Engineers India Limited Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Engineers India Limited - EIL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 Oct 2024
Closing Date4 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Health check and strengthening of cooling tower foundations

-

-

-

... More
To carryout adequacy study of the existing RCC foundations and to provide necessary civil works to ensure installation of the new cooling towers on the respective foundations including supply of all testing tools and tackles, manpower, material like concrete, reinforcement, shutttering, water proofing materials, paint, pedestal bolts, baseframes, etc.

1

-

-

... More
Supply, Erection Testing and Commissioning Works

-

-

-

... More
Supply, installation, testing and commissioning of 03 Nos.of Induced draft, vertical discharge, CTI certified FRP cooling towers with FRP water basin either fitted with spray nozzles or having self rotating sprinklers, including supply of high efficiency TEFC type with IP 55 protection and class F insulation Fan Motor having a high and flat efficiency curve for 50 to 100% loads suitable for vertical installation. The fan shall preferably be direct driven eliminating the gear box/belts. Refer scope of work document 8590-000-89-46-SOW-5136 for complete details. Any item required to make new Cooling Tower system functional and to meet the perfomance criterion as per the specification, but not specified in this SOR shall also be in Contractor's scope of supply/works.

1

-

-

... More
Supply of Spares

-

-

-

... More
For successful pre-commissioning and commissioning/performance test,plant operation and during guarantee period of the plant, requirement of spares are to be provided by the Contractor and are to be listed in the bid.Contractor shall attach list of manadatory and two years opeartional spares along with the bid.Refer scope of work document 8590-000-89-46-SOW-5136 for complete details

-

-

-

... More
Mandatory spares for all cooling towers

1

-

-

... More
Training

-

-

-

... More
Contractor shall provide operational training to seven EIL operating personnels.The training program shall included operational,basic maintenance and troubleshooting activities based on operating manual

1

-

-

... More
Description of Items

-

-

-

... More
Dismantling and Modification Works

-

-

-

... More
Buy Back of Serviceable and non-serviceable materials Contractor shall stack all the scrap material in order to create space and for maintaining the work space clean, buy back all the materials stacked.

-

-

-

... More
Metallic scrap(Galvanised Iron/Carbon steel/Mild steel etc.)-Existing cooling tower,associated MS Pipes,other corrored pipes etc.

1

-

-

... More
Non Metallic scrap(FRP/Plastic/PVC etc.)

1

-

-

... More
Description of Items

-

-

-

... More
Dismantling and Modification Works

-

-

-

... More
Two year operational spares for all cooling towers

1

-

-

... More
Note: *Optional item shall not be considered for Evaluation

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.