Indian Army Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_IHQ_329900_1Bid Award Id
ViewTender No
RFP 10 18 19 Urology MedicinesTender Authority
Indian Army ViewPurchaser Address
-Website
http://https://www.indianarmy.nic.in/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply & fixing of rotary type new compressor of water cooler upto 65 ltr. water cooling capacity this includes cartaging of water cooler from site to work shop,dismantling of defective compressor,fixing of new compressor testing of entire unit & refixing the same at its original place complete etc as required. Note: The old & defective compressor will be the property of the contractor & the rates is to be quoted the agency considering the cost of old compressor accordingly.(Make:- Toshiba/Kirloskar/Hitachi/Tecumsheh/Highly)
1
10588
10588
Recharging of refrigerant gas in the existing window AC this includes flushing out the cooling coils,nitrogen pressure testing to detect the leakage and brazing the coil to remove the same,vaccumisation and charging the suitable amount of refrigerent gas (R-22) complete with testing etc as reqd.
2
4442
2221
Recharging of refrigerant gas in the existing split AC this includes flushing out the cooling coils,nitrogen pressure testing to detect the leakage and brazing the coil to remove the same,vaccumisation and charging the suitable amount of refrigerent gas (R-22) complete with testing etc as reqd.
5
12805
2561
Supply & fixing of indoor unit of 1.5/2.0 TR of different make Split Air Conditioner, this includes dismantling of old/defective indoor unit testing,commissioning etc complete as required.
1
9580
9580
Recharging refrigerant gas in the existing water cooler this includes flushing out the cooling coils,nitrogen pressure testing to detect the leakage and brazing the coil to remove the same,vaccumisation and charging the suitable amount of refrigerent gas (R-134) complete with testing etc as reqd.
2
3690
1845
Supply & fixing of following components/parts in the existing window AC/Split AC i/c dismantling of defective or faulty components /parts testing etc as required.
-
-
-
a) Starting relay
4
2272
568
b) Running capacitor 25/36 MFD (M/s Asian/Usha/Havells)
3
1002
334
c) Starting capacitor 100/120 MFD (M/s Asian/Usha/Havells)
6
2124
354
e) Thermostat
4
1416
354
f) Air filter
3
2286
762
g) Fan motor capacitor 4/6 MFD(M/s Asian/Usha/Kirloskar)
5
345
69
h) Selector switch with knob
3
921
307
i) New condenser fan motor
1
2005
2005
j) Swing motor of 1.5/2.0 TR split AC
2
1830
915
k) Indoor unit motor of 1.5/2.0 TR split AC unit
1
1955
1955
Servicing of existing water cooler by cleaning the tank with detergent,oiling,greasing of fan motor making connections i/c preventing minor leakage in inner tank by using m-seal , testing etc as required.
4
2340
585
Supplying, laying and fixing of extra refrigerant copper piping of Suitable size (5/8 inches , 1/4 inches) including soldering, brazing and duly insulated with minimum 6 mm thick nitrile rubber insulation, S/fixing 3 core 2.5 sq mm PVC insulated copper conductor power and control cable of suitable size etc. complete as required.
20
22580
1129
S/F 15 mm dia. PVC flexible drain pipe for drainage of waste water from split AC indoor unit etc complete as reqd.
20
1420
71
Comprehensive maintainence of existing window air conditioners of different make and 1.5 Tr capacity for six months ,it includes repairing/replacement of all parts of ACs(Minor and Major) . Making arrangement to attend the complaint within 24 hours of registering the complaint for smooth operation of Window/Split AC's etc complete as reqd. (Note:- Comprehensive maintenance period will start after 15 days of actual date of start date of work i.e. After making all the ACs in working condition withion fifteen days after actual date of start of work).
18
5508
306
Comprehensive maintainence of existing split air conditioners of different make and 1.5/2.0 TR capacity for six months ,it includes repairing/replacement of all parts of ACs(Minor and Major) . Making arrangement to attend the complaint within 24 hours of registering the complaint for smooth operation of Window/Split AC's etc complete as reqd. (Note:- Comprehensive maintenance period will start after 15 days of actual date of start date of work i.e. After making all the ACs in working condition withion fifteen days after actual date of start of work).
72
28944
402
Comprehensive maintainence of existing water coolers of different make and upto 65.0 litre for six months ,it includes repairing/replacement of all parts of water coolers (Minor and Major) . Making arrangement to attend the complaint within 6 hours of registering the complaint for smooth operation of water coolers etc complete as reqd. (Note:- Comprehensive maintenance period will start after 15 days of actual start date of work i.e. After making all the water cooler in working condition withion fifteen days after actual date of start of work).
24
6240
260
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements