Public Works Department Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Mar 2024
Closing DateCancelled
Tender Amount₹ 95,71,341
Costs
EMD
₹ 1,91,427Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_255483_1Tender No
71/EE/PWD WR-1/2023-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://www.pwddelhi.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Centering and shuttering including strutting, propping etc. and removal of form for all heights:
-
-
-
Suspended floors, roofs, landings, balconies and access platform
444
411699
927.25
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more.
5880
634158
107.85
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland Cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately)
-
-
-
All works up to plinth level.
Concrete of M25 grade with minimum cement content of 330 kg /cum
84
798399
9504.75
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
-
-
-
Cement mortar 1:6 (1 cement : 6 coarse sand)
21
149777
7132.25
12 mm cement plaster of mix :
-
-
-
1:6 (1 Cement: 6 Coarse sand)
97
33334
343.65
Neat cement punning
103.5
8275
79.95
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work
198
47867
241.75
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
-
-
-
Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
12
18043
1503.6
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
5
17756
3551.25
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..
-
-
-
In cement mortar
5
10301
2060.2
Providing and laying at or near ground level factory made Kerb Stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
NOTE:
1) Nothing extra shall be paid for fixing the kerb stone after cutting into size for filling the gaps between kerb stone/ wall/ obstruction/ discontinuity/ other blocks at the edges/ around the unpaved tree edges etc.
2) The contractor shall be responsible for implementing measures to mitigate rat infestation issues that may potentially damage the footpaths and tiles. This includes the application of pesticides, rat-killing medicines, chemicals & the incorporation of ground glasses with sand and soil beneath the tiles as deemed necessary to deter rodent activity.
3) Only paved portion of the footpath will be measured for payment process (i.e. excluding of unpaved portion around trees, green patches, soil patches meant for green areas).
44
445174
10117.6
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
3265
128478
39.35
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be madeseparately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
7568
997084
131.75
Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineerin-charge. (Old CC paver blocks shall be supplied by the department free of cost).
NOTE:
1) Nothing extra shall be paid for fixing the paver block after cutting into sizee for filling the gaps between kerb stone/ wall/ obstruction/ discontinuity/ other blocks at the edges/ around the unpaved tree edges etc.
2) The contractor shall be responsible for implementing measures to mitigate rat infestation issues that may potentially damage the footpaths and tiles. This includes the application of pesticides, rat-killing medicines, chemicals & the incorporation of ground glasses with sand and soil beneath the tiles as deemed necessary to deter rodent activity.
3) Only paved portion of the footpath will be measured for payment process (i.e. excluding of unpaved portion around trees, green patches, soil patches meant for green areas).
5166
2081640
402.95
Laying at or near ground level Old Kerb Stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost).
NOTE:
1) Nothing extra shall be paid for fixing the kerb stone after cutting into size for filling the gaps between kerb stone/ wall/ obstruction/ discontinuity/ other blocks at the edges/ around the unpaved tree edges etc.
2) The contractor shall be responsible for implementing measures to mitigate rat infestation issues that may potentially damage the footpaths and tiles. This includes the application of pesticides, rat-killing medicines, chemicals & the incorporation of ground glasses with sand and soil beneath the tiles as deemed necessary to deter rodent activity.
2286
250203
109.45
Providing and laying factory made chamfered edge Cement Concrete Paver Blocks In foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer's specifications & direction of Engineer- in-Charge.
NOTE:
1) Nothing extra shall be paid for fixing the paver block after cutting into size for filling the gaps between kerb stone/ wall/ obstruction/ discontinuity/ other blocks at the edges/ around the unpaved tree edges etc.
2) The contractor shall be responsible for implementing measures to mitigate rat infestation issues that may potentially damage the footpaths and tiles. This includes the application of pesticides, rat-killing medicines, chemicals & the incorporation of ground glasses with sand and soil beneath the tiles as deemed necessary to deter rodent activity.
3) Only paved portion of the footpath will be measured for payment process (i.e. excluding of unpaved portion around trees, green patches, soil patches meant for green areas).
-
-
-
60mm thick Cement concrete Paver Block of M-35 grade with approved colour, design & pattern.
2270
2373626
1045.65
Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) :
-
-
-
Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35
205
65631
320.15
Providing and laying factory made Tactile paver blocks (for vision impaired persons as per standard) in foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/laying of inter locking paver block into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as required size and pattern, finishing and sweeping extra sand, all complete as per manufecturer's specification & direction of Engineer-in-Charge.
-
-
-
60mm thick Tactile paver block of M-30 grade with approved colour, design & pattern.
132
166188
1259
Laying old kerb stones around trees in the required line & level, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost)
NOTE:
1) Nothing extra shall be paid for fixing the paver bock/ kerb stone after cutting into size for filling the gaps between kerb stone/ wall/ obstruction/ discontinuity/ other blocks at the edges/ around the unpaved tree edges etc.
2) The contractor shall be responsible for implementing measures to mitigate rat infestation issues that may potentially damage the footpaths and tiles. This includes the application of pesticides, rat-killing medicines, chemicals & the incorporation of ground glasses with sand and soil beneath the tiles as deemed necessary to deter rodent activity.
3) Only paved portion of the footpath will be measured for payment process (i.e. excluding of unpaved portion around trees, green patches, soil patches meant for green areas).
294
12069
41.05
Providing services of GPS enabled water tanker of 10000 Liter (Truck Mounted) running on CNG having emission norms BS-VI. The water tanker should be equipped/designed for discharging/spraying water through pressure jet nozzle and hose pipe for washing of Kerb Stone, Crash Barrier, Over Head Signage Board, Footpath etc for different roads. The raw/unfiltered water shall be used in the tanker. The rate is inclusive of all above mentioned operations, driver, helper, fuel , lubricant, water cost and other T&P etc. complete as per the direction of Engineer-in-Charge and nothing extra shall be paid on any account. Daily coverage of output will be minimum of 8 to 10 KM pass.
180
297900
1655