Gulf Cooperation Council Tender Results

Gulf Cooperation Council Tender Results

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
PROVISION OF MANPOWER FOR OPERATION AND MAINTENANCE OF DESALINATION PLANT AT HALUL-CONTRACTOR shall supply all manpower, testing equipment, tools and each & every item necessary for the Operation and Maintenance support services of RO Desalination Units at Halul. The Contract Duration shall be five (05) years from the Effective Date
Contract Date15 Aug 2018
Contract AmountQAR 8.6 Million (USD 2.3 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
MUD CHEMICALS, MUD ENGINEERING SERVICES FOR ONSHORE OP'S-QP requires CONTRACTOR to provide mud chemicals, mud engineering services, CONTRACTOR PERSONNEL and equipment on call-off basis, within 24 hours of receiving QP's Release Order (RO), and each and every item of expenses necessary for QP's Onshore Operations.
Contract Date12 Aug 2018
Contract AmountQAR 320.2 Million (USD 87.9 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
OPERATION AND MAINTENANCE SUPPORT FOR WATER NETWORK SYSTEM WITHIN DUKHAN CONCESSION AREA-The Contract is for the Operation & Maintenance of Dukhan Water Network System (DWNS) including all related pumping stations, distribution network, SCADA network, Chlorine Dioxide manufacturing & dosing systems and disinfection chemicals, water leak rectification etc.
Contract Date5 Aug 2018
Contract AmountQAR 5.4 Million (USD 1.4 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
MAINTENANCE OF FIRE EXTINGUISHERS AT VARIOUS LOCATIONS-QP intends to engage a specialized Contractor to perform inspection, periodical maintenance which includes repairs, supply and replacement of spare parts of portable safety and fire Equipment located at Doha, Dukhan, Mesaieed Industrial City and Ras Laffan industrial city.
Contract Date1 Aug 2018
Contract AmountQAR 823.4 K (USD 226 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
CALL-OFF SERVICES FOR MAINTENANCE & TECHNICAL SUPPORT OF ANALYSERS AT MESAIEED OPERATIONS-CONTRACTOR shall supply all labor, services, supervision, warehousing, supply of required consumables, necessary tools/testing devices, Environment Protection Agency (EPA) Certified Gas Cylinders for Continuous Emission Monitoring Systems (CEMS) Checks and Audit along with each and every item of expense necessary for the performance of the Preventive/Breakdown Maintenance, repair/servicing and calibration of Analysers as well as to carry out Relative Accuracy Test Audit (RATA) of CEMS systems. CONTRACTOR shall also provide Technical Support Services from Analyser Vendors [OEMs] on Call-Off basis as per Appendix A - Scope of Services and Specifications for the following QP, Mesiaeed Operations locations: 1. Gas Processing Department - OG(M),[NGL-1/2 & Storage/Loading] 2. Gas Processing Department - ON(M),[NGL-3/4 & GSF] 3. Mesaieed Terminal Department - OT(M)
Contract Date25 Jul 2018
Contract AmountQAR 10.8 Million (USD 2.9 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
PROVISION OF SCHOOLING PLACEMENT CONSULTANCY SERVICES-QP is seeking an external CONTRACTOR to provide School Placement Services for children of newly joined employees within QP.The Contractor is required to provide a child-centered school placement support to new employees, walk parents through the whole process from finding the right school and curriculum, guidance and tutoring on application procedures, tests and interviews up until securing the child's seat in the preferred schools.
Contract Date15 Jul 2018
Contract AmountQAR 2.8 Million (USD 786.5 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
MECHANICAL AND INSTRUMENT SUPPORT SERVICES AT OFFSHORE-CONTRACTOR shall provide qualified and experienced and competent Senior Mechanical Technicians, Mechanical Technicians, Coded Welders, and Senior Instrument Technicians, Instrument Technicians, Instrument Fitters capable of carrying out required maintenance services under QP's direct supervision at all offshore locations and/or any other QP's offshore locations. Contract Duration is five (05) years
Contract Date15 Jun 2018
Contract AmountQAR 32.3 Million (USD 8.8 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
PROVISION OF STORE KEEPERS & MATERIAL HANDLERS AT HALUL-Contractor shall provide dedicated crews comprising three (03) Store Keepers and two (02) Material Handlers for stores at Halul Island. Contract duration shall be five(05) years. Planned start date: 01/06/2018
Contract Date1 Jun 2018
Contract AmountQAR 2.4 Million (USD 677.8 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
FEED FOR UPGRADE OF GAS RECYCLING (RG) FACILITIES-The main objective is to perform Front End Engineering Design to identify and develop the required modifications to upgrade the existing production facilities at Gas Recycling (RG) Plant, in order to accommodate the impact of change in feed gas composition and the production profile up to the year 2028 based on forecasted well fluid data
Contract Date29 May 2018
Contract AmountQAR 2.7 Million (USD 745.3 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
CALL OFF SERVICES FOR REPAIR OF GDS PIPELINES USING CLOCK SPRING FOR 5YEARS AT MESAIEED OPERATIONS-CALL OFF SERVICES FOR REPAIR OF GDS PIPELINES USING CLOCK SPRING FOR 5 YEARS AT MESAIEED OPERATIONS: The Scope Of Services comprises carrying out composite repair of corroded sections along pipeline & piping carrying GAS/CONDANSATE/OIL/Utilities etc using Clock Spring, Snap Wrap and Contour method by Clock Spring for all areas under jurisdiction of Mesaieed Operations on Call-Off basis for a total duration of five (5) calendar years starting from the EFFECTIVE DATE of the CONTRACT. The SERVICES defines the contractual responsibilities of CONTRACTOR for the procurement of required materials and application of composite pipe repair with Clock Spring, Snap Wrap & Contour and associated facilities to the extent of covering efficiently all reported defective areas including all related SERVICES of wrapping and coating removal, re-wrapping & coating, inspection, documentation and disposal of leftover materials. CONTRACTOR shall supply all labour, services, materials, equipment, supervision, testing, consumables, tools and each and every item of expense necessary for the performance of SERVICES of the composite repair of pipelines with Clock Spring, Snap Wrap and Contour method.
Contract Date20 May 2018
Contract AmountQAR 43.5 Million (USD 11.9 Million)
1821-1830 of 1998 active Tender Results