Irrigation Department Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Irrigation Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date31 Dec 2022
Closing Date7 Jan 2023
Tender Amount₹ 6,10,00,000
Costs
EMD
₹ 12,20,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPIDC_763612_1Bid Award Id
ViewTender No
17/SE/2022-23Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying of PCC M15 (1:2:4 )levelling course 100mm thick below the pile cap inclding all cost of material, labour and T&P etc. complete as per directed by Engineer-in- charge.
18
-
-
Dismantling of Reinforced Concrete Pile head i/c its removal with proper disposal,etc. inclding all cost of material, labour and T&P etc. complete as per directed by Engineer-in- charge.
14.43
-
-
Cement Concrete (M35)for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification inclding all cost of material, labour and T&P etc complete as per directed by Engineer-in- charge.
318.1
-
-
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications inclding all cost of material, labour and T&P etc complete as per directed by Engineer-in- charge.
127.2
-
-
Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV)(a) Conduction initial load test by kentledge method preparation of pile head submission of test report as per IS-2911 part IV including all arrangement ,safe load 350.0 tonn , Total Load is 875.0 tonn inclding all cost of material, labour and T&P etc. complete as per directed by Engineer-in- charge
1
-
-
Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV)(b) Conduction routine vertical load test by kentledge method preparation of pile head submission of test report as per IS-2911 part IV including all arrangement ,safe load 350.0 tonn , Total Load is 525.0 tonn inclding all cost of material, labour and T&P etc comlete as per directed by Engineer-in- charge.
1
-
-
Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV)(c)Conducting Laterial load test as per IS -2911,part -IV- Load -50.0 tonn inclding all cost of material, labour and T&P etc complete inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
1
-
-
Providing and Laying M-35 Grade Reinforced cement concrete in Sub-Structure as per Drawing and Technical Specification inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
193.65
-
-
Design, Manufacture, Providing and fixing in position true to line and level POT-PTFE bearing and Guides Bearing as per IRC: 83 (Part III) 2002complete as per drawing and Technical Specifications Section 2006 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.(a) Free Pot/PTFE fixed bearing with Vedrtical Load Capacity 240 Tonnes inclding all cost of material, labour and T&P etc comlete inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- char
4
-
-
Design, Manufacture, Providing and fixing in position true to line and level POT-PTFE bearing and Guides Bearing as per IRC: 83 (Part III) 2002complete as per drawing and Technical Specifications Section 2006 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.(b) Longitudinal Guided Pot/PTFE fixed bearing with Vedrtical Load Capacity 240 Tonnes and Horizontal Capacity of 80 Tonnes inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
4
-
-
Design, Manufacture, Providing and fixing in position true to line and level POT-PTFE bearing and Guides Bearing as per IRC: 83 (Part III) 2002complete as per drawing and Technical Specifications Section 2006 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.(c) Transverse Guided Pot/PTFE fixed bearing with Vedrtical Load Capacity 240 Tonnes and Horizontal Capacity of 80 Tonnes inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
4
-
-
Design, Manufacture, Providing and fixing in position true to line and level POT-PTFE bearing and Guides Bearing as per IRC: 83 (Part III) 2002complete as per drawing and Technical Specifications Section 2006 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.(d) Fixed Guided Pot/PTFE fixed bearing with Vedrtical Load Capacity 240 Tonnes and Horizontal Capacity of 80.0Tonnes inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
4
-
-
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Sub Structure complete as per Drawing and Technical Specifications inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
28
-
-
Providing and laying pitching on Slopes laid over prepared Filter media including boulder apron laid dry in front of embankment complete as per drawing and technical specification inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
95.2
-
-
Providing and laying pitching Filter material underneath pitching in slopes complete as per drawing and technical specification inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
95.2
-
-
Providing weep holes in masonry / Plain / Reinforced concrete abutment, wing wall/return wall with Heavy Duty 100 mm Dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards draining face complete as per drawing, Technical Specification Section 2700 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
62
-
-
Back filling Providing back filling with granular material behind abutment, wing wall and return wall complete as per drawing, Technical Specification Section 300, IRC: 78 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge
300
-
-
Providing and laying of Filter media of thickness not less than 600 mm complete as per drawing, Technical Specification Section 2500 behind abutment, wing wall and return wall inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
100
-
-
Furnishing and Placing M-45 Grade Reinforced / Pre-stressed cement concrete in super structure complete as per drawing and Technical Specifications Sections 1700 &2300 inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
402.9
-
-
Extra Cost for errection and transportation of precast prestressed girdervin in position inclding all cost of material, labour and T&P etc.as per directed by Engineer-in- charge.
195.84
-
-
PCC M15 (1:2:4) Grade leveling course below approach slab complete as per drawing and Technical specification inclding all cost of material, labour and T&P etc. complete as per directed by Engineer-in- charge.
8.51
-
-
Providing and Laying M 30 Grade Reinforced cement concrete in RCC Approach as per Drawing and Technical Specification inclding all cost of material, labour and T&P etc. complete as per directed by Engineer-in- charge.
24.15
-
-
Supplying ,providing and placing in position and profiling high tensile steel strands of specified ultimate strength including cutting,threading,tieing and providing necessary anchorage,sheathing ,stressing,grouting etc. complete as per detailed drawing & specifications and including all materials, labour, equipment, staging etc., all complete for 12T13 cables in post-tensioned HT Strands in PSC girders inclding all cost of material, labour and T&P etc. complete as per directed by Engineer-in- charge.
8.56
-
-
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 40 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation inclding all cost of material, labour and T&P etc.
34.5
-
-
Providing and fixing in position 100 mm dia.drainage spouts true to line and level complete as per drawing, technical specification inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge.
20
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge.
397.5
-
-
Providing and laying 25 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515 inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge.
397.5
-
-
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Super structure complete as per Drawing and Technical Specifications inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge
48.28
-
-
Providing and laying Reinforced Cement Concrete Crash Barrier on bridges, edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete including cost of HYSD (TMT Fe500) reinforcement and expansion joints complete as per drawing, IRC: 5, IRC: 6, IRC: 21 Technical Specification Sections 1000, 1500, 1600, 1700 and 2700 inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge.
106
-
-
Earth work in excavation in ordinary soil for making sub grade including all cost of labour t&p etc. complete.
640
-
-
Scraping old road painted surface i/c disposal of all scraped material inc. all cost labour, Material, t&p etc. complete.
510
-
-
Earth work in filling by transported earth with avg.lead up to 3.00 k.m. including all cost of labour t&p etc complete
11500
-
-
Construction of granular sub -base by providing close material,mixing in a mechanical mix plant at OMC, carriage of mixed material to work site ,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge.
339
-
-
P/L consolidation stone size 63-45 mm in WBM as per morth specification including. all cost labour, Material & t&p etc. complete.
210
-
-
P/L consolidation stone size 53-22.4mm in WBM as per morth specification including. all cost labour, Material & t&p etc. complete.
210
-
-
Prime Coat by VG 10 Grade Providing and applying primer coat with bitumen emulsion on pripared surface of granular base including cleaning road surface and spray @ 9kg/10 m2 using mechanical mean i/c cost of all material, labour, and t & p with all charges. As per morth 502 page 123 unit m2 taking out put 3500m2 inclding all cost of material, labour and T&P etc. comlete.
1355
-
-
Tack coat 80/100 bitumen on prepared surface over the prime granular base including road surface and spray as per month 502 bitumen @3.0 kg per 10.0 m2 using mechanical mean i/c cost of all material, labour, and t & p with all charges
1460
-
-
Tack coat 80/100 bitumen on prepared surface between the interface of two bitumens layer i/c cleaning road surface spray as per morth 502 bitumen @2.50 kg per 10.00m2. using mechanical mean i/c cost of all material, labour, and t & p with all charges
1237
-
-
Prioviding and laying Dense graded Bitumenous Macadam as per Morth Specification Clause 507 (50 mm Compacted thickness with 4.25% bitumen)including. Cost of all material, labour and T&P with all charges as per directed by Engineer-in-charge.
135
-
-
Providing and laying Bituminous concrete as per Morth Specification clause 509(40 mm compected thickness with 5.0 % bitumen ) Including cost of Tack coat inclding all cost of material, labour and T&P etc. comlete as per directed by Engineer-in- charge.
1237
-
-
Providing and laying Brick on edge soiling including. all cost of labour, Material & t&p etc. comlete.
415
-
-
P/L C.C. 1:3:6 including. all cost labour, Material & t&p etc. complete.
105
-
-
R.R. Stone masonary in 1:4 cement mortar including cost of all material, Labour and t&p etc. complete.
355
-
-
First class Brick work in 1:3 C.M. including all cost of labour,material and t&p.etc. Complete
27
-
-
12.5 mm thick cement plaster in 1:4 including all cost of labour,material and t&p etc. complete.
90
-
-
Providing centering and shuttering for c.c. work including all cost of all material, labour and t&p.etc complete.
135
-
-
Painting two coat on parapet wall with readymade colour cement paint including all cost of all labour, material and t& p etc complete.
90
-
-
Providing and laying Dry Stone Pitching including all cost of material, labour and t&p etc. complete.
692
-
-
Providing and Laying G.I. WIRE CRATE (3.0x1.5x1.0) m Size.Including all cost of material, labour and t&p etc. complete.
56
-
-
Dumping stone boulder in toe of canal for making base of G.I. Wire crate. Including all cost of material, labour and t&p etc. complete.
128
-
-
Providing and laying Cement Concrete 1:2:4 . Including all cost of material, labour and t&p etc. complete.
41.5
-
-
Providing & pilling eucalyptus ballies 125 mm dia 6.0 m long /no. including all cost of materials,labour and t&p etc. complete.
400
-
-
Providing and fixing and placing in position EC Bags including all cost of labour ,material and T&P etc. complete.
7000
-
-
Grouting on stone pitching in 1:3:6 cm including cost of all material , labour and t&p. Complete
1540
-
-
Providing and laying coarse sand in filter including cost of all material labour and t&p etc. complete.
154
-
-
Providing and laying stone gritt 5-10 mm size in filter including cost of all material labour and t&p etc. complete.p
154
-
-
Providing and laying stone gritt 10-20 mm size in filter including cost of all material labour and t&p etc. complete.
154
-
-
E/w in digging /theck clearence from internal section of canal deposited due to construction of bridge with proper disposal and all lead and lift.etc. Complete as per directed bya Engineer-in-charge.
2800
-
-
Providing ,laying hot applied thermo plastic compound 2.5mmthick refletrorising glass beads @250gm/sqm area,thickness of 2.5mm is exclusive of surface applied glass beads as per i.r.c.35.the finish surface to be level uniform and free from straks and holes.composition of thermoplastic material shall be as per table 800-3of clause 803 of morth including cost of all material ,labour ,t&p etc.require for proper completion of work as directed by engineer in charge
65.4
-
-