DEPT OF THE NAVY USA Tender Result
DEPT OF THE NAVY USA Tender Result
AOC Description
Contact Information|4|n741.2|gds|717-605-7751|steve.smithey@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|tbd|tbd|tbd|tbd|tbd|n/a|n/a|tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|weapon System Support| equal Opportunity (sep 2016)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (feb 2024)|13|336611|1,300|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1. This Solicitation Is For The Following Procurement: a. Clin 0001; Tile; Nsn: 1hs 2090 012244912 St; Quantity 800 In Accordance With Reference Number 5808278 Tile Ad-79m Shape B.this Part Requires Engineering Source Approval By The Design Control Activity In Order To Maintain The Quality Of The Part. Existing unique Design Capability, Engineering Skills, And Manufacturing Knowledge By The Qualified Source(s) Require Acquisition Of The Part From The Approved Source(s). The Approved Source(s) Retain Data Rights, Manufacturing Knowledge, Or Technical Data That Are Not economically Available To The Government, And The Data Or Knowledge Is Essential To Maintaining The Quality Of The Part. An Alternate Source Must Qualify In Accordance With The Design Control Activity's Procedures, As Approved By The Cognizant Government engineering Activity. The Qualification Procedures Must Be Approved By The Government Engineering Activity Having Jurisdiction Over The Part In The Intended Application. 2. Government-source Inspection And Acceptance (g-s I&a) Is Required. If The G-s I&a Will Occur At A Different Cage From The Admin Award Cage, Please Provide The Procurement Facility Cage And/or Packaging Cage With The Quote. 3. Mil-std Packaging Is Required And It Will Not Be Waived. 4. Please Provide The Following Information In The Procurement Quote: a. Your Cage (used As The Awardee Cage):___________________ b. The Unit Procurement Price: $____________________________________ (firm Fixed Price). c. The Procurement Cage _____________ And Packaging Cage___________ (as Described In #2). d. Procurement Acquisition Time, Delivered In _____ Days. please Note The Following When Generating Your Quote: We Are Requesting That The Quote's Validity Extend For 6 Months From The Submitted Proposal Date. 5. Since There Is Only One Business Concern Capable Of Procurement On This Nsn, The Small Business Set-aside Requirement Has Been Dissolved. 6. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. 7. Please Submit A Procurement Quote To Steve Smithey Via Email: Steve.smithey@navy.mil. This Is The Only Submission Method Authorized. All Other Delivery Methods (i.e., Fax, Neco, Etc.) Will Not Be Accepted. 8. Please Read This Solicitation In Its Entirety. Please Direct Questions Regarding This Solicitation To The Point Of Contact (poc): Steve.smithey@navy.mil. 9. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 10. This Is A Rated Order Certified For National Defense Use, And The Contract Will Follow All The Requirements Of The Defense Priorities And Allocations System Regulation (15 Cfr 700). 11. This Order Will Be Issued Pursuant To Emergency Acquisition Authority. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Tile , Part Of The ;special Hull Treatment Program. This Specification Covers One Class Of Rubber Tiles, Identified As Type Ad-79m Shape "b"; . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.3 ;certian Documents Pertaining To This Item Are Classified. The Seller Must Be Cleared To Receive These Classified Documents. A Dd Form 254 Is Required. Vendors Require Access To Confidential National Security Information. Drawings (53711) 5808344 And 5808346 Are Classified. Classification Is Confidential.; 2.4 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;drawing 5808344 & 5808346 Are Classified. (confidential); drawing Data=5808278 |53711| I| |d|0001 | I|49998|0055339 drawing Data=5808278 |53711| I| |d|0002 | I|49998|0020045 drawing Data=5808278 |53711| I| |d|0003 | I|49998|0026681 drawing Data=5808278 |53711| I| |d|0004 | I|49998|0035057 drawing Data=5808278 |53711| I| |d|0005 | I|49998|0039263 drawing Data=5808278 |53711| I| |d|0006 | I|49998|0022155 drawing Data=5808278 |53711| I| |d|0007 | I|49998|0017245 drawing Data=5808278 |53711| I| |d|0008 | I|49998|0037926 drawing Data=5808278 |53711| I| |d|0009 | I|49998|0036457 drawing Data=5808278 |53711| I| |d|0010 | I|49998|0027305 drawing Data=5808278 |53711| I| |d|0011 | I|49998|0028560 drawing Data=5808278 |53711| I| |d|0012 | I|49998|0027185 drawing Data=5808278 |53711| I| |d|0013 | I|49998|0024123 drawing Data=5808278 |53711| I| |d|0014 | I|49998|0036564 drawing Data=5808278 |53711| I| |d|0015 | I|49998|0045738 drawing Data=5808278 |53711| I| |d|0016 | I|49998|0042279 drawing Data=5808278 |53711| I| |d|0017 | I|49998|0039438 drawing Data=5808278 |53711| I| |d|0018 | I|49998|0032175 drawing Data=5808278 |53711| I| |d|0019 | I|49998|0034470 drawing Data=5808278 |53711| I| |d|0020 | I|49998|0031465 drawing Data=5808278 |53711| I| |d|0021 | I|49998|0038438 drawing Data=5808278 |53711| I| |d|0022 | I|49998|0039550 drawing Data=5808278 |53711| I| |d|0023 | I|49998|0032985 drawing Data=5808278 |53711| I| |d|0024 | I|49998|0037627 drawing Data=5808278 |53711| I| |d|0025 | I|49998|0020182 drawing Data=5808278 |53711| I| |d|0026 | I|49998|0031199 drawing Data=5808278 |53711| I| |d|0027 | I|49998|0027656 drawing Data=5808278 |53711| I| |d|0028 | I|49998|0032085 drawing Data=5808278 |53711| I| |d|0029 | I|49998|0034677 drawing Data=5808344 |53711| B| |d|0001 | B|00026|0000000 drawing Data=5808346 |53711| E| |d|0001 | E|00026|0000000 document Ref Data=mil-std-105 | | |e |950227|a| | | document Ref Data=mil-std-129 | | |p |041029|a| |03| document Ref Data=mil-std-147 | | |d |960325|a| | | document Ref Data=mil-std-177 | | |a |880531|a| | | document Ref Data=fed-std-313 | | |d |000321|a| |01| document Ref Data=mil-std-407 | | | |910321|a| | | document Ref Data=mil-std-973 | | | |920417|a| | | document Ref Data=mil-std-2073 |0001| |d |020510|a| |01| document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=s6360-ad-hbk-10 | | | |940930|e| | | document Ref Data=astm-d1974 | | |92 |940301|a| | | document Ref Data=astm-d2240 | | | |920622|a| | | document Ref Data=astm-d297 | | | |930915|a| | | document Ref Data=astm-d3767 | | | |920417|a| | | document Ref Data=astm-d3951 | | | |901221|a| | | document Ref Data=astm-d412 | | | |921115|a| | | document Ref Data=astm-d4615 | | | |941003|a| | | document Ref Data=astm-d471 | | | |980911|a| | | document Ref Data=astm-d5118/d5118m | | |90 |940301|a| | | document Ref Data=astm-d573 | | | |880527|a| | | document Ref Data=astm-d635 | | | |910715|a| | | document Ref Data=iso9001 | | | |910606|a| | | document Ref Data=iso9002 | | |94 |940701|a| | | document Ref Data=mil-std-973 | | | |950113|a| |03| document Change Data=di-e-2121 |di-misc-80678 document Change Data=di-t-2072 |di-ndti-80809 document Change Data=di-t-4902 |di-misc-80678 document Change Data=mil-p-116 |mil-std-2073-1 document Change Data=pp-b-636 |astm-d5118 & Astm-d1974 3. Requirements 3.1 ;this Part Requires Engineering Source Approval By The Design Control Activity In Order To Maintain The Quality Of The Part. Existing Unique Design Capability, Engineering Skills, And Manufacturing Knowledge By The Qualified Source(s) Require Acquisition of The Part From The Approved Source(s).the approved Source(s) Retain Data Rights, Manufacturing Knowledge, Or Technical Data That Are Not Economically Available To The Government, And The Data Or Knowledge Is Essential To Maintaining The Quality Of The Part. An Alternate Source Must Qualify In accordance With The Design Control Activity's Procedures, As Approved By The Cognizant Government Engineering Activity. The Qualification Procedures Must Be Approved By The Government Engineering Activity Having Jurisdiction Over The Part In The Intended application. Contractors Are Cautioned That Award Of This Contract/purchase Order Will Not Be Delayed Solely For The Purpose Of Approving Additional Sources. contractors Desiring To Qualify Under The Engineering Source Approval Qualification (esaq) Program Are Urged To Contact The Government Design Control Activity To Arrange For Test And, If Approved, Added To The (esaq) List Of Approved Sources For Subsequent procurements.; 3.2 Manufacturing And Design - The Tile Furnished Under This Contract/purchase Order Shall Meet The Material And Physical Requirements As Specified ;on 53711 Drawing 5808278, Confidential 53711 Drawing 5808344 And Confidential 53711 Drawing 5808346 Except As amplified Or Modified Herein.; . 3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 3.5 Security Clearance Required - This Contract/purchase Order Requires The Contractor To Have A Government Security Clearance In Accordance With The Attached Contract Security Classification Specification (dd Form 254). 3.6 ;security - The Contractor Is Responsible To Provide Security Safeguards For All Confidential Data, Molds, Tiles And The Controlled Area As Specified In Paragraph 6.9 Of 53711 Drawing 5808278.; 3.7 ;molds - The Contractor Is Responsible For Designing Molds To Produce The Tiles As Specified In Paragraph 6.3 Of 53711 Drawing 5808278. the Contractor Shall Certify That All Molds Are Equivalant In Critical Dimensions And Allowable Tolerances.the Government Reserves The Right To Examine Mold Drawings Or Molds And To Accept Or Reject Plan Tolerances. the Molds Are Unclassified But Shall Be Afforded Maximum Protection To Ensure Minimum Visibility And Prevent Access By Unauthorized Personnel In Accordance With Paragraph 6.3 And 6.9.1 Of 53711 Drawing 5808278.; 3.8 ;material Safety Data Sheets (msds) - Material Safety Data Sheets Shall Be In Accordance With Paragraph 3.3.2 Of 53711 Drawing 5808278.; 3.9 ;responsibility For Inspection - The Contractor Is Responsible For The Performance And Certification Of All Inspection Requirements As Specified In Paragraph 4.1 Of 53711 Drawaing 5808278, Unless Specified Elsewhere In This Specification.; 3.10 ;adhesion Of Tiles To Steel - "sht" Epoxy Paint Hull Preservation Dtnsrdc - 2844-1109 (nnvsea Drawing 53711, 5808333) And Epoxy Adhesive Dtnsrdc 2844-1102 (navsea Drawing 53711, 5808332) Will Be The Only Paint And Adhesive To Be Used For "sht" Material "adhesion Of Tiles To Steel" Testing.; 3.11 Marking - This Item Shall Be Physically Identified In Accordance with ;the Requirements Of Mil-std-129, Paragraph 3.2.1 And 5.2.3 Of Drawing 5808277; . 3.12 ;special Marking - Special Marking Shall Be In Accordance With Paragraph 5.2.3 And 5.2.3.1 Of 53711 Drawing 5808278 in Addition, All Outside Containers Are To Be Marked With Black Letters A Minimum Of One (1) Inch High In Non-fading, Water Resistant Ink, With The Designation "sht".; 3.13 ;production Lot Test/quality Conformance Inspection Approval (government Testing) - Production Lot Test (plt)/quality Conformance Inspection (qci) And Approval Is Required.; 3.13.1 ;material Submitted For Production Lot Test/quality Conformance Inspection shall Be Certified To Have The Same Composition, Construction And manufacturing Process As The Material Supplied For The First Article Test/engineering Source Approval Qualification (esaq) Testing.; 3.13.2 ;production Lot Test/quality Conformance Inspection - The Test/inspections To be Performed For Production Lot/quility Conformance Inspection Shall Be As Specified In Table Iii Of 53711 Drawing 5808278.; note: Lot - A Lot Shall Consist Of All Tiles Produced In One Plant Under Essentially The Same Conditions And Offered For Inspection At One Time. In each Case, The Number Of Tiles Offered For Inspection Constitute The Lot Size. 3.13.3 ;sampling And Rating For Production Lot Test/quality Conformance Inspection - Sampling For Production Lot Test/quality Conformance Inspection (non Destructive And Destructive) Shall Be In Accordance With The Requirements Of Paragraph 4.3.3.3 And Table iv Of 53711 Drawing 5808278.; 3.14 ;manufacturing Accountability And Control - The Contractor Shall Develop Auditable Records To Account For All Tiles Molded In Accordance With Paragraph 6.9.4 Of 53711 Drawing 5808278.; 3.15 ;disposition Of Non - Conforming, Excess, Or Scrap Material - Disposal Of Non - Conforming Or Scrap Material Shall Be In Accordance With The Requirements Of Paragraph 6.5 Of 53711 Drawing 5808278.; 3.16 ;cleaning Procedure - See Section 6 (notes) Of This Specification For Cleaning Procedure.; 3.17 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required. 3.18 Production Lot Approval (government Testing) - Production Lot Test And Approval Is Required. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Inspection System Requirements - The Supplier Shall Provide And Maintain An Inspection/quality System Acceptable To The Government. The Inspection System Requirements For This Contract/purchase Order Shall Be In Accordance With Mil-i-45208. Suppliers certified To Perform Under Iso 9001 Or Iso 9002 Are Granted Permission To Utilize The One Desired In Lieu Of Mil-i-45208. 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies. 4.5 ;certification/data Report (molds) - The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).; 4.6 ;material Safety Data Sheet (msds) - The Contractor Shall Prepare And Submit Material Safety Data Sheets In Accordance With The Contract Data Requirements List (dd Form 1423). the Msds Is Form Osha-20 And Is Found As Part Of Fed-std-313.; 4.7 ;responsibility For Inspection - The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).; 4.7.1 Units That Undergo Destructive Testing Are Rendered Unusable And Shall Not Be Considered In The Quantity Listed For The "ship To" On The Schedule Page Of This Contract/purchase Order. The Number Of Units That Will Be Destroyed Under The Destructive testing Shall Be Inaddition To The Quantity Required On The Schedule Page. 4.8 ;production Lot Test/quality Conformance Inspection (lot Acceptance Test) (government) - The Contractor Shall Deliver Test Samples To The Government Test Facility For Production Lot/quality Conformance Inspection In Accordance With The Requirements specified In Paragraph 4.3 Of 53711 Drawing 5808278. The Test/inspection Shall Consist Of All The Requirements Of 53711 Drawing 5808278, Paragraph 4.3.1, Batch Acceptance, Paragraph 4.3.2 Tile Assembly Inspection And Paragraph 4.3.3, Lot Acceptance Test.; 4.9 ;tile Assembly Inspection - The Contractor Shall Preform Tile Assembly Inspection As Specified In Paragraph 4.3.2 Of 53711 Drawing 5808278.; 4.10 ;certification Data Report (material For Production Lot Test/quality conformance Inspection) - The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).; 4.11 ;production Lot Test/quality Conformance Inspection - The Test/inspections To be Performed For Production Lot Test/quality Conformance Inspection (lot Acceptance) Shall Be As Specified In Table Iii Of 53711 Drawing 5808278. sampling For Lot Acceptance Test Shall Be In Accordance With The Requirements of Paragraph 4.3.3.3 And Table Iv Of 53711 Drawing 5808278.; 4.12 ;note production Lot Test/quality Conformance Inspection - Lot; A Lot Shall Consist Of All Tiles Produced In One Plant Under Essentially The Same Conditions And Offered For Inspection At One Time. In Each Case, The Number Of Tiles Offered for Inspection Constitute The Lot Size. ; 4.12.1 ;production Lot/quality Conformance Inspection Test Samples For Lot Acceptance Test Shall Be Shipped To: commander naval Surface Warfare Center, Carderock Division 5001 South Broad Street Attn: Code 617 ; Lisa Weiser 215-897-1612 Philadelphia, Pa 19112; 4.13 Production Lot Test Approval - Production Lot Test Approval Is Required Prior To Shipment Of The Production Lot. 4.14 ;manufacturing Accountability And Control - The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423).; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 ;note: All Special Hull Treatment Operations Previously Requiring 1,1,1-trichloroethane, Use Butyl Acetate As A Direct Replacement. butyl Acetate Shall Conform To The Requirements Of Astm D 4615.; Sht Tile Cleaning For The Tile Manufacturing Process Material Requirements A.butyl Acetate (astm D 4615) B.clean, White Cotton Rags Warning Consult The Msds For Butyl Acetate Prior To Initiating The Cleaning Process To Determine The Proper Ppe And Environmental Controls Required By Your Site. Additionally, Be Sure That Use Of This Solvent Does Not Violate, State, Or Federal Environmental regulations. Note This Procedure Shall Be Used Before And After The Etching Process. Before Etching, Only The Molded Side Shall Be Cleaned. After Etching, Both Sides Of The Tile Shall Be Cleaned With This Procedure. procedure: 1. Place Tile On A Clean Surface. 2. Scrub Surface Of The Tile With A Rag Moistened With Butyl Acetate. Note Butyl Acetate Shall Be Poured Onto The Rag To Prevent Contamination Of The Cleaning Solvent-do Not Dip Rag Into Solvent. Change Rags Frequently. 3. Repeat The Cleaning Of The Tile Surface 2 To 3 Times As Necessary To Eliminate Contamination On The Tile. Note The White Cotten Rag Will Be Blackened Somewhat By The Cleaning Process. Continue The Scrubbing The Tile Surface Until The Rag Does Not Get Any Lighter With Successive Washes. 4. Allow The Solvent To Flash Off (evapporate) For At Least One Half Hour Prior To Stacking Or Packaging The Tile. Note do Not Recontaminate The Tile After The Cleaning By Placing It In Contact With Unclean Surfaces. 6.2 ;initial (first Time) Testing (first Article Test/esaq And Production Lot Test/quality Conformance Inspection) For Each Lot Or Sub Lot Shall Be At The Expense Of The Government. Second Time Testing Or Retesting Will Be At The Expense Of The Contractor.; 6.3 ;shelf Life - Sht Tiles Shall Have A Five (5) Year Uninstalled Shelf Life From Date Of Manufacture.; 6.4 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navicp Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navicp Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, F Or X Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Defense Logistics Service Center (dlsc) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Forign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Ar To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offerer Is To Enter The Appropriate Price Group. The Price Group Are Defines As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered Inpricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Becoded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. 6.5 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.6 Note To Government Testing Facility - Upon Completion Of The Government Tests Cited Under Section 4, Quality Assurance, A Letter Stating Approval/disapproval Of The Testing Performed Shall Be Mailed Within 5 Days To The Naval Inventory Control Point, attention: Procurement Contracting Officer, Identified In This Contract/purchase Order, 5450 Carlisle Pike, P.o. Box 2020, Mechanicsburg, Pa. 17055-0788. 6.7 ;production Lot Test/quality Conformance Inspection - Samples Submitted To The Govertment Testing Facility For Test/inspection That Are Consumed Or Destroyed In Testing Will Not Be Returned To The Contractor.; 6.8 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. 6.9 ;isea Poc:commander, Naval Surface Warfare Center; 5001 Broad Street Philadelphia, Pa 19112 ; Attn: Lisa Weiser, 215-897-1612, Code 617; 6.10 ;"250.009 Cui Request For Naval Sea Systems Command Consideration For Reduction In Receipt Inspection Requirements For Submarine Special Hull Treatment Material" & "9690 Ltr Ser 05u7_039 - Sht Reciept Inspection Reduction Distro (004).pdf Are Available upon Request. Documents Cover Noise Reduction And Whether Or Not Plt Can Be Waived In Lieu Of A Coc/coa.; p/n: 5808278 Tile Ad-79m Shape B date Of First Submission=030 Dac ;certification/data Report - Molds Shall Be Certified To Be In Accordance With The Requirements Paragraph 6.3 Of 53711 Drawing 5808278. ; block 12 - Submit For Approval Prior To First Article Test/inspection. ;block 14a - Forward One (1) Dcmc-qar Approved Copy To The Navicp-m Pco Prior To First Article Test/inspection. block 14a - Isea Information Copy; Naval Surface Warfare Center Carderock Division (nswccd) Code 6244, Philadelphia Naval Base, Philadelphia, Pa.19112-5083. ; block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". ;block 14a - Submit One (1) Dcmc-qar Approved Copy To The Government Testing Facility With The Samples For First Article Test.; date Of First Submission=120 Dac ;material Safety Data Sheet (msds) - Shall Be In Accordance With Paragraph 3.3.2 Of 53711 Drawing 5808278 And Fed-std-313. in The Event Of Conflict, Fed-std-313 Shall Take Precedence Over Di-misc-80678.; ;contractor Shall Submit One (1) Dcmc-qar Approved Copy To Navicp-mech Pco At The Time Of First Article Test Submission. ; ;block 14a - Package One (1) Dcmc-qar Approved Copy Inside Each Container For Each Shipment.; ;block 14a - Isea Information Copy; Naval Surface Warfare Center Carderock Division (nswccd) Code 6244, Philadelphia Naval Base, Philadelphia Pa. 19112-5083.; block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". ;block 14a - Submit One (1) Dcmc-qar Aooroved Copy To The Government Testing Facility With The Samples For First Article Test.; date Of First Submission=180 Dac ;certification/data Report Shall Be In Accordance With The Requirements Of Paragraph 4.1 Of 53711 Drawing 5808278. ; ;block 14a - Forward One (1) Dcmc-qar Approved Copy With Dd Form 250 To The Navicp-mech Pco At The Time Of Shipment. in Addition Package One (1) Dcmc-qar Approved Copy With The Dd Form 250 Inside The First Shipping Container Of Each Shipment And Identify The Container.; ;block 14a - Isea Information Copy; Naval Surface Warfare Center Carderock Division (nswccd), Code 6244, Philadelphia Naval Base, Philadelphia Pa. 19112-5083.; block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". date Of First Submission=120 Dac ;certification/data Report - Samples For Production Lot Test/quality Conformance Inspection Shall Be Certified To Be In Accordance With The Requirements Of Paragraph 4.3 Of 53711 Drawing 5808278.; ;block 14a - Submit One (1) Dcmc-qar Approved Copy To Navicp-mech Pco Upon Completion Of Production Lot Test/quality Conformance Inspection.; ;block 14a - Isea Information Copy; Naval Surface Warfare Center Carderock Division (nswccd), Code 6244, Philadelphia Naval Base, Philadelphia, Pa. 19112-5083.; block 14a - Isea Information Copy Cover Letter And First Page Of Data Shall Be Clearly Marked "information Copy". ;block 14a - Submit One (1) Dcmc-qar Approved Copy To The Government Testing Facility With The Samples For Production Lot Test/quality Conformance Inspection.; date Of First Submission=180 Dac ;the Contractor Shall Prepare And Submit Reports In Accordance With The Requirements Of Paragraph 6.9.4 Of 53711 Drawing 5808278. the Records Shall Be Provided To The Dcmc-qar For Inspection And Acceptance On A Quarterly Basis. ; 1.1 The Dcmc Qar Approved Deliverable Shall Be Sent, Within 10 Days Of Approval, To Activities Listed Under Distribution.
Contact
Award Id
N0010424QNB88Award No
N0010424QNB88Tender Id
N0010424QNB88 ViewTender Id
N0010424QNB88Tender Authority
DEPT OF THE NAVY USA ViewPurchaser Address
-Email
STEVE.SMITHEY@NAVY.MILWebsite
beta.sam.gov
Bidder Details
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Bidder AddressThis Information is for unsubscribed user
- Award Amount234234234200
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Bidder AddressThis Information is for unsubscribed user
- Award Amount234234234200
- Qualified BiddersThis is message for unregistered
- Lowest Bidder662
- Number of Bids99