Department Of Environment And Natural Resources Tender
Department Of Environment And Natural Resources - DENR Tender
Costs
Summary
Labor And Materials For The Construction Of Ranger Station At San Jose, San Mariano, Isabela Within The Northern Sierra Madre Natural Park (nsmnp)-western Side , Construction Materials And Supplies ,department Of Environment And Natural Res. - Penro, Isabela
Description
Description Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 4 Section I. Invitation To Bid 6 Section Ii. Instructions To Bidders 9 1. Scope Of Bid 9 2. Funding Information 9 3. Bidding Requirements 9 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 9 5. Eligible Bidders 10 6. Origin Of Associated Goods 10 7. Subcontracts 10 8. Pre-bid Conference 10 9. Clarification And Amendment Of Bidding Documents 10 10. Documents Comprising The Bid: Eligibility And Technical Components 11 11. Documents Comprising The Bid: Financial Component 11 12. Alternative Bids 11 13. Bid Prices 12 14. Bid And Payment Currencies 12 15. Bid Security 12 16. Sealing And Marking Of Bids 12 17. Deadline For Submission Of Bids 12 18. Opening And Preliminary Examination Of Bids 13 19. Detailed Evaluation And Comparison Of Bids 13 20. Post Qualification 13 21. Signing Of The Contract 13 Section Iii. Bid Data Sheet 14 Section Iv. General Conditions Of Contract 17 1. Scope Of Contract 18 2. Sectional Completion Of Works 18 3. Possession Of Site 18 4. The Contractor’s Obligations 19 5. Performance Security 19 6. Site Investigation Reports 19 7. Warranty 19 8. Liability Of The Contractor 19 9. Termination For Other Causes 20 10. Dayworks 20 11. Program Of Work 20 12. Instructions, Inspections And Audits 20 13. Advance Payment 20 14. Progress Payments 21 15. Operating And Maintenance Manuals 21 Section V. Special Conditions Of Contract 22 Section Vi. Specifications 24 Section Vii. Drawings Section Viii. Bill Of Quantities Section Ix. Checklist Of Technical And Financial Documents 31 Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Department Of Environment And Natural Resources Provincial Environment And Natural Resources Office City Of Ilagan, Isabela Telefax No.: (078) 325-5701 Invitation To Bid Labor And Materials For The Construction Of Ranger Station At San Jose, San Mariano, Isabela Within The Northern Sierra Madre Natural Park (nsmnp)-western Side The Provincial Environment And Natural Resources Office Isabela (penro-isabela), Through The Authorized Appropriations Under The Fy 2024 General Appropriations Act, Intends To Apply The Sum Of One Million Pesos (₱1,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Labor And Materials For The Construction Of Ranger Station At San Jose, San Mariano, Isabela Within The Nsmnp-western Side. The Period For The Performance Of The Obligations Under The Contract Shall Not Go Beyond The Validity Of The Appropriation For The Project. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Penro-isabela Now Invites Bids For The Above-entitled Procurement Project. Completion Of The Work Requires 60 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Interested Bidders May Obtain Further Information From The Penro-bids And Awards Committee (bac) Secretariat Through The Contact Details Given Below And Inspect The Bidding Documents As Posted On The Philippine Government Electronic Procurement System (philgeps). A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On September 16, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos (₱1,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. Interested Bidders’ Representatives Must Also Present A Letter Duly Signed By The General Manager/owner, If A Sole Proprietorship, Or Authorized Signatory If A Corporation, Authorizing Him/her To Acquire The Bidding Documents. The Denr-penro Ilagan, Isabela Will Hold A Pre-bid Conference On September 24, 2024, 9:30am At The Pinaroc Hall, Penr Office, Osmeña, City Of Ilagan, Isabela Which Shall Be Open To Prospective Bidders. Bids Must Be Duly Received By The Bac Secretariat Or The Penro-isabela Records Section Through Manual Submission At The Office Address Indicated Below On Or Before October 7, 2024, 1:00 P.m. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On October 7, 2024, 1:30 Pm At The Given Address Below. Bids Will Be Opened In The Presence Of The Authorized Bidders’ Representatives Who Choose To Attend The Activity. The Penro-isabela Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Preciosa G. Oñate Head, Bac Secretariat Denr-penr Office Osmeña, City Of Ilagan, Isabela Penroisabela@denr.gov.ph C.p. No.: 0917-628-3429 You May Download The Bidding Documents At Philgeps Website. September 13, 2024 (sgd) Luz S. Soriano Chair, Bids And Awards Committee Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Provincial Environment And Natural Resources Office – Isabela (penro-isabela) Invites Bids For The “labor And Materials For The Construction Of Ranger Station At San Jose, San Mariano Isabela Within The Nsmnp-western Side” The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Fy 2024 In The Amount Of One Million Pesos (₱1,000,000.00). The Period For The Performance Of The Obligations Under The Contract Shall Not Go Beyond The Validity Of The Appropriation For The Project. 2.2. The Source Of Funding Is Fy 2024 General Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site Prior To Pre-bid Conference, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 7.2 Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. A. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit Three Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 9 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 12 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 The Required Pcab License For This Contract Is As Follows: A. License Category : Small A & Small B B. Single Largest Completed Contract : Above Php500,000.00 Up To Php10m C. Allowable Range Of Contract Cost : Up To Php15m For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: (i) A Single Contract That Is Similar To The Project And Whose Value Must Be At Least Fifty Percent (50%) Of The Abc To Be Bid; Or (ii) (a) At Least Two (2) Similar Contracts And The Aggregate Contract Amounts Should Be Equivalent To At Least Fifty Percent (50%) Of The Abc To Be Bid; And (b) The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. Failure To Submit A Copy Of The Single Largest Completed Contract With Proof Of Completion Is A Valid Ground For Disqualification Of The Bidder. 7.1 Sub-contracting Is Not Allowed. 10.3 No Further Instructions. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience 1 – Project Manager Preferably Technical Individual With At Least Three (3) Years’ Experience As Project Manager; 1 – Project Engineer A Licensed Civil Engineer With At Least Two (2) Years’ Experience As Project Engineer In Similar Works; 1- Electrical Engineer A Licensed Electrical Engineer With At Least One (1) Year Experience As Electrical Engineer 1 – Safety/health Officer With Training Certificate And With At Least Two (2) Years’ Experience As Safety Officer 1 - Foreman With At Least Two (2) Years’ Experience As Foreman For Earthworks, Concreting And/or Other Related Works; 10.5 The Minimum Equipment Requirements Are The Following: Equipment Description Capacity No. Backhoe 0.80 M3/1.04 Yd3 1 Dump Truck 12 Yd3 1 Plate Compactor (400-500 Gasoline Engine) 5hp 1 One Bagger Mixer 4-6 Ft3/min 1 Bar Bender (25 Mm Maximum Rebar Ø) Three Phase 1 Bar Cutter (25 Mm Maximum Rebar Ø) Grade 40 Single Phase 1 Cutting Outfit 1 Welding Machine Electric Driven/dc Output 500 Amp 1 12 [insert Value Engineering Clause If Allowed.] 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond 15 Each Bidder Shall Submit One (1) Originally Signed Certified True Copy Of The Original Document And Two (2) Duplicate Copies Of The First And Second Components Of Its Bid. Bidder Must Arrange Each Bid Documents Into Sections With Tabs Properly Labeled Separating Each Document According To The Provided Checklist. 19.2 Partial Bids Are Allowed, As Follows: [insert Grouping Of Lots By Specifying The Items And The Quantity For Every Identified Lot.] 20 [list Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It, E.g. Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone, Etc.] 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And Scurve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 Please Refer To Section Vi. Specifications. 4 The Project Shall Be Completed Within 60 Calendar Days From Receipt Of The Notice To Proceed. 7.2 The Warranty Shall Cover Two (2) Years From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fifteen (15) Calendar Days Of Delivery Of The Notice Of Award. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Items Of Work Description Quantity Unit Material Labor Total Amount U. Cost Amount U. Cost Amount 1 General Requirements Mobilization / Demobilization 1.00 Lot Materials Lifting And Handling 1.00 Lot Temporary Power Supply 1.00 Lot Temporary Water Supply 1.00 Lot Total For General Requirements Structural Works 2 Site Works Clearing & Grubbing 40.00 M² Levelling & Grading 40.00 M² Lay-out & Staking 40.00 M² Excavation Footing 10.00 M³ Tiebeam 7.50 M³ Wallfooting 6.40 M³ Septic Tank 6.20 M³ Gravel Bedding Footing 1.00 M³ Tiebeam 1.20 M³ Wallfooting 1.50 M³ Slab-on-grade 8.00 M³ Septic Tank 0.60 M³ Backfilling 24.00 M³ Subtotal 3 Formworks Column 65.00 M² Slab-on-grade 45.00 M² Roof Beams 54.00 M² Septic Tank 14.00 M² Subtotal 4 Reinforcements Footing 115.00 Kgs Column 145.00 Kgs Slab 190.00 Kgs Footing Tiebeam 195.00 Kgs Roof Beams 195.00 Kgs Wallfooting 65.00 Kgs Septic Tank 85.00 Kgs Stairs 147.00 Kgs Subtotal 5 Concrete Works Footing 1.20 M³ Column 2.20 M³ Slab 12.40 M³ Footing Tie Beam 2.10 M³ Wallfooting 2.00 M³ Roof Beams 2.10 M³ Septic Tank 1.80 M³ Stairs 1.70 M³ Subtotal 6 Structural Steel Roof Framing W 6 X 15 210.00 Kgs Lc-100mm X 50mm X 15mm C - Purlins 135.00 Kgs 12mm Thick Base Plates 48.00 Kgs Consumables 1.00 Lot Roofing Pre-painted Long Span Roofing (0.5mm) 40.00 M² Roofing Insulation 40.00 M² Subtotal Total For Structural Architectural Works 7 Masonry Works And Painting Works Exterior Wall 4" Chb (inclusive Of Rebars, Mortar & Installation) 69.00 M² Interior Wall 4" Chb (inclusive Of Rebars, Mortar & Installation) 34.00 M² Wall Plastering Exterior Wall 70.00 M² Interior Wall 114.00 M² Painting Works Exterior Wall 80.00 M² Interior Wall 145.00 M² Subtotal 8 Doors And Windows And Accessories Doors And Windows And Accessories D- 1 1.00 Set D- 2 1.00 Set Aluminum Glass Window W - 1 1.00 M² W - 2 1.00 M² W - 3 0.25 M² Subtotal 9 Surface Finishes Ceramic Tiles Ranger Station 25.00 M² Observation Deck 20.00 M² Subtotal 10 Ceiling Finishes Ground Floor & Second Floor 4.5mm Ficemboard On Light Metal Framing Flat Latex Paint Finish 48.00 M² Subtotal Total For Architectural Electrical Works Lighting Fixtures Roughing Ins 1.0 Lot Fixtures Lighting Fixtures 5 Pc Wall Lamp 1 Pc 2 Gang Outlet 4 Pc 2 Gang Switch 2 Pc Power System Roughing Ins 1.0 Lot Panelboard & Breakers Solar Panel System 1.0 Set Panel Board 1 Pc 30a Breaker 1 Pc 20a Breaker 2 Pc 15a Breaker 1 Pc 60a Breaker 1 Pc Total For Electrical L Works Plumbing And Sanitary Works Roughing Ins 1.0 Lot Plumbing Fixtures Water Closet 1 Set Floor Drain 1 Set Lavatory 1 Set Sink 1 Set Goose Faucet 1 Set Storm Drainage System Roughing Ins 1.0 Lot Waterline System Roughing Ins 1.0 Lot Total For Plumbing And Sanitary Works Total Direct Cost 10% Mark-up Professional Fee Grand Total Summary General Requirements Structural Works Architectural Works Elecrical Works Plumbing And Sanitary Works Total Direct Cost 10% Mark-up Professional Fee Grand Total Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; D. Site Inspection Report; E. Construction Schedule In The Form Of Pert/cpm Or Precedence Diagram And Bar Chart With S-curve And Cash Flow; F. Manpower Schedule; G. Construction Methodology In Narrative Form; H. Equipment Utilization Schedule; And I. Construction Safety And Health Program ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter. Bid Form For The Procurement Of Infrastructure Projects [shall Be Submitted With The Bid] _________________________________________________________________________ Bid Form Date : _________________ Project Identification No. : _________________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: A. We Have No Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Project: [insert Name Of Contract]; B. We Offer To Execute The Works For This Contract In Accordance With The Pbds; C. The Total Price Of Our Bid In Words And Figures, Excluding Any Discounts Offered Below Is: [insert Information]; D. The Discounts Offered And The Methodology For Their Application Are: [insert Information]; E. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein And Reflected In The Detailed Estimates, F. Our Bid Shall Be Valid Within The A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; G. If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The The Allowable Forms Of Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; H. We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; I. We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And J. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. K. We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The [name Of Project] Of The [name Of The Procuring Entity]. L. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: ___________________________________________________________________ Legal Capacity: ____________________________________________________________ Signature: ________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: __________________________________ Date: ___________________ Bid Securing Declaration Form [shall Be Submitted With The Bid If Bidder Opts To Provide This Form Of Bid Security] _________________________________________________________________________ Republic Of The Philippines) City Of _______________________) S.s. Bid Securing Declaration Project Identification No.: [insert Number] To: [insert Name And Address Of The Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice]
Contact
Tender Id
7cf777ce-1120-3bc1-8d8a-aa84a90200a7Tender No
11249899Tender Authority
Department Of Environment And Natural Resources ViewPurchaser Address
-Website
https://www.denr.gov.ph/