BARANGAY SAGRADA, PILI, CAMARINES SUR Tender
BARANGAY SAGRADA, PILI, CAMARINES SUR Tender
Costs
Summary
Itb-construction Of Emergency Response Center , Construction Projects ,barangay Sagrada, Pili, Camarines Sur
Description
Description Republic Of The Philippines Office Of The Punong Barangay Sagrada, Pili, Camarines Sur Bids And Awards Committee Contact No. +639857600284 Sagrada, Pili, Camarines Sur 4418 Invitation To Bid Construction Of Emergency Response Center The Local Government Unit Of Sagrada, Pili, Camarines Sur Through The 20% Barangay Development Fund (bdf) (reprogrammed 2024) Intends To Apply The Sum Of Six Hundred Fifty Thousand Eight Hundred Eighty Five Pesos (p650,885.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Construction Of Emergency Response Center. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Local Government Unit Of Sagrada, Pili Camarines Sur Now Invites Bids For The The Construction Of Emergency Response Center Is Required Ninety (90) Days. Bidders Should Have Completed, Within 2 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Instructions To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. A Complete Set Of Bidding Documents Maybe Purchased By Interested Bidders On January 21, 2025 To February 10, 2025 At 8:00 Am. From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of One Thousand Pesos (p1,000.00) Only. Bid Must Be Delivered To The Address Below On Or Before February 10, 2025 At 8:00 Am. At The Session Hall, Barangay Sagrada, Pili, Camarines Sur. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Bid Opening Shall Be On February 10, 2025 10:00 A.m. At The Session Hall, Barangay Sagrada, Pili, Camarines Sur. Bids Will Be Opened In The Presence Of The Bidders Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Local Government Unit Of Sagrada, Pili, Camarines Sur Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Part I. General Requirements B.5 Project Billboard/signboard Est. Qty. : 1 Each A. Labor 1 Construction Foreman 1 Skilled Laborer B. Equipment Handtools ( 5 % Of Labor) C. Materials 64 Sq.ft. Tarpauline (with Coa Format) 2 Pcs. 1/4" Marine Plywood 12 Pcs. 2" X 3" X 12' Coco Lumber 8 Pcs. 2" X 2" X 12' Coco Lumber 1 Kg. Assorted Cw Nails B.9 Mobilization/demobilization Est. Qty. : 1 L.s. 1 Lot Lump Sum Part Ii. Civil, Electrical, & Sanitary/plumbing Works A. Earthworks 801(1) Removal Of Structures And Obstruction Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Unskilled Laborer B. Equipment 1 Unit Jack Hammer Handtools ( 10 % Of Labor) C. Materials 803(1)a Structure Excavation (common Soil) Est. Qty. : 9 M3 A. Labor 1 Construction Foreman 3 Unskilled Laborer B. Equipment Handtools ( 10 % Of Labor) C. Materials 804(4) Gravel Fill Est. Qty. : 2.00 M3 A. Labor 1 Construction Foreman 1 Unskilled Laborer B. Equipment Handtools ( 5 % Of Labor) C. Materials 1 M3 Boulder (apple Size) 1 M3 G 1" Crushed Gravel B. Plain And Reinforced Concrete Works 900(1)c1 Structural Concrete, Class A, 28 Days Est. Qty. : 12.11 M3 A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment 1 Unit Concrete Vibrator 1 Unit 1-bagger Mixer Minor Tools ( 10 % Of Labor) C. Materials 13 M3 G 3/4 "crushed Gravel 7 M3 Albay Sand 109 Bags Portland Cement 12 Bags Sahara 902(1)a Reinforcing Steel Bars, Grade 40 Est. Qty. : 1,227.47 Kgs. A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment 1 Unit Bar Cutter, Single Phase (25 Mm Ø) 1 Unit Bar Bender Minor Tools ( 10 % Of Labor) C. Materials 70 Pcs. 10mm Ø Rsb 35 Pcs. 12mm Ø Rsb 52 Pcs. 16mm Ø Rsb 88 Pcs. 9mm Ø Rsb 25 Kgs. #16 G.i. Tie Wire 903(1) Formworks And Falseworks Est. Qty. : 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 5 Unskilled Laborer Stripping 1 Construction Foreman 1 Unskilled Laborer B. Equipment 2 Sets H-frame 1.7m X 1.2m, Set 2 Pcs H-frames 4 Pcs Diagonal Cross Braces 4 Pcs Horizontal Braces 8 Pcs Joint Pins Minor Tools ( 10 % Of Labor) C. Materials 15 Pcs. 1/4" Marine Plywood 1,000 Bd.ft. Coco Lumber Consumables ( 5 % Of Material Cost) C. Finishing And Other Civil Works C.1. Fabricated Materials 1006(6) Steel Doors & Frame Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D1 - Steel Grille Door (installed) (see Plan For Details) 1 Set Sd1 - Sliding Steel Door (installed) (see Plan For Details) 1010(2)b Wood Panel Door Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D2 - Wood Panel Door With Door Jamb, Lever Type Stainless Steel Door Know $ Accessories (installed) (see Plan For Details) 1008(2) Aluminum Glass Windows Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 6 Sets W1- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed With Fixed Glass (installed) (see Plan For Details) 1009(2) Jalousie Window Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set W2- Tinted Glass Jalousie Window Blades On Anolok Alum. Framing (jalou Plus)(installed) (see Plan For Details) C.2. Carpentry And Joinery Works 1003(1)a1 4.5mm Fiber Cement Board On Metal Frame Ceiling Est. Qty. 14.62 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 6 Pcs. 4.5 Mm. Hardieflex Sheet (1.2 M. X 2.4 M.) 17 Pcs. Double Metal Furring 6 Pcs. Carrying Channel 15 Pcs. Hanger Bars/rod 88 Pcs. Wall Clip 4 Pcs. Wall Angle 1 Box Blind Rivet (500pcs/box) 59 Pcs. 1" Metal Screw Consumables ( 5 % Of Material Cost) 1003(4) Cabinets Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 1 Set Wall Counter With Cabinet 2 Pcs. Counter Cabinet W/ Overhead Cabinet C.3. Masonry Works 1003(1)a1 100mm Chb Non-load Bearing (including Reinforcing Steel) Est. Qty. 43.39 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 565 Pcs. 100 Mm Thk Chb (non-load Bearing) 23 Bags Portland Cement 2 M3 Albay Sand 38 Pcs. 10mm Ø Rsb 5 Kgs. #16 G.i. Tie Wire C.4. Finishes 1027(1) Plain Cement Plaster Finish Est. Qty. 136.45 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 46 Bags Portland Cement 4 M3 Albay Sand 1018(1) Glazed Tiles Est. Qty. 12.90 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 85 Pcs. 400 X 400 Ceramic Glazed Floor Tiles 5 Bags Portland Cement 1 M3 Albay Sand 2 Bags Tile Grout (2kg.) 2 Bags Tile Adhesive (25 Kgs.) Consumables ( 5 % Of Material Cost) 1018(2) Unglazed Tiles Est. Qty. 1.80 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 12 Pcs. 400 X 400 Ceramic Unglazed Floor Tiles 1 Bags Portland Cement 1 M3 Albay Sand 1 Bags Tile Grout (2kg.) Consumables ( 5 % Of Material Cost) C.5. Paint Works 1032(1)a Painting Works (masonry Painting) Est. Qty. 136.45 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 5 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 3 Gal. Concrete Neutralizer 6 Gal. Concrete Sealer/primer 7 Gal. Patching Compound 7 Bags Skim Coat 3 Pail Semi-gloss Paint Consumables ( 5 % Of Material Cost) 1032(1)c Painting Works (metal Painting) Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 1 Gal. Red Oxide Primer 4 Gal. Enamel Paint 2 Gal. Paint Thinner Consumables ( 5 % Of Material Cost) D. Plumbing/sanitary Works 1001(9) Storm Drainage & Downspout Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 1 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 4 Pcs. 3"ø X 10" Pvc Pipe 6 Pcs. 3"ø X 45° Pvc Elbow 2 Pcs. 3"ø X 90° Pvc Elbow 6 Pcs. 3"ø Pipe Straps And Accessories 2 Pcs. 3"ø Ss, Downspout Strainer 1 Liter Solvent E. Electrical Works 1100(10) Conduit Boxes And Fittings Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 3 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 18 Pcs. 1/2"ø X 10' Pvc, Pns Conduit Pipe 5 Pcs. 3/4"ø X 10' Pvc, Pns Conduit Pipe 8 Pcs. Octagonal Junction Box Gauge #16 Deep Type (101mm X 101mm X 53mm) 10 Pcs. Utility Box Gauge #16, Deep Type (50mm X 101mm X 53mm) Consumables ( 5 % Of Material Cost) 1101(33) Wires And Wiring Devices Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 1 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 40 M. 2.0mm² Thhn Wires, Stranded 30 M. 3.5mm² Thhn Wires, Stranded 20 M. 5.5mm² Thhn Wires, Stranded 2 Sets 2-gang Switch With Plate 2 Sets 3-gang Switch With Plate 8 Pcs. Duplex Convenience Outlet, Consumables ( 5 % Of Material Cost) 1102(1) Panelboard With Main & Branch Breakers Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 1 Set 40 At, 2p, 230v Circuit Breaker 1 Set 20 At, 2p, 230v Circuit Breaker 1 Set 15 At, 2p, 230v Circuit Breaker 1 Set 4-hole Panel Board Consumables ( 5 % Of Material Cost) 1103(1) Lighting Fixtures Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 3 Sets Pinlights, 3 1/2"ø 9 Watts, Dl 4 Sets Pinlights, 11 Watts, Dl 2 Sets Emergency Lights Pre-bid - January 28, 2025, 1:00pm Bid Evaluation - February 12, 2025 Post-qualification - February 14, 2025 Notice Of Award - February 17, 2025 Notice To Proceed - February 20, 2025 For Further Information, Please Refer To: Abel B. Hernandez Bac Chairman/ Brgy. Kagawad Lgu-sagrada, Pili, Camarines Sur +639857600284
Contact
Tender Id
1e89b98a-e8eb-30f1-ba77-52b0e2f14918Tender No
11675597Tender Authority
BARANGAY SAGRADA, PILI, CAMARINES SUR ViewPurchaser Address
-Website
notices.philgeps.gov.ph