Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works of the construction project to replace joint compensation with independent compensation and replacement of existing suspension with equipotential suspension on the Overhead Contact Line. Line 200. Calatayud – Ricla single track section.
Contract DateNA
Contract AmountEUR 1.5 Million (USD 1.6 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Action for Infrastructure Improvement (AMI): Drafting of the project and execution of the leveling, alignment and road profiling work. Line 246 Mollet - Sant Fost - Castellbisbal junction with Rubí needles. Sections: A11 Castellbisbal – CH1 Nudo Mollet fork, kilometer points 1+ 136 – 21+456 and A19 Castellbisbal – CH3 fork. Mollet Knot kilometer points 1+268 – 21+613.
Contract DateNA
Contract AmountEUR 1.6 Million (USD 1.7 Million)
1571-1580 of 1988 active Tender Results