Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Third order against framework agreement for the supply of rail for the construction works of the access to terminal T4 of the Madrid-Barajas Adolfo Suarez airport in standard gauge. Action No. 1
Contract Date9 Sep 2024
Contract AmountEUR 1.1 Million (USD 1.2 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of works for the construction project to remove the level crossing at km 202/459 on the Madrid - Chamartín – Hendaya line, in the municipality of Medina del Campo (Valladolid).
Contract Date9 Sep 2024
Contract AmountEUR 1.6 Million (USD 1.8 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
ADIF conventional network multimedia IP network evolution plan. Phase 1: Detailed engineering services in the network area and supply, installation, migration and commissioning of core equipment.
Contract Date9 Sep 2024
Contract AmountEUR 2 Million (USD 2.2 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of works for the "Repair project for tunnel no. 17 bis - Pinar de Antequera, pp.kk. 240+810 to 242+800, line 100 Madrid Chamartín Clara Campoamor - Hendaya / Irún border (pk 641.181). Route Viana-Arcas Reales pb (Valladolid)".
Contract Date9 Sep 2024
Contract AmountEUR 2.1 Million (USD 2.3 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works of the construction project for the elimination of level crossings of PP.KK. 522/700 and 523/088 of the Santander-Llanes (RAM) line. Municipality of Santa Cruz de Bezana (Cantabria)
Contract Date9 Sep 2024
Contract AmountEUR 2.3 Million (USD 2.5 Million)
221-230 of 1668 active Tender Results