Tenders of Bgis Pwgsc Rp1
Tenders of Bgis Pwgsc Rp1
Bgis Pwgsc Rp1 Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Corrigendum : Closing Date Modified
Canada
In Coordination With Tfms Feasibility Planning Report (goc5762859), Consultant Is To Provide Recommendations To Optimize The Existing Building Layout To Provide Additional Office Space And Optimized Use, Meeting Current Pmm Standards. Consultant To Use Tfms Feasibility Planning Report As A Baseline But Confirm Design Complies With Applicable Standards/codes And Provide Suggestions Of Design Changes As Applicable Scope Includes, But Is Not Limited To: -renovate Ccru General Office, Staff Sergeant, Hall/exhibit Custodian, Exhibits, Equipment Room, Office/hall, Locker/exercise Room, Analyst Office, Bull Pen And New General Admin Office As Pre Tfms Feasibility Planning Report. Protect The Occupied Areas With Hoarding To Keep Debris And Distractions To A Minimum. Staff Working In The Areas Under Construction Must Be Able To Use The Kitchen/boardroom Located On The West Side Of The Building As A Temporary Workspace. -design A New Entry To The Building, Ccru Sergeant Office, Analyst Office, Ccru General Office, A Project Room, Kitchenette, Bull Pen, Flex Stations, Staff Sergeant Office, Sergeant Office And Another Enclosed Office Space. Additionally, The Locker Room Will Have A Larger Entrance And The Office/hall Will Become Storage. The Equipment Room Will Lose 1 Entry, Which Will Maximize The Storage Space Within And The Men’s Wc Near The Back Entry Will Now Include A Urinal. -the Demolition Phase Will Include The Front Face Of The Building, Where Windows Will Be Enclosed And A Door Will Be Installed. A New Public Accessible Washroom Adjacent To The Main Entrance Will Be Included In The Space. Hoarding Must Be Placed Around The Existing Staff Sergeant And New General Admin Offices To Protect The Occupied Areas And Keep Distractions To A Minimum. Staff Will Use One Of The 2 Kitchenette Spaces As Temporary Workspaces And Must Be Accessible. -during All Phases, Access To Fire Exits, Washrooms And Kitchen Must Remain. -consultant To Confirm The Current Fit-up Is Compliant With All Building Code Requirements. This Should Include Electrical And Mechanical Considerations. -all Construction Hoarding Must Meet The Security Requirements Of The Rcmp, During All Phases Of The Program Of Work. -consultant To Complete A Full Review Of The Hvac, Controls, Electrical And Lighting Systems Including Age, Condition And Expected Useful Life. Options Are To Be Provided Complete With Lifecycle Cost Assessments As Per Sections 7.15 And 7.16 Of This Requirements Document. Systems Are To Be Modified To Suit New Layout. -for Modified Lighting System:
Closing Date12 Jul 2024
Tender AmountRefer Documents
Bgis Pwgsc Rp1 Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Canada
For All Mechanical Room Floors, At Both Portage I&ii, The Cracks In The Concrete Shall Be Epoxy Injected To Prevent Water Infiltration. After The Epoxy Is Cured, Apply An Anti-slip Epoxy Floor Sealant To The Full Extent Of The Room. Products Shall Have Low To No Vocs.
Closing Date16 Jul 2024
Tender AmountRefer Documents
241-250 of 871 archived Tenders