Military Engineer Services Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Solar Installation and Products
Eprocure
Opening Date18 Dec 2024
Closing Date1 Jan 2025
Tender Amount₹ 24,99,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
D) Maintenace a. Preventive Maintenance : i) The Operators shall be responsible for ensuring smooth operations of all components. ii) To inspect and maintain periodically the plant equipment as per the preventive and curative maintenance schedule. iii) The operators shall carry out PV module cleaning Twice every month for effective generation as required. LIST OF MANDATORY SPARES i)Spares such as MCB,MCCBs,Fuses,DC Fuses,Al cards such as input/output Card ,power supply card ,processor card ,PV Modules, Glands,lugs,MC4 connectors,tie connectors,clamps,cable Ties and all other consumables/spares which are required for uninterrupted O&M of the Plant should be kept readily available at Site . ii) The Contractor shall provide an inventory report items consumed to the departmment on a monthly basis. iii) The Contractor has to use the mandatory spares(s) available at site for replacing defective part(s) of equipment for minimizing system outage temporarily and top up the quantity of spares so that the required quantity of spares shall be made available at site at all times and shall be handed over to the department at the end of O&M Period .The cost of spares is deemed to be incl in the quoted cost. iv) The Contractor is bound to provide .01 Sr Electrician,01 Electrician and 02X labour Operator for maintenance /operation of solar PV Plant system on daily basis from 0900 to 1700 Hrs by providing all minor accessories as required for smooth maintenance inclusive of daily,weekly,quarterly ,half yearly maintenance including all consumable material and chemicals as required and other spares required. v) Earthing Register has to be maintained by the Contractor.The earthing values of all Earting mentioned in Appx'A' of LA and Solar Earthing is mandatory and any earthing material required to recharge of the earth pit shall be borne by the Contractor.The cost of New Earthing alongwith connected accessories like earthing strip,excavation etc if required to executed at site is deemed to be incl in the quoted rates. Note: if the Earthing Value comes to be more than 3 Ohm .The Contractor has to recharge and make good the earthing value.If required he has to execute new earth pit at no extra cost to the department .In case of Non compliance a penalty of Rs 500 Per day per earthing shall be levied .And the same shall be recovered from his Payment. vi) All above terms to be paid in the unit quote rates as per the items and no payment will be made separately on this account

-

-

-

... More
E) Operators Representative and Personnel i) Contractor shall ,designate a duly qualified and experienced person to manage and administer the O&M Services for the performance of the O&M Services,Contractor shall employ only such personnel those are qualified,skilled and experienced in their respective callings. F) The Operators shall perform the services in relation to the Plant in accordance with the safety manageement plans.SOPs and procedures as applicable and/or in accordance with accepted industry practise.The operators shall adhere to the health and safety standard to ensure minimal accidents during the term .In this respect the Department shall not be liable for any accidents or untoward events. G) The Contractor,for any major equipment fail such as Inverters/Solar Module/ACDB shall replace the equipment on free of cost basis.The cost of new equipment (Solar PV Module/Inverter of suitable capacity)is deemed to be incld in the quoted rate. The Old Inverter and Solar PV Module shall not be a property of Contractor and has to be deposited by him in the MES Store. Preventive Maintenance Schedule & Checklist 1) PV Module cleaning after 15 Days. 2) Module Interconnects Tightness -Visual Check Monthly 3) Integrity of Cable Terminations in Junction Box in Visual Check-Monthly 4) Visual Inspection of Cracked ,Chipped and Broken Modules-Monthly 5) Visual Inspection of Rodent Attacks on Cable Conduits -Monthly 6)Visual Inspection of Junction Box & Combiner Box enclosures -Monthly 7) Hardware on Structures - Monthly 8) Vertical Post Structures Rigidity -Visual Check Quarterly 9) Earthing Strip Check Visual Check-Monthly 10) DC and AC termination checks and retightening as required in Inverters -Visual Check-Half Yearly 11)Cleaning of Filters in Suction Side of Inverters -Monthly

-

-

-

... More
PLANT MONITORING SYSTEM The Power Plant shall incorporate a communication system to monitor the output of each string and Inverter so that system faullts can be detected and rectified before they have an appreciable effect on energy production.The monitoring system shall be a combination of Web based Internet Portal Solution and on ASite local area network for acquisition of data through onsite servers.For Monitoring Weather data alongwith generation data.Remote monitoring thru proper cloud based system of complete plant to be provided by bidder, including SIM/GSM for complete tenure of plant O&M.The original server is with the OEM (M/s WAAREE ENERGIES PVT LTD) .The Contractor shall responsible for making the site available for the monitoring of data.The Cost for runnintg and maintenance of the site shall be borne by the Contractor within the stipulated amount. Logger,Data Logger and Web based Internet Portal Solution should be compatible with each other .The logged weather data generation data should be in time series.

-

-

-

... More
The lists of monitoring and recording parameters to be mentioned are as under:- a) String Current b)Inverter Input Voltage c)Inverter input current d)Inverter input power e)Inverter output Voltage f)Inverter output Current g)Inverter output active Power h)Inverter output reactive Power j)Power Factor k) Global Irradiation on POA l) Ambient Temperature m) PV Module Back temperature n) String failure detection o) Grid Status ,error Codes and all other parameters provided by Inverter p) Daily power generation in kWh q) Monthly power generation in kWh r) Annual power generation in kWh

-

-

-

... More
The proposed Bldgs and SPV generation shall be as Appx 'A' Attached Guaranteed CUF of the Plants: The Plant shall produce minimum Generated Electricty of 21,15,000 units per year Depriciation 6% of the Total Generated Unit is to be accepted.Difference in generation produce in KWH after Depreciation of 6% will be recovered from Contractor @12 per unit . Note No 3:Comprehensive maintenance of Solar Power Plant shall start from the day of handing over of site.The Scope of Comprehensive maintenance shall be as under. Terms & Conditions; * Monthly Reports of the Units Generated by the Plant are to be submitted in Hard Copy(The cost of Hard /Soft Copy is deemed to be incld in the Quoted Cost) * Any spares & material required during O&M of plant shall be provided by Contractor. * Total Period of Contract shall be 11 Months. * Permanent dedicated Technical staff (01x Sr Electrician ,01 x Electrician and 02 Labour)shall be provided by contractor on a daily basis. Water Charges for module cleaning to be borne by bidder Transportation of water tank thru trolley rikshaw/E rikshaw within plant battery limit in scope of bidder

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.