Delhi Transport Corporation Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Delhi Transport Corporation - DTC Tender
Civil Works Others
Eprocure
Opening Date1 Dec 2021
Closing Date14 Dec 2021
Tender Amount₹ 6,63,663
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_DTC_211957_1Bid Award Id
ViewTender No
DTC/ Dy.CGM (Civil)/ CED-M/2021-22/14Tender Authority
Delhi Transport Corporation ViewPurchaser Address
-Website
http://http://www.dtc.nic.in/home/delhi-transport-corporation-dtc
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. (a) Cement mortar 1:6 (1 cement : 6 coarse sand)
60
-
4795.15
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : (a) Raised and cut pointing
400
-
305.7
Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses,parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,
sunken floor etc., up to floor five level, excluding the cost of centering,shuttering and finishing :
a) 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
8
-
6990.4
Providing and fixing concertina coil fencing with punched tapeconcertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of
wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of
M.S. angle, C.C. blocks shall be paid separately)
50
-
255
Disposal of building rubbish / malba / similar unserviceable, dismantledor waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads
including all lifts involved.
40
-
120.55
Deduction for Old stone available at site which are to be used for stone work.
80
-
1190
Add cost index @ 12.75 % on DSR-2016=
650402.95
-
0.13
Deduction @ 9.50 % on the total amount of all items of this schedule. =
733329.33
-
0.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements