Ircon International Limited Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Ircon International Limited - IRCON Tender
Civil And Construction
Eprocure
Opening Date23 Jan 2024
Closing Date1 Feb 2024
Tender Amount₹ 1,16,47,648
Costs
EMD
₹ 2,17,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Ncrtc/ventilation System/lt/116
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IRCON_182696_1Bid Award Id
ViewTender No
NCRTC/Ventilation System/LT/116Tender Authority
Ircon International Limited ViewPurchaser Address
-Website
http://https://www.ircon.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Indoor Unit-CRP Room- 2.56 TR roof mounted Round flow Cassette AC with cordless remote
2
-
-
Indoor Unit-Control Room- 2.56 TR Roof mounted Round flow Cassette AC with Cordless remote
2
-
-
Indoor Unit-Office Meeting Room - 2.56 TR Roof mounted Round Flow Cassette AC with Cordless remote
2
-
-
Remote Controller
-
-
-
Cordless Remote Control for indoor units (Receiver + Handset)
6
-
-
I-touch Controller
1
-
-
Refrigerant 'Y' joint required for distribution of refrigerant in copper piping etc complete as per specification
3
-
-
Supply of Ventilation System
-
-
-
13800 CFM AHU 70 mm SP (1W+1S) for GIS Hall
2
-
-
Supply Air Tube Axial Fan 5000 CFM 35 mm SP with cowl and Bird Screen for AMS Room
1
-
-
Exhaust Air Tube Axial Fan 1500 CFM 5 mm SP with Cowl and Bird Screen for AMS Room
1
-
-
Supply Air Tube Axial Fan 7600 CFM 40 mm SP with Pre Filter and Freash Air Louver for Cellar Room
1
-
-
Exhaust Air Tube Axial Fan of 1500 CFM 15 mm SP with Cowl and Bird Screen for Battery Room
1
-
-
Exhaust Air Propeller fan with gravity louver 500 CFM for toilets
2
-
-
Supply of Ducting and Grill
-
-
-
Ducting GI Sheet
300
-
-
Supply Air Grills
15
-
-
Exaust Air Louver with Automatic Sensor for GIS
2
-
-
Fresh Air Louver for Cellar Room
2
-
-
Exhaust Air Gravity Louver for Cellar Room
2
-
-
Canvas Connection
20
-
-
Installation, Testing and Commissioning
-
-
-
Installation, Testing & Commissioning of VRV/VRF Type Air Conditioning System of Make Daikin/Hitachi/As approved, complete including following:
(i) Premium Class Copper refrigerant piping with insulation
(ii) Communication cable between IDU & ODU
(iii) Power Cable between Outdoor & Indoor Unit
(iv) PVC Drain pipe with Nitrile Insulation
(v) ELCB & MCB 3 Phase with TPN Box for ODU
(vi) MCB 1-Phase for IDU
(vii) ODU Stand
(viii) Anti Corrosion coating with ODUs
(ix) Transportation, Loading/Unloading, shifting of all VRV AC material at site.
(x) Nitrogen Reprocessing and Vacumising of all units
(xi) Installation, Testing and commissioning of AC Units with all accessories
(xii) Topping of Refrigeration in VRV systems.
(xiii) Hot dip galvanised Perforated cable trays
(xiv) Minor Civil works- wall chiselling & making holes and makeup in good conditions
(xv) Any other activity not mentioned but required for completion of work.
1
-
-
Fixing of Ventilation System (AHU, Ducting, Ventilation Fans and accessories)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements