Military Engineer Services Tender

... More
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Military Engineer Services - MES Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 May 2025
Closing Date14 Jun 2025
Tender Amount₹ 40,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cleaning of DID Swimming Pool of size 50 m x 21 m before operation using Eco friendly harmless to human beings cleaning material and suitable methods to make the pool water crystal clear bottom of the pool and transperant water all the time before filling as required at site complete all as specified and as directed.

1

22

-

... More
Cleaning of Harbux Stadium Swimming Pool of size 50 m x 21 m before operation using Eco friendly harmless to human beings cleaning material and suitable methods to make the pool water crystal clear bottom of the pool and transperant water all the time before filling as required at site complete all as specified and as directed.

1

22

-

... More
Cleaning of Harbux Stadium Deep Diving Pool of size 16 m x 16 m before operation using Eco friendly harmless to human beings cleaning material and suitable methods to make the pool water crystal clear bottom of the pool and transperant water all the time before filling as required at site complete all as specified and as directed.

1

22

-

... More
Cleaning of Harbux Stadium Baby Pool of size 6 m x 4 m before operation using Eco friendly harmless to human beings cleaning material and suitable methods to make the pool water crystal clear bottom of the pool and transperant water all the time before filling as required at site complete all as specified and as directed.

1

22

-

... More
Cleaning of TOI Swimming Pool of size 25 m x 13.5 m after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Cleaning of NOM Swimming Pool of size 25 m x 13.5 m after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Cleaning of RRRC Swimming Pool of size 25 m x 13.5 m after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Cleaning of DID Swimming Pool of size 50 m x 21 after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Cleaning of Harbux Stadium Swimming Pool of size 50 m x 21 m after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Cleaning of Harbux Stadium Deep Diving Pool of size 16 m x 16 m after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Cleaning of Harbux Stadium Baby Pool of size 6 m x 4 m after completion of operation including complete drain out of pool with the help of required capacity Submersible monoblock P/set and Dry with using cotton cloth as well as complete drain out of filtertion plant and make the plant room neat & clean complete all as specified and directed by Engr-In-charge.

1

22

-

... More
Supply and fixing in replacement Butterfly valves including with jointing materials, rubber gaskets, old worn out nut-bolts, washers etc complete all as specified and as directed. For the following sizes:- Note:- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item. (ii) Genuine PV's & MTC of vavle be produced by contractor alongwith RAR for payment.)

-

-

-

... More
100 mm dia

2

22

-

... More
150 mm dia

6

22

-

... More
200 mm dia

4

22

-

... More
Supply , fixing, jointing and testing in replacement of Cast Iron Non-Return Valve without bypass arrangement, swing type, confirming to IS-5312, flanged ends pressure rating PN 1.0 including taking out old unsv NRV from the existing place of following sizes:- Note:- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item. (ii) Genuine PV's & MTC of vavle be produced by contractor alongwith RAR for payment.)

-

-

-

... More
100 mm dia

1

22

-

... More
150 mm dia

6

22

-

... More
200 mm dia

2

22

-

... More
Supply, fixing, jointing and testing in replacement of Cast Iron Sluice Valve of sizes as under ISI Marked , flanged ends drilled pressure rating PN-1.6 PD Short body, confirming to IS 14846-2000 having stainless steel spindle with cast iron operation wheel at top including taking out unsv Sluice Valve complete all as specified and as directed for the following sizes:- Note:- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item. (ii) Genuine PV's & MTC of vavle be produced by contractor alongwith RAR for payment.)

-

-

-

... More
100 mm dia

1

22

-

... More
150 mm dia

6

22

-

... More
200 mm dia

3

22

-

... More
Taking down/out including opening of Pumping set of capacity of 7.5 HP to 25 HP, carrying out the servicing, greasing, oiling, gland filling, replacement of tyre coupling & renewal of wornout bearing with & including suitable size SS nuts, bolts and washers etc and other repairs of minor nature and applying two coats of synthetic enamel paint of existing colour or as directed over a coat of red oxide primer, checking and starting and testing complete pump set for satisfactory pump set complete all as specified and as directed

8

22

-

... More
Taking down/out including opening of Pumping set of capacity above 25 HP, carrying out the servicing, greasing, oiling, gland filling, replacement of tyre coupling & renewal of wornout bearing with & including suitable size SS nuts, bolts and washers etc and other repairs of minor nature and applying two coats of synthetic enamel paint of existing colour or as directed over a coat of red oxide primer, checking and starting and testing complete pump set for satisfactory working of pump set complete all as specified and as directed

10

22

-

... More
Taking down/out including opening of Compressor upto 7.5HP at site, carrying out the servicing, greasing, topping up compressor oil of the suitable grade, cleaning of Air filter, replacement of filter element, replacement of suitable size and suitable make bearings, fan belts of same type including suitable size SS nuts, bolts and washers etc and other repairs of minor nature and applying two coats of synthetic enamel paint of existing colour or as directed over a coat of red oxide primer, checking and starting and testing complete pump set for satisfactory working of pump set complete all as specified and as directed.

4

22

-

... More
Material and labour for preparation of steel surfaces and applying painting on steel and iron surfaces on the pool operating equipments, filteration plants with two coat of synthetic enamel paint over a coat of red oxide primer as per existing colour scheme or pattern after preparation of old painted surface of any description over 10 cm in width or girth complete all as specified and directed. (NOTE:- Old paint from the steel structures will be scrapped off completely and the surface will be smoothen with water Emery paper.)

300

22

-

... More
Material and Labour for fabrication in replacement of rusted base frame with MS Channel (MC-25/50/75/100/125) for foundation of centrifugal pump sets including one coat of red oxide primer and two applying two coat of black syenthetic enamel paint and inclduing taking out of old base frame and grouting new frame in the existing grouted bolts and nuts, complete all as specified and as directed. (Note:- (i) The contractor will make sure that the frame fixed is leveled and both pump and motor are fully alligned to work smoothly.

280

22

-

... More
Supply and fixing including testing & commissioning of LED tube light fitting integral type suitable for 1 x 18 watts, 220 volts, connector block etc with all accessories internallly prewired and including connecting with twin core flexible copper cable of suitable size including taking down/out old fitting at site complete all as specified and as directed.

20

22

-

... More
Supplying, laying, jointing, welding & testing MS Pipe (Heavy duty class 'C') laid in trenches or on floors for connections to centrifugal pump sets for suction, pump to header and to connect out going water main CI/DI pipe line including MS Flanges and Flange joints complete with jointing materials complete all as specified and directed by Engr-in-Charge for following sizes:-

-

-

-

... More
80 mm dia

12

22

-

... More
100 mm dia

30

22

-

... More
150 mm dia

36

22

-

... More
200 mm dia

18

22

-

... More
Supply & fixing including testing & commissioning of CI foot valve of rating PN 1.0 flanged ends, swing type opration with rubber sheet, as per IS:4038 including taking out unsv foot valve and removed to MES Store yard under contractor's own arangment complete all as specified and directed by Engr-in-Charge for following sizes:- (Note:- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item.

-

-

-

... More
150 mm dia

6

22

-

... More
200 mm dia

4

22

-

... More
Supply and charging(filling in) in replacement of old worn out/uncleaned/choked filter media in filtration cum recycle plant sutiable for swimming pool approx 5900 kg/filtration plant to maintain filter flow rate 111 M3/Hr as recommended by manufactuere and swimming pool norms including supplying & filling of following Filter media details complete all as specified and directed:-

8

22

-

... More
(i) Quartz Media Depth – 915 MM (ii) Quartz Pebbles of 1" – 3/4" size Not less then 100 mm thick layer (iii) Quartz Pebbles of 3/4" to 1/2" size Not less then 100 mm thick layer (iv) Quartz Pebbles of 1/2" to 1/4" size Not less then 100 mm thick layer (v) Quartz Pebbles of 1/4" to 1/10" size Not less then 100 mm thick layer (vi) Quartz sand of assorted sizes Not less than 900mm thick layer (vii) Making Back wash arrangement functional/repair – Back wash arrangement shall be made through the running water hence arrangement shall be made to facilitate the back washing system. (viii)Replacement of Pressure gauges and flow meters from all Filtration plants – 02 Nos of suitable rating (ix) Repair and replacement of Air release pipe and valve from all filteration plants .

-

-

-

... More
M&L cleaning of balancing tank from the bottam and side walls scrubbing with brush for removing fungus and washing with water after removing all the sediments collected at the bottam of balancing tank complete all as spacified and directed

5

22

-

... More
Material and labour testing & commissioning of motor after providing re-winding material copper winding of electric motor of filltration plant,suction sweeper motor, 3 to 25 HP Motor at swimming pools including replacement of ball bearing and dismantling and refixing, connection, testing etc complete all as specified and directed by Engr-in Charge. (Note:- (i) Testing & commissioning of motor shall be carried out from approved work shop with RAR. (ii) A BOO will be ordered for preparation of inventory and approved & concured by GE.

50

22

-

... More
M&L applying two coat of apply synthetic enamel paint with one coat of spray painting of approved colour to LT pannel, pumps and motors of any size complete including MS/CI pipe line and valves etc complete including prepration of old painted surface complete all as specified and directed.

4

22

-

... More
Testing of Swimming pool in the area of AGE(U) W/S No.II and submission of detailed test report to the office of Engineer-in-Charge. (i) Carrying out minimum essential testing of water as per IS 3328 mandatory for chemical colour, odour, taste, turbidity, PH value, TDS total hardness, iron, chloride, fluoride and residual free chlorine and Bacteriological total coliform organisms per 100 ml (MPN) and E Coli in 100 ml) with specific recommendation regarding suitability of water for swimming pools purposes. (ii) Collection of water from different sources of water ie. swimming pools in a sterilized bottle and testing in NABL Approved laboratory as mentioned in specification Note :- Rate Quoted shall also deemed to be included for the followings:- (i) Cost of sterilized bottle as required. (ii) To and fro transportation charges for collection of samples from source swimming pool.

9

22

-

... More
M&L Framed work such as in grills, grating, angle Iron, MS strip, MS Sheet upto 3 mm, etc with ends of bars, shoulder or revetted or forged into spike frame,guard bars barred iron door,railing frame or similar work and locking arrangement including cutting, drilling , welding and painting with two coat of synthetic enameled paint over a coat of redoxide primer after preparation of surface complete all as specified and directed by Engineer-in-charge.

550

22

-

... More
M&L for sign board made out of 2mm thick in Radium Paint sheet steel of size 120x90 Cms painted both side with a coat of red oxide primer and writing both side Swimming pool with pool name given by Engr-in-charge, GE (U) water supply Delhi cantt-10" with white paint over approved painted back ground and embedded in PCC 1:3:6 type C2 of 30cmx30cm x 30 cm at 2 mtr height above ground level complete including stainless steel pipe of SS-304 grade of 40 mm dia and length 2.3 metres including taking down old unsv sign board complete all as specified and directed by Engr-in-charge. NOTE: Excavaion and Earth work shall be deemed to be included in unit rate quoted by contractor.

5

22

-

... More
S & F of 1000 ltrs PVC under ground tank tripple layer in and including complete all fittings etc including taking down old unsv complete all as specified and directed.

5

22

-

... More
Supply and fix in Replacement of Earthing complete with galvanised iron earth plate electrode of size 60cm x 60cm x 6mm thick buried directly in ground (earth pit not less than 2.25mtr deep below ground level) with top edge of the plate not less than 1.5mtr below normal ground level, connected to galvanised iron strip 32 x 6mm as earth continuity conductor connected to earth plate by means of GI light bolt nuts, check nuts and washers of including providing earth wire protection pipe GI light grade 40mm bore from earth plate to main switch board/panel, watering pipe 40mm bore GI pipe medium grade with wire mesh and funnel at top, earth pit of PCC in 1:2:4 type B-1, with RCC cover 1:2:4 type B-0 using MS TMT 8mm dia @ 150 c/c both way with suitable handle, angle iron frame made out of angle iron of size 40 x 40 x 4mm, including adequate quantity of charcoal dust and salt in alternate layers all around the earth plate, including excavation and earth work in any type of soil complete all as per electrical plate No 3 of SSR Part-I (2009) connected to earthing test point including test point made out of 40 x 3mm GI flat iron, all as specified and indicated including testing on completion, including taking down old unserviceable earthing, for machinery/ equipment installed at power house/sub station complete all as specified and directed. NOTE: (1) GI strip 32x6 mm beyond 7.5 metres from test point shall be measured and paid separately. (2) Excavaion and Earth work shall be deemed to be included in unit rate quoted by contractor.

3

22

-

... More
Supply and fix in Replacement of Earthing complete with galvanised iron earth plate electrode of size 60cm x 60cm x 6mm thick buried directly in ground (earth pit not less than 2.25mtr deep below ground level) with top edge of the plate not less than 1.5mtr below normal ground level, connected to galvanised iron strip 32 x 6mm as earth continuity conductor connected to earth plate by means of GI light bolt nuts, check nuts and washers of including providing earth wire protection pipe GI light grade 40mm bore from earth plate to main switch board/panel, watering pipe 40mm bore GI pipe medium grade with wire mesh and funnel at top, earth pit of PCC in 1:2:4 type B-1, with RCC cover 1:2:4 type B-0 using MS TMT 8mm dia @ 150 c/c both way with suitable handle, angle iron frame made out of angle iron of size 40 x 40 x 4mm, including adequate quantity of charcoal dust and salt in alternate layers all around the earth plate, including excavation and earth work in any type of soil complete all as per electrical plate No 3 of SSR Part-I (2009) connected to earthing test point including test point made out of 40 x 3mm GI flat iron, all as specified and indicated including testing on completion, including taking down old unserviceable earthing, for machinery/ equipment installed at power house/sub station complete all as specified and directed. NOTE: (1) GI strip 32x6 mm beyond 7.5 metres from test point shall be measured and paid separately. (2) Excavaion and Earth work shall be deemed to be included in unit rate quoted by contractor.

3

22

-

... More
M & L for earthing in replacement GI plate 60×60cm ×3.15mm thick electrode and 32x6mm galvanised strip as earthing lead thick buried directly in ground vertically to a depth not less than 2.25 mtr below normal ground level, connected to copper strip of size 25x4mm as earth lead by means of bolts, nuts and washers madeout of copper or tinned brass and protection GI pipe of 40mm dia all as specified and testing complete including earthwork, PCC chamber, RCC chamber cover with handle GI watering pipe 20mm dia, GI funnel with wire mesh, magnesium sulphate, salt, charcoal, lugs etc and method of earthing shall be as per plate No :3 of SSR part -I. NOTE: (1) GI strip 32x6 mm beyond 7.5 metres from test point shall be measured and paid separately. (2) Excavaion and Earth work shall be deemed to be included in unit rate quoted by contractor.

5

22

-

... More
S&F in replacement LED Flood light fitting 100 watt energy saving, environmental friendly, long life, exclusive innovative die cast aluminium IP65 flood light with high power LEDs as light source, suitable for highlighting architectural facade high mast and general purpose lighting complete all as specified and as directed at site

4

22

-

... More
S&F in replacement LED Flood light fitting 150 watt energy saving, environmental friendly, long life, exclusive innovative die cast aluminium IP65 flood light with high power LEDs as light source, suitable for highlighting architectural facade high mast and general purpose lighting complete all as specified and as directed at site

4

22

-

... More
S&F in replacement LED Flood light fitting 120 watt energy saving environmental friendly, long life, exclusive innovative die cast aluminium IP65 flood light with high power LEDs as light source, suitable for highlighting architectural facade high mast and general purpose lighting complete all as specified and as directed at site.

4

22

-

... More
S&F in replacement Energy saving flood light 30 Watt environmental friendly, long life, exclusive innovative die cast aluminium IP65 flood light with high power LEDs as light source, suitable for highlighting architectural facade high mast and general purpose lighting complete all as specified and as directed at site.

9

22

-

... More
Excavation in trenches not exc. 1.5 m wide and not exc. 1.5 m in depth and getting out in hard /dense soil incl. , trimming the sides and forming bottom surfaces to required level complete all as specified and directed by Engineer-in-Charge.

219

22

-

... More
Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed.

164

22

-

... More
Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed.

55

22

-

... More
M&L Boring holes under road pavement by bocky manually/mechanically in any type of soil upto 200 mm bore complete all as specified and directed by Engineer-in-Charge. (Note:-Location & depth of boring holes is as directed by EIC)

12

22

-

... More
Taking up Cast Iron/ Ductile Iron/Cement/PVC water mains of following bore including all fittings with spigot & socket ends of lead joints including burning out lead joints and recovering lead complete all as specified and as directed. (Note :- (i) Excavation & earth work for new location shall be measured & paid separetely.

1080

22

-

... More
Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. Note 4 :- Cost of Rubber gasket joints (Tyton Joint) included in quoted unit rates.

-

-

-

... More
80 mm bore

180

22

-

... More
100 mm bore

900

22

-

... More
S & F in replacement for fixing MCCB 4 pole 250 amp 415 volts with breaking capacity 36 kA in existing/new location complete all as specified and directed.

2

22

-

... More
S & F in replacement for fixing MCCB 3 pole 63 amp 415 volts with breaking capacity 25 kA in existing/new location complete all as specified and directed.

5

22

-

... More
S & F in replacement for fixing MCCB 4 pole 200 amp 415 volts with breaking capacity 36 kA in existing/new location complete all as specified and directed.

1

22

-

... More
Supply and fixing in replacement of MCB Three pole adjustable type 63 Amp capacity 15 KA complete all as specified and directed

3

22

-

... More
Supply and fixing in replacement of MCB single pole adjustable type 6-32 Amp complete all as specified and directed .

6

22

-

... More
S&F in replacement DOL starter 5 HP relay range 7-10Amp in existing starter panel complete all as specified and directed

4

22

-

... More
Taking down the unserviceable FASD ML 1.5 (with MU relay) of any size and replacement with new FASD ML 1.5 (with MU relay) including stainless steel box existing starter panel complete all as specified and directed

2

22

-

... More
Taking down the unserviceable FASD ML 2 (with MU relay) of any size and replacement with new FASD ML 2 (with MU relay) including stainless steel box existing starter panel complete all as specified and directed

4

22

-

... More
Supply and fixing in replacement elecrtonic timer type ST 100 for fixing in panel complete all as specified and as directed.

8

22

-

... More
Supply and fixing in replacement single phase preventor VSP 2 complete all as specified and directed .

6

22

-

... More
Supply and fixing in replacement FRLS PVC insulated industrial grade copper conductor wire of following size, 1100 volts complete all as specified and as directed.

-

-

-

... More
4.00 sqmm, single core

90

22

-

... More
16.00 sqmm, single core

90

22

-

... More
25.00 sqmm, single core

90

22

-

... More
Supply, installation and testing flanged ends strainer/dirt box of following sizes with stainless steel mesh suitable for cold water meter to avoid foreign material entering into meter and making good connection with flanged ends, with gasket rubber sheet and nut & bolts fixing in horizontal/inclind/ vertical position, including taking out unsv strainer/dirt box complete all as directed at site by the Engr-in-Charge. (Note :- (i) Flange joints including jointing materials shall deemed to be included in the unit rate of this item.

-

-

-

... More
150 mm bore

5

22

-

... More
200 mm bore

2

22

-

... More
Supply and Fixing in replacement wooden base brush as per existing old sample suitable for suction sweeper assembly with nylon hair brush with bristles of length 7 cm and 1mm dia each complete all as specified and directed.

5

22

-

... More
Supply and Fixing in replacement FPBC nylon flexible hose pipe 40mm outer dia size heavy duty capacity suitable for suction sweeper complete all as specified and directed.

150

22

-

... More
An amount of Rs 2,82,720.00 shall be deducted from BOQ on account of schedule of credit

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.