph 4.1 Of 53711 Drawing 5808330.; ;block 14a - Forward One (1) Dcmc Approved Copy With Dd Form 250 To Navicp-mech Pco At The Time Of Shipment. In Addition Package One (1) Dcmc Approved Copy With The Dd Form 250 Inside The First Shipping Container Of Each Shipment And Identify The Container.; block 14a - Isea Information Copy To ;carderock Division Naval Surface Warfare Center (cdnswc), Code 6244, Philadelphia Naval Base, Philadelphia Pa. 19112-5083.; . block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". date Of First Submission=asreq ; A Certificate Of Conformance (coc) Or Certificate Of Acceptance (coa) Shall Accompany Each Sht Material, As Stated Within Pns Ltr 9110 Ser 250/009 Of 1 Mar 23. Package One Coc/coa Per Item.supplier Format Is Acceptable. coc/coa Shall Provide Test Reports Certifying Conformance Of Material Samples To Requirements. In Addition, The Coc/coa Shall Provide Documentation For Traceability Of Each Unit To The Mateial Batch That Produced It. coc/coa Satisfies The Laboratory/material Testing Part Of The Receipt Inspection Process. Per Approval Letter, "no Receipt Inspection Material/laboratory Testing Is Required." Pns Ltr 9690 Ser 05u7/039, 29 Mar 2023, Approves Request From Pns Ltr 9110 250/009, 1 mar 23; Both Availableupon Request. The Requirements Of Letters Do Not Authorize Any Change In Terms, Conditions, Delivery Schedule Or Price Or Amount Of The Subject Contract Or Any Other Government Contract. In The Event You Consider That These Requirements Represent A Change For Which You Are entitled To An Equitable Adjustment, You Are To Comply With The Requirements Of The "notification Of Changes" Clause In The Contract.;
Contact
Tender Id
N0010424QYE34Tender No
N0010424QYE34Tender Authority
DEPT OF THE NAVY USA ViewPurchaser Address
-Website
beta.sam.gov