Delhi University Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Delhi University - DU Tender

Works
Solid Waste Management
Eprocure
Opening Date1 May 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
iii)  All other necessary civil construction works, as may be required, including but not restricted to:

-

-

-

... More
a)  Sewage collection Tank/Treated water tank of appropriate size.

-

-

-

... More
b)  Panel Room of appropriate size.

-

-

-

... More
c)  Piping, valves etc. within the plant.

-

-

-

... More
d)  All other allied works.

-

-

-

... More
iv)  All types of Pumps and Motors (of appropriate capacity, Head, Rating, etc), Electrical Panels including complete accessories, feeders, other mechanical equipments etc. as required for the operation of the plant.

-

-

-

... More
v)    All kinds of filter media, strainers etc., as required.

-

-

-

... More
vi)         Organic Media etc., as required.

-

-

-

... More
vii)     Inorganic Media, stone pebbles, crushed stones, Coarse sand, Stone aggregates, Earthworms, Green Disinfection etc. of required size and capacity.

-

-

-

... More
viii)  All tools and plants, as required.

-

-

-

... More
ix)  All safety devices.

-

-

-

... More
x)  Any equipment as may be required for Bacterial treatment, Disinfection of the treated effluent.

-

-

-

... More
xi)   Any other equipment or arrangement as may be required for the tertiary treatment which may be needed to achieve the design parameters of the treated effluent to meet CPHEEO Manual.

-

-

-

... More
xii) Any other material, work, services etc. as may be required for successful SITC of the STP

-

-

-

... More
xiii)    Treated Water characteristics at output of STP based on any Proven Technology shall be as per CPHEEO Norms (Annexure-I).

-

-

-

... More
xiv). All civil works to be carried out after getting the architectural design approved by Engineer- in- Charge. However, structural design Screen chamber, Sewage collection tank, Biological treatment tank, tertiary treatment tank structure, Treated Effluent Tank, any other civil structure will be got approved by the contractor at his own cost and expenses from any of the following: (The expenditure for vetting will be reimbursed later)

-

-

-

... More
a)  IIT Delhi, Delhi

-

-

-

... More
b)  IIT Roorkee, Uttarkhand

-

-

-

... More
c)  Delhi Technological University, Delhi

-

-

-

... More
d)  Jamia Millia Islamia University, Delhi

-

-

-

... More
e)  NIT Kurukshetra, Haryana

-

-

-

... More
f)  NIT Jaipur, Rajasthan

-

-

-

... More
g)  CBRI, Ballabhgarh, Haryana

-

-

-

... More
h)  Punjab Engineering College, Chandigarh

-

-

-

... More
Netaji Subhas University of Technology, Delhi

-

-

-

... More
In case the design submitted by the contractor is not found suitable, the Principal/Engineer -in -Charge shall have absolute authority to direct the contractor to revise the design and submit accordingly for obtaining approval of Engineer-in-charge.

-

-

-

... More
(xvi) SITC of STP shall be completed within a period of 07 months. Subsequently, trial run shall be done for a period for 3 months, till the desired treated water results are consistent at the cost of contractor. However, period may be extended, if the plant does not perform to the design parameters.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.