Tender Results of Rail Coach Factory

Tender Results of Rail Coach Factory

Rail Coach Factory - RCF Tender Result

Goods
Publishing and Printing
Ireps
Result Stage: Awarded  (AOC Available)
India
Description :vinyl Film Colour Shade Cobalt Blue As Per Ral-5013, In Roll Size Of 4 Feet X1 50 Feet, As Per Drawing/specification: Mdts-156 Rev.7 (excluding Pre-spacer Tape As Per Para 5.3) With Amendment Dated 18/10/2021, Corrigendum-1 Dated 17/1/2024 And Corrigendum- 2 Dated 4/10/2024. Vinyl Film Must Be Wrapped Around Cardboard Tube. [ Warranty Period: 42 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 Lacs ] ]
Contract Date3 Jan 2025
Contract AmountINR 799.4 K (USD 9.2 K)

Rail Coach Factory - RCF Tender Result

Goods
Furnitures and Fixtures
Ireps
Result Stage: Awarded  (AOC Available)
India
Set Of Angle Assly
Contract Date3 Jan 2025
Contract AmountINR 865 K (USD 10 K)

Rail Coach Factory - RCF Tender Result

Goods
Machinery and Tools
Ireps
Result Stage: Awarded  (AOC Available)
India
73032761 hex Head Bolt M24x180 High Tensile, As Per Drawing: Is:1364(part-1)-1992, B, 8.8, ce, Wf, Coating As Per Mdts-057, Packing Instruction: As Per Standard Packing. It Should Be ensured That Item Should Not Rub During Transportation. The Item Should Be Packed Wi th Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warra nty Period: 30 Months After The Date Of Delivery ] ] consignee Furnishing Depot, Rcf Punjab 3006.00 Numbers inspection
Contract Date3 Jan 2025
Contract AmountINR 1.2 Million (USD 14.1 K)

Rail Coach Factory - RCF Tender Result

Goods
Machinery and Tools
Ireps
Result Stage: Awarded  (AOC Available)
India
33553658 cross Member, As Per Drawing: 2 10113.1.03.100.176 Alt.'-r', Packing Instruction: N o Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items E tc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. Howev er Transit Damage If Any Shall Be At The Cost Of Supplier., Proction Procedure: Wi100100, Qu ality Plan: Na [ Warranty Period: 30 Months After The Date Of Delivery ] ] consignee Shell Depot, Rcf Punjab 2550.00 Numbers inspection details Stage Inspection Not Required
Contract Date3 Jan 2025
Contract AmountINR 1.3 Million (USD 16.1 K)

Rail Coach Factory - RCF Tender Result

Goods
Furnitures and Fixtures
Ireps
Result Stage: Awarded  (AOC Available)
India
Set Of Angle Assly
Contract Date3 Jan 2025
Contract AmountINR 1.6 Million (USD 19.1 K)

Rail Coach Factory - RCF Tender Result

Goods
Ireps
Result Stage: Awarded  (AOC Available)
India
Seamless Stainless Steel Pipe Size 25 Mm (1") Nb X 3800 Mm
Contract Date3 Jan 2025
Contract AmountINR 1.6 Million (USD 19.4 K)

Rail Coach Factory - RCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
India
33694953: INTERIOR STICKERS WITH BRAILLE SCRIPT FOR LHB SCN COACHES, as per Drawing: LS64007 ALT b ITEM NO.1,2,6,8,13 TO 17,19,21,23,25 & 26 WITH BRAILLE SCRIPT TO ICF/MD/SPEC-317,REV.00, Packing Instruction:
Contract Date3 Jan 2025
Contract AmountINR 1.7 Million (USD 20.9 K)

Rail Coach Factory - RCF Tender Result

Goods
Ireps
Result Stage: Awarded  (AOC Available)
India
Set Of Partition Frame & Pillar For Lwslrd Amrit Bharat
Contract Date3 Jan 2025
Contract AmountINR 1.8 Million (USD 21.1 K)

Rail Coach Factory - RCF Tender Result

Goods
Machinery and Tools
Ireps
Result Stage: Awarded  (AOC Available)
India
33553658 cross Member, As Per Drawing: 2 10113.1.03.100.176 Alt.'-r', Packing Instruction: N o Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items E tc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. Howev er Transit Damage If Any Shall Be At The Cost Of Supplier., Proction Procedure: Wi100100, Qu ality Plan: Na [ Warranty Period: 30 Months After The Date Of Delivery ] ] consignee Shell Depot, Rcf Punjab 2550.00 Numbers inspection details Stage Inspection Not Required
Contract Date3 Jan 2025
Contract AmountINR 2.5 Million (USD 29.9 K)

Rail Coach Factory - RCF Tender Result

Goods
Ireps
Result Stage: Awarded  (AOC Available)
India
Set Of Partition Frame & Pillar For Lwslrd Amrit Bharat
Contract Date3 Jan 2025
Contract AmountINR 3 Million (USD 35.3 K)
81-90 of 10000 active Tender Results