- Home/
- United States/
- DEPT OF THE ARMY USA/
- Overview
DEPT OF THE ARMY USA Tender
DEPT OF THE ARMY USA Tender
Costs
Summary
Repair Quonset Hut Building S-1709, Camp Casey (matoc Only)
Description
Repair Quonset Hut Building S-1709 Camp Casey, Korea (matoc Only) 2.1.1. Civil Work 2.1.1.1. Replace 0.6m Width Steel Grating Ditch. 2.1.1.2. Replace Concrete Sidewalk. 2.1.1.3. Replace Granite/concrete Curb. 2.1.1.4. Replace Stone Wall With Average 06m H High Land Free Standing Wall. 2.1.1.5. Plant Rhododendron Indicum And Cherry Blossom Tree. 2.1.1.6. Restore Ac Pavement. 2.1.1.7. Replace Six (6) Surface Inlet (0.5x0.5m) With 150mm Dia Pvc Drainpipe. 2.1.1.8. Paint 150mm Thickness Reflective White. 2.1.1.9. Replace 100mm Thk Gravel On 4mm Thk Non-woven Fabric. 2.1.1.10. Restore Solid Sodding With Topsoil. 2.1.1.11. Replace 150mm Pvc Sewer Line With One (1) Surface Cleanout. 2.1.1.12. Replace Two (2) Concrete Encasement On Sewer Line. 2.1.1.13. Replace Water Lines And Gate Valves With Necessary Accessories. 2.1.2. Architectural Work tp I-1 2.1.2.1. Floor Work 2.1.2.1.1. Replace Deteriorated Existing Floor Tile With New Polyvinyl Chloride Tile (pvct) Including Vinyl Cove Base (vcb) As Shown On New Floor Plan And Interior Finish Schedule. the Existing Concrete Flooring Shall Be Smooth, True, Level Plane With All Defects Such As rough Or Scaling Concrete, Low Spots, High Spots, Painting, And Uneven Surface Shall Be Corrected For New Flooring. Provide Leveling Concrete For Existing Concrete Slab If Needed. 2.1.2.1.2. Replace Deteriorated Existing Fct With New Including Cement Bond Coat, Waterproof Membrane, Mortar Bed As Shown On Floor Plans, Sections And Detail Drawings. 2.1.2.1.3. Apply Epoxy Coating With Non-slip Grits On Exist Floors As Shown On Floor Plan, And Interior Finish Schedule. 2.1.2.1.4. Replace Deteriorated Existing Concrete Stoops With New As Shown On Floor Plan. 2.1.2.1.5. Replace Deteriorated Existing Granite Stone Tile With New Including Mortar Bed As Shown On Floor Plans, Detail Drawing And Finish Schedule. . 2.1.2.2. Interior And Exterior Wall Work 2.1.2.2.1. Replace Existing All Gwb Wall Board Walls With New Gwb Wall (normal, Water Resistant Or 'x' Type) Including Metal Studs As Shown On Floor Plans, Sections, And Detail Drawings. 2.1.2.2.2. Paint On All Existing Interior Walls Including As Shown On Floor Plan, Detail Drawings Interior Finish Schedule. 2.1.2.2.3. Replace Deteriorated Existing Glazed Ceramic Wall Tile (gcwt) With New Including Cement Bond Coats, Waterproof Membrane, Plastering With Metal Lath And Waterproof Gwb As Shown On Floor Plans And Section. 2.1.2.2.4. Replace Existing Exterior Walls With New Eifs And Face Bricks As Shown On Floor Plan, Elevations, Sections And Detail Drawings. 2.1.2.2.5. Replace Deteriorated Existing Wall With New Wooden Panel As Shown On Floor Plan And Interior Finish Schedule. 2.1.2.2.6. Replace Deteriorated Existing Wall With New Mcp (marble Composition Panel) At Vest-1 As Shown On Floor Plan And Interior Finish Schedule. 2.1.2.2.7. Replace Deteriorated Existing Wall With Glass Block At Vest-1 As Shown On Floor Plan, Elevation And Interior Finish Schedule. 2.1.2.2.8. Apply Skim Coat Plaster On Concrete Wall As Shown On Floor Plan, Sections And Finish Schedule. 2.1.2.3. Interior And Exterior Ceiling And Roof Work 2.1.2.3.1. Replace Deteriorated Existing Ceiling With New Acoustical Ceiling Tiles Including Metal Suspension Systems As Shown On Floor Plans And Interior Finish Schedule. 2.1.2.3.2. Replace Deteriorated Existing Ceiling With New Gwb (normal, Water Resistant Or tp I-2 'x' Type) Ceiling Including Ceiling Suspension System As Shown On Floor Plans And Finish Schedule. 2.1.2.3.3. Paint On All Interior Ceiling Surfaces As Shown On Interior Finish Schedule And Section. 2.1.2.3.4. Replace Deteriorated Existing Roof With New Standing Seam Metal Roof Including Insulation And Accessories As Shown On Floor Plan, Roof Plan, Elevations And Details. 2.1.2.3.5. Replace Deteriorated Metal Canopy With New As Shown On Floor Plans, Elevations, And Detail Drawing. 2.1.2.3.6. Replace Deteriorated Existing Rain Gutters, Downspouts And Concrete Splash Blocks With New As Shown On Floor Plans, Elevations, Sections And Detail Drawings. 2.1.2.4. Miscellaneous Work 2.1.2.4.1. Replace Deteriorated Existing Doors And Door Frames With New Including New Hardware Sets As Shown On New Floor Plan And Door Schedule. 2.1.2.4.2. Replace Deteriorated Existing Window Including Insect Screen With New Aluminum Thermal Breaker Type Windows Including Glass As Shown On Floor Plans, Elevations, And Window Schedule. 2.1.2.4.3. Replace Deteriorated Existing Window Horizonal Mini Blinds With New, Fireproof Type. 2.1.2.4.4. Replace Deteriorated Existing Wooden Head, Jam And Sill For All Windows With New As Shown On Door/window Schedule (natural Color, Oak). 2.1.2.4.5. Replace Deteriorated Existing Aluminum Louver With New As Shown On Floor Plans and Louver Schedule. 2.1.2.4.6. Replace Deteriorated Existing Fire Extinguisher Cabinets (fec) With New As Shown On New Floor Plan And Detail Drawing. 2.1.2.4.7. Replace Existing All Toilet Accessories With New As Shown On Floor Plans And Detail Drawings. 2.1.2.4.8. Replace Interior And Exterior Signages With New As Shown On Floor Plan, Elevation And Signage Schedule. 2.1.2.4.9. Replace Deteriorated Existing Metal Shelf With Mop Rack With New In Janitor Room. 2.1.2.4.10. Replace Deteriorated Existing Al Grating With New At Main Entrance As Shown On Floor Plan And Detail Drawing. 2.1.2.4.11. Replace Deteriorated Existing Bulletin Board With New As Shown On Floor Plan, Detail Drawing And Signage Schedule. 2.1.2.4.12. Replace Deteriorated Existing Lavatory Cabinet And Kitchen Cabinet With New Including Base Cabinets And Upper Cabinets As Shown On Floor Plan, Interior Elevation And Detail Drawing. 2.1.2.4.13. Replace Deteriorated Existing Wooden Wall Rail And Wooden Base Board With New As Shown On Floor Plans, Interior Elevations, Sections And Detail Drawings. 2.1.2.4.14. Replace Deteriorated Existing Projection Screen And Projector Mount With New As Shown On Floor Plans, Detail Drawings And Interior Finish Schedule. tp I-3 2.1.2.4.15. Replace Deteriorated Access Doors With New On Wall & Ceiling As Required. 2.1.2.4.16. Provide 3 Sets Renderings (size: 760mm X 500mm) And Image File For Exterior Building S-1709, Camp Casey. 2.1.2.4.17. Remove Existing Acm As Below In The Building S-1709, Camp Casey. - Transit Board (mech Room) – 20 Sf - Air Sampling (work Area) - Final Air Sampling - Econ Unit - Acm Transportation & Disposal (1 Ton Truck) - Mob/ Demobilization 2.1.3. Mechanical Work 2.1.3.1. Repair The Heating And Cooling System By Installing New Split Heat Pump System, Electric Wall Heater, Split Air Conditioning Unit, Electric Unit Heater, Valves, Piping, Insulations, Controls, Equipment Support (concrete Pad), And All Associated Accessories For Hvac System As Shown On Drawings. 2.1.3.2. Repair The Ventilation System By Installing New Energy Recovery Ventilator, Exhaust Fans, Controls, Diffusers, Resister, Ducts, Insulations, Outside Air Intake Louver With Bird Screen, Motorized Damper And All Associated Accessories For Ventilation System As Shown On Drawings. 2.1.3.3. Repair The Plumbing System By Installing New Electric Domestic Hot Water Heater, Electric Water Cooler, Domestic Hot Water Recirc, Pump, Domestic Cold And Hot Water Piping System, Insulation, Sewer And Vent Piping System, Water Hammer Arresters, Floor Drain, Floor Clean Out, Including Plumbing Fixtures, And All Associate Accessories As Shown On Drawing. 2.1.4. Electrical Work 2.1.4.1. Replace Existing Interior/exterior Lightings, Fixtures, Exit Lights, Toggle Switches, 3-way Switches, Lighting Contactor With Photocell, Wires And Conduits With New. 2.1.4.2. Replace Existing Watthour Meter And Current Transformer, Panelboards, Receptacles With Cover Plates Associated Wiring And Conduits With New. 2.1.4.3. Replace Existing Safety Switches, Motor Controllers, Junction Boxes, Control/power Wires And Conduits For Mechanical Systems With New. 2.1.4.4. Replace Existing Fire Alarm Control System With New Addressable Fire Alarm Control And Mass Notification System Panel, Manual Pull Station, Smoke Detector And Relay Module, Antenna, Visual/signal Strobes (15 Or 75 Candela), Microphone, Speaker (wattage As Required) Device, Fire Alarm Building Transmitter, Lighting Arrester And Associated Wiring And Conduit. 2.1.4.5. Replace Existing Telecommunication System Including Telephone Terminal Board, Telephone/data Outlets With Cover Plates, Terminal Blocks, Equipment Rack, And Associated Wire And Conduit With New. tp I-4 2.1.4.6. Replace Existing Catv Distribution Cabinet, Pull Boxes, Catv Outlets And Associated Wiring And Conduit With New. 2.1.4.7. Replace Existing Exterior Underground Telecommunication Line And Associated Accessories As Shown On The Drawings. 2.1.4.8. Replace Existing Exterior Power Distribution System With New Including Pad Mounted Transformer, Primary Concrete Pole, Manhole, Primary, Secondary Line And Associated Accessories, Wiring And Conduit As Shown On The Drawings. 2.1.5. Structure Work 2.1.5.1. Repair By Replacing Existing Concrete Slab. 2.1.5.2. Repair By Replacing Existing Concrete Stoop. 2.1.5.3. Repair By Replacing Existing Wall With 200 Thk Concrete Wall And Foundation. 2.1.5.4. Repair By Replacing Existing Roof With Steel Column And Beam. 2.1.5.5. Submit Structure Design Analysis And Shop Drawing. 2.2. Schedule #ii, New Construction (l): All Work Shall Be In Accordance With The Attached Drawings And Specifications. 2.2.1. Civil Work 2.2.1.1. Construct One (1) Pavilion. 2.2.1.2. Construct 1.0m W Foot Notes Pavement. 2.2.1.3. Construct 150mm Thk Concrete Pad. army Contract Writing System (acws) Transition Information For Offerors the Army Contracting Enterprise (ace) Is In The Process Of Deploying New Solicitation And Contract Writing Software To Army Contracting Offices Worldwide. Known As The Army Contract Writing System (acws), This Modern Software Suite Will Soon Replace Most Existing Army Contract Writing Systems, Including The System Used To Create And Release This Solicitation. during This Transition Period, Offerors Are Hereby Advised: the Contracting Office May Use Any Combination Of Contract Writing Systems To Create And Release Documents Related To This Solicitation (e.g. Solicitation Amendments And Awards, If Any). Due To This: this Solicitation May Contain Different Offer Submission Instructions Than Other Solicitations Released By The Same Contracting Office (e.g. Requiring Offer Submission Via The Piee Solicitation Module Vs. E-mail). Offerors Should Review All Offer Submission Instructions Contained In The Solicitation Documents And Direct Any Questions Or Concerns To The Contract Specialist Or Contracting Officer. if The Contracting Office Switches Contract Writing Systems Prior To Award, Documents You Receive From The Contracting Officer Or View On Sam.gov Or Other Forums May Appear Noticeably Different Than The Initial Solicitation Or Previous Solicitations Or Awards From The Same Contracting Office. This Is Normal And Expected. a Change Between Contract Writing Systems May Cause Important Information Concerning Solicitation Response (amendments) Or Accepted Terms (awards) To Take On Different Formatting Or Appear In Different Parts Of Later Documents Issued. Offerors Shall Review All Documents Carefully To Locate This Important Information And Direct Any Questions Or Concerns To The Contract Specialist Or Contracting Officer. the Government Does Not Intend To Use The Transition Between Contract Writing Systems To Effect Any Changes To Solicitation Or Award Terms And Conditions Without Accompanying Document Narratives Explicitly Stating Such Changes Are Deliberate And Desired. While The Contract Specialist And Contracting Officer Will Take Care To Minimize Or Eliminate Any Inadvertent Changes When Adapting To The New Contract Writing Software, You, As The Offeror, May Still Be The First To Spot Such Errors. Therefore, Offerors Shall: notify The Contracting Officer Immediately If Any Observed Changes, Removals, Or Additions Affect Your Award Eligibility, Violate Or Alter Existing Quote/proposal Terms, Or Could Affect Contract Performance Post-award. take Special Care To Ensure All Fill-in Clauses Are Populated And Remain Populated Across Documents Received From The Contracting Office Throughout The Solicitation And Award Process. contact The Contracting Officer Listed On The First Page Of The Solicitation Or Solicitation Amendment For Guidance If You Notice Or Suspect Any Inadvertent Change Has Occurred Between Document Issuances. the Contracting Officer Will Correct Problems Affecting Award Documents (if Any) Via Bilateral Modification, At No Cost To The Contractor. Any Such Modification Will Reconcile The Award With The Latest Version Of This Solicitation Reflecting Deliberate Action By The Contracting Officer (e.g. The First Issuance If No Amendments, Or The Latest Amendment With Accompanying Narratives), Inclusive Of Any Documented Pre-award Negotiations Or Accepted Supplemental Offer Terms. in The Unlikely Event A Network Disruption, Contract Writing System Error, Or Financial System Error Threatens Timely Award Of The Requirement Set Forth In This Solicitation, The Contracting Officer: may Elect To Use Alternative Mechanisms To Obligate Funds And Allow Work Or Deliveries To Legally Begin To The Benefit Of, And With Legal Protection For, Both Parties. will Incorporate The Latest Version Of This Solicitation Into Such Mechanisms To Serve As A Framework For Contract Execution Until Any Such System Problems Are Resolved. will Ensure Any Action Taken Does Not Conflict With The Stated Offer Evaluation And Award Methodology Of This Requirement. will Issue A Complete, Properly-formatted Award Accurately Reflecting This Requirement And All Applicable Terms And Conditions Once Systems Return To Normal.
Contact
Tender Id
W90VN824R0061Tender No
W90VN824R0061Tender Authority
DEPT OF THE ARMY USA ViewPurchaser Address
-Website
http://beta.sam.gov