Telecommunications Consultants India Limited Tender
... More
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Telecommunications Consultants India Limited - TCIL Tender
Eprocure
Opening Date10 Mar 2025
Closing Date24 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 2,50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tcil/rec/2024/ Balance_ibms_works/02
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_TCIL_229477_1Bid Award Id
ViewTender No
TCIL/REC/2024/ Balance_IBMS_Works/02Tender Authority
Telecommunications Consultants India Limited ViewPurchaser Address
-Website
http://https://www.tcil-india.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fire Alarm system
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing UL Listed Analoge addressable Photoelectric smoke detector with mounting based LED, Address Switch to programme the detectors from 01-99, with BASE complete as required . If material cannot be rectified, then material is to be supplied & installed by the agency and rate are deemed to be included in this item
39
-
-
... More
Rectification, Installation, Testing and Commissioning of manual call point with necessary fixing arrangements as required & shall be latest I.S. specifications. If material cannot be rectified, then material is to be supplied & installed by the agency and rate are deemed to be included in this item
4
-
-
... More
Rectification, Installation, Testing & commisioning of Fire Alarm system complete in all respect including integration with other services like boom barrier, boom bollard, etc., ensuring proper functioning of system in totality. Any material required to be replaced for proper commissioning of Fire Alarm system, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Public Address System
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing Class AB amplifier with Consummate short-circuit and over temperature protect function, Built in short circuit dispersed heat structure for better stability, LCD to show temperature and volume degree in real time, Adopt address module which can set the address by binary system, With remote volume control, remote temperature monitor and over temperature alarm function. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
Approved Makes: Honeywell / Marantz/ Bose/System Sensor
2
-
-
... More
Rectification, Installation, Testing & commissioning of existing IP based Digital Controller: 8 zone IP based, digital Voice Alarm controller expandable upto 256 zones. The voice alarm controller should be able to connect directly over existing Ethernet. It should have functions like the audio playing, zone control, fault monitoring, log recording, volume control and amplifier switchover. The Voice alarm controller should also have the following functions:
- 255 Priorities
-Time schedule broadcasts
-Its own PTT microphone
-Capable of amplifier redundancy
-8 trigger inputs/outputs If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commissioning of existing 6W Wall mount with max SPL1M/1W 96dB . Frequency response of 160Hz-20KHz. The speaker shoud have tappings at 6W/3W. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
6
-
-
... More
Parking Management System
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing Single Line Display, 16 Digits/Line, Single Color dot pitch, for Floor Direction & Supply, Installation, testing and commissioning of Single Line Display, 16 Digits/Line, Single Color dot pitch, for Entrance Display. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
15
-
-
... More
Rectification, Installation, Testing & commissioning of existing Ultasonic Detector, up to 4.5m Range,with LED Indication for Parking Space Status & Rectification, Installation, Testing and commissioning of LED Indicators ( Red and Green High brightness ) Occupied and Unoccupied. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
5
-
-
... More
Rectification, Installation, Testing & commisioning of Parking Management System complete in all respect including realingment of installed sensors, etc., ensuring proper functioning of system in totality. Any material required to be replaced for proper commissioning of Parking Management System, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Automatic Blind System
-
-
-
... More
Rectification, Installation, Testing & commisioning of Automatic Blind System complete in all respect, ensuring proper functioning of system in totality. Any material required to be replaced for proper commissioning of Automatic Blind System, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Access control system
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing UL Listed 2 reader IP based controller shall support 5,000 card capacity,8000 history and 4000 Alarm capacity as per specifications etc complete as reqd . If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
20
-
-
... More
Rectification, Installation, Testing & commissioning of existing contact-less smart card reader with a read range of 1 inch as per specifications etc complete as reqd. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
6
-
-
... More
Rectification, Installation, Testing & commissioning of existing Access Control System Server Software with SQL database engine consisting of Access Control system, Elevator Control, Guard Tour Management, Mantrap, Alarm Document, Alarm management, 5 client License, Graphical layout, Card Enrollment, Badge designing, Web Access,BMS Integration over BACnet.MIS Interface for sharing cardholder information to external ODBC based program, Data movement between access server & controller should be Encrypted for Secure movement. Access Control shall Integrate with VMS System on common database (Access and VMS of Same OEM) All these along with high end security features (License should be included in the package based) as per specifications etc complete as required. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commisioning of Access control system complete in all respect, ensuring proper functioning of system in totality. Any material required to be replaced for proper commissioning of Access control system, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Boom Barrier & RF Reader
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing Long Range UHF RFID Reader with a long read range of 8 Mtr Minimum. Including testing and commissioning of RFID Tags. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commissioning of existing Traffic Boom Barrier, electro mechanical type, 100 % duty cycle. Length 4-5Mtr. Duty Cycle Time 3-4-8 Sec, Any material required to be replaced for proper commissioning ofBoom Barrier system deemed to be included in the rate.
1
-
-
... More
Building Management System
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing DDC Controller with SITC of Programmable and Application specific 32 bit, UL Listed BACnet (BTL certified) controllers, field mounted configured as per Data Point Summary for respective building services and as per below distributions. The controller shall be housed in vandal proof lockable MS cabinets. For AHU's Maximum of One Controller /1AHU Shall be used. For Other Equipments, the controller selection shall be such that distance from controller to field devices should not go beyound 40 Mtrs. The Expansion controller connected with Controller shall also be 32 Bit, UL Listed BACnet( BTL) controller and communication with Expansion units to Main Controller shall be on BACnet MS/TP. Proprietry Protocol shall not be accepted. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
10
-
-
... More
Rectification, Installation, Testing & commissioning of existing Slab embedded sensor with thermowell, Measuring range 0-50 Deg C, Response time should be 1 Minute. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
46
-
-
... More
Rectification, Installation, Testing & commissioning of existing Duct Mount CO2 Sensor UL Listed, Measuring range 0-2000PPM CO2, Response time (0-63%) should be 1 Minute & Warm-up Time should less than 5 minute. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
15
-
-
... More
Rectification, Installation, Testing & commissioning of existing Surface Mount CO Sensor UL Listed, Measuring range 0-600 PPM CO, Response time (0-63%) should be 1 Minute & Warm-up Time should less than 5 minute. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
10
-
-
... More
Rectification, Installation, Testing & commissioning of existing Duct Temp & RH Sensor shall capable to measure relative humidity of 0 to 100%, suitable for duct installation and accuracy shall be ± 34°F at 70°F & Resistance Change approx 3ohms/°F for Measuring return air Temprature & Humidity of AHUs etc. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
15
-
-
... More
Rectification, Installation, Testing & commissioning of existing Immersion Temp Sensor (Resistance type) for CHW line with measuring Range 32-160 deg. F. The accuracy shall be at least ± 0.36 degrees F. The pressure rating shall be 10 kgf/sq cm . If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
7
-
-
... More
Rectification, Installation, Testing & commissioning of existing Bacnet Compatible UL Listed Room Temp, Humidity Sensor & Occupancy Sensor. Measuring Range: Temp: -30 to 50 Deg C & RH 0-100%, Accuracy: +/- 1 Degc +/- 3% & minimum 94 angular degree for Occupancy Sensor (at 4 mtr). If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
4
-
-
... More
Rectification, Installation, Testing & commissioning of existing IP 66 protected Differential Pressure Switch across the Pumps, Supply, installation, testing and commissioning of IP 66 protected Water Flow Switches. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
15
-
-
... More
Rectification, Installation, Testing & commissioning of existing Differential pressure switches across the Air Handling Unit Filter for indicating the Filter status. Pressure differential – 10 mm – 125 mm. The switch shall be with connecting tube and metal bends for connections to the duct. The housing shall be IP 54 rated.,Supply, installation, testing and commissioning of Differential pressure switches across the Air Handling Unit, Air washer & scrubber and Blower for indicating the Blower status. Pressure differential – 10 mm – 125 mm. The switch shall be with connecting tube and metal bends for connections to the duct. The housing shall be IP 54 rated. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
8
-
-
... More
Rectification, Installation, Testing & commissioning of existing TDS Analyser. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commissioning of existing Ultrasonic Water Flow Meter. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
2
-
-
... More
Rectification, Installation, Testing & commissioning of existing PH Analyser. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commissioning of existing Hardness Analyser. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commissioning of existing Ultrasonic BTU Meter 200 mm dia. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
2
-
-
... More
Rectification, Installation, Testing & commissioning of existing Web Based Energy Management & Reporting Tool software for Monitoring Building efficiency and store the data into separate application database (SQL server) for analysis. The Information should be available as "Screen In Dashboards,Reports in PDF, EXCEL and other formats" This Software should have the following Key features with SITC Works:
1. User Defined dashboard. Any Number of dashboard can be added by user .The Standard reports include Energy consumpption, Demand Profile Comparison, Energy Analysis.Building Load Profile. 2. Universal Dashboard: Ability to create dashboard for any point and monitor/compare it with any /multiple points as a function of time. 3. Monthly Calender Dashboard: Monitor the demand/consumption pattern for all days in a a month in a single screen. 4.Segmentation of Energy Information at a glance
5. Web based tool 6. EMAIL / SMS OPTION AVAILABLE 7. Mobile Plateform: IPAD/Android Compatible.
If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commisioning of Building management system complete in all respect including integration of all services with BMS, ensuring proper functioning of system in totality. Any material required to be replaced for proper commissioning of Building management system, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Visitor Management System
-
-
-
... More
Rectification, Installation, Testing & commissioning of existing BAR code Scanner Integrated with Access control system and VMS system for security gate and auditorium reception. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Rectification, Installation, Testing & commissioning of existing Web Based application Visitor Management System semalessly integrated with access control software to issue access cards /facility to issue barcode through Print, Email,) , server application loaded on common application & database server for Access and VMS ( VMS Shall be of same OEM as of Access Control Software). The System shall be of same make as Access Control and shall be seamlessly Integrated with access control allowing completed control of facility access at doors, floors and zone level with approved workflow, rule based alerts to facility management, secure storage of visitors credintial with extensive audit and reporting capabilities, email and sms integration. The Application should have following features · Online requests for appointment , Appointment approval & rejections , Pre-registration of groups and individuals for one or multiple days, Email notification of requests, approval, rejections, Daily view of appointments/expected visitors, Business card scanning and autofilling of visitor data in the system database for speedy registrations, Visitors’s photo capture, Visitor sign out and tracking, Barcode generation and tracking, Import/ mail merge of bulk visitor list for bard code generation and email dispatch to invitees by integration with corporate mail server , Visitor history and black listing, Integration with corporate directory /mail server and appointments calendar, Integration with access control system, Visitor badge/pass printing with or without bar code, Generation of alerts for overstaying visitors, At least two level access to the system – reception and security gate. Integration of login system with the corporate IT system Generation of daily and weekly reports of visitors, and audit trail reports· Audit trail of badges issued· Integration with remote cameras for visitor sign in Rectification, Installation, Testing & commissioning of existing Client Version Software with security/reception with web camera and color laser printer ( with Label Facility) for photopass printing . The VMS Software shall use the Access Control Client Workstations and shall be able to allow Audit trails of Cards issued and Privilege change. The Database Server shall be same as of Access Control System. If material cannot be rectified, then material is to be supplied & installed by the agency and rate deemed to be included in this item
1
-
-
... More
Total
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements