Public Works Department Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date7 Dec 2024
Closing Soon26 Dec 2024
Tender Amount₹ 7,20,07,740 
Notes
Download

Costs

Summary

Construction Of Minor Bridge/ Culvert On Ratan Lal Sahdev Marg Under Division South East Road -1, Sub Division South East Road -14.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
9. Providing and mixing all ingradients of cement concrete as per approved mix design including admixture, if any in approved concrete batching and mixing plant, transporation of concrete to specified location in transit mixer of adequate capacity, placement of concrete with suitable means including concrete pump, compacting/ vibrating concrete, finishing to design line and level and curing etc. 10. Filling up of the abandoned empty bore with M15 grade cement concrete and restoration of road if required. 11. Working for all leads, lifts, pumping / bailing out of water, labour, materials and equipments etc. 12. Mobilising to site, installation at different locations transferring / dismantling, shifting, reinstalling and removal from site of the piling rigs and/or other equipments and all accessories including working platforms from site. 13. Identification, protection and maintenance of existing services, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation or any related activities including temporary shifting of such services to facilitate piling job at no extra cost. 14. Safety measures including Barricading around the bore holes during and after boring as specified elsewhere in the tender document. 15. All incidentals, labour, materias, equipments and works required to execute and complete the job.Cost of Construction of temporary diversions/coffer dams for going inside drain for pilling work is deemed to be included in quoated rate 16. The quoted rate will be applicable for all lengths of piles. 17. Cost of testing of all materials involved in the execution of item as per approved QAP and Specifications in internal / external laboratory including providing the samples and transporting to the testing laboratory. B) Mode of Measurement : Measurement for payment shall be made on the length of pile measured from cut off level to the bottom tip of the pile correct to a centimetre. The tentative length of piles to be measured as detailed in the specifications is from 20-25 meters. This shall be considered as a guidance only and there will be no change in the rate of pile in case of increase or decrease in pile length. Reinforcement shall be measured and paid separately under relevant item.Permanent liner if used will be paid under seperate item.

-

-

-

... More
Extra for providing Permanent Liner of 6mm thick mild steel plate in place of temporary liner wherever required for piling works including fabrication and setting out in position. Mode of Measurement : Measurment shall be based on length of liner becoming part of permanent structure and nothing extra shall be paid for cutting & withdrawal of liner upto cut-off level.

6

115147

690886

... More
Providing and laying Design Mix Reinforced Cement Concrete in Pile Caps, Open Foundations and any other foundation etc. in M35 grade of concrete using Pozzolana Portland Cement (Conforming to strength requirement of IS: 1489 (Part-I) 1991) including centering and shuttering, but excluding the cost of reinforcement, with all leads, lifts and depths all complete as per approved drawings and as directed by Engineer-in-charge. (Cement content considered in this item is 400 kg/cum. Extra cement required as per design mix will be paid under seperate item.) A) Scope of work: 1. Inclusive of all initial layout and setting out work using total station survey, identification and temporary protection of existing services. 2. Excavation from OGL to botttom level of PCC levelling course through all types of soils with stable slopes including removal of all obstructions like boulders, rocks, cement concrete structures etc. 3. Disposal of all spoils, dismantled materials, surplus earth for all leads and lifts, and to keep the work area neat and tidy during the work and thereafter. 4. Cost of pumping/bailing out of water, including its labour, material and equipments etc. 5. Cost of providing centering and shuttering including its erection, dismantling and removal for all leads and lifts with all required tools and plants. 6. Providing and mixing all ingradients of cement concrete as per approved mix design including admixture, if any in approved concrete batching and mixing plant, transporation of concrete to specified location in transit mixer of adequate capacity, placement of concrete with suitable means including concrete pump, compacting/ vibrating concrete, finishing to design line and level and curing etc. 7. All arrangements needed to keep the reinforcement bars of pile cap and pier in position with due cover blocks of approved quality and thickness. 8. Cost of compacted backfilling around the pile cap/isolated footing with approved material like filling sand/good earth etc and temporary restoration of road if required.

-

-

-

... More
9. Cost of Maintenance and protection of existing services if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services to facilitate construction of pile cap/footing work shall also have to be done, if so required by the Engineer-in-charge, and the cost for the same shall be included in the quoted rates. 10. Installation of any fixture into the pile cap/footing (cost of fixture to be paid separately as per requirement). 11. Barricading and all safety requirements as specified elsewhere in the tender documents. 12. All incidental labour, materials, equipment and works required to execute and complete the job as per approved drawings and specifications. 13. Cost of testing of all materials involved in the execution of item as per approved QAP and Specifications in internal / external laboratory including providing the samples and transporting to the testing laboratory. 14. Breaking of pile heads (manual chipping) after a minimum of 3 days and to remove and dispose spoiled concrete to bring the pile head to the cut off level including cleaning and arranging the extended reinforcement bars as per drawings. Mode of Measurement : Measurements for payment shall be made on the volume basis in cubic meters of concrete of M35 and the volume shall be calculated by simple geometrical concepts and formulae for the finished volume only. Quantity of concrete of piles, which has gone into the pile caps shall be deducted. Reinforcement shall be measured and paid separately under relevent item.

389

7932

3085704

... More
Providing and laying machine batched, machine mixed and machine vibrated design mix reinforced concrete for construction of piers, pier caps, abutments, abutment caps, shear key, bearing pedestals, dirt wall, Portal frame, retaining wall, wing walls etc. in concrete of specified grade using with 43/53 grade Ordinary Portland Cement (conforming to strength requirement of IS:8112) as per approved drawings issued by the Engineer-in-charge including all types of shuttering, staging, scaffolding, necessary tools, plants, machinery and all related operations as required to complete the work with all leads, lifts, and depths true to level and position all complete but excluding the cost of reinforcement .

-

-

-

... More
(i) Pedestals/ piers/pier cap/abutment /abutment cap/dirt wall etc. all complete as per approved drawing in M-45 grade concrete with Ordinary Portland Cement. (Cement content considered for concrete mix in this item is 420 kg/cum. Extra/less cement required as per design mix will be paid/recovered under seperate item)

380

7988

3035489

... More
(ii) Retaining walls/wing walls/toe walls including their foundation, base slab, stem wall etc. all complete as per approved drawing in M-35 grade concrete with Ordinary Portland Cement. (Cement content considered for concrete mix is 380 kg/cum. Extra/less cement required as per design mix will be paid/recovered under seperate item)

86

7628

656080

... More
A) Scope of work: 1. Providing, placement and removal of shuttering, staging, scaffolding, form liner etc, for piers, abutments, pier/abutment caps, bearing pedestals, Portal frame, retaining walls etc. and other similar works including all incidental work required to complete the job as per approved drawing and direction of Engineer in charge. 2. Providing and mixing all ingredients of cement concrete as per approved mix design including admixture, if any in approved concrete batching and mixing plant, transporation of concrete to specified location in transit mixer of adequate capacity, placement of concrete with suitable means including concrete pump, compacting/ vibrating concrete, finishing to design line and level and curing etc. 3. Casting of piers, pier caps, abutments, abutment caps, bearing pedestals, Portal frame, retaining walls etc. as per drawing, specifications and the directions of the Engineer-in-charge. 4. Disposal of all spoils and rubbish and to keep the work area neat and tidy during the work and thereafter. 5. Installation of any fixture, weep holes etc into piers/pier caps/walls or any similar structure etc. (cost of fixtures/weep holes if any, to be paid separately). 6. Safety measures including barricading around the piers/abutments or any similar structure during construction as specified in approved drawings and as directed by the Engineer-in-Charge. 7. All incidental labour, materials and testing, equipment and works required to execute and complete the job as per specifications and as directed by the Engineer-in-Charge. Construction of coffer dams and its removal inside Nallah is incidental to the work 8. Making arrangements for fixing of bearing, bearing plate, studs etc. as per approved drawing and direction of Engineer-in-Charge. Mode of Measurement : Measurements for payment shall be made on the volume basis in cubic meters of concrete and the volume shall be calculated by simple geometrical concepts and formulae for the finished volume. No deduction shall be made for the volume occupied by any fixture provided in the pier, abutment, etc. For form finish on the pier surface, actual volume of concrete after deduction for all grooves and indentation shall be considered for measurement. Reinforcement shall be measured separately under relevent item.

-

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix reinforced concrete of grade M45 with 43/53 grade Ordinary Portland Cement in deck slab in superstructure using 20mm & down stone aggregates and approved quality sand complete as per approved drawings, designs and specifications including the necessary tools, plants and machinery complete but excluding the cost of reinforcement. (Cement content considered in this item is @ 420 kg/cum.Extra/less cement required as per design mix will be paid/recovered under seperate item) A) Scope of work: 1. Providing and mixing all ingredients of cement concrete as per approved mix design including admixture, if any in approved concrete batching and mixing plant, transporation of concrete to specified location in transit mixer of adequate capacity, placement of concrete with suitable means including concrete pump, compacting/ vibrating concrete, finishing to design line and level and curing etc. 2. Making provisions for installation of expansion joints over the bridge deck as per approved drawings and as per manufacturer specifications/ directions of Engineer-in-charge. 3. Providing shuttering, staging and scaffolding, including its modifications, erection and removal in accordance with the provisions mentioned elsewhere in the tender document.Creating temporary diversion in drain for staging is also included. 4. Necessary arrangement to keep the reinforcement in position with suitable cover blocks. 5. Cost of Maintenance and protection of existing services if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services to facilitate construction of deck slab shall also have to be done, if so required by the Engineer-in-charge, and the cost for the same shall be included in the quoted rates. 6. Working for all leads, lifts, heights, labour, material and equipment etc. 7. Placing the concrete using Concrete Pump/Boom Placer. 8. Testing all the materials involved in the execution of the item as per QAP and specifications including providing the samples and transporting the same to the testing laboratory.

100

7623

762368

... More
9. All incidental labour, materials, equipment and works required to execute the job as per the directions of Engineer-in-charge. 10. Providing barricading and all traffic safety requirements including management of traffic as direct by Engineer-in-charge and traffic police. 11. The top surface has to be finised with the help of floater etc so as to maintain proper level and camber. 12. Fixing/ embedding all necessary electrical or other fixtures (the cost of fixtures shall be paid separately). Mode of Measurement : The measurements shall be made for the finished volume of concrete in postion in cubic meter restricted to design volume as per approved construction drawing. All linear dimensions shall be measured correct to one centimeter restricted to design dimension and volume calculations shall be correct to two decimal place in cubic meter. The steel reinforcement shall be measured under relevant item.

-

-

-

... More
Providing and laying Design Mix Reinforced Cement Concrete of grade M35 with Ordinary Portland Cement (Conforming to strength requirement of IS: 8112 ) in cast-in-situ Approach Slabs, Friction Slabs over the approaches, complete as per drawing excluding the cost of steel reinforcement.(Cement content considered in this item is @ 400 kg/cum. Extra/less cement required as per design mix will be paid/recovered under seperate item) A) Scope of work: 1. Providing and mixing all ingredients of cement concrete as per approved mix design including admixture, if any in approved concrete batching and mixing plant, transporation of concrete to specified location in transit mixer of adequate capacity, placement of concrete with suitable means including concrete pump, compacting/ vibrating concrete, finishing to design line and level and curing etc. 2.Providing steel shuttering, staging, and scaffolding, including its modification if any , erection and removal in accordance with the provisions mentioned elsewhere in the tender documents for all leads and lifts with all required tools and plants. 3. All incidental labour, material, equipments and works required to execute and complete the job. 4. All arrangements needed to keep the reinforcement bars in position with due cover blocks of approved quality and thickness. 5. Cost of testing of all materials involved in the execution of item as per approved QAP and Specifications in internal / external laboratory including providing the samples and transporting to the testing laboratory. 6. Making provisions for installation of expansion joints over the bridge deck as per approved drawings, as per manufacturer specifications and directions of Engineer-in-charge. Mode of Measurement: The measurement shall be made for the finished volume of concrete (excluding bed concrete which shall be paid separately) only. The reinforcement shall be measured and paid under relevant item separately.

38

7226

274588

... More
Providing and fixing M45 grade reinforced cement concrete with 43/53 grade Ordinary Portland Cement in cast-in-situ crash barriers over the superstructure, bridge and over the retaining wall as shown in the drawings. Reinforcement shall be measured and paid separately. (Cement content considered in this item is @ 420 kg/cum. Extra/less cement required as per design mix will be paid/recovered under seperate item) A) Scope of work: 1. Providing and mixing all ingredient of cement concrete as per approved mix design including admixture, if any, in approved concrete batching and mixing plant, transportation to site in transit mixer of adequate capacity, placement of concrete with appropriate means including concrete pumps, compacting/ vibrating concrete, finishing to line and level, curing etc for cast in situ crash barrier. 2. Approval of the facia patterns, if any, on crash barrier panels from the Engineer-in-Charge. 4. Providing shuttering, staging and scaffolding including its modification, erection and removal in accordance with the provisions mentioned else where in the tender document. 5. Making arrangement and/or fixing/embedding all necessary fixtures. Cost of fixtures shall be paid for separately. 6. Fixing/embedding all necessary provisions like HDPE pipes (2nos. 100mm dia) and conduits of electrical etc.Cost of HDPE will be paid separately. 7. Cutting grooves in cast insitu crash barrier portion on outer pheriphery including top width at spacing of 9m centre to centre of size 8mm wide and 25mm deep. 8. Testing all the materials involved in the execution of the item as per QAP and specifications including providing the samples and transporting the same to the testing laboratory. 9. The outside surface has to have a formliner finish. The cost of same is deemed to be to be included in the quoted rates. The design of form liner will be as per direction of engineer in charge. 10. All incidental labour, materials, equipment and works required to execute the job as per the directions of Engineer-in-charge. 11. The grroves will be filled with poly-sulphide sealant which will be paid for seperately as per requirement. Mode of Measurement : Measurements shall be made for the finished volume of concrete in Crash Barrier in cum. All linear dimensions shall be made correct to one centimeter restricted to design dimensions and volume calculation shall be worked out naearest to two decimal places in cubic meter. No deductions shall be made for providing holes and fixtures in crash barriers. The reinforcement shall be measured and paid under relevent item.

50

8372

418625

... More
Providing and installing to true lines levels MSM Spherical bearings of specified load capacity as detailed here under and as per section 2000 of MORTH Specifications. Item includes preparation of designs and drawings and its approval from the Engineer-in-charge, manufacturing, testing, transportation to site, storage with all handling, leads & lifts etc. and placing the permanent bearings in position, grouting holes and filling the underside of base plates using prepacked, free flowing high strength, non-shrinkage grout such as CONBEXTRA HF of M/s FOSROC or approved equivalent, as per manufacturer's specifications. (Bearings shall be provided with a warranty of trouble free maintenance of 25 years). MSM Spherical Bearing (up to 2000 KN ultimate Vertical Capacity) (Fixed/Free/Transverse Guide/Longitudanal Guide/Pin etc. as per GFC drawings and Structural requirement) A) Scope of work: 1. Designing, preparation and submission of bearing designs & drawings to get approval from Engineer-in-charge before execution of works. 2. Placement of various types of bearings and their all components in position during casting of piers, pier caps, abutments and any similar structure etc., as per specifications/instructions under supervision of manufacturer's technical representative including grouting of the holes underside of base plate with approved quality of ready mix non-shrink cementitious grout all complete. 3. Cost of all materials, labour, equipments, tools and plants, machinery required for execution of works. 4. Cost of providing temporary bearings/supports as required and other incidental expenses (if any). 5. Cost of cleaning blocks, placing and grouting anchor bolts in position after proper levelling etc. 6. Cost of maintenance of bearings during construction period. 7. Cost of supervision by technical representatives of bearing manufacturer during installation. 8. Cost of testing of all materials involved in the execution of item as per approved QAP and Specifications in internal/external laboratory including providing the samples and transporting to the testing laboratory. 9. Above range is for Design vertical load. Nothing extra will be payable for any Lateral Load/movement etc (for Guide/free/fix type bearing) if specified in GFC drawings as it will be considered as a part of contractors quoted rates. However, measurement for payment will be done using Vertical load capacity only. B) Mode of Measurement : Measurement for payment shall be made in KN. Example:- For a bearing with vertical capacity of 1500 KN, amount payble shall be 1500 x 28 x (Contractor enhancement/rebate).

21000

28

588000

... More
Providing, fabricating , transportation, assembling and erection in position of steel members for Steel Plate Girder Bridge using structural steel plates of Grade E-350, Normalised/control cooled, conforming to IS-2062 with latest amendments, to the required profile and shape as per the drawings and specifications. This item includes preparation of fabrication shop drawings and their approval, necessary templates, adequate temporary supports, scaffolding and staging, all cutting, grinding, welding (using automatic submerged arc welding and gas metal arc (MIG) welding wherever specified) & all labour, tools, plants & equipments and operations etc required to complete the job as per drawings and specifications. Every precaution to be taken to prevent rusting of sections. This item also includes all tests on materials and welded fabricated parts as per specifications and directions of Engineer-in-Charge. Temporary bolts and nuts (Grade 4.6) to be used during assembling shall be removed before site erection. All site erection bolts shall be HSFG type only. Item also include costs of sand blasting on external surface using abrasive charge conforming to SA 2.5 (ISO 8501-1988), application of primer and various coats of internal and external painting in fabrication shop and final painting on site including all touch up works after erection as per technical specifications. Priming & Painting shall be done as per technical specifications mentioned in relevant portion of the document. A) Scope of work: 1) Design and fabrication of any additional temporary structure including all types of lifting brackets, supporting brackets for deck slab casting, which will be required for transportation and erection in position / launching of fabricated parts for complete Plate girder in position. 2) Making provisions and arrangements for required openings/inserts for fixing lights fixtures and running cable conduits below or inside the Plate girders at soffit level. 3) All incidental labour, equipments and plants required to execute and complete the job from fabrication to erection at final position as per drawings, specifications and directions of Engineer-in-Charge. 4) All provisions of door openings/cutout in diaphragms or any other locations for inspection and maintenance purposes. 5) Cleaning and removal of all spoils, temporary arrangements for casting of deck slab, and any other material from the surface of the girder and giving a coat of final painting as per specifications. 6) Safety measures including Barricading during construction as specified in approved drawings and as directed by the Engineer-in-Charge. Submission of Erection scheme along with hiring of a proffessional safety consultant to oversee the work of heavy girder launching and submission of safety audit report thereoff.

113

162800

18396400

... More
7) Procurement of all materials from approved manufacturers and fabricators. Complete methodology for structural steel works, name of workshop for fabrication works, testing facilities and procedures etc. to be intimated for approval of Engineer-in-charge. 8) The provision for temporary bearings/sand jacks for supporting steel Plate girders during erection. 9) Provision for stability during erection against wind load or any other type of loading & supporting steel Plate girder during erection. 10) Connection of the bearing with plate girder including all provision as per recommendations of bearing supplier. Cost of bearing shall be paid separately under relevant item. B) Mode of Measurement : Measurement shall be only for structural steel which is erected and is part of permanent structure and paid as per approved shop drawings. All wastages, temporary works, jigs, temporary assembly bolts etc. are deemed to be included in the quoted rates. No allowance or increase in weight for welding and nuts & bolts etc. will be applicable. All HSFG nuts, bolts and washers shall be measured and paid separately under relevant item. Shear studs shall be measured and paid separately under relevant item.

-

-

-

... More
Providing, fabricating , transportation, assembling and erection in position of steel members using structural steel plates, rolled of Grade E 250 A, Normalised/control cooled conforming to IS-2062 with latest amendments, to the required profile and shape as called for as per the drawings and specifications. This item includes preparation of fabrication shop drawings and their approval, necessary templates, adequate temporary supports, scaffolding and staging, all cutting, grinding, surface treatment, painting, welding (using automatic submerged arc welding and gas metal arc (MIG) welding wherever specified) including hexagonal black bolts & all labour, tools, plants & equipments and operations etc required to complete the job as per drawings and specifications. This item excludes the shear studs profiled from the high strength MS rods (Yield strength=385 MPa) and fusion welded to top flange of the girder (which is to be measured and paid separately under relevant item). Every precaution to be taken to prevent rusting of sections. This item also includes all tests on materials and welded fabricated parts as per specifications and directions of Engineer-in-Charge. Temporary bolts and nuts (Grade 4.6) to be used during assembling shall be removed before site erection. All site erection bolts shall be HSFG type only. Item to include costs of sand blasting on external surface using abrasive charge conforming to SA 2.5 (ISO 8501-1988) on materials, application of primer and various coats of internal and external painting in fabrication shop and final painting on site including all touch up works after erection as per technical specifications. A) Scope of work: 1) Design and fabrication of any additional temporary structure including all types of lifting brackets, supporting brackets for deck slab casting, which will be required for transportation and erection in position / launching of fabricated parts for complete Plate girder in position. 2) Making provisions and Arrangements for required openings/inserts for fixing lights fixtures and running cable conduits below or inside the Plate girders at soffit level. 3) All incidental labour, equipments and plants required to execute and complete the job from fabrication to erection at final position as per drawings, specifications and directions of Engineer-in-Charge. 4) All provisions of door openings/cutout in diaphragms or any other locations for inspection and maintenance purposes.

13

160979

2092734

... More
5) Cleaning and removal of all spoils, temporary arrangements for casting of deck slab, and any other material from the surface of the girder and giving a coat of final painting as per specifications. 6) Safety measures including Barricading during construction as specified in approved drawings and as directed by the Engineer-in-Charge. Submission of Erection scheme along with hiring of a proffessional safety consultant to oversee the work of heavy girder launching and submission of safety audit report thereoff. 7) Procurement of all materials from approved manufacturers and fabricators. Complete methodology for structural steel works, name of workshop for fabrication works, testing facilities and procedures etc. to be intimated for approval of Engineer-in-charge. 8) The provision for temporary bearings/sand jacks for supporting steel Plate girders during erection. 9) Provision for stability during erection against wind load or any other type of loading & supporting steel Plate girder during erection. 10) Connection of the bearing with plate girder including all provision as per recommendations of bearing supplier. Cost of bearing shall be paid separately under relevant item. B) Mode of Measurement : Measurement shall be only for structural steel which is erected and is part of permanent structure and paid as per approved shop drawings. All wastages, temporary works, jigs, temporary assembly bolts etc. are deemed to be included in the quoted rates. No allowance or increase in weight for welding and nuts & bolts etc. will be applicable. All HSFG nuts, bolts and washers shall be measured and paid separately under relevant item. Shear studs shall be measured and paid separately under relevant item.

-

-

-

... More
Providing, testing and tightening of High Strength Friction Grip Bolts (HSFG bolts) of class/grade 8.8 up to proof loads as per IS:4000 using Automatic Calibrated Torque Wrench at all locations of splicing and at all heights, wherever specified as per drawings and their compatible nuts and washers all complete required to execute the job. All HSFG bolts and nuts, washers conforming to IS:1367, IS:6610, IS:6623 and IS:4000 shall be used. The measurement shall be made for complete assembly of bolt, nut and compatible washers used in permanent works.

3150

169

533295

... More
Providing, testing and fixing of High Strength shear connectors shear studs of size 22 x 125 mm profiled from high strength MS rods (Yield strength=385 MPa, minimum elongation=18 %, Characteristic tensile strength=495 mpa) and fusion welded to top flange of the Plate girders of appropriate diameter and height as per approved designs and relevant specifications to connect steel girders with the reinforced concrete deck slab. The measurement shall be made in Nos. and nothing extra shall be paid for welding to connect studs with steel plate girders.

1800

135

243234

... More
Providing & placing in position at all depths and heights Thermo-Mechanically Treated (TMT) Fe 500 D grade Reinforcement Bars including cutting, straightening, bending, binding with mild steel annealed binding wire of 18 SWG i/c, testing of materials complete as per approved drawings, specifications and as per directions of the Engineer-in-charge. A) Scope of work: 1. The item includes the cost of all the operations involved from procurement of the steel in the stacking yard up to the placement including cutting and bending as per the Bar Bending schedules (BBS to be prepared by the contractor and approved by the Engineer-in-charge) including the cost of stacking. 2. Binding the steel with binding wires of 18 SWG gauge and/or by welding by electric arc recess at two of the four points at each crossing of reinforcement bars as per direction of Engineer-in-charge and as per the specifications. The size of the weld shall be adequate to ensure that it can withstand the handling till concreting. 3. The item includes the cost of spacers, chair bars, cover blocks, couplers (if used) reinforcement bars for lifting, hooks, handling and overlapping of bars for placing the steel. 4.Providing Laps in bars as shown on drawings or otherwise specified by the Engineer-in-Charge. However, bars of maximum length shall be used in the work. 5. Cost of testing of all materials involved in the execution of item as per approved QAP and Specifications in internal / external laboratory including providing the samples and transporting to the testing laboratory. 6. Providing barricading and all traffic safety requirements as directed by Engineer-in-charge and Traffic Police. 7. The item includes all other incidental expenditures for completing the job.

185

91646

16954516

... More
B) Mode of Measurement : The measurement for the payment shall be made on the weight in Tonnes and the weight shall be calculated by multiplying the total length of all the reinforcement of different diameter as per BBS by the standard coefficient for each diameter of bar. Method of deriving the weight of reinforcement used is as follows : (i) Reinforcement shall be measured in length of different diameters as per drawings nearest to a centimeter. (ii) The standard sectional weights referred to as in Table IV in para 5.3.4. in revised CPWD specifications for C.M, C.C & RCC works, 2009 of volume -II will be considered for conversion of length of various sizes of TMT Fe 500D bars into standard weight. The weight shall be computed correct upto two decimal places but payment shall be made as per given in sub para (iii) and (iv) below. iii) Records of actual sectional weights shall be kept diameterwise and lotwise. The average sectional weight for each diameter shall be arrived at from samples from each lot of steel received at site. The decision of the Engineer-in-Charge shall be final w.r.t. the procedure to be followed for determining the average sectional weight of each lot. Quantity of each diameter of steel received at site of work each day will constitute one single lot for the purpose. The weight of steel by conversion of length of various sizes of bars based on the actual weighted average sectional weight shall be termed as Derived Actual Weight. (iv) (a) If the Derived Weight as in sub-para (iii) above is lesser than the standard weight as in sub-para (ii) above then the derived actual weight shall be taken for payment.(b) If the derived actual weight is found more than the standard weight, then the standard weight as worked out in sub-para (ii) above shall be taken for payment. In such case nothing extra shall be paid for the difference between the derived actual weight and the standard weight.

-

-

-

... More
Providing and installing expansion joints as per specifications detailed in IRC-SP:69-2005 duly supplemented with manufacturer's recommendations. Entire installation is to be carried out strictly in the presence of manufacturer's representative only at all times. Item to include preparation of designs and drawings to obtain the necessary approval from the Engineer-in-charge. The seal of the expansion joints shall be such as not to permit any dust collection at all times. Single strip seal joint with a total allowable movement upto 80mm Scope of work: 1. Cost of all materials, labours, equipments and other incidental charges for execution of this item. Supervision during installation by the manufacturer is also included. 2. Installation and fixing of expansion joints as per manufacturers specifications and designs/drawings approved by the engineer-in-charge including chipping of concrete, cleaning of concrete from reinforcement bars, leveling, necessary shuttering, preparation of recess, placement of Expansion Joint in recess true to line and level, pre-setting of expansion joint, if necessary, placement of reinforcement (cost of reinforcement to be paid separately), filling of recess with concrete of approved mix, vibrating / compacting, finishing to line and level and curing etc. (cost of concretingdone in filling the recess shall be measured and paid in the item of deck slab/ precast segment) 3.Providing warranty for trouble free performance for minimum fifteen (15) years and free rectification of defects/replacement of joint, if required during this period. 4. Cost of testing of all the materials involved in the execution of this item as per Quality Assurance Plan (QAP to be prepared by the contractor and duly approved by the Engineer-in-charge). Mode of Measurement : The expansion joints shall be measured in running metre. The length of expansion joint in the clear carriageway (including footpath) only is payable, though joints will be provided in the vertical parts of kerbs/crash barriers also. Measurement shall be made correct to one centimeter.

36

7267

261634

... More
Providing, laying and fixing 4mm thick fiber impregnated, bituminous, bridge deck waterproofing APP membrane of approved quality and make including application of suitable primer, heating APP sheet with buten torch, rolling, overlapping and sealing joints etc. all complete as per specification and direction of Engineering-in-Charge. A) Scope of work : 1. Preparation of deck surface by chipping-out loose concrete, scales, undulations etc., cleaning the surface and repairing the undulations of surface with GP-2 or equivalent material to provide smooth surface for application of primer. 2. Providing bituminous primer of approved quality and applying the same over prepared deck surface as per manufacturer's specifications. 3. Providing, laying and pasting APP membrane with help of butane torch and sealing the overlaps as per manufacturer's specification and direction of Engineer-in-Charge. 4. Testing of materials as per BIS/ASTM or other appropriate codes as per direction of Engineer-in-Charge. Mode of Measurement : The measurement shall be made for the finished deck area in sqm only. Overlaps as per manufacturers recommendations will not be paid. Vertical pasting over crash barrier is payable only upto 100 mm.

452

579

262015

... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.

108

218

23641

... More
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

32

2784

89088

... More
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge.

32

2914

93258

... More
Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion

-

-

-

... More
On W.B.M / W.M.M. @ 0.4kg/sqm

540

21

11448

... More
on bituminous surface @ 0.25 kg/sqm

3300

14

46365

... More
Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.

83

11129

923753

... More
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.

66

12126

800329

... More
Providing and laying stone matrix Asphalt (SMA) using crushed stone aggregates of specified grading, premixed with bituminous binder and lime filler and cellulose fiber transporting the hot to work site by tippers, laying with paver finisher equipped with electronic sensor to the. required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per MORTH specification (5th revision) clause no. 515, complete in all respects and as per directions of Engineer-in-charge. 40/50 mm compacted thickness with bitumen of grade VG-30 @ 6% (percentage by weight of total mix) and lime filler @ 3% (minimum) (percentage by weight of Aggregate) and bitumen coated cellulose fiber pellets @ 0.30% of total mix, prepared in Batch Type Hot Plant of 100-120 TPH capacity. Note:- The overall minimum bitumen content shall be 6% of tatal mix and lime filler @ 3% (minimum) (percentage by weight of Aggregate) and bitumen coated cellulose fiber pellets @ 0.30% of total mix. Nothing extra shall be paid for variation in materials in as per mix, design.

18

14089

253602

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :a) Two or more coats on new work.

60

155

9354

... More
Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : Concrete of M15 grade with minimum cement content of 240 kg /cum

73

8986

655989

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil

1000

177

177500

... More
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform and preparation of pile head or construction of test cap as per standard procedure and dismantling of test cap after test etc. complete as per specification & the direction of Engineer-in-Charge.

-

-

-

... More
Initial test for pile loads up to 600 MT (For each test)

1050

450

472500

... More
Routine test for pile loads up to 350 MT (For each test)

630

450

283500

... More
Scope of Work i) The load tests shall be in accordance with the Indian Standard Code of Practice for Design and Construction of Pile Foundations IS 2911 (Part IV) Load Tests on Piles. For initial load test, test load will be 2.5 times the theoretical designed capacity of pile. For initial load test, arrangement shall also cater for additional 25% above test load and nothing extra will be paid on this account. Stresses in test arrangements (steel truss or plate girder) to cater for test load plus additional 25% load shall be within permissible limit as per IS:800 (as for permanent structure). For test frame, structural steel of grade conforming to IS:2062 shall be used. ii) Engineer-in-Charge will decide the locations and nos of initial load tests to be performed in different zones depending on variation in substrata. The contractor shall undertake construction of test piles required for initial pile load test in the initial stages of work using the same methodology and equipment which will be subsequently used for working piles. These tests shall be undertaken well in advance of working pile. No working pile would be allowed to be undertaken till satisfactory initial pile load tests have completed. Non-granting of permission for pile/pile cap by Engineer-in-Charge in such respect will not be considered as reason for delay or any claim thereof. The test arrangement to be employed shall be of nature which is quick to install and remove and easily transferable. Sufficient nos. of test arrangement will be required to be mobilized by contractor so as to conduct required nos. of initial load tests simultaneously. Vertical cyclic loading tests shall be carried out where specially needed and specified for separation of skin friction and point bearing components of the load carrying capacity of the piles. iii) Routine tests shall be performed on working piles to determine/check the load carrying capacity and settlement of the pile foundation. The sequence of piles for Routine Load Test shall be selected by the Engineer-in-Charge. The Routine load tests shall be in accordance with the Indian Standard Code of Practice for Design and Construction of Pile Foundations i.e. IS 2911 (Part IV) Load Tests on Piles. iv) The Contractor shall give the Engineer-in-Charge at least 48 hours notice of the commencement of construction of these piles which are to be subjected to Initial Tests. The load tests shall not normally be conducted unless the concrete is at least 28 days old.

-

-

-

... More
v) All testing shall be done under the direction of experienced personnel conversant with the equipment and the testing procedure. Before the commencement of the tests, all the particulars regarding the test pile including boring data and concrete cube strengths shall be made available at site and shall form a part of the test report. vi) On completion of each load test the Contractor shall submit a report of the load test which shall include the following information: a. Description of soil conditions, ground water table, actual boring and installation records, concrete cube test results. b. Method of load application. c. Load settlement readings during loading and unloading. d. Time load-settlement curve. e. All other observation relevant to the test being conducted. Mode of payment:- Measurement shall be done in MT. Example:- For initial test load of 500 MT, amount payble for 1 test shall be 500 x 450 x (Contractor enhancement/rebate).

-

-

-

... More
Lateral load testing of piles in accordance with IS Code of practice IS : 2911 (Part IV) for determining safe allowable lateral load on pile:

-

-

-

... More
Initial test for pile loads up ot 20 MT (For each test)

34

2500

85000

... More
Routine test for pile loads up to 20 MT (For each test)

34

2500

85000

... More
Scope of Work i) The load tests shall be in accordance with the Indian Standard Code of Practice for Design and Construction of Pile Foundations IS 2911 (Part IV) Load Tests on Piles. For initial load test, test load will be 2.5 times the theoretical designed capacity of pile. For initial load test, arrangement shall also cater for additional 25% above test load and nothing extra will be paid on this account. Stresses in test arrangements (steel truss or plate girder) to cater for test load plus additional 25% load shall be within permissible limit as per IS:800 (as for permanent structure). For test frame, structural steel of grade conforming to IS:2062 shall be used. ii) Engineer-in-Charge will decide the locations and nos of initial load tests to be performed in different zones depending on variation in substrata. The contractor shall undertake construction of test piles required for initial pile load test in the initial stages of work using the same methodology and equipment which will be subsequently used for working piles. These tests shall be undertaken well in advance of working pile. No working pile would be allowed to be undertaken till satisfactory initial pile load tests have completed. Non-granting of permission for pile/pile cap by Engineer-in-Charge in such respect will not be considered as reason for delay or any claim thereof. The test arrangement to be employed shall be of nature which is quick to install and remove and easily transferable. Sufficient nos. of test arrangement will be required to be mobilized by contractor so as to conduct required nos. of initial load tests simultaneously. iii) Routine tests shall be performed on working piles to determine/check the load carrying capacity and settlement of the pile foundation. The sequence of piles for Routine Load Test shall be selected by the Engineer-in-Charge. The Routine load tests shall be in accordance with the Indian Standard Code of Practice for Design and Construction of Pile Foundations i.e. IS 2911 (Part IV) Load Tests on Piles. iv) The Contractor shall give the Engineer-in-Charge at least 48 hours notice of the commencement of construction of these piles which are to be subjected to Initial Tests. The load tests shall not normally be conducted unless the concrete is at least 28 days old.

-

-

-

... More
v) All testing shall be done under the direction of experienced personnel conversant with the equipment and the testing procedure. Before the commencement of the tests, all the particulars regarding the test pile including boring data and concrete cube strengths shall be made available at site and shall form a part of the test report. vi) On completion of each load test the Contractor shall submit a report of the load test which shall include the following information: a. Description of soil conditions, ground water table, actual boring and installation records, concrete cube test results. b. Method of load application. c. Load settlement readings during loading and unloading. d. Time load-settlement curve. e. All other observation relevant to the test being conducted. Mode of payment:- Measurement shall be done in MT. Example:- For initial test load of 15 MT, amount payble for 1 test shall be 15 x 2500 x (Contractor enhancement/rebate).

-

-

-

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge

103

3551

365779

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar

115

2060

236923

... More
Credit for cost of scrap/salvage value of dismantled mild steel materials received from site, which will be the property of the contractor

10300

30

-314253

... More
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All Kind of Soil.

200

129

25970

... More
Extra for covering top of membrane with Geotextile, 120 gsm non woven, 100% polyester of thickness 1 to 1.25 mm bonded to the membrane with intermittent touch by heating the membrane by Butane Torch as per manufactures recommendation.

198

88

17602

... More
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

198

883

174864

... More
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Flush/Ruled Pointing

198

385

76309

... More
Supplying and fixing in Horizontal position in unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge. 200 mm nominal size dia

50

1250

62524

... More
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter

36

377

13586

... More
Modified Estimated Cost after using Correction factor on DSR-2023 on account of GST @ 0.973 (on DSR Item Total 3804282)

1

3701566

3701566

... More
Add Cost Index on DSR amount

1

111047

111047

... More
MORTH Item Total

1

56025006

56025006

... More
Add GST @18% multiplying factor (0.2127) upto on MORTH Items (i.e. 56025006)

1

11916519

11916519

... More
Market Rate Items Total

1

253602

253602



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.