Tenders of Bgis Pwgsc Rp1

Tenders of Bgis Pwgsc Rp1

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Install A New Back-up Electrical Power Supply Generator
Closing Date29 Feb 2024
Tender AmountRefer Documents 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Corrections to the Envelope and Structure of Buildings
Closing Date29 Feb 2024
Tender AmountRefer Documents 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Canada
Building Automation System Replacement
Closing Date4 Mar 2024
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
Canada
Install Back-up Generator & Transfer Switch
Closing Date4 Mar 2024
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Canada
Building Automation System Replacement
Closing Date4 Mar 2024
Tender AmountRefer Documents 

Bgis Pwgsc Rp1 Tender

Others
Corrigendum : Closing Date Modified
Canada
On-Demand Commissioning Agent Services
Closing Date7 Mar 2024
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Others...+2Civil And Construction, Civil Works Others
Canada
Home Place Skylight Windows Replacement
Closing Date15 Mar 2024
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Consultancy Services
Canada
Request For Contractor Services
Closing Date15 Mar 2024
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Civil Works Others, Building Construction
Canada
Carpet Shall Be Removed And Replaced With High Traffic Commercial Grade Carpet Tile Throughout The Common Areas. Proceed With 2 Floors (maybe 3 If Funds Allow) Of Carpet Replacement Prioritized Via The Carpet Master Plan Completed In 2019-20 (goc990571). (specify Square Footage Of Carpet To Be Replaced). After Removal Of Carpet, Existing Condition Of Substrate Shall Be Assessed Before Application Of New Carpet Tile. Existing Removed Carpet To Be Disposed & Recycled As Required By Environmental Legislations And Standards While Providing Proof Certification. Ensure Flooring Is Prepped While Providing And Installing New Carpet Tile Including Adhesive Square Connectors, New Base, Transition Strips & Carpet Accessories. All Items To Match Base Building Standard, Where Applicable. Lift/move Furniture As Required For Installation And Return Back To Same Location After Work Is Done. Glue-free Installation To Be Used For Installation Of New Carpet Tile. New Baseboards Shall Have A High Contrast Colour To Differentiate Between Carpet Floor Surface. Carpet Shall Not Have A Strong Visual Pattern And Provide Minimal Glare As Per The Latest Accessibility Standards. The Carpet Pile Texture Should Be Level Loop, Level Cut Or Uncut. The Maximum Pad And Pile Height Of The Carpet Should Not Exceed 13 Mm.
Closing Date15 Mar 2024
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Canada
Replace Generator With Back-up Generator Capability
Closing Date15 Mar 2024
Tender AmountNA 
231-240 of 871 archived Tenders