Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Jan 2025
Contract AmountEUR 183.8 K (USD 189.3 K)
Technical management and technical assistance for the supervision of works of the "Construction project for the installation of two elevators and heightening of two platforms at the Linares-Baeza station (Jaén)"

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date10 Jan 2025
Contract AmountEUR 50 K (USD 51.8 K)
Repair of Guardian type DC (direct current) and AC (alternating current) power equipment.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date9 Jan 2025
Contract AmountEUR 68.5 K (USD 70.5 K)
Consulting and assistance contract for the control of the works for the execution of the construction project for priority actions to improve evacuation and ventilation conditions in the event of fire at the Embajadores underground commuter train station - Madrid (Phase I)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date9 Jan 2025
Contract AmountEUR 286.6 K (USD 295 K)
Technical assistance services for the control and monitoring of the works of the construction project for the rationalization of the tracks at the Guadalajara station (Cercanías)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date3 Jan 2025
Contract AmountEUR 9.2 K (USD 9.5 K)
Pest control service at the CFT DE VALENCIA. Second request against the "Framework Agreement on pest control services in ADIF premises and spaces".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date3 Jan 2025
Contract AmountEUR 36 K (USD 37 K)
Consulting services for the drafting of the execution project for the warehouse with a pit for locomotive repairs at the Barcelona Can Tunis TTM

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date3 Jan 2025
Contract AmountEUR 99 K (USD 101.7 K)
Execution works for the modernisation project and improvement of the energy efficiency of the lighting of the platforms and the hall of the Logroño Station

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date23 Dec 2024
Contract AmountEUR 6.8 Million (USD 7 Million)
Maintenance of the hardware and software equipment of the 1.5kV, 3kV and 25kV energy remote controls of the Conventional Network

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date20 Dec 2024
Contract AmountEUR 114.7 K (USD 118.1 K)
Technical assistance service for the control of the remodelling works of the stations between the Aranda-Aranda fork. Line 102. Track.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date20 Dec 2024
Contract AmountEUR 125.6 K (USD 130.9 K)
Project drafting and execution of works for the construction of a rockfill wall to contain landslides at km 55/700 of line 740.
81-90 of 1874 active Tender Results