DEPT OF THE ARMY USA Tender Result

View complete overview of DEPT OF THE ARMY USA Tender Result

DEPT OF THE ARMY USA Tender Result

Energy, Oil and Gas
Contract Date17 Apr 2025
Contract Period15 Days
Contract AmountUSD 1,21,047.5 

AOC Description

As Of 3/27/25 The Bid Structure Has Been Changed With Amendment 0003 amendments 0001, 0002, & 0003 Have Been Added To This Solicitation see Statement Of Work (sow), Attachment I For Details overview: this Task Order Will Consist Of Services Associated With The Propane Supply. Services Shall Include Refueling Of Propane Tanks, Fixing/replacing Of Any Tanks With Issues, Installing Tanks And All Necessary Equipment/parts And Removing Tanks That Are No Longer Necessary. All And Any Exceptions Shall Be Submitted In Writing. key Elements: the Work Includes But Is Not Limited To: Work Shall Consist Of Furnishing All Supervision, Labor, Equipment And Materials In Performing All Operations In Connection With The Installation, Relocation, And Refueling Of Propane Tanks In Various Locations Throughout The Depot, Stated In Enclosed Specifications. At The Conclusion Of The Contract Period, Vendor-owned Tanks Must Be Removed And Taken. a: Contractor Shall Install The Following Tanks At Locations Stated Below: bldg. Tank Size Quantity 49 1000 Gal 1 (underground Tank) 54 1000 Gal 1 212b 500 Gal 1 3002 500 Gal 1 3006 120 Gal 2 1013 500 Gal 1 72 1000 Gal 1 b: Contractor Shall Fill Above Cylinders For The Duration Of The Contract Term And Remove When Contract Is Terminated. c: Contractor Must Furnish All Necessary Piping, Fittings, Regulators And Hardware To Connect To Existing Propane Supply Piping d: All Installations Must Comply With Federal And Local Codes. The Codes Can Be Found In Paragraph 2.1. e: Contractor Shall Ensure Ample Fuel Supply For All Heating Systems. Delivery Must Be At A Minimum Of Once In A Two-week Period Or Sooner If Necessary. 10 October 2024 Propane Supply And Service page 2 Of 22 f. Contractor Shall Relocate Tanks As-needed To Meet Building Or Regulatory Demands. g: Contractor Shall Connect All Grounding Cables And Ensure Tanks And Piping Are Properly Grounded. h: Contractor Shall Respond To Any Emergency Within A Response Time Of 4 Hours. i: Contractor Shall Visit The Site Of The Work, Check All Dimensions And Otherwise Acquaint Himself With All The Details And Conditions Affecting The Work, Quantities And Type Of materials And All Factors To Meet The Purpose And Intent Of These Specifications And The terms Of The Contract. j. At The End Of Contractual Period, If A Follow-on Contract Is Not Utilized, All Vendor- Owned Tanks Will Be Removed By The Vendor And Taken Away.

Contact

Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.