Military Engineer Services Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Military Engineer Services - MES Tender

Works
Eprocure
Opening Date20 May 2021
Closing Date17 Jun 2021
Tender Amount₹ 6,06,100 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Notes for ser item Nos 1.00 to 3.00 :- (a) The entire work mentioned in item No. 1.00 to 3.00 of BOQ, including comprehensive , Preventive and periodical maintenance of lifts/ elevators shall be got executed through OEM i.e. M/s ThyssengKrupp Elevators (India) Pvt. Ltd. . The contractor shall upload/submit the scanned copy of MOU with OEM in cover-1, failing which the tender application/ bid will be summarily rejected. The contractor will also submit the physical copy of MOU alongwith their application and DD in the office of tender inviting authority prior to bid opening date (Cover 1) failing which bid submitted by the contractor cover No.2 shall not be opened. (b) The tenderer shall have to replace the U/s materials within the OEM materials only. Necessary paid vouchers shall be submitted from OEM for the materials like ARD, drive, etc. Contractor is responsible for renewal of licence fee. The charges for annual Government inspection is deemed to be included in the quoted rate.

-

-

-

... More
(c) The comprehensive maintenance include weekly, fortnightly, monthly, quarterly, half yearly inspection/ testing/ preventive maintenance, replacement of unserviceable parts/ material including labour, transportation etc. complete. (d) The complaints shall be attended forthwith as the complaint/failure from the time to time of receipt of the same. The contractor shall deploy sufficient lift mechanic and helper. Rate quoted is deemed to be inclusive of T&P required to carry out repairs, stationery for upkeep of records, uniform to mechanic and helper etc. The contractor shall maintain the attendence register of personnel deployed for the work and the same shall be put upto the Engineer-In-Charge as and when asked.

-

-

-

... More
(e) The contractor shall obtain signature of Authorized representative of GE as token of satisfactory rectification of defects. Any minor complaints requiring no spare parts shall be rectified within 0ne hour and if requiring minor parts, shall be rectified within two hours. Any major complaints requiring major parts / repair shall be recctified within 24 hrs. In case delay in rectification of minor complaints , a panel recovery @ Rs. 100.00 per hour shall be imposed upon the contractor and in case of delay in major repair of the lkifts for more than 24 hours and upto 10 (ten) days, penalty on the contractor for a sum of Rs. 2000.00 per lift per day or part thereof and Rs. 4000.00 per lift per day or part thereof after 02 (two) days shall be imposed. The decision of the GE as to particular repair is minor/ major and a particular lift has been maintained or not a particular day, will be final and binding. The above penalty shall be in addition to the provision made in Clause No. 50 of IAFW-2249. In the event of burning of motor,

-

-

-

... More
a time of 7 days shall be allowed to the contractor for rectification of fault. After that period, penal recovery at the rate of Rs.2000.00 per day shall be imposed on the contractor. (f) A complaint register will be maintained by the contractor and the contractor will obtain the complaint from JE/ AGE E/M office on every working day at 0800 hrs or will be informed telephonically by the Dept. at any time. Two mobile Nos and two email IDs to be maintained by the contractor to communicate the complaints. After attending the complaints the contractor will obtain the signature from the Authorised Representative of GE every day as token of complaints attended.

-

-

-

... More
(g) Ser Item No. 1.00 & 2.00 of BOQ consists of comprehensive maintenance of M/S ThyssenKrupp lifts at WAC area at Subroto Park. The work will be carried out under Authorised dealer for comprehensive maintenance of lifts all as specified in BOQ, Special condition, Particular specification, MES SSR Part-I and as directed by GE/Engineer-in-Charge. (h) Lift mechanic shall be well experieced in lift/elevators repairs and maintenance and fully equipped with required T&P.

-

-

-

... More
(i) Contractor shall submit police verification certificates of personeel employed before commencement of works. (j) Contractor shall carry out daily, weekly, fortnightly, monthly, quarterly and half yearly inspection and report of the same shall be sbmitted to the Engineer-In-Charge. (k) Contractor shall provide uniform to the personnel employed without any extra cost to the Deptt. And cost of the same is deemed to be included in the rate quoted of ser item Nos above and for non wearing of uniforms by the personnel employed by the contractor a penalty of Rs. 500.00 shall be levied per person per shift. (l) The contractor shall ensure proper functioning of safety devices. (m) The contractor shall stick/paste safety instructions at inside the cabins of all lifts with the contact number of opreater/machanic. (n) The following repairs are deemed to be included in the rate quoted by the contractor under comprehensive maintenace :-

-

-

-

... More
(i) CAR CABIN (aa) Maintenance/repairs of cabin fan ( except rewinding) (ab) Contractor is responsible for maintaining the car cabin neat and clean. Necessary cleaning to car cabin shall be done by the contractor on daily basis. (ii) CONTROLLER (aa) Checking fuses of controller and mains, replace if any found defective. (ab) Checking the condition of breake oil and replacement if required. (ac) Checking the flexible leads to relays to make them serviceable. (iii) AC MOTOR (aa) Lubricate bearing with suitable lubricants. (ab) Clean ventillation passages on weekly basis. (ac) Carry out the insulation test and continuity test of motor on quarterly basis and make them in serviceable condition. (ad) Checking the alignment of motor shaft and relignment of shaft.

-

-

-

... More
(iv) GOVERNOR (aa) Lubricate bearing on weekly basis with suitable lubricants. (ab) Checking that levers working smoothly. (ac) Checking that electrical contacts opens before rope get locked. (v) ROPES (aa) Checking the condition of hoist and governor ropes. (ab) Lubricate ropes on weekly basis. (ac) Checking the dia of ropes and record in maintenance book on quarterly basis for its proper functioning. (vi) HOIST WAY (aa) Lubricate guides and guide shoes on weekly basis with suitable lubricants. (ab) Checking that the buffers are in proper position and measure and record counter weight and buffer cleans with the car at the top. (ac) Checking the rope fastening at the car and counter weight.

-

-

-

... More
(ad) Checking the guide clamps and adjusted. (ae) Checking the upper and lower limit switches for proper connection after physical inspection get the lift to travel by holding from the controller and see that the switches operate properly. (af) Checking the condition of travelling cables and termination at junction boxes. (vii) MACHINE ROOM (aa) Checking and adjusting of over load relay and phase failure relay. (ab) Checking power wiring termination in switch motor controller and power switching relays. (ac) Checking lubrication of all equipments on weekly basis. (ad) Cleaning the machine room on daily basis. (ae) Cleaning the relay contacts, replacement of contacts.

-

-

-

... More
(viii) GEAR BOX (aa) Inspect for stray noises. (ab) Checking axial play of work shaft. (ac) Lubricate bearing and top up oil in gear box as and when required. (ix) BREAKES (aa) Cleaning of oil surfaces and trace source of oil leakage and arrest the leakages. (ab) Adjust clearence between shoes and drum on monthly basis. (x) RETIRING CAR AND LOCKS (aa) Checking operation car and lock from the top at each landing, checking that the retiring car solenoid is not getting over heated and that the movement of car is smooth.

-

-

-

... More
(ab) Checking that all locks are functioning properly, mechanically and electrically after opening of covers, checking all set screws and springs and replace if necessary. The lever should lock the breake properly. (ac) Checking that the retiring car does not touch the lock roller at the landing which is being passed. (ad) Checking the door closes safely, clean and adjust if necessary. (ae) Checking the car gear switch operates properly. (af) Lubricate top track and door motor and linkage. (ag) Checking the landing door and can be operated by emergency keys. (ah) Repar/replacement of retiring car solenoid lock doors closer safety switch. (xi) GENERAL (aa) Checking the car frame for bends or cracks and correct if required.

-

-

-

... More
(ab) Checking and carry out insulation resistance test half yearly basis for the following:- (i) All power circuit cables and incoming cables. (ii) Switch and feed upto controller. (iii) Between different power relays. (iv) Power card in the travelling cables. (v) Motor. (vi) Checking opertaion of the car over speed safety gear by moving the levers mannually landing so that the safety locks up properly. (ac) Checking that the sheaves are tight on the shaft , also checking with hammer sounding for cracks, chech sheave bearing clean and re-lubricate. Adjust for proper axial play. (ad) Unload car(s) checking the worn gear lash and adjust by removal of sheaves as required. (ae) Checking of motor bearing, clean and lubricate. (af) Checking that the gear coupling belts are tight.

-

-

-

... More
(ag) Checking the oil seal of gear box and fill frush oil if required. (ah) Contractor is responsible for maintenance of lift well/pit/ shaft/ machine room in dry and clean condition at all times. Any entry of water needs to be pumped immediately and rate quoted is inclusive of the cost of necessary pumping arrangement. A pump should be kept in store at all time to meet the emergency requirement. No extra payment will be done on this account. (aj) Remove breake shoes clean and refit or replace breake linings inspect pins springs clean and reassemble. Checking that the breake drum is not scored or worn unevenly. (ak) The cost of additional technicians required to do peridical maintenance checks is deemed to be included in the rates quoted. Nothing extra shall be paid on this account.

-

-

-

... More
Notes for ser item Nos 04 & 5 :- Charges for fixing, installation and testing is inclusive in comprehensive maint quoted rate. No extra cost claimed from department for fixing, installation and testing

-

-

-

... More
Supply only in replacement alarm band (hooter) suitable for ThyssenKrupp lift including taking down unsv items from existing position all as specified and directed by Engineer-in-Charge.

2

-

-

... More
Supply only in replacement Door sensor cat no 1000084700 suitable for ThyssenKrupp lift including taking down unsv items from existing position all as specified and directed by Engineer-in-Charge.

1

-

-

... More
M&L for taking down unsv pit pulley without damged pit and flooring and supply and installation of new pit pulley yj240b620*13*6 Torin cat No 1000047476 by mechanically and supporting labour with propper finshing by using Cement and supporting colomm all as specified and directed by Engineer-in-Charge.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.