Directorate General Defence Estates Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Costs
EMD
₹ 98,000Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DGDE_680591_1Bid Award Id
ViewTender No
DCB/8/E and M/C-5/2024-25Tender Authority
Directorate General Defence Estates ViewPurchaser Address
-Website
http://defproc.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Comprehensive Maintenance of Electric Sub-Station
-
-
-
Regular, routine service and comprehensive maintenance of 2 (two) Transformer of capacity 1250 kVA each., installed at Cantonment General Hospital, job includes regular maintenance for keeping the transformer in working condition. The job includes one time service in a year of these 2 transformers. Note (i): All the material/accessories will be provided by the contractor without any extra cast to department. Note (ii): Service of the electrical equipment should be done as the OEM authorised service provider.
12
-
-
HT Panel
12
-
-
Main LT Panel
12
-
-
Comprehensive Maintenance of Air Conditioning
-
-
-
Regular, routine service and comprehensive maintenance of air cooled VRV/VRF suitable to operate on 3 phases, 415-volt AC supply consisting of modular type outdoor condensing unit equipped with highly efficient scroll/rotary compressor with invertor technology special aryl percolated heat exchange, low noise condenser, fen with motor, auto check function for error in display panel auto address setting 18 HP-04 nos.
12
-
-
LOW SIDE High static ductable type indoor units equipped with cordelles remote, prefilter, low noise fan, multispeed motor, electric expansion valve outer cabinet, Castrol and power panel with remote etc. and maintenance of feeder pillar outdoor type consisting of incoming and outgoing switcher gear such a MCCB, RCBO etc.-04 nos and Split Indoor Unit 1.5TR 16 Nos.
12
-
-
Comprehensive Maintenance of HVAC System
-
-
-
Chiller plant of capacity 40TR-3Nos.(incl. descaling-2times, microprocessor, compressor etc.)
12
-
-
Air handling unit of different capacity, Motor Repair and Replacement of Filter-06Nos.
12
-
-
Heavy Duty Exhaust Airplant and connecting ducting-1No.
12
-
-
Cooling Tower including replacement of fins-3Nos.
12
-
-
Topup of Refrigent Gas (R-22/R-410/R-32)
150
-
-
Main Control Panel of Chiller & AHU-1No.
12
-
-
AHU Remote Panel-1No.
12
-
-
Comprehensive Maintenance of Fire Fighting System
-
-
-
Fire jockey pump (30 HP)-1No.
12
-
-
Electrical Driven Main Fire Pump (60 HP)-1No.
12
-
-
Diesel Engine Driven Fire Pump (92 HP)-1 No.
12
-
-
Main Fire Panel-1No.
12
-
-
Booster Pump (5 HP)- 5No.
12
-
-
Booster Pump (3 HP)- 5No.
12
-
-
Comprehensive Maintenance of UPS & Electrical Equipment
-
-
-
UPS of capacity 20 kVA-02Nos.
12
-
-
All electrical panels installed at every floor of CGH-09 Nos.
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements