Indian Ports Association Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Indian Ports Association - IPA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Jan 2024
Closing Date12 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of floor tiles and PCC

135

-

-

... More
Dismantling of electrical work

135

-

-

... More
Dismantling of plumbing work

135

-

-

... More
Dismantling of existing Plinth at skirting level

38

-

-

... More
Dismantling of existing Granite

38

-

-

... More
Dismantling of existing false ceiling and lighting

135

-

-

... More
Remomval of existing doors and chowkhats

1

-

-

... More
Shifting of malba from site. Rate to be calculated on basis of number of trips made for whole house. ( overall demolition)

1

-

-

... More
PANTRY NEW CIVIL WORKS

-

-

-

... More
P/F of cement plastering for repair work during chasing of walls for conduiting etc.

1

-

-

... More
P/A three coats of tapecrete water proofing in (kitchen) areas with 1'-6"on vertical surface. Rate to include 10 mm thk plaster in kitchen.

214

-

-

... More
Providing and laying of P.C.C in floor area in ratio 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 20mm average size) of average thickness of 50 mm.(for receiving Tile)

135

-

-

... More
P/f of 12-15mm thk. cement plastering on walls

200

-

-

... More
P/F of 8 - 10mm thk. plaster of paris (super fine quality) punning, including scraping & hacking the existing finished surfaces and applying plaster of paris on walls, making in proper grooves, line and levels/ plumb for smooth finish etc. complete as per design and drawings.

65

-

-

... More
PANTRY ELECTRICAL WORKS

-

-

-

... More
Termination of all points to main DB- inclusing its re-location

1

-

-

... More
ELECTRICAL WORK- to include all conduiting, wiring, fixing of switch plate, light fittings and fixtures and fans on all floors and providing main connections to DBs. Switch plates to be of specified makes of Crabtree/ Schinder/ Anchor Roma or equivalent. Fire rated wires of Finolex/ Havells to be used. LAN/ CCTV/ music will be charged separately based on requirement

135

-

-

... More
PANTRY PLUMBING WORKS

-

-

-

... More
Supply and Fixing of following bathroom fixtures and fittings + drain points + piping point+ labour for one kitchen

1

-

-

... More
Kitchen Faucet

1

-

-

... More
Kitchen Sink -NEELKANTH DOUBLE BOWL

1

-

-

... More
Kitchen Water cooler

1

-

-

... More
Kitchen Geyser 5 Ltr instant

1

-

-

... More
Utility Area Faucet - Jacquar Make

1

-

-

... More
Angle valve

6

-

-

... More
PANTRY FLOORING WORKS

-

-

-

... More
FL01- Kitchen Flooring- P/F of tiles of size 600*600 mm on existing pcc base fixed with 1:4 (1 cement : 4 coarse sand) base mortar and 2mm spacer with epoxy grout. Rate to include epoxy / laticrete grout and protection of floor after laying with Plastic sheet and 15 mm thk POP layer.(Base rate of tile 100/-)

135

-

-

... More
P/F of 125mm high skirting

53

-

-

... More
PANTRY FINISHES WORKS

-

-

-

... More
TL-01-Kitchen- Wall tile- Matte vitrified grey wall tile= 600X300 MM- P/F of .P/F of tiles with epoxy grout on wall. (Base rate of tile 100/-)

62

-

-

... More
TL-02-Kitchen- Backsplash printed Wall tile- Vitrified printed tiles =300x 300MM- P/F of .P/F of tiles with epoxy grout on wall. (Only application)

86

-

-

... More
CT-01-Kitchen Commercial wall tile- till 2'9" from FFL- P/F of tiles with epoxy grout on wall.

74

-

-

... More
PT-01-Kitchen- off-white paint- Two coats of ICIC velvet touch paint of approved colour with a coat of primer as per approved sample

90

-

-

... More
PANTRY DOORS/WINDOWS

-

-

-

... More
D-03- Hinged Master GF Bathroom Door- of size- 3'0" (L) X 7'0"(H)- 32mm thick waterproof flush door cladded with laminate on both sides as per approved sample.Rate to include all locks, handles, hinges, door stoppers, door closers etc and all hardware of Hafele make.

1

-

-

... More
D03- P/F Chowkhat of size 60mm x 150mm complete with rebate, made with seasoned CP teak with anti-termite treatment and finished with duco as per approved shade and PU Coating.

19

-

-

... More
PANTRY CEILING WORKS

-

-

-

... More
P/F for pelmets + 150*150mm cove made with 40x40mm salwood framing and finished with ply and gypsum on one side and ply on the other with 150 x 150mm cove left as/detail for lighting and cirtains . Rate to be inclusive of all taping and finishing as per specifications

16

-

-

... More
C 01: P/F suspended POP False ceiling consisting of 23 gauge GI sheets main rafters of size 50 mm and two flanges of 38mm each from the soffit at 1000mm centres.suspended with 25mm X 2mm MS hook with steel expansion fastners.Ceiling section of 23 swg GI sheet channel of size 40mm and two flanges of 40mm each from the soffit at 355mm centre fixed to main rafter with steel screws.20 swg. wire mesh fixed to runners with steel screws.10mm 1st. coat POP layer finished to smooth to an even surface complete including coves cornices etc and opening to be maid for cassette A.Cs, trap doors, complete as per drg. measurement will be surface area of ceiling.

140

-

-

... More
Ceiling paint (CP-01): White paint Providing two coats of first quality of plastic emulsion paint ICI velvet touch make of approved make and colour inclusive of a coat of approved primer.

140

-

-

... More
PANTRY WOODWORK

-

-

-

... More
Kitchen Counter- 600mm deep counter to be made of 19mm the BWP and finished with 1mm laminate on all sides. To be provided with drawers and shutters with shelves as per detail. All open shelves to be made of 19mm ply and 1mm laminate/Membrane on both sides.Unit to have 3" high skirting in bwp + laminate/ membrane. To be made complete with all hinges, channels, locks and other hardware of Ozone/ Dorset make. Century Make ply

45

-

-

... More
Counter Top to be finished with 19mm thk. Black Granite. Base Rate of granite @ Rs.140 per sqft.

30

-

-

... More
3"high 19mm thk. Black Granite. Base Rate of granite @ Rs.140 per sqft.

25

-

-

... More
OFFICE ELECTRICAL WORKS

-

-

-

... More
Termination of all points to main DB- inclusing its re-location

1

-

-

... More
ELECTRICAL WORK- to include all conduiting, wiring, fixing of switch plate, light fittings and fixtures and fans on all floors and providing main connections to DBs. Switch plates to be of specified makes of Crabtree/ Schinder/ Anchor Roma or equivalent. Fire rated wires of Finolex/ Havells to be used. LAN/ CCTV/ music will be charged separately based on requirement

1500

-

-

... More
OFFICE PARTITION WORKS

-

-

-

... More
P-01-Both side Ply : 80mm thk ply partition made with 50x 40mm termite treated salwood frames/ GI section finished with 8mm ply on both sides. (new workstation cabin + Conference room-02 for TV screens)

148

-

-

... More
P-02-Both side Ply : 560mm thk ply panelling made with 50x 40mm termite treated salwood frames/ GI section finished with 8mm ply on exposed sides. (workstation area)

37

-

-

... More
Green wall- inclusive of all hardware, structure, fittings and plants (Connection between new and old office corridor)

66

-

-

... More
OFFICE FINISHES WORKS

-

-

-

... More
DP-01-Chairman office, dining area- off-white paint- Two coats of duco spray paint of approved colour with a coat of primer as per approved sample

635

-

-

... More
DP-01-Conference room-02- off-white paint- Two coats of duco spray paint of approved colour with a coat of primer as per approved sample

600

-

-

... More
VP-02-Reception area- Veneer panelling behind reception polished as per approved sample

160

-

-

... More
PN-01--Fluted panels- P/F of readymade fluted panels screwed/pasted on existing wall. (In reception area)

220

-

-

... More
PN-02-ply panelling - P/F of 1mm thk wooden laminate pasted on 8mm thk ply pasted on existing panels. (In conference room-01 for lacquered glass backing)

100

-

-

... More
Wallpaper: On existing wall in Chairman dining area

50

-

-

... More
PT-02: External textured paint -Two coats of ICIC velvet touch textured paint of approved colour with a coat of primer as per approved sample (external entrance corridor walls

300

-

-

... More
LG-01- P/F of 6mm thk lacquered toughened glass (conference-1)

100

-

-

... More
LM-01: 1mm thk wooden Laminate cladding on existing base ply. (new workstation area cabin)

230

-

-

... More
GL-01: toughened glazing with 20mm thk wooden beading on both sides (new workstation area cabin)

42

-

-

... More
PT-03 Two coats of ICIC velvet touch paint of approved colour with a coat of primer as per approved sample

200

-

-

... More
FF-01 : Fluted film on clear glass (On existing glass doors and partitions)

640

-

-

... More
SB01- Softboard panelling - 24mm thick panel made with 12mm thick ply base and 12mm thick softboard cladding complete with fabric as per selection. Edge finished in 24*12mm wood beading complete with matte melamine polish as per approved sample. Rate to include installation at site. (Inside cabins)

150

-

-

... More
OFFICE DOORS/WINDOWS

-

-

-

... More
D-01- Pivot Entrance Door- of size- 3'10" (L) X 7'10"(H)- 32mm thick flush door cladded with veneer on both sides with infill of clear glass as per approved sample and design.Rate to include all locks, handles, hinges, door stoppers, door closers etc and all hardware of Hafele make.

1

-

-

... More
D01.1-P/F MDF Chowkhat of size 200mm x 150mm finished in duco paint as/approved sample.

1

-

-

... More
D-03- Hinged Lobby double Door- of size- 5'0" (L) X 9'3"(H)- 32mm thick flush door cladded with veneer on both sides with infill of clear glass as per approved sample and design.Rate to include all locks, handles, hinges, door stoppers, door closers etc and all hardware of Hafele make. (corridor of new and existing door)

1

-

-

... More
D03.1- P/F Chowkhat of size 60mm x 150mm complete with rebate, made with seasoned CP teak with anti-termite treatment and finished with duco as per approved shade and PU Coating.

18

-

-

... More
D-04- Pivot Cabin-05 Glass door- of size- 3'0" (L) X 8'0"(H)- 10mm thk clear toughened glass door as per approved sample and design.Rate to include all locks, handles, hinges, door stoppers, door closers etc and all hardware of Hafele make. (New cabin door)

1

-

-

... More
OFFICE CEILING WORKS

-

-

-

... More
C 01: P/F suspended POP False ceiling consisting of 23 gauge GI sheets main rafters of size 50 mm and two flanges of 38mm each from the soffit at 1000mm centres.suspended with 25mm X 2mm MS hook with steel expansion fastners.Ceiling section of 23 swg GI sheet channel of size 40mm and two flanges of 40mm each from the soffit at 355mm centre fixed to main rafter with steel screws.20 swg. wire mesh fixed to runners with steel screws.10mm 1st. coat POP layer finished to smooth to an even surface complete including coves cornices etc and opening to be maid for cassette A.Cs, trap doors, complete as per drg. measurement will be surface area of ceiling. (Near workstation area)

190

-

-

... More
Ceiling paint (CP-01): White paint Providing two coats of first quality of plastic emulsion paint ICI velvet touch make of approved make and colour inclusive of a coat of approved primer. (Entire office ceiling )

3200

-

-

... More
OFFICE MISCELLANEOUS

-

-

-

... More
Blinds

400

-

-

... More
INDOOR PLANTS

10

-

-

... More
DIGITAL DOOR LOCK

1

-

-

... More
Bathroom mirrors-  Proving and fixing of 6mm thk. Bevelled clear MTG mirror with base panelling of 12mm thk. Ply with 12mmx12mm Metal frame

30

-

-

... More
BUILT-IN FURNITURE

-

-

-

... More
F01- Reception Table - 8'5"(l) x 2'0"( d) x 2'6"(h) and - structure made of 19mm ply with laminate on all exposed sides and front side fascia of size 6'0" x 2'6" finished with fluted hdhmr/MDF finished in duco paint. Table to be made complete table top ( work desk of 600mm depth ) made of 19mm ply finished with balck marble and complete with 100mm high drawers of 18" depth with telescopic channels. All thicknesses to be finished with edge banding tape. Unit to be made complete with drawers and shutters as per detail and flap of 2'6" x 2'0"

1

-

-

... More
F02- Cabin Desk of size 9'2" x 3'6" x 2'6"(h) with 30mm thk. table top made of 19mm ply and 4mm veneer and finished with matte melamine polish and all edges complete with wood beadings and polish. Table support legs made of teak wood legs in tapered profile as per detail and made complete with matte melamine polish. Side unit credenza of size 2'2" (w) x 2'3"(h) x 2'2"(d) made with 19mm ply and laminate on the inside and 4mm veneer complete with polishing. Unit to be amde complete with drawers and shutters as per detail. All installation and hardware to be inclusive. (CHAIRMAN OFFICE)

1

-

-

... More
F03- Conference Table of size- 9'6"(L) x 4'0"(d) x 2'6" (h)- 2" thk. table top made of 19mm ply as table top finished with 4mm veneer complete with polishing and finishing and central band of size 8" x 6'6" made of 19mm ply and 4mm MDF finished with grey duco paint as per approved sample. Edge of table to be made complete with 8mm thk. MDF finished with duco paint. Base of table to have a boxed structure of size 1'0" x 6'0" made of 19mm ply and finshed with wood laminate on all sides. Table to be made complete with 2 nos. legrand POP up boxes for access to electrical/ LAN/ usb PORTS. (Conference room-01)

1

-

-

... More
F04- Storage in Conference Room- of size -2'5"(d) x 8'5" (w) x 7'0"(h) with carcass made of 19mm ply with 1mm laminate on both sides complete with adjustable shelves made with 19mm ply and laminate and all sides finished with matching edge banding tape. Shutter to be made with 19mm thk. ply with laminate both sides. Unit to be made complete with hardware and installation of all elements. (Conference room-01)

1

-

-

... More
F05- Printer storage- of size -2'8"(d) x 4'4" (w) x 9'0"(h) with carcass made of 19mm ply with 1mm laminate on both sides complete with adjustable shelves made with 19mm ply and laminate and all sides finished with matching edge banding tape. Shutter to be made with 19mm thk. ply with laminate both sides. Unit to be made complete with hardware and installation of all elements. (near reception area)

1

-

-

... More
F06-A -CABIN DESK- of size 6'0"(l) X 2'6" (d) x 2'6" (h) with table top thickness of 30mm made with 19mm ply and finished in 1mm thick laminate on all exposed sides edge banding tape on thickness of table top. Unit to be made made complete with shutters and drawers as per detail including all hardware and fittings. Rate to include hardware and installation of elements. (CABIN-01 & CABIN-02)

2

-

-

... More
F06- B- Cabin Back Credenza- of size-3'0" (l) x 1'6"(d) x 2'3"(h) made of 19mm thk ply made complete with shutters and drawers as per design approved. Unit to be finished in laminate inside and outside with edge banding tape on all exposed edges. Rate to include hardware and fittings with installation of all elements. Unit to be lockable. (CABIN-01 & CABIN-02)

2

-

-

... More
F07-A -CABIN DESK- of size 6'0"(l) X 2'6" (d) x 2'6" (h) with table top thickness of 30mm made with 19mm ply and finished in 1mm thick laminate on all exposed sides edge banding tape on thickness of table top. Unit to be made made complete with shutters and drawers as per detail including all hardware and fittings. Rate to include hardware and installation of elements. (CABIN-04)

1

-

-

... More
F07- B- Cabin Back Credenza- of size-3'0" (l) x 1'6"(d) x 2'3"(h) made of 19mm thk ply made complete with shutters and drawers as per design approved. Unit to be finished in laminate inside and outside with edge banding tape on all exposed edges. Rate to include hardware and fittings with installation of all elements. Unit to be lockable. (CABIN-04)

1

-

-

... More
F08-A -CABIN DESK- of size 6'4"(l) X 2'6" (d) x 2'6" (h) with table top thickness of 30mm made with 19mm ply and finished in 1mm thick laminate on all exposed sides edge banding tape on thickness of table top. Unit to be made made complete with shutters and drawers as per detail including all hardware and fittings. Rate to include hardware and installation of elements. (CABIN-03)

1

-

-

... More
F08- B- Cabin Back Credenza- of size-3'0" (l) x 1'6"(d) x 2'3"(h) made of 19mm thk ply made complete with shutters and drawers as per design approved. Unit to be finished in laminate inside and outside with edge banding tape on all exposed edges. Rate to include hardware and fittings with installation of all elements. Unit to be lockable. (CABIN-03)

1

-

-

... More
F09-A -CABIN DESK- of size 5'0"(l) X 2'2" (d) x 2'6" (h) with table top thickness of 30mm made with 19mm ply and finished in 1mm thick laminate on all exposed sides edge banding tape on thickness of table top. Unit to be made made complete with shutters and drawers as per detail including all hardware and fittings. Rate to include hardware and installation of elements. (CABIN-05)

1

-

-

... More
F09- B- Cabin Back Credenza- of size-3'0" (l) x 1'6"(d) x 2'3"(h) made of 19mm thk ply made complete with shutters and drawers as per design approved. Unit to be finished in laminate inside and outside with edge banding tape on all exposed edges. Rate to include hardware and fittings with installation of all elements. Unit to be lockable. (CABIN-05)

1

-

-

... More
F10- Conference Table of size- 12'0"(L) x 4'0"(d) x 2'6" (h)- 2" thk. table top made of 19mm ply as table top finished with 4mm veneer complete with polishing and finishing and central band of size 8" x 6'6" made of 19mm ply and 4mm MDF finished with grey duco paint as per approved sample. Edge of table to be made complete with 8mm thk. MDF finished with duco paint. Base of table to have a boxed structure of size 1'0" x 6'0" made of 19mm ply and finshed with wood laminate on all sides. Table to be made complete with 2 nos. legrand POP up boxes for access to electrical/ LAN/ usb PORTS. (Conference room-02)

1

-

-

... More
F11- Conference room Floating Unit- of size 10'8" (d) x 1'6"(h) x 1'8"(d)- made of 19mm ply and 8mm back ply finished in 4mm veneer outside ( complete with polishing and finishing ) and 1mm laminate inside as per approved sample and made complete with lockable shutters and adjustable shelves made with 19mm ply and 1mm laminate on all sides with edge banding tape on exposed sides as per detail including all hardwares and fittings. Rate to include hardware and installation of all elements. Top of the unit to b finshed with 14-16mm thk. Black Marquina Marble( Base Rate at Rs. 450 / sqft). Rate to include installation and polishing of the marble. (Conference room-02)

1

-

-

... More
F12- Workstation Floating Unit- of size 12'0" (d) x 3'0"(h) x 2'0" (d)- made of 19mm ply and 8mm back ply finished in 4mm veneer outside ( complete with polishing and finishing ) and 1mm laminate inside as per approved sample and made complete with lockable shutters and adjustable shelves made with 19mm ply and 1mm laminate on all sides with edge banding tape on exposed sides as per detail including all hardwares and fittings. Rate to include hardware and installation of all elements. Top of the unit to b finshed with 14-16mm thk. Black Marquina Marble( Base Rate at Rs. 450 / sqft). Rate to include installation and polishing of the marble.

1

-

-

... More
F13 WORKSTATION ROOM DESKS- 3'6"(l) x 1'8"(d)x 2'6"(h) made in 19mm thick ply and finished in 1mm thick laminate. Unit to be made complete with shutters and drawers as per detail including all hardware and fittings. Rate to include hardware and installation of elements.

16

-

-

... More
F14- Storage in Conference Room- of size -2'5"(d) x 8'5" (w) x 7'0"(h) with carcass made of 19mm ply with 1mm laminate on both sides complete with adjustable shelves made with 19mm ply and laminate and all sides finished with matching edge banding tape. Shutter to be made with 19mm thk. ply with laminate both sides. Unit to be made complete with hardware and installation of all elements.

1

-

-

... More
F15- Entrance Planter- of size 3'0"(l) x 1'0" (d) x 3'0"(h)- made of 19mm ply and 8mm back ply finished in 4mm veneer outside ( complete with polishing and finishing ) and 1mm laminate inside as per approved sample and made complete with lockable shutters and adjustable shelves made with 19mm ply and 1mm laminate on all sides with edge banding tape on exposed sides as per detail including all hardwares and fittings. Rate to include hardware and installation of all elements. Top of the unit to b finshed with 14-16mm thk. Black Marquina Marble( Base Rate at Rs. 450 / sqft). Rate to include installation and polishing of the marble.

1

-

-

... More
F16- Over-head Units of Cabins- Filing Storage- of depth 1'2"( for cabins) 6'0" (l) 3'8" (h) x 1'2" (d) with complete structure made with 19mm ply and 8mm back ply finished in 1mm thick laminate from both sides as per approved sample and made complete with lockable shutters and adjustable shelves made with 19mm ply and 1mm lmainate on all sides with edge banding tape on exposed sides as per detail including all hardwares and fittings. Rate to include hardware and installation of all elements. To be made complete with pelmet for lighting as per detail.

2

-

-

... More
SOURCED FURNITURE

-

-

-

... More
RECEPTION ARM CHAIRS

3

-

-

... More
RECEPTION 1'4" DIA COFFEE TABLE

1

-

-

... More
RECEPTION CHAIR FOR RECEPTIONIST

2

-

-

... More
CHAIRMAN'S OFFICE 6'6" LONG SOFA

1

-

-

... More
CHAIRMAN'S OFFICE 4'0" X 2'6" CENTER TABLE

1

-

-

... More
CHAIRMAN'S OFFICE LOUNGE CHAIRS

3

-

-

... More
CHAIRMAN'S OFFICE 6'6" X 1'6" CONSOLE

1

-

-

... More
CHAIRMAN'S OFFICE EXECUTIVE CHAIR

1

-

-

... More
CHAIRMAN'S OFFICE OFFICE CHAIRS

4

-

-

... More
CHAIRMAN'S OFFICE 2'0" X 2'0" TABLE

1

-

-

... More
CHAIRMAN'S OFFICE 1'4" DIA SIDE TABLE

1

-

-

... More
CONFERENCE ROOMS CONFERENCE CHAIRS

26

-

-

... More
CABINS EXECUTIVE CHAIRS

5

-

-

... More
CABINS OFFICE CHAIRS

10

-

-

... More
WORKSTATIONS OFFICE CHAIRS

16

-

-

... More
WORKSTATIONS 6'0" X 1'6" SIDE CONSOLE

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.