Tender Results of Rail Coach Factory
Tender Results of Rail Coach Factory
Rail Coach Factory - RCF Tender Result
Ireps
Result Stage: Awarded (AOC Available)
NA
31310072: KEY FOR BRAKE SHOE-(QR Code as per CDE/RCF Letter No. MD44121 DT. 24.11.2021.), as per Drawing: EMU-3-1-005 ALT d, Packing Instruction: NO SPECIAL PACKING REQUIRED, Proction Procedure: WI100050, Quali
Contract Date15 Dec 2022
Contract AmountINR 123 K (USD 1.4 K)
Rail Coach Factory - RCF Tender Result
Ireps
Result Stage: Awarded (AOC Available)
NA
N7821027: RISHABH 4 Containers Lid with individual container PUF Insulation Material Stainless Steel Hot Tiffin Box Brand: RISHABH (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC
Contract Date15 Dec 2022
Contract AmountINR 150.4 K (USD 1.8 K)
Rail Coach Factory - RCF Tender Result
Automobiles and Auto Parts
Ireps
Result Stage: Awarded (AOC Available)
India
31310072: KEY FOR BRAKE SHOE-(QR Code as per CDE/RCF Letter No. MD44121 DT. 24.11.2021.), as per Drawing: EMU-3-1-005 ALT d, Packing Instruction: NO SPECIAL PACKING REQUIRED, Proction Procedure: WI100050, Quali
Contract Date15 Dec 2022
Contract AmountINR 228.6 K (USD 2.7 K)
Rail Coach Factory - RCF Tender Result
Ireps
Result Stage: Awarded (AOC Available)
NA
672214970016: FRONT AXLE ASSEMBLY ( CONSISTING OF AXLE HOUSING, COMPLETE BRAKE ASSY, i.e. BRAKE DRUM, BRAKE SHOES, WHEEL CYLINDER,BACKING PLATE, OIL SEALS, SPRINGS, NUT BOLT ETC & DRIVER AXLE FOR ACE FORK LIFT TRU
Contract Date15 Dec 2022
Contract AmountINR 247.7 K (USD 2.9 K)
Rail Coach Factory - RCF Tender Result
Machinery and Tools
Ireps
Result Stage: Awarded (AOC Available)
India
33650690: WIRE ROPE ASSEMBLY, as per Drawing: EDML152,REV-A, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADE
Contract Date15 Dec 2022
Contract AmountINR 268.1 K (USD 3.2 K)
Rail Coach Factory - RCF Tender Result
Machinery and Tools
Ireps
Result Stage: Awarded (AOC Available)
India
33650690: WIRE ROPE ASSEMBLY, as per Drawing: EDML152,REV-A, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADE
Contract Date15 Dec 2022
Contract AmountINR 496.6 K (USD 5.9 K)
Rail Coach Factory - RCF Tender Result
Ireps
Result Stage: Awarded (AOC Available)
India
33556210: INTEGERATED WTCC FOR ANTYODAYA COACHES, as per Drawing: LG10344 ALt.'a', Packing Instruction: 1. THE SUPPLIER SHALL PACK THE INTEGRATED WTCC IN A SUITABLY DESIGNED RETURNABLE FIXTURE IN SUCH A WAY T
Contract Date15 Dec 2022
Contract AmountINR 1.3 Million (USD 16.6 K)
9871-9880 of 10000 active Tender Results