- Home/
- United States/
- DEPT OF THE NAVY USA/
- Overview
DEPT OF THE NAVY USA Tender
DEPT OF THE NAVY USA Tender
Costs
Summary
43--vacuum Pump Unit,ro, In Repair/modification Of
Description
Contact Information|4|n742.11|wr5|717-605-7574|ashton.k.perry.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| time Of Delivery (june 1997)|20|clin 0001|six (6)|365|||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|certifications - Stand-alone Receiving Report; Material - Receiving Report & Invoice Combo|material - Inspect & Accept At Source|tbd|n00104|tbd|tbd|n60138 |tbd|n/a|n/a|n/a|see Form Dd1423|n/a|n/a| see Form Dd1423|1-866-618-5988 - Wawf Helpdesk| note For Contractor/administrative Contracting Officer|3|||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| firm Fixed Price Repair Purchase Orders|1|tbd| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| annual Representations And Certifications (jan 2025)|13|333914|750 (# Of Employees)|||||||||||| type Of Contract (apr 1984)|1|firm-fixed Price| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1|| 1. This Is An Advanced Equipment Repair Program (aerp) Requirement. 2. Offerors Must Have A Valid U.s. Security Clearance Of Confidential Or Higher In Order To Respond To This Rfp N0010425rza18, Because The Rfp N0010425rza18 Includes An Annex Classified At The Confidential Level Which Will Be Released Only To Offerors Possessing the Appropriate Clearance. All Classified Material Must Be Handled In Accordance With The National Industrial Security Program Operating Manual (nspom)(dod 5220-22-m) And Industrial Security Regulation (dod5220.22-r). 3. All Contractual Documents (i.e. Contracts, Purchase Orders, Deliveryorders,task Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commercemethods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. 4. If Requirement Will Be Packaged At A Location Different From The Offeror'saddress, The Offeror Shall Provide The Name, Address, And Cage Of The Facility. 5. When Submitting A Proposal, Specify Any Exceptions (i.e. Mil-std Packaging,mil-std Labeling, Inspection & Acceptance Locations, Packaging House, Surplusmaterial, Etc.). If No Exceptions Are Indicated Or Received, Award Shall Bebased Upon Solicitation requirements. Changes Or Requests For Changes Afteraward Shall Be Subject To Consideration Costs Deducted From The Unit Price. 6. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certifiedfor National Defense Under The Defense Priorities And Allocations System(dpas). Provision 52.211-13, Notice Of Priority Rating For National Defense,emergency Preparedness, And Energy program Use, Shall Be Inserted Insolicitations When The Contract To Be Awarded Shall Be A Rated Order. 7. In Repair Price, Include All Costs Associated With Receipt And Complete Repair Of The Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, Wear Damage, And Cav Reporting. Also Provide The Following Information: 7.1. Teardown & Evaluation Rate: 7.2. Repair Turn Around Time (rtat): 7.3. Throughput Constraint: 7.4. Induction Expiration Date: 8. Repair Turn Around Time (rtat) - The Resultant Contractual Delivery Requirement Is Measured From The Asset Return To The Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Contract. 8.1. Requested Rtat: 365 Days 8.2. Proposals Shall Reference The Proposed Rtat And Any Capacity Constraints. 9. Price Reductions - Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Of (tbd Price) Per Unit. This Adjustmentwill Be Implemented Via A Reduction Modification At The End Of Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. 10. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Resulting Contract. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture Or Refurbishment And The Contract Quality Requirements For The Vacuum Pump Unit,ro . 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;structureborne Noise Generation Is Confidential When Filled Out Is Confidential When Filled Out Is Confidential; 3. Requirements 3.1 Refurbished Material - This Item Must Be Inspected And Where Necessary, Refurbished To Be In Accordance With Cage ;42280; , Drawing ;15-3818 Pc 1; ,and The Applicable Submepp Repair Instruction ;5280-012-0006 Rev - Chg 3 (csd465); , Except As Amplified Or modified Herein. 3.1.1 Parts That Are Replaced During Refurbishment Must Be In Accordance With This Tdp (technical Data Package) And The Submepp Repair Instruction. 3.2 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd465, Csd445 And Csd446; In Ecds At Https://register.nslc.navy.mil/ 4. Quality Assurance Provisions - Not Applicable. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. 5.1.1 Additional Preservation, Packaging, Packing And Marking Requirements Are Included In The Referenced Refurbishment Instruction Or Procurement Specification From Submepp. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible. date Of First Submission=asreq date Of Subsequent Submission=asreq see Csd (contract Support Document) Called Out Within Paragraph 3 - Requirements. all Csds Are To Be Obtained From Ecds (electric Contractor Data Submission) At:https://register.nslc.navy.mil/. certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow)to The Maximum Extent Possible.
Contact
Tender Id
N0010425RZA18Tender No
N0010425RZA18Tender Authority
DEPT OF THE NAVY USA ViewPurchaser Address
-Website
beta.sam.gov