Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

View complete overview of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Civil And Construction
Excavation
Contract Date6 Nov 2024
Contract Period90 Days
Contract AmountEUR 63,399 (USD 66,770.86)
Download

AOC Description

Translated

Order No. 4 against Framework Agreement for the modification of the location of the PN railway equipment located at kilometer point 51/347 of Line 202, in the municipality of Almazán (Soria).

Original

Pedido Nº 4 contra Acuerdo Marco para la modificación de la ubicación del equipamiento de vía férrea del P.N. situado en el punto kilométrico 51/347 de la Línea 202, en el municipio de Almazán (Soria).

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.