Qatarenergy Tender Result

View complete overview of Qatarenergy Tender Result

Qatarenergy Tender Result

Contract Date26 Feb 2012
Contract Period911 Days
Contract AmountQAR 11,69,88,359 (USD 3,21,24,504)
Download

AOC Description

EPIC FOR 16'' JET A1 PIPELINE FROM QP REFINERY TO BSV-3-"EPIC of 16'' Jet A1 Fuel P/L from QP Refinery to BSV-3" Engineering, procurements/supply & construction of a dedicated system for the supply of JET A1 fuel from QP Refinery to BSV-3 by 16 inch dia. pipeline. The estimated length of the pipeline between QP Refinery and BSV-3 is about 36.0 km. The system also includes new pumping system (3 nos. Booster pumps & 3 nos. Mainline pumps will be installed in a new pump house inside QP-Refinery) & associated facilities. Jet A1 Fuel is currently transported by a multi-product transfer system consisting of a pump station at the QP Refinery in Mesaieed, a 12 inch multi-product pipeline and a tank farm at Doha Depot situated in the Abu Hamour area on the southern outskirts of the city of Doha, via intermediate station BSV-3. From Doha Depot, it is transported to the existing airport by tankers. A new 18 inch multi-product pipeline, currently under pre-commissioning, will be used to transfer multi-products to Doha Depot. A new 16" Jet A1 Fuel pipeline from BSV-3 to STATION C-1 INSIDE NDIA is under EPIC stage and it is being constructed under contract ref. GC09106100 by DOPET. Under this contract, QP is laying an estimated 16.5 km of 16 inch internally and externally coated buried pipeline from BSV-3 to STATION C-1 INSIDE NDIA including temporary Pig Launching facility and Tie-in to existing 12 inch multi-product pipeline at BSV3 & pig receiving facilities, filtration, separation, metering facilities with Satellite and Equipment room at STATION C-1 INSIDE NDIA. Since the condition of existing 12 inch multi-product pipeline from QP Refinery to BSV-3 is not known, QP has decided to lay the proposed new approximately 36 KM long & 16'' dia. Jet A1 pipeline from QP Refinery (at Mesaieed) to BSV-3. Based on the above, purchase order has already been placed by QP for 16" line pipe API 5LX 60, 7.9 mm wall thickness for the Jet A1 Fuel pipeline project. The line pipe will be Free Issue Material for the EPIC Contractor.

Contact

  • Award Id

    GT11106200
  • Award No

    GC11106200
  • Tender Id

    GT11106200
  • Tender Authority

    Qatarenergy View
  • Purchaser Address

    QatarEnergy P.O. Box 3212, Doha, Qatar http://qatarenergy.qa
Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.