Netaji Subhas Institute Of Technology Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Netaji Subhas Institute Of Technology - NSIT Tender
Eprocure
Opening Date27 May 2019
Closing Date3 Jun 2019
Tender Amount₹ 5,00,290
Costs
EMD
₹ 10,006Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_NSIT_172821_1Bid Award Id
ViewTender No
NIT No 19/VC/18-19/NSUTTender Authority
Netaji Subhas Institute Of Technology ViewPurchaser Address
-Website
http://http://www.nsit.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
4 Providing and fixing of vertical blinds 100 mm ( Vista or equivalent ).
10
-
1030.4
... More
5 SPRAY PAINTING OF STEEL FURNITURE a) Steel Almirah ( Big Size) i) Outer
11
-
1200
... More
ii) Inside
11
-
1000
... More
6 STEEL FRAME CANNED CHAIRS a ) Replacement of New wooden seat (duly canned and polished).
22
-
279
... More
b) Replacement of New Wooden Back ( duly canned and polished)
22
-
279
... More
7 Renovation/ Repairing of student plastic chairs with change of wooden arm including painting and welding of steel frame and change with of new rubber shoes.
30
-
250
... More
8 Minor repair with stitching of chair cloth etc all complete as per direction of Engineer-In-Charge.
10
-
93
... More
9 Providing and fixing of new heavy duty PVC chair base for revolving chairs with heavy duty 5 Nos. wheels casters etc all complete as per direction of Engineer-In-Charge.
55
-
744
... More
10 Replacement of defective wheels /caster of revolving chairs with superior quality wheels etc all complete as per direction of Engineer-In-Charge.
20
-
93
... More
11 STEEL FRAME CANNED CHAIRS a) Repair of revolving cane chair Seat
1
-
500
... More
b) Repair of revolving cane chair back
1
-
500
... More
12 Renovation of sofa set including replacement of old foam, fabric or any other defective component. The sofa seat will be renovated by using 4" thick 40 density foam (make : sleepwell, feather foam, curl-on) in seat, back and arm rest and finishing with superior quality fabric as approved by Engineer-in-charge. But the item including painting / polishing of exposed steel / wooden members as may be the case. The item also includes nuts, bolts, shoes etc all complete as per direction of Engineer-In-Charge.
5
-
1906.5
... More
13 Replacement of PU handles for chairs etc all complete as per direction of Engineer-In-Charge.
20
-
465
... More
14 Dry cleaning of visitors chairs / Auditorium chairs.
75
-
150
... More
15 STEEL ALMIRAH a) Replacement of defective Lock with superior quality (5 lever) lock.
5
-
275
... More
b) Replacement of Handle C 21
5
-
250
... More
c) P/F of New Legs (Base)
3
-
950
... More
16 Repair of stool seat including change of foam/cloth etc all complete as per the directions of Engineer-In-Charge.
10
-
300
... More
17 Renovation of cushion chairs with change of fabric only including labour charges etc complete as per direction of Engineer-in-charge.
32
-
600
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements