Cleaning Tenders
Cleaning Tenders
Other Organizations Tender
Electrical and Electronics...+1Electrical Works
France
Details: Firm tranche: The mission of the holder consists of carrying out the following services: Studies: hydraulic, electrical, civil engineering, implementation, etc.; Procurement; Intervention documents. Carrying out the works: Site easements; A concrete retention tank; A concrete channel; A concrete slab; Electrical cables and their connection; Piping and its connection; Regulation of the operation of the air cooler and the refrigeration units; Waste disposal; Testing and start-up; Cleaning the site; Updating plans; Carrying out the Doe; Acceptance operations. Optional tranche: The mission of the holder consists of carrying out the following services: Option No. 1: Regulation controls for each circuit. Option No. 2: Dismantling the Tar and its surroundings (piping, electrical cables, etc.) between the premises and the Tar: Demolition of the Tar support; Waste disposal; Modification of the premises' electrical cabinet following the removal of the Tar; Modification of the "Normal" and "Emergency" cabinets; Updating of the plans.
Closing Soon15 Nov 2024
Tender AmountRefer Documents
Geb Udewirtschaft Cottbus Gmbh Tender
Civil And Construction...+1Others
Germany
Details: Scaffolding work: 739 m² facade scaffolding, 140 m consoles, 140 m interior railings, 630 m² scaffolding cladding, 1 scaffolding staircase | Preparation/demolition: 75 pcs. window protection, 110 m dismantling rain sheets, 30 m chiseling off balcony exits, 15 pcs. demolition of loggia escape route panels, bulky waste container, disposal of bulky waste | Joint work: 755 m joint inspection, 650 m demolition of joint sealant containing asbestos, residual fiber binder, 75 m chiseling work, concrete cutting, mortaring, reprofiling, joint sealing | Subsurface preparation for balcony/facade: 720 m² subsurface inspection, cleaning of wall surfaces, 630 m² subsurface inspection, cleaning of balcony surfaces, 108 m exposing of breakouts, 120 pcs. demolition of contact sheets for railings | Corrosion protection, reprofiling of balconies | Shotcrete work | Connection of windows and windowsills: 305 m substrate preparation of reveals, 36 m aluminum window sills including demolition, 305 APU strips, 305 m reveal insulation, 305 m corner formation, reinforcement layer | surface treatment of balcony and facade surfaces: 370 m² leveling/filling, 108 m drip profile, 208 m² fabric filler, finishing plaster, 371 m² paint coating of interior balconies, 305 m paint coating of reveals, 472 m² paint coating of graveled areas | Balcony floor sealing: 30 exit thresholds, 25 m² EP gradient screed, 155 m² EP primer, leveling, 180 m cove connection, 155 m² PUR balcony coating, color chips, sealing | Other: 30 balcony sockets, 50 m concrete edging stone, 15 m² rolling gravel strips
Closing Date19 Nov 2024
Tender AmountRefer Documents
City Of Canlaon Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Republic Of The Philippines City Of Canlaon Office Of The Bids And Awards Committee Invitation To Bid For The Early Procurement Activity (epa) For The Procurement Of Construction Materials For The Improvement Of Day Care Center The Local Government Of Canlaon City, Through The Aip 2025 Intends To Apply The Sum Six Hundred Sixty-one Thousand, Two Hundred Twenty-four & 89/100 (p661,224.89) Being The Abc To Payments Under The Contract For The Supply And Delivery Of Various Construction Materials For Use In The Improvement Of Day Care Center, Sitio Palaming, Brgy. Binalbagan, Canlaon City. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Award Of The Contract Is Subject To The Effectivity Of The General Appropriations Act (gaa) For Fy 2025. The Local Government Of Canlaon City Is Conducting This Procurement Through The Early Procurement Activity (epa) For Fy 2025 To Ensure The Timely Delivery Of Goods, Implementation Of Infrastructure Projects And Rendition Of Consultancy Services, Consistent With The Gppb Resolution No. 14-2019 Dated July 17, 2019. Epa Shall Refer To The Conduct Of Procurement Activities, From Posting Of The Procurement Opportunity, If Required, Until Recommendation Of The Bids And Awards Committee (bac) To The Hope As To The Award Of The Contract For Goods To Be Delivered, Infrastructure Projects To Be Implemented And Consulting Services To Be Rendered In The Following Fiscal Year (i.e Fy 2025), Pending Approval Of Their Respective Funding Sources. The Bidders, Therefore, Are Herewith Informed Of The Following: A. Interested Bidders Are Invited/requested To Submit Their Bid Proposals Based On Indicative Budget (i.e. Subject To Final Approval) Through This Invitation To Bid, Together With The Bidding Documents; B. The Local Government Of Canlaon City, Will Evaluate The Bid Proposal And Determine The Winning Bidder. The Financial Bid Proposal Of The Winning Bidder Will Be The Contract Price/amount Which Is Considered Fixed Price. However, The Notice Of Award (noa) Will Only Be Issued Upon The Approval Of The Budget. C. Would There Be A Delay In The Award As Affected By The Possible Delay In The Budget Approval, The Bid Validity As Specified In The Bidding Documents (which Is A Maximum Of 120 Calendar Days), The Winning Bidder May Be Requested To Extend The Validity, If The Bidder Refuses To Extend The Bid Validity, The Bid Submitted By Said Bidder Will Be Rejected. The Local Government Of Canlaon City, Now Invites Bids For The Supply And Delivery Of Various Construction Materials For Use In The Improvement Of Day Care Center, Sitio Palaming, Brgy. Binalbagan, Canlaon City. Delivery Of The Goods Is Required 7 Calendar Days After Issuance And Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Ten Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184 Interested Bidders May Obtain Information For The City Government Of Canlaon City Thru The Office Of The Bids And Awards Committee And Inspect Bidding Documents During Office Hours (8:00am To 5:00pm), Monday To Friday. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On November 4, 2024 To November 25, 2024 Until 10:00 Am At The Office Of The Bids And Awards Committee, Canlaon City, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos Only (p1,000.00) Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Facsimile. The Local Government Of Canlaon City Will Hold A Pre-bid Conference On November 12, 2024 – 2:00 Pm At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City, Which Shall Be Open To Prospective Bidders Bids Must Be Received By The Bac Secretariat Through Manual Submission On Or Before November 25, 2024, 10:00 Am At The Office Of The Bids And Awards Committee, 2nd Floor, City Hall Building, Canlaon City. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On November 25, 2024, 10:00 Am At The At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. For The Purpose Of Constituting A Quorum, Either The Physical And Virtual Presence Of The Bac Member Shall Be Considered Pursuant To Gppb Resolution No. 09-2020. The Local Government Unit Of Canlaon Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Alice D. Mcguiggan Bac Secretariat Mobile No. 0917-561-7931 Email Address: Bacofficelgucanlaon@yahoo.com Date Of Posting: November 3, 2024 Doris Y. Flores Bac Chairperson Republic Of The Philippines City Of Canlaon Bids And Awards Committee Control No.: #1 Bid Form Name Of Project: Improvement Of Day Care Center Brief Description: Supply And Delivery Of Various Construction Materials Location: Sitio Palaming, Brgy, Binalbagan, Canlaon City Bill Of Quantities Stock No. Quantity Unit Item Description Unit Cost Unit Cost Total Cost 1. 1 Set 400mmx600mm, Stainless Sink W/ Accessories (gooseneck Faucet, Flexible Hose) 3,000.00 2. 1 Pc 8' X 8', Tarpaulin, Billboard (see Ceo For Sample) 4,375.00 3. 10 Cu.m. Aggregate Base Course (item 201) 1,350.00 4. 16 Length Angle Bar (1" X 1" X 1/8") 435.00 5. 3 Box Blind Rivets, (1/8" X 1/2") 376.67 6. 1 Pc Bolt, 1/2"ɸ X 6", B.i., Full Thread With Nut And Washer 85.00 7. 4 Cu.m. Boulder 1,236.00 8. 100 Pcs Cable Ties, 8 X 300 Mm 12.00 9. 21 Length Carrying Channel (11mm X 37mm X 11mm X 1.6mm X 5m) 279.00 10. 1 Set Cement Epoxy 4,000.00 11. 1,725 Pc Chb (4" X 20cm X 40cm) 18.50 12. 2 Kgs Concrete Nails, (2") 125.67 13. 30 Mtrs. Conductor Wire, 14.0mm² Thw, Cu. 132.50 14. 200 Mtrs. Conductor Wire, 3.5mm² Tw, Cu. 52.00 15. 15 Mtrs. Conductor Wire, 8.0 Mm² Tw, For Grounding 113.00 16. 10 Pcs Conduit Clamp, 25mm ɸ Upvc, Orange Color W/ Concrete Nail 5.25 17. 1 Lngth Conduit Pipe, 25mm ɸ X 3m', Rsc 337.50 18. 1 Pc Connector Ground Rod For ⅝"ɸ, Galv. 102.00 19. 5 Pcs Connector, Compression, Parallel #100 150.00 20. 3 Sets Convenience Outlet, Duplex, Universal, Flush Type, Anam Or Equivalent 197.00 21. 40 Sheet Corrugated Gi Sheet (12'), Ga 26 980.00 22. 20 Length C-purlins (1 1/2" X 4"), G-16 800.00 23. 39 Length C-purlins (2" X 3"), G-16 778.33 24. 20 Length C-purlins (2" X 6"), G-16 1,236.33 25. 6 Pc Cutting Disc, (4" Ø) 577.67 26. 2 Kgs Cwn, (1 1/2") 100.50 27. 2 Kgs Cwn, (2 1/2") 96.00 28. 5 Kgs Cwn, (3") 91.50 29. 6 Kgs Cwn, (4") 89.00 30. 218 Length Deformed Bar, (10mmø X 6m) 238.33 31. 21 Length Deformed Bar, (12mmø X 6m) 333.33 32. 3 Pc Diamond Tile Cutter Blade (4" Ø) 525.33 33. 6 Pc Disc Cutter (14" Ø) 316.33 34. 60 Length Double Furring (17mm X 49mm X 17mm X 0.6mm X 5m) 217.00 35. 1 Set Drill Bit 12mmø (for Masonry) 250.00 36. 10 Set Drill Bit, (1/8" Ø), For Steel 175.50 37. 3 Rolls Electrical Tape, (0.16mm X 19mm X 16yrds), Plastic 75.00 38. 1 Pc Entrance Cap, 25mm ɸ, Rsc 162.00 39. 10 Gal Epoxy Primer Red Oxide W/ Catalyst 1,358.00 40. 9 Cu.m. Fine Sand 1,347.33 41. 100 Mtrs. Flexible Conduit Pipe, 20mmɸ Upvc, Coilable, Orange Color 78.75 42. 10 Mtrs. Flexible Conduit Pipe, 25mm ɸ Upvc, Orange Color, Coilable 113.00 43. 50 Pc Floor Tiles, (400mm X 400mm) 150.00 44. 6 Length Gi Pipe (2"), Sch. 40 2,098.33 45. 1 Lngth Gi Pipe 3"ɸx20' Sched. 40 4,231.50 46. 8 Sheet Gi Plain Sheet, Ga 26 X 8' (0.40 Mm) 670.00 47. 23 Kgs Gi Tie Wire, Ga 16 102.67 48. 5 Cu.m. Gravel - 3/4" 2,378.00 49. 3 Pc Grinding Disc (4" Ø) 320.00 50. 1 Lngth Ground Rod, ⅝" ɸ X 10' , Galv. Steel 933.00 51. 2 Pc Hacksaw Blade, Lenox, 24tpi 82.67 52. 4 Sheet Hardiflex (1/2" X 4' X 8') 1,815.34 53. 27 Sheet Hardiflex (1/4" X 4' X 8') 907.67 54. 8 Pcs. Junction Box, 4" X 4" Upvc, Orange Color W/ Cover And Screws 54.00 55. 5 Pcs Led Bulb (9w) 120.00 56. 4 Sheet Marine Plywood (1/4" X 4' X 8') 649.00 57. 0.3 Gal Mayon Lacquer Thinner 782.00 58. 1 Pc Paint Brush, 1 1/2" 41.00 59. 3 Pc Paint Brush, 4" 105.00 60. 1 Assy. Panel Board, 40at/50af, Bolt-on, 240 V, Complete With 2-15at And 2-20at 2-pole, 240v, Bolt-on Branch Circiuts 8,000.00 61. 6 Length Plain Bar (10mmø X 6m) 256.00 62. 50 Pcs. Poly Flex Connector For Flexible Hose 20mm' ɸ 10.00 63. 7 Pc Porcelain Tiles, (600mm X 1200mm) 405.00 64. 313 Bags Portland Cement, Type I, 40 Kgs. (grand) 310.00 65. 1 Pc. Pull Box, 12" X 12" X 6" Depth, Melamine Coated W/ Cover 1,100.00 66. 5 Pc Putty Knife, 5" Blade (medium) 150.00 67. 2 Pc Putty Plate 20.50 68. 4 Length Pvc Blue Pipes (1/2" Ø) 110.00 69. 5 Pc Pvc Clean-out W/ Plug (4"ø) 111.50 70. 8 Pc Pvc Elbow (90ᵒ X 1/2") 15.50 71. 5 Pc Pvc Female Adapter (1/2"ø) 23.00 72. 3 Can Pvc Solvent (200 Ml) 110.00 73. 4 Pc Pvc Tee (1/2"ø) 19.50 74. 2 Pc Pvc Water Faucet 182.50 75. 5 Cu.m. Ready Mixed 1,094.00 76. 433.3 Bd-ft Rough Lumber (2" X 2" X 10') - 130 55.00 77. 5 Pcs Round Vertical Downlight Recessed Type, Glossy Reflector, 6" 280.00 78. 15 Pcs. Sand Paper #180 35.50 79. 5 Pcs. Sand Paper #36 117.50 80. 5 Pc Sanitary Elbow (3"ø X 90ᵒ) 67.50 81. 2 Pc Sanitary Elbow (4"ø X 45ᵒ) 81.00 82. 2 Pc Sanitary Elbow (4"ø X 90ᵒ) 107.50 83. 6 Pc Sanitary Tee (3"ø) 104.00 84. 1 Set Secondary Rack With Sool Insulator 1-3/4" Dia, Groove, Brown Porcelain Hd 400.00 85. 100 Mtrs. Service Drop Wire, 14.0mm², Duplex, All Aluminum 41.00 86. 2 Sets Single Pole Switch, Flush Type, Or Equivalent 148.00 87. 14 Bags Skim Coat, 25kgs 709.50 88. 2 Pc Stainless Floor Drain (4" X 4") 239.00 89. 1 Pc Steel Tape, Stanley, Tylon 8m/16' 300.00 90. 1 Pc Teflon Tape (3/4" X 30m) 44.00 91. 2 Pc Tekscrew Adaptor 28.00 92. 342 Pc Tekscrew, (5/16" X 2 1/2") 4.75 93. 1,200 Pc Tekscrew, (5/16" X 2") 4.00 94. 2 Pcs. Terminal Lug, Sa 135, Solderless 196.00 95. 4 Bags Tile Adhesive Cement, 25kgs 452.00 96. 15 Kgs Tile Grout 97.50 97. 10 Length Tile Trim (1/2" X 2.40m) 320.00 98. 1 Gal Time Out Body Filler 948.50 99. 2 Pc Toilet Paper Holder 300.00 100. 1 Sets Triplex Switch, Flush Type, Or Equivalent 350.00 101. 6 Length Upvc Sanitary Pipes, S-1000 (3"ø X 3m) 827.00 102. 5 Length Upvc Sanitary Pipes, S-1000 (4"ø X 3m) 1,127.00 103. 2 Pc Upvc Wye (4"ø) 194.50 104. 6 Pcs. Utility Box, 2"x 4" Upvc, Orange Color 32.00 105. 27 Length Wall Angle (1mm X 25mm X 25mm X 2.4m 80.50 106. 112 Pc Wall Tiles, (400mm X 400mm) 120.00 107. 20 Cu.m. Washed Sand 1,325.00 108. 2 Unit Water Closet, 6l, Hcg W/ Accessories 9,620.50 109. 21 Pc W-clip/double Furring Clip 18.00 110. 22 Kgs Welding Rod, (e6013) 175.67 111. 1 Gal Zinc Chromate (yellow) 1,950.00 Total Brand Model:_____________ Delivery Period:______________________ Warranty: After Having Carefully Read & Accepted Your General Conditions. I/we Quote On The Item/s Price/s Noted Above. Total Bid Price (in Words) Bid Security: Amount: Submitted By: Bidder/supplier Date:_________________________
Closing Date25 Nov 2024
Tender AmountPHP 661.2 K (USD 11.3 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n733.11|n00383|215-697-3992|jessica.p.laychock.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports Combo|invoice And Receiving Reports Combo|tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days|45 Days Of The Last Delivery Under This Contract |||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a7 ||
this Rfq Is For Repair. Navsup Wss Requests That Contractors Submit A Quote That Includes Either A Firm-fixed Price Or Tt&e Pricing As Well As Estimate Costs To Repair This Item.
the Requested Rtat Is 45 Days
the Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement.
this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal
constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification.
\
1. Scope
1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.3 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
heat Exchanger,flui ;70207-000-1; P/n, ;1660-01-454-5010; Nsn, ;tech Publication Found In Jedmics; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
heat Exchanger,flui ;ametek Thermal Systems; Company Name , ;d/b/a Ametek Hughes-treitler, 300 Endo Blvd, Garden City, Ny 11530-6708; Address , ;12536; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date18 Nov 2024
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n791.09|t1h|215-697-2196|joseph.bodnik@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit.|45 Days After Defect Was Found.|||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
contract Definitization (oct 2010)|9||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The
fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This Contract.
required Rtat: ## ___55_ Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ## (000)___ Per Month Reflects No
throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation:
a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under This Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such Prices Are
based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;boeing; Drawing Number ( ;81205; ) ;112a7316-429; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
panel Assy Lh Side, ;112a7316-429; P/n, ;7rh 1680 016537099 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
panel Assy Lh Side, ;boeing; Company Name , ;mail Stop 45-24 P.o. Box 3707, Seattle Wa 98124-2207; Address , ;81205; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date18 Nov 2024
Tender AmountRefer Documents
Department Of Tourism Tender
Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description Technical Specifications Project Request For Procurement Of Opaa Office Equipment Minimum Requirements Must Be Registered With The Philippine Government Electronic Procurement Systems (philgeps). Must Provide A Breakdown Of Prices And Services Included In The Quotation. Quotation To Include E-vat And Other Government Taxes. Amenable To Government Procedures Or Send-bill Arrangement. Scope Of Work/deliverables Provide The Office Equipments For Official Use Of The Office Of Public Affairs And Advocacy (opaa). Date Of Delivery : 45 Days Upon Acceptance Of Purchase Order Venue Of Delivery : Department Of Tourism General Services Division G/f, New Dot Bldg., 351 Sen. Gil Puyat Ave., Makati City Time : Office Hours These Equipment Will Be Used To Support The Department Of Tourism’s Photo And Video Documentation, Editorial, Video Production, Social Media Management And Support To Operations Of The Department. Lot Equipment Quantity Lot #1 Zoom Lens (wide Lens 17-40mm F/4l Usm, Ef Mount) Aperture Range - Wide / Long F/4.0-22 Number Of Aperture Blades 7 Filter Size 77mm Note: For Existing Equipment Of The Team (canon) 2 Pcs Lens (zoom Lens 18-150mm F/3.5-6.3 Is Stm, Rf Mount) Focal Length 18 To 150mm (35mm Equivalent Focal Length: 29 To 240mm) Maximum Aperture F/3.5 To 6.3 Minimum Aperture F/40 Lens Format Coverage Aps-c Angle Of View 74° 20' To 10° 25' Minimum Focus Distance 6.7" / 17 Cm Maximum Magnification 0.44x Optical Design 17 Elements In 13 Groups Diaphragm Blades 7, Rounded Focus Type Autofocus Filter Size 55 Mm (front) Dimensions (ø X L) 2.7 X 5" / 69 X 126.7 Mm Weight 10.9 Oz / 310 G Note: For Existing Equipment Of The Team (canon) 1 Pc Lens (wide Lens 18-45mm F/4.5-6.3 Is Stm, Rf Mount) Maximum Aperture F/4.5 To 6.3 Minimum Aperture F/32 Lens Mount Lens Format Coverage Aps-c Angle Of View 74° 20' To 33° 40' Minimum Focus Distance 7.9" / 20 Cm Maximum Magnification 0.16x Optical Design 7 Elements In 7 Groups Diaphragm Blades 7, Rounded Focus Type Autofocus Filter Size 49 Mm (front) Dimensions (ø X L) 2.7 X 1.7" / 68.9 X 44.3 Mm Weight 4.6 Oz / 130 G Note: For Existing Equipment Of The Team (canon) 1 Pc Lens Extender Ef1.4x Iii Ef Mount Teleconverter 1.4x Magnification Factor Microcomputer Controlled Communication Between Lens & Camera Spectra Coating Reduces Ghosting/ Flare Protective Fluorine Coating Dust And Water Resistant Compatible With Select Ef Mount Lenses Note: For Existing Equipment Of The Team (canon) 1 Pc Lens Adapter (rf To Ef Mount) Mount Specification Ef Mount (camera Side); Rf Mount (lens Side) Usable Lensef Lenses; Excludes Rf Lenses, Ef-m Lenses, Cn-e Lenses (ef Cinema Lenses) Usable Camera Eos R Camera Dust- & Water-resistance Provided (rubber Ring) Dimensions Φ2.80 X 0.94 In. / Φ71.2 X 24mm (adapter Only) Weight Approx. 3.9 Oz. / 110g (adapter Only) Note: For Existing Equipment Of The Team (canon) 3 Pcs Dslr Gimbal Stabilizer Compatibility - Mobile App: Yes: Android & Ios App Name: Ronin App Load Capacity - 3kg Mount - 1 X 1/4"-20 Female; 2 X Nato Rail Weight - 1.07 Kg Material - Aluminum Alloy Note: For Existing Equipment Of The Team (rs4 Pro) 2 Pcs Drone Battery For Dji Mini 4 Pro Drones 2590 Mah Power Capacity Up To 34 Minutes Of Flight Time 58 To 70 Minutes Of Charging Time Note: For Existing Equipment Of The Team (mini 4 Pro) 5 Pcs Camera Battery (lp-e6nh) Battery Capacity 2130 Mah Output Voltage 7.2 Vdc Battery Chemistry Lithium-ion Dimensions 2.24 X 1.51 X 0.83" / 56.8 X 38.4 X 21 Mm Note: For Existing Equipment Of The Team (canon) 4 Pcs Camera Battery Pack (lp-e17) Item Dimensions L X W X H 2.76 X 3.54 X 1.97 Inches Item Weight 0.05 Kilograms Amperage 1040 Milliamps Battery Capacity 1040 Milliamp Hours Note: For Existing Equipment Of The Team (canon) 20 Pcs Camera Charger (2 Lp-e6nh) (2 Lp-e17) For Lp-e6nh Dual Charger With 2 Charging Ports To Quickly Charge Two Lp-e6nh Batteries At The Same Time Charger Has 2 Input Options, The Included Usb Type-c Or The Older Micro Usb Interface Can Also Be Used For Lp-e17 With Micro Usb And Type C Dual Interface Charger, Support A Variety Of Charging Methods Product Type: Double-slot Electrical Appliance; Current Input: 5v/2.1a Note: For Existing Equipment Of The Team (canon) 4 Pcs Camera Flash (ttl Li-ion Round Head Camera Flash) 330-degree Rotation And 120+ Degree Tilt Full Power Recycle Time Of Fewer Than 1.5 Seconds Approximately 650 Full Power Flashes Per Charge Zooming Head With Automatic Zoom Or Manual Control High Speed Sync For Shutter Speeds Up To 1/8000 Second Note: For Existing Equipment Of The Team (v1 Pro Speedlight) 4 Pcs Camera Mic (wireless Mic) 250m (820 Ft.), Range 15-hour Battery Oled Touchscreen 14-hour Recording Note: For Existing Equipment Of The Team (dmt02) 2 Pcs Phone Gimbal Stabilizer Portable And Foldable Activetrack 6.0 Built-in Extension Rod Magnetic Quick Release Design Bluetooth 5.1 Support Usb Type-c Power Input Note: For Existing Equipment Of The Team (osmo Mobile 6) 2 Pcs Light-weight Tripod Camera Mounting Screw 1x 1/4"-20 Male Head Type Fluid Head Drag Control Yes Primary Material Aluminum Load Capacity 22 Lb / 9.98 Kg Maximum Working Height 61.06" / 155.1 Cm Minimum Working Height 30.8" / 78.2 Cm Closed Length 32.5" / 82.5 Cm Weight 7.94 Lb / 3.6 Kg Camera Attachment Camera Mounting Screw 1x 1/4"-20 Male Head Head Type Fluid Head Base Mount 75 Mm Half Ball Pan & Tilt Drag Control Yes Independent Pan Lock Yes Independent Tilt Lock No Vertical Tilt +90° To -75° Legs Primary Material Aluminum Leg Lock Twist Lock Leg Sections 3 Foot Features Spiked, Retractable General Load Capacity 22 Lb / 9.98 Kg Maximum Working Height 61.06" / 155.1 Cm Minimum Working Height 30.8" / 78.2 Cm Closed Length 32.5" / 82.5 Cm Accessory Mounting 1x Pan Handle Fitting Bubble Level Yes Spreader Support Mid-level (integrated) Weight 7.94 Lb / 3.6 Kg Packaging Info Package Weight 11 Lb Box Dimensions (lxwxh) 39.5 X 6.5 X 6.5" Note: For Existing Equipment Of The Team (befree Gt Xpro Carbon Fiber) 3 Pcs Studio Light (2800k - 6800k)(200w) 200w Point-source Led Light. Beam Angle: 105°, Dims 0-100% Color: 5600k, Cri/tlci: 95/96. Bluetooth Remote Controllable. Ac Power, Optional Battery. 8 Built-in Customizable Effects. Bowens Reflector Mount, Umbrella Holder Note: For Existing Equipment Of The Team (amaran 200x S) 3 Pcs Softbox Parabolic Umbrella (depends On The Studiolight That Will Be Procured) Diameter 90cm Depth 60cm Collapsed Length 75cm Net. Weight 1.5kg Speedring Diameter 11.5cm Box Weight 2.2kg Box Specifications Approximately Height:13cm Width: 20cm Length: 83cm Note: For Existing Equipment Of The Team (light Dome Se) Softbox Honeycomb (depends On The Studiolight That Will Be Procured) Type: Octagon Softbox With Honeycomb Grid Soft Box Diameter: 90cm Package Size: 77cm * 12cm * 8cm Package Weight: 620g Note: For Existing Equipment Of The Team (light Dome Se Grid) It Could Be A Set If Available With The Supplier 3 Pcs Studio Light Stand Stainless Steel 12ft Pro Light Stand (air Cushion) Butterfly Light Stand 3.7m Air Cushioned Pro Light Stand Folded Length: 106cm Max Height: 370 Cm Tube Diameters: 40/35/30/25mm Tip: 1/4″ Screw Or 3/8″ Screw Note: For Existing Equipment Of The Team (heavy-duty Air-cushioned Light Stand) 3 Pcs Boom Mic (dslr,fixed Tube With Reduced Visual Appearance And Easy Handling (camera- Or Boom-mounted) Flat, Wide-range Frequency Response For Exceptionally Clean And Natural Reproduction Of Both Music And Speech Superior Rejection Of Electromagnetic Hum, Optimized For Shielding Against Broadband Interference Emitted By Computer Monitors Internal “air Suspension” Shock Isolation Virtually Eliminates Mechanical Noise Transmission Highly Effective Pop Filter Eliminates Need For Any Add-on Protection Against Explosive Breath Sounds, Even For Close-up Vocals Or Narration Classic Cardioid Polar Pattern, Uniform With Frequency And Symmetrical About Axis, To Provide Maximum Rejection And Minimum Coloration Of Off-axis Sound Note: For Existing Equipment Of The Team (sm7db) 1 Pc Action Camera Accessories (waterproof Dome Port) Color: Black / Yellow Material Of Construction Plexiglass, Pc Resin, Naval-grade Stainless Steel Dimensions: 7.3 X 7.3 X 4" / 185 X 185 X 102 Mm Weight : 14.8 Oz / 420 G Note: For Existing Equipment Of The Team (telesin Waterproof Dome) 1 Pc Camera Bag (35x24x62cm) Fits Pro Mirrorless Or Dslr With 70-200mm, 4-5 Extra Lenses Maxfit Divider System For Maximum Capacity & Snug Protective Fit Space For 15'' Laptop, 10'' Tablet, Plus Wacom Type Tablet Carry-on Ready: Meets Standard Carry-on Requirements Travel Friendly: Stowable Shoulder Straps, Removable Waist Belt Weight 2.39 Kg External Dimensions 32 X 25 X 48 Cm Tablet Compartment Dimensions 21.5 X 1.5 X 24 Cm Internal Dimensions 28 X 15 X 42 Cm Note: For Existing Equipment Of The Team (pro Trekker Bp 350 Aw Ii) 2 Pcs Subtotal P 667,618.26 Lot #2 Mic Boom Stand Height: 1070 Mm - 2400 Mm (42.1" - 94.5") Weight: 2.6 Kg (5.7 Lbs.) Boom Length: 780 Mm (30.7") Folded Size: 980 Mm X 95 Mm X 95 Mm (38" X 3.7" X 3.7") Note: For Existing Equipment Of The Team (mc-125 Pro Mic Boom Stand) 1 Pc Camera Hard Case (28x13x48cm) Weight: 1 Kg Total Volume: 25.5 L Internal Dimensions: 28 X 13 X 48 Cm External Dimensions: 29 X 18.5 X 49 Cm Camera Compartment Dimensions: 16.5 X 9.5 X 24 Cm Laptop Compartment Dimensions: 27 X 2 X 41 Cm Primary Device Camera Device Volume: 4.5 L Exterior Material 300d Polyester Ripstop (recycled), 600d Polyester Solution Dyed Interior Material 200d Polyester (recycled) Note: For Existing Equipment Of The Team (trekker Lite Bp 250 Aw) 2 Pcs Camera Cage Battery Plate Type No Accessory Mounting Cage Multiple 1/4"-20 Female Thread Multiple 3/8"-16 Female Thread 1x Arri Anti-twist 3/8"-16 Female Thread 1x Qd (quick Detach) Camera Mounting 1/4"-20 Male Screw Tripod Mounting Cage 1/4"-20 Female Thread, 3/8"-16 Female Thread, Built-in Arca-type Plate Cage Built-in Arca-type Plate Shoe Mounting Cage, Top 1x Cold Shoe Materials Aluminum Dimensions 5.8 X 4.1 X 2.8" / 146.8 X 103.7 X 70.8 Mm Weight 5.5 Oz / 156 G Note: For Existing Equipment Of The Team (smallrig "black Mamba") 1 Pc Subtotal P 22,903.13 Lot #3 Heavy Duty Tripod (dslr, Aluminum Alloy) Variable Fluid Drag System On Pan And Tilt Movements. 4kg Pre-set Counterbalance System On Tilt Movement. Sliding Plate For The Fastest Camera Connection. Levelling Bubble Makes Setup Simple. Aluminium Telescopic Twin Leg Tripod Keeps Your System Firm. Note: For Existing Equipment Of The Team (mvk502am-1 502 Fluid) 3 Pcs Video Transmitter Battery Video I/o Transmitter: 1x Hdmi 1.4b Input Transmitter: 1x Bnc (3g-sdi) Input Receiver: 1x Hdmi 1.4b Output Transmitter: 1x Bnc (3g-sdi) Output Embedded Audio Hdmi/sdi Latency 50 Ms Video Format Hdmi Uhd 4k: 30/29.97/25/24/23.98 1080p: 60/59.94/50/30/29.97/25/24/23.98 1080i: 60/59.94/50 720p: 60/59.94/50 Sdi 1080p: 60/59.94/50/30/29.97/25/24/23.98 1080i: 60/59.94/50 720p: 60/59.94/50 Power Consumption Transmitter: 11 W Receiver: 8 W Mounting 1/4"-20 Female Note: For Existing Equipment Of The Team 2 Pcs Subtotal P 59,478.98 Grand Total P 750,000.37 Payment Procedure: Government Procedure And Is Subject To Appropriate Government Taxes. Approved Budget For The Contract Seven Hundred Fifty Thousand And 37/100 Pesos Only (php 750,000.37) Total Budget Shall Be Charged Against The Approved 2024 Wfp Of Opaa Project By The Office Of Public Affairs And Advocacy (opaa) For Further Information, Please Refer To The Following Project Officer Below At Telephone Numbers (2) 459-5200, Loc. 316. Project Officer - Jhorica Jhane P. Hernandez - Information Officer I Note: The Winning Bid Shall Be Determined Based On The Best Package Suited To The Market At The Most Advantageous Financial Cost, Provided That The Amount Of Bid Does Not Exceed The Above Total Budget.
Closing Soon11 Nov 2024
Tender AmountPHP 750 K (USD 12.8 K)
DEPT OF THE NAVY USA Tender
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n731.45|n00383|215-697-0169|alyssa.t.thieu.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports Combo|inspection Site Source Final Acceptance Site Source|tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year|45 Days Of The Last Delivery Under This Contract|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||a7|
the Purpose Of This Amendment Is To Incorporate The Following Changes:
1. The Response Date For Rfp N00383-24-r-n377 Is Hereby Extended By 90 Days, To 12 November 2024.
all Other Terms And Conditions Remain The Same.
this Amendment Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To Issue This
amendment.
all Terms And Conditions Of Boa N00383-23-g-a701 Shall Apply.
this Rfp Is For Repair. Navsup Wss Requests That Contractors Submit A Quote That Includes Either A Firm-fixed Price Or Nte Pricing As Well As Estimate Costs To Repair This Item.
the Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement.
this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal
constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification.
\
1. Scope
1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.3 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
receiver,infrared ;717407100-009; P/n, ;5865 016785246; Nsn, ;iaw Oem Technical Drawings; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
receiver,infrared ;lockheed Martin Corp; Company Name , ;5600 W Sandlake Road Mp 125, Orlando, Fl. 32819-8907; Address , ;04939; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Soon12 Nov 2024
Tender AmountRefer Documents
Department of Real Estate, A.S. Tender
Electrical Goods and Equipments...+2Machinery and Tools, Electrical and Electronics
Czech Republic
Details: The subject of the order is the purchase of a floor washing machine with extraction of at least the following parameters: • Cylindrical brushes with a sweeping function with Min. Coverage 1,000 Mm • Container For Collected Dirt Minimum: 30 L • Tank Volume Minimum: 260 L • Area Output Minimum: 10,000 M2/h • Brush Pressure Minimum: 150 Kg, 210 G/cm2 • Battery: Capacity Minimum: 600 Ah • Beacon Safety • Led Daytime Lighting • Armrests On Both Sides • Robust Metal Suction Bar With Special Clamping, Bent Min. 1,140 Mm With Spirit Level And Handle For Easy Handling. • Adjustable driver's seat • Hose connection with a cleaning gun for washing the tank + rinsing the machine • Gradeability up to 25% - for the exit of the machine between individual floors • Stainless filter basket for coarse impurities • 2 carbonless turbines The subject of filling is also delivery to the place of filling and training Attendants
Closing Date18 Nov 2024
Tender AmountRefer Documents
Province Of Iloilo Tender
Laboratory Equipment and Services
Philippines
Details: Description Bids And Awards Committee Iloilo Provincial Government Procurement Of Laboratory Supplies Bid No. Iph-24-1390-b Philippine Bidding Documents Sixth Edition July 2020 . Table Of Contents Section I. Invitation To Bid……………………………………………………..3 Section Ii. Instructions To Bidders………………………………………..…...5 1. Scope Of Bid ………………………………………………………………………. 5 2. Funding Information………………………………………………………………. 5 3. Bidding Requirements ……………………………………………………………. 5 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 5 5. Eligible Bidders…………………………………………………………………… 5 6. Origin Of Goods ………………………………………………………………….. 6 7. Subcontracts ……………………………………………………………………… 6 8. Pre-bid Conference ………………………………………………………………. 7 9. Clarification And Amendment Of Bidding Documents …………………………… 7 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 7 11. Documents Comprising The Bid: Financial Component …………………………... 7 12. Bid Prices …………………………………………………………………………. 8 13. Bid And Payment Currencies ……………………………………………………… 8 14. Bid Security ………………………………………………………………………. 8 15. Sealing And Marking Of Bids ……………………………………………………… 9 16. Deadline For Submission Of Bids …………………………………………………. 9 17. Opening And Preliminary Examination Of Bids ………………………………….. 9 18. Domestic Preference ……………………………………………………………… 9 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 9 20. Post-qualification ………………………………………………………………… 10 21. Signing Of The Contract …………………………………………………………… 10 Section Iii. Bid Data Sheet …………………………………………………..11 Section Iv. General Conditions Of Contract ……………………...………..12 1. Scope Of Contract ………………………………………………………………… 12 2. Advance Payment And Terms Of Payment ……………………………………….. 12 3. Performance Security ……………………………………………………………. 12 4. Inspection And Tests ……………………………………………………………… 12 5. Warranty …………………………………………………………………………. 13 6. Liability Of The Supplier ………………………………………………………….. 13 Section V. Special Conditions Of Contract ………………………………….14 Section Vi. Schedule Of Requirements ……………………………………....16 Section Vii. Technical Specifications …………………………………………17 Section Viii. Checklist Of Technical And Financial Documents …………..17 Section I. Invitation To Bid Purchase Of Laboratory Supplies Bid No. Iph-24-1390-b 1. The Iloilo Provincial Government Through The Charged To Supplemental Budget Cy 2024 Intends To Apply The Sum Of One Million One Hundred Forty-two Thousand Nine Hundred Thirty- Seven Pesos And Ninety-nine Centavos (php 1,142,937.99) Being The Abc To Payments Under The Contract For The Purchase Of Laboratory Supplies Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Iloilo Provincial Government Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By 14 Days Upon Receipt Of The Notice To Proceed (ntp).bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat Of The Iloilo Provincial Government And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 22, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Iloilo Provincial Government Will Hold A Pre-bid Conference On October 29, 2024 At The Bac Office, 5th Floor, New Iloilo Provincial Capitol And/or Through Video Conferencing Or Webcasting, Upon Request At Least Three (3) Days Before The Pre-bid Conference, Via Zoom Or Other Videoconferencing Portals, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac Office,5th Floor, Iloilo Provincial Capitol, Bonifacio Drive, Iloilo City On Or Before November 12, 2024 At 9:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On November 12, 2024 At 9:01 A.m. At The Bac Office, 5th Floor, New Iloilo Provincial Capitol. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. A. The Participating Bidder/supplier Or Its Authorized Representative Must Indicate In Any Of The Eligibility Documents, An Email Address Or A Working Fax Number. The Absence Of Which Shall Be A Ground For Disqualification. Notice To The Bidder/supplier Through The Use Of Either Of These Means (email/fax) Is Considered Sufficient Notice. The Date Of Filing Of Reconsideration And All Communications With The Bac Shall Be Its (bac) Date Of Receipt. B. The Bidder(s)/awardee(s) Or Its Authorized Representative Must Conform To The Notice Of Award Within Three (3) Calendar Days From Receipt Of Such Notice And The Winning Bidder Shall Post The Required Performance Security And Enter Into Contract With The Procuring Entity Within Ten (10) Calendar Days From Receipt By The Winning Bidder Of The Notice Of Award In Accordance With Section 37.2.1 Of The Revised Irr Of R.a. No. 9184. C. The Bidder/supplier Must Have No Pending Unaccepted Notice To Proceed Three (3) Days From The Date Of Acceptance And Signing Of The Purchase Order. Otherwise, It Shall Be A Ground For Disqualification And The Bidder Will Be Rated "failed" During The Preliminary Examination Of Bids And/or Its Bid Shall Be Declared As "non-responsive" During Post-qualification. D. The Bidder/supplier Must Have No Notice Of Award Pending Its Conformity Three (3) Days From The Date Of Its Receipt Of The Notice Of Award. Otherwise, It Shall Be Aground For Disqualification And The Bidder Will Be Rated "failed" During The Preliminary Examination Of Bids And/or Its Bid Shall Be Declared As "non-responsive" During Post-qualification. E. The Bidder/supplier Shall Submit A List Of All Its Ongoing And Completed Projects With The Iloilo Provincial Government Indicating The Delivery Periods And Accomplishments Of Such Projects. F. The Bidder/supplier At The Time Of The Bidding Must Have No Pending Unposted Performance Or Warranty Security, As The Case May Be, Beyond The Period Allowed In The Notice Of Award. Otherwise, It Shall Be A Ground For Disqualification And The Bidder Will Be Rated "failed" During The Preliminary Examination Of Bids And/or Its Bid Shall Be Declared As "non-responsive" During Post-qualification. G. When An Occurrence Of A Tie Among Bidders Takes Place, I.e., Two Or More Of The Bidders Are Determined And Declared As The Lowest Calculated And Responsive Bidder (lcrb), The Winning Bidder Shall Be Determined By Draw Lots Upon Notice To The Bidders Concerned And/or Their Authorized Representatives In Accordance With The Relevant Circulars Issued By The Government Procurement Policy Board (gppb). 11. The Iloilo Provincial Government Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Atty. Raemman M. Lagrada Bac Secretariat Head 5th Floor, Bids And Awards Committee Iloilo Provincial Capitol Email Address: Ipg_bacs@yahoo.com Website: Iloilo.gov.ph Telephone Number: (033) 336-0736 13. You May Visit The Following Websites For Downloading Of Bidding Documents: Ipg.gov.ph And/or Philgeps.com October 15, 2024 Atty. Dennis T. Ventilacion Chairman, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Iloilo Provincial Government Wishes To Receive Bids For The Purchase Of Laboratory Supplies With Bid No. Iph-24-1390-b. The Procurement Project (referred To Herein As “project”) Is Composed Of Twelve (12) Items, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2024 In The Amount Of One Million One Hundred Forty-two Thousand Nine Hundred Thirty- Seven Pesos And Ninety-nine Centavos (php 1,142,937.99) 2.2. The Source Of Funding Is: A. Lgus, The Annual Or Supplemental Budget, As Approved By The Sanggunian. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. C. For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: [select Either Failure Or Monopoly Of Bidding Based On Market Research Conducted] I. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And Ii. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time At Its Physical Address As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Complete Bid - One Project Having Several Items That Shall Be Awarded As One Contract In Case Of Complete Bid. Line Bidding/partial Bidding - One Project Having Several Items, Which Shall Be Awarded As Separate Contracts Per Item 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Refers To The Contracts To Be Bid Or The Object Of The Contract; B. Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 12 The Price Of The Goods Shall Be Quoted Ddp Iloilo Provincial Hospital, Pototan Iloilo Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc, If Bid Security Is In Surety Bond. 15 Bidders Shall Prepare An Original Of The First (eligibility And Technical) And Second (financial) Envelopes. In Addition, Bidders Shall Submit Separate Copies Of The First And Second Envelopes (copy 1, Copy 2) And Each Set Of Documents Must Clearly Indicate Whether The Same Is Original, Copy 1, Or Copy 2. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.3 No Further Instructions. 20.2 For The Procurement Of Drugs And Medicines And Medical Equipment/supplies, The Bidder Shall Submit The Following: A. Certificate Of Product Registration From Food And Drug Administration (fda) For Easy Validation During The Post-qualification; B. Certificate If Good Manufacturing Practice From Fda, For Easy Validation During The Post-qualification; C. Batch Release Certificate From Fda, For Easy Validation During The Post-qualification; D. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/ Dealer Of The Products / Items For Easy Validation During The Post-qualification; E. For The Procurement Of Regulated Drugs, The Applicable Type Of S-license: S-1, S-3 (retailer) S-4 (wholesaler) S-5c (manufacturer) S-5d (bulk Depot/storage) S-5e S-5i (importer); F. License To Operate (lto) Issued By Fda, If Applicable; G. After-sales Services/parts, If Applicable; H. Manpower Requirements, If Applicable. 21.2 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 6.1. In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered To Iloilo Provincial Hospital, Pototan, Iloilo. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Authorized Employee/official Of The Iloilo Provincial Government. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. 2.2 Partial Payment Is Not Allowed. 4 The Inspections And Tests That Will Be Conducted Are Through Physical Inspection. Item Number Description Quantity Total Delivered, Weeks/months 1 Cell Pack Dcl 20l Compatible W/ Xn-330 Hematology Analyzer 30 30 2 Sulfolyser 1.5l Compatible W/ Xn-330 Hematology Analyzer 5 5 3 Lysercell Wdf 2l Compatible W/ Xn-330 Hematology Analyzer 15 15 4 Flurocell Wdf 22ml Compatible W/ Xn-330 Hematology Analyzer 5 5 5 Hematology Control (l-m-h) Compatible W/ Xn-330 Hematology Analyzer 4 4 6 Hematology Washing Soln. Compatible W/ Xn-330 Hematology Analyzer 4 4 7 Thromborel S (10x4ml) Compatible W/ Sysmex Coagulation Machine 4 4 8 Pathromtin Sl (10x5ml) Compatible W/ Sysmex Coagulation Machine 2 2 9 Cacl2 10x15ml Compatible W/ Sysmex Coagulation Machine 1 1 10 Citrol I (10x1ml) Compatible W/ Sysmex Coagulation Machine 1 1 11 Ca Cleaner 120ml Compatible W/ Sysmex Coagulation Machine 2 2 12 Reaction Tube 500's Compatible W/ Sysmex Coagulation Machine 1 1 Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. _______________________ Signature Over Printed Name Section Vii. Technical Specifications Bid No.: Iph-24-1390-b Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Cell Pack Dcl 20l Compatible W/ Xn-330 Hematology Analyzer 2 Sulfolyser 1.5l Compatible W/ Xn-330 Hematology Analyzer 3 Lysercell Wdf 2l Compatible W/ Xn-330 Hematology Analyzer 4 Flurocell Wdf 22ml Compatible W/ Xn-330 Hematology Analyzer 5 Hematology Control (l-m-h) Compatible W/ Xn-330 Hematology Analyzer 6 Hematology Washing Soln. Compatible W/ Xn-330 Hematology Analyzer 7 Thromborel S (10x4ml) Compatible W/ Sysmex Coagulation Machine 8 Pathromtin Sl (10x5ml) Compatible W/ Sysmex Coagulation Machine 9 Cacl2 10x15ml Compatible W/ Sysmex Coagulation Machine 10 Citrol I (10x1ml) Compatible W/ Sysmex Coagulation Machine 11 Ca Cleaner 120ml Compatible W/ Sysmex Coagulation Machine 12 Reaction Tube 500's Compatible W/ Sysmex Coagulation Machine _______________________ Signature Over Printed Name Section Viii. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages);or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (e) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (h) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (i) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (j) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (o) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (p) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Soon12 Nov 2024
Tender AmountPHP 1.1 Million (USD 19.6 K)
Province Of Iloilo Tender
Others
Philippines
Details: Description Bids And Awards Committee Iloilo Provincial Government Procurement Of Housekeeping Supplies Bid No. Frt-24-1790-b Philippine Bidding Documents Sixth Edition July 2020 Table Of Contents Section I. Invitation To Bid……………………………………………………..3 Section Ii. Instructions To Bidders………………………………………..…...5 1. Scope Of Bid ………………………………………………………………………. 5 2. Funding Information………………………………………………………………. 5 3. Bidding Requirements ……………………………………………………………. 5 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 5 5. Eligible Bidders…………………………………………………………………… 5 6. Origin Of Goods ………………………………………………………………….. 6 7. Subcontracts ……………………………………………………………………… 7 8. Pre-bid Conference ………………………………………………………………. 7 9. Clarification And Amendment Of Bidding Documents …………………………… 7 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 7 11. Documents Comprising The Bid: Financial Component …………………………... 7 12. Bid Prices …………………………………………………………………………. 8 13. Bid And Payment Currencies ……………………………………………………… 8 14. Bid Security ………………………………………………………………………. 8 15. Sealing And Marking Of Bids ……………………………………………………… 9 16. Deadline For Submission Of Bids …………………………………………………. 9 17. Opening And Preliminary Examination Of Bids ………………………………….. 9 18. Domestic Preference ……………………………………………………………… 9 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 9 20. Post-qualification ………………………………………………………………… 10 21. Signing Of The Contract …………………………………………………………… 10 Section Iii. Bid Data Sheet …………………………………………………..11 Section Iv. General Conditions Of Contract ……………………...………..12 1. Scope Of Contract ………………………………………………………………… 12 2. Advance Payment And Terms Of Payment ……………………………………….. 12 3. Performance Security ……………………………………………………………. 12 4. Inspection And Tests ……………………………………………………………… 12 5. Warranty …………………………………………………………………………. 13 6. Liability Of The Supplier ………………………………………………………….. 13 Section V. Special Conditions Of Contract ………………………………….14 Section Vi. Schedule Of Requirements ……………………………………....16 Section Vii. Technical Specifications …………………………………………18 Section Viii. Checklist Of Technical And Financial Documents …………..19 Section I. Invitation To Bid Purchase Of Housekeeping Supplies Bid No. Frt-24-1790-b 1. The Iloilo Provincial Government Through The General Fund 2024 Intends To Apply The Sum Of Three Hundred Eighty-seven Thousand Six Hundred Pesos (php387,600.00) Being The Abc To Payments Under The Contract For The Purchase Of Housekeeping Supplies. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Iloilo Provincial Government Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By 14 Days Upon Receipt Of The Notice To Proceed (ntp). Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat Of The Iloilo Provincial Government And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 8, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos (php 500.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Iloilo Provincial Government Will Hold A Pre-bid Conference On N/a At The N/a And/or Through Video Conferencing Or Webcasting, Upon Request At Least Three (3) Days Before The Pre-bid Conference, Via Zoom Or Other Videoconferencing Portals, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The 5th Floor, Bac Secretariat Office, Iloilo Provincial Capitol, Bonifacio Drive, Iloilo City On Or Before November 18, 2024 At 9:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On November 18, 2024 At 9:01 A.m. At The 5th Floor, Bac Secretariat Office, Iloilo Provincial Capitol, Bonifacio Drive, Iloilo City Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. A. The Participating Bidder/supplier Or Its Authorized Representative Must Indicate In Any Of The Eligibility Documents, An Email Address Or A Working Fax Number. The Absence Of Which Shall Be A Ground For Disqualification. Notice To The Bidder/supplier Through The Use Of Either Of These Means (email/fax) Is Considered Sufficient Notice. The Date Of Filing Of Reconsideration And All Communications With The Bac Shall Be Its (bac) Date Of Receipt. B. The Bidder(s)/awardee(s) Or Its Authorized Representative Must Conform To The Notice Of Award Within Three (3) Calendar Days From Receipt Of Such Notice And The Winning Bidder Shall Post The Required Performance Security And Enter Into Contract With The Procuring Entity Within Ten (10) Calendar Days From Receipt By The Winning Bidder Of The Notice Of Award In Accordance With Section 37.2.1 Of The Revised Irr Of R.a. No. 9184. C. The Bidder/supplier Must Have No Pending Unaccepted Notice To Proceed Three (3) Days From The Date Of Acceptance And Signing Of The Purchase Order. Otherwise, It Shall Be A Ground For Disqualification And The Bidder Will Be Rated "failed" During The Preliminary Examination Of Bids And/or Its Bid Shall Be Declared As "non-responsive" During Post-qualification. D. The Bidder/supplier Must Have No Notice Of Award Pending Its Conformity Three (3) Days From The Date Of Its Receipt Of The Notice Of Award. Otherwise, It Shall Be Aground For Disqualification And The Bidder Will Be Rated "failed" During The Preliminary Examination Of Bids And/or Its Bid Shall Be Declared As "non-responsive" During Post-qualification. E. The Bidder/supplier Shall Submit A List Of All Its Ongoing And Completed Projects With The Iloilo Provincial Government Indicating The Delivery Periods And Accomplishments Of Such Projects. F. The Bidder/supplier At The Time Of The Bidding Must Have No Pending Unposted Performance Or Warranty Security, As The Case May Be, Beyond The Period Allowed In The Notice Of Award. Otherwise, It Shall Be A Ground For Disqualification And The Bidder Will Be Rated "failed" During The Preliminary Examination Of Bids And/or Its Bid Shall Be Declared As "non-responsive" During Post-qualification. G. When An Occurrence Of A Tie Among Bidders Takes Place, I.e., Two Or More Of The Bidders Are Determined And Declared As The Lowest Calculated And Responsive Bidder (lcrb), The Winning Bidder Shall Be Determined By Draw Lots Upon Notice To The Bidders Concerned And/or Their Authorized Representatives In Accordance With The Relevant Circulars Issued By The Government Procurement Policy Board (gppb). 11. The Iloilo Provincial Government Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Atty. Raemman M. Lagrada Bac Secretariat Head 5th Floor, Bids And Awards Committee Iloilo Provincial Capitol Email Address: Ipg_bacs@yahoo.com Website: Iloilo.gov.ph Telephone Number: (033) 336-0736 13. You May Visit The Following Websites For Downloading Of Bidding Documents: Ipg.gov.ph And/or Philgeps.com November 4, 2024 Atty. Dennis T. Ventilacion Chairman, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Iloilo Provincial Government Wishes To Receive Bids For The Purchase Of Housekeeping Supplies With Bid No. Frt-24-1790 -b. The Procurement Project (referred To Herein As “project”) Is Composed Of Twenty-three (23) Items, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information The Gop Through The Source Of Funding As Indicated Below For 2024 In The Amount Of Three Hundred Eighty-seven Thousand Six Hundred Pesos (php387,600.00). 2.1. The Source Of Funding Is: A. Lgus, The Annual Or Supplemental Budget, As Approved By The Sanggunian. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. C. For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: [select Either Failure Or Monopoly Of Bidding Based On Market Research Conducted] I. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And Ii. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time At Its Physical Address As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Complete Bid - One Project Having Several Items That Shall Be Awarded As One Contract In Case Of Complete Bid. Line Bidding/partial Bidding - One Project Having Several Items, Which Shall Be Awarded As Separate Contracts Per Item 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Refers To The Contracts To Be Bid Or The Object Of The Contract; B. Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 12 The Price Of The Goods Shall Be Quoted Ddp [federico Roman Tirador Sr. Memorial District Hospital, Janiuay, Iloilo] Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc, If Bid Security Is In Surety Bond. 15 Bidders Shall Prepare An Original Of The First (eligibility And Technical) And Second (financial) Envelopes. In Addition, Bidders Shall Submit Separate Copies Of The First And Second Envelopes (copy 1, Copy 2) And Each Set Of Documents Must Clearly Indicate Whether The Same Is Original, Copy 1, Or Copy 2. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.3 No Further Instructions. 20.2 For The Procurement Of Drugs And Medicines And Medical Equipment/supplies, The Bidder Shall Submit The Following: A. Certificate Of Product Registration From Food And Drug Administration (fda) For Easy Validation During The Post-qualification; B. Certificate If Good Manufacturing Practice From Fda, For Easy Validation During The Post-qualification; C. Batch Release Certificate From Fda, For Easy Validation During The Post-qualification; D. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/ Dealer Of The Products / Items For Easy Validation During The Post-qualification; E. For The Procurement Of Regulated Drugs, The Applicable Type Of S-license: S-1, S-3 (retailer) S-4 (wholesaler) S-5c (manufacturer) S-5d (bulk Depot/storage) S-5e S-5i (importer); F. License To Operate (lto) Issued By Fda, If Applicable; G. After-sales Services/parts, If Applicable; H. Manpower Requirements, If Applicable. 21.2 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 6.1. In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered To Federico Roman Tirador Sr. Memorial District Hospital, Janiuay, Iloilo. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Authorized Employee/official Of The Iloilo Provincial Government. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. 2.2 Partial Payment Is Not Allowed. 4 The Inspections And Tests That Will Be Conducted Are Through Physical Inspection. Item No. Description Quantity Total Delivered, Weeks/months 1 Bathsoap, Antibacterial, 90g 300 300 2 Battery Aaa 300 300 3 Battery Aa 200 200 4 Bleaching Solution, 3785ml/gal 80 80 5 Cling Wrap, 30m 100 100 6 Bathroom Deodorizer, 50g 100 100 7 Detergent Bar, 130g 100 100 8 Detergent Powder, 1kg Not Repacked 300 300 9 Dishwashing Liquid, Antibacterial 30 30 10 Disinfectant Spray, 510g 40 40 11 Doormat, Cloth 100 100 12 Dustpan, Plastic 20 20 Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. 13 Fabric Conditioner, 24ml 300 300 14 Garbage Bag, Black, Xl 10000 10000 15 Garbage Bag, White, Medium 10000 10000 16 Garbage Bag, Yellow, Xl 1000 1000 17 Garbage Bag, Green, Xl 1000 1000 18 Insect Spray, 500ml 24 24 19 Mop Head 80 80 20 Muriatic Acid, 3.75l/gal 30 30 21 Paper Meal Box, 3 Division 3000 3000 22 Soft Broom 50 50 23 Toilet Bowl Cleaner, 500ml 100 100 ____________________________ Signature Over Printed Name Section Vii. Technical Specifications Bid No.: Frt-24-1790-b Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1. Bathsoap, Antibacterial, 90g 2 Battery Aaa 3 Battery Aa 4 Bleaching Solution, 3785ml/gal 5 Cling Wrap, 30m 6 Bathroom Deodorizer, 50g 7 Detergent Bar, 130g 8 Detergent Powder, 1kg Not Repacked 9 Dishwashing Liquid, Antibacterial 10 Disinfectant Spray, 510g 11 Doormat, Cloth 12 Dustpan, Plastic 13 Fabric Conditioner, 24ml 14 Garbage Bag, Black, Xl 15 Garbage Bag, White, Medium 16 Garbage Bag, Yellow, Xl 17 Garbage Bag, Green, Xl 18 Insect Spray, 500ml 19 Mop Head 20 Muriatic Acid, 3.75l/gal 21 Paper Meal Box, 3 Division 22 Soft Broom 23 Toilet Bowl Cleaner, 500ml _________________________ Signature Over Printed Name Section Viii. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages);or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (e) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (h) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (i) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (j) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (o) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (p) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Date18 Nov 2024
Tender AmountPHP 397.6 K (USD 6.8 K)
8751-8760 of 8785 active Tenders