Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of the works of the construction project to remove the level crossing of PK 2/805 on the León-Matallana Line of metric gauge (RAM). TM Villaquilambre (León)
Contract DateNA
Contract AmountEUR 5.1 Million (USD 5.6 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Vegetation control and elimination service using herbicide train on high-speed tracks in operation
Contract DateNA
Contract AmountEUR 5.2 Million (USD 5.6 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Maintenance and improvement actions of 33 units of auxiliary rolling stock rehabilitated by TALLERES ALEGRÍA.
Contract DateNA
Contract AmountEUR 5.3 Million (USD 5.9 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Construction project execution works to improve evacuation and ventilation conditions in the event of fire at the Alcobendas – San Sebastián de los Reyes Subterranean Commuter Station
Contract DateNA
Contract AmountEUR 5.3 Million (USD 5.6 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of the works of the construction project for accessibility in the Villabona station (Asturias).
Contract DateNA
Contract AmountEUR 5.6 Million (USD 5.9 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Maintenance services for overhead contact line installations, remote energy control, needle heating and associated installations of the Plasencia-Badajoz high-speed line.
Contract DateNA
Contract AmountEUR 5.6 Million (USD 5.9 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of the works on the project to remove level crossings at PK 361/620 and 361/845 on the León – A Coruña Line. Municipal District of Monforte de Lemos (Lugo).
Contract DateNA
Contract AmountEUR 5.6 Million (USD 6.1 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of the construction project works for the removal of level crossings at PK 269/872 of the Valencia – Tarragona railway line and PK 97/087 of the Lérida – Reus – Tarragona railway line. Municipality of La Canonja (Tarragona)
Contract DateNA
Contract AmountEUR 5.7 Million (USD 6 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Supply and transportation of sleepers for the track renewal of the Xátiva-Ontinyent section, of line 342 Xátiva-Alcoi
Contract DateNA
Contract AmountEUR 5.7 Million (USD 6.2 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Emergency works and services due to serious damage to the La Grandota tunnel, Line 154 Tudela Veguín - Lugo Llanera. Kilometer points 0+879 to 4+635, Asturias.
Contract DateNA
Contract AmountEUR 5.8 Million (USD 6.2 Million)
1561-1570 of 1855 active Tender Results