Municipal Corporation Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Municipal Corporation Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Sep 2024
Closing Date30 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil

2.5

454

181.83

... More
110.18:Providing and laying compacted bed of dry brick aggregate of 40/50 mm thick nominal size in required thickness including spreading, well ramming, consolidating and grouting with Jamuna sand including finishing smooth etc. complete as per direction of Engineer-in-charge (compacted thickness to be measure for the purpose of payment)

12.38

29152

2355.72

... More
16.91.1:Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern.

426.4

377265

884.77

... More
19.27.1:Constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 ( 1 cement: 4 coarse sand) including 500x450 mm pre- cast R.C.C. horizontal grating with frame complete as per standard design:With common burnt clay F.P.S(non modular) bricks of class designation 7.5

2

10418

5209.08

... More
19.6.4:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:300 mm dia R.C.C. pipe

6

5181

863.66

... More
110.32.a:Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately).(Note:- Cement content considered in this item is @ 303 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). Deduct for using of M-20 grade concrete instead of M-25 grade concrete in C.C. pavement.

46.2

391533

8474.75

... More
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

0.97

6557

6788.63

... More
1.1.11_06:Disposal of materials by mechanical transport including loading ,unloading and stacking :Lead for 6 km :steel

48

8406

175.14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.