Tender Results of Dept Of The Army Usa
Tender Results of Dept Of The Army Usa
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
W911sa25qa126 Custodial Services For Ia033 (des Moines, Ia)
Contract Date25 Apr 2025
Contract AmountUSD 232.9 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Laurel River Lake Trash Pickup And Dumpster Service
Contract Date23 Apr 2025
Contract AmountUSD 24.4 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Access Road Paving, Townshend Lake, Townshend, Vt
Contract Date23 Apr 2025
Contract AmountUSD 89.2 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Groundskeeping Services, Jennings Randolph Lake, Wv
Contract Date22 Apr 2025
Contract AmountUSD 480 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Solicitation Notice For Forward Repair System (frs) M7a1 Tool Load
Contract Date22 Apr 2025
Contract AmountUSD 95.2 Million
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Pressure Wash Of Exterior Building Walls For Area Iv
Contract Date18 Apr 2025
Contract AmountUSD 591.9 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Please See Attached Solicitation For Van Tool Bins Purchase.
please See Attached Government Requirements Document.
the Amendment To The Solicitation Is To Add Photos.
photos Will Be Provided As A Separate Attachment. Please See Attached Photos.
additional Information: Vehicles Are Electric.
please See Attached Amendment 02 To The Solicitation.
please See Attached Additional Photos.
please See Amendment03 For The Correct Quantity For Line Item 1 And Line Item 6.
Contract Date17 Apr 2025
Contract AmountUSD 34.1 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Grounds Maintenance Services, Knightville Dam & Littleville Lake, Huntington, Ma
Contract Date17 Apr 2025
Contract AmountUSD 35.7 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
As Of 3/27/25 The Bid Structure Has Been Changed With Amendment 0003
amendments 0001, 0002, & 0003 Have Been Added To This Solicitation
see Statement Of Work (sow), Attachment I For Details
overview:
this Task Order Will Consist Of Services Associated With The Propane Supply. Services Shall Include Refueling Of Propane Tanks, Fixing/replacing Of Any Tanks With Issues, Installing Tanks And All Necessary Equipment/parts And Removing Tanks That Are No Longer Necessary. All And Any Exceptions Shall Be Submitted In Writing.
key Elements:
the Work Includes But Is Not Limited To: Work Shall Consist Of Furnishing All Supervision, Labor, Equipment And Materials In Performing All Operations In Connection With The Installation, Relocation, And Refueling Of Propane Tanks In Various Locations Throughout The Depot, Stated In Enclosed Specifications. At The Conclusion Of The Contract Period, Vendor-owned Tanks Must Be Removed And Taken.
a: Contractor Shall Install The Following Tanks At Locations Stated Below:
bldg. Tank Size Quantity
49 1000 Gal 1 (underground Tank)
54 1000 Gal 1
212b 500 Gal 1
3002 500 Gal 1
3006 120 Gal 2
1013 500 Gal 1
72 1000 Gal 1
b: Contractor Shall Fill Above Cylinders For The Duration Of The Contract Term And Remove When Contract Is Terminated.
c: Contractor Must Furnish All Necessary Piping, Fittings, Regulators And Hardware To Connect To Existing Propane Supply Piping
d: All Installations Must Comply With Federal And Local Codes. The Codes Can Be Found In Paragraph 2.1.
e: Contractor Shall Ensure Ample Fuel Supply For All Heating Systems. Delivery Must Be At A Minimum Of Once In A Two-week Period Or Sooner If Necessary.
10 October 2024 Propane Supply And Service
page 2 Of 22
f. Contractor Shall Relocate Tanks As-needed To Meet Building Or Regulatory Demands.
g: Contractor Shall Connect All Grounding Cables And Ensure Tanks And Piping Are Properly Grounded.
h: Contractor Shall Respond To Any Emergency Within A Response Time Of 4 Hours.
i: Contractor Shall Visit The Site Of The Work, Check All Dimensions And Otherwise Acquaint Himself With All The Details And Conditions Affecting The Work, Quantities And Type Of
materials And All Factors To Meet The Purpose And Intent Of These Specifications And The
terms Of The Contract.
j. At The End Of Contractual Period, If A Follow-on Contract Is Not Utilized, All Vendor- Owned Tanks Will Be Removed By The Vendor And Taken Away.
Contract Date17 Apr 2025
Contract AmountUSD 121 K
DEPT OF THE ARMY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Asbestos Disposal Sault Sainte Marie Project Office (ssmpo) Bank And Msb Offices
Contract Date16 Apr 2025
Contract AmountUSD 34.1 K
11-20 of 1805 active Tender Results