- Home/
- Philippines/
- Department Of Agriculture/
- Overview
Department Of Agriculture Tender
Department Of Agriculture Tender
Costs
Summary
Supply Of Labor And Materials For The Construction Of 4 Units Cacao Dryer Located At (i) Brgy. Apolonia, Paranas, Samar, (ii) Brgy. Nenita, Mondragon, Northern Samar, (iii) Brgy. Juangon, Malitbog, So , Construction Projects ,department Of Agriculture - Region Viii
Description
Description Section I. Invitation To Bid Da8-infra-2025-15 (id No. Bt-25-infra-hvcdp 39838-0003) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Hvcdp-2025 Current Fund Intends To Apply The Sum Of One Million Two Hundred Thousand Pesos Only (p1,200,000.00) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of 4 Units Cacao Dryer Located At (i) Brgy. Apolonia, Paranas, Samar, (ii) Brgy. Nenita, Mondragon, Northern Samar, (iii) Brgy. Juangon, Malitbog, Southern Leyte, And (iv) Brgy. Tongonan, Ormoc City, Leyte”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works For The Four (4) Sites Is Required Within Eighty (80) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders. Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of 4 Units Cacao Dryer Located At (i) Brgy. Apolonia, Paranas, Samar, (ii) Brgy. Nenita, Mondragon, Northern Samar, (iii) Brgy. Juangon, Malitbog, Southern Leyte, And (iv) Brgy. Tongonan, Ormoc City, Leyte Scope Of Work: 1,200,000.00 Location: Brgy. Apolonia, Paranas, Samar 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sqm Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sq. M. Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq M Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq M Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq M Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Location: Brgy. Nenita, Mondragon, Northern Samar 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sqm Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sq. M. Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq. M. Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq. M. Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq. M. Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Location: Brgy. Juangon. Malitbog, Southern Leyte 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sqm Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sqm Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq M Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq M Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq M Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Location: Brgy. Tongonan, Ormoc City, Leyte 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sq M Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sq. M. Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq M Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq M Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq M Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Provide Contractor's All Risk Insurance (cari) 2. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 3. Complete The Construction Of Four (4) Sites Within 80 Calendar Days; 4. Provide Necessary Tools For The Satisfactory Completion Of The Project; 5. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 6. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 7. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 8. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 9. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 10 Attend Pre-construction Meeting. 11. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 12. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 13. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 21, 2025 To February 11, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Five Thousand Pesos Only (p5,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 6. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 28, 2025, 9:00 Am (bac-secretariat Time) At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before February 11, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 11, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 10. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Contact
Tender Id
452d5500-9d82-353b-baeb-e92e060586feTender No
11677442Tender Authority
Department Of Agriculture ViewPurchaser Address
-Website
https://www.da.gov.ph/