Tender Results of Rail Coach Factory
Tender Results of Rail Coach Factory
Rail Coach Factory - RCF Tender Result
Goods
Machinery and Tools
Ireps
Result Stage: Awarded (AOC Available)
India
Description :female Connector., As Per Drawing: Gai22lrcf Of M/s Parker Or Equivalent Wit
h Infrastructure Requirements As Per Mdst-108 Rev. Nil., Packing Instruction: As Per Standa
rd Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The I
tem Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The
cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Contract Date21 Jan 2025
Contract AmountINR 61.8 K (USD 714.4873)
Rail Coach Factory - RCF Tender Result
Goods
Paints and Enamels
Ireps
Result Stage: Awarded (AOC Available)
India
Security Check Paint Marker (volume: 30 Ml, Nature Of Paste: Highly Visible, Viscous And Fluorescent) Color - Red, Tip Size 2.9 Mm Extended Nozzle With Variable Point Of 1 Mm & 2 Mm, Make : Century Or Similar.
Contract Date21 Jan 2025
Contract AmountINR 90.2 K (USD 1 K)
Rail Coach Factory - RCF Tender Result
Goods
Ireps
Result Stage: Awarded (AOC Available)
India
Description :equal/union Tee, As Per Drawing: T10lcf Ermeto Or Equivalent With Infrastruc
ture Requirements As Per Mdst-108 Rev Nil, Packing Instruction: As Per Standard Packing. It
should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be
packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplie
r. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Contract Date21 Jan 2025
Contract AmountINR 94.4 K (USD 1 K)
Rail Coach Factory - RCF Tender Result
Goods
Machinery and Tools
Ireps
Result Stage: Awarded (AOC Available)
India
Description :female Connector., As Per Drawing: Gai22lrcf Of M/s Parker Or Equivalent Wit
h Infrastructure Requirements As Per Mdst-108 Rev. Nil., Packing Instruction: As Per Standa
rd Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The I
tem Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The
cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Contract Date21 Jan 2025
Contract AmountINR 360.9 K (USD 4.1 K)
Rail Coach Factory - RCF Tender Result
Goods
Ireps
Result Stage: Awarded (AOC Available)
India
Description :equal/union Tee, As Per Drawing: T10lcf Ermeto Or Equivalent With Infrastruc
ture Requirements As Per Mdst-108 Rev Nil, Packing Instruction: As Per Standard Packing. It
should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be
packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplie
r. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Contract Date21 Jan 2025
Contract AmountINR 622.8 K (USD 7.1 K)
1-10 of 10000 active Tender Results