Interior, Department Of The Tender Result
Interior, Department Of The Tender Result
AOC Description
Tsc - Differential Scanning Calorimeter W/ Refrigerated Cooling System, Crucibles And Press, Including Install, Training, And Shipping.the Differential Scanning Calorimeter Shall Be Capable Of Performing The List Of Astm Standards Below:astm D3417 Standard Test Method For Enthalpies Of Fusion And Crystallization Of Polymers By Differential Scanning Calorimetryastm D3418 Standard Test Method For Transition Temperatures And Enthalpies Of Fusion And Crystallization Of Polymers By Differential Scanning Calorimetryastm D3895 Standard Test Method For Oxidative-induction Time Of Polyolefins By Differential Scanning Calorimetryastm E793 Standard Test Method For Enthalpies Of Fusion And Crystallization By Dscastm E794 Standard Test Method For Melting And Crystallization By Dscastm E928 Standard Test Method For Determination Of Purity By Dscastm E1269 Standard Test Method For Determining Specific Heat Capacity By Dscastm E1356 Standard Test Method For Glass Transition Temperatures By Dscastm E2160 Standard Test Method For Heat Of Thermally Reactive Materials By Differential Scanning Calorimetrythe Dsc Must Be Capable Of:1. Performing At A Temperature Range From -90° Celsius (c) To 500°c.2. A Refrigerated Cooling System Is Required To Measure Glass Transition (tg) Temperatures Below Room Temperature. 3. Operating At Heating Rates From 5-50°c/min And Cooling Rates From 2-20°c/min.4.temperature Accuracy And Precision Of +/- 1.5°c At Time Of Laboratory Installation5. Equipment Power Must Work Off 120v/ 20a Circuit6. An Autosampler Is Not Required.the Delivered System Must Include:1. Complete System Including:a. Differential Scanning Calorimeterb. Refrigerated Cooling Systemc. 100 Crucibles And One Pressd. Calibration Reference Samplee. Computer-controlled Hardware And Software Compatible With Microsoft Windows 10 Or Higherf. Cable Communication Between Refrigerated Cooler, Computer, And Dscg. Instrument Manualthe System Shall Be Plug And Play And Usable Once Setup. No Additional Modifications Prior To Production Level Work Should Be Required. The System Shall Be Provided With Up-to-date Equipment Calibration Documentation And Shall Be Manufactured With All New Parts. All Hardware And Software Proposed For This Project Would Need To Be Capable Of Running In An Air-gapped Environment (no Internet Connectivity). Therefore, All System Updates Need To Be Capable Of Being Performed Through Means Other Than Network Connectivity. The System Shall Include At Least A One-year Warranty Provided By The Supplier. Supplier Must Have Lifetime Technical Support. Supplier Must Install Equipment And Provide Onsite Training For Operation.
Contact
Award Id
140R8123Q0231Award No
140R8123Q0231Tender Id
140R8123Q0231 ViewTender Id
140R8123Q0231Tender Authority
Interior, Department Of The ViewPurchaser Address
-Email
rojohnson@usbr.govWebsite
-
Bidder Details
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Bidder AddressThis Information is for unsubscribed user
- Award Amount234234234200
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Bidder AddressThis Information is for unsubscribed user
- Award Amount234234234200
- Qualified BiddersThis is message for unregistered
- Lowest Bidder662
- Number of Bids99