If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Delhi Jal Board - DJB Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date20 Aug 2022
Closing Date27 Aug 2022
Tender Amount₹ 21,70,697 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Desmantling of flexible pavement ( bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometer, as per direction of Engineer-In- Charge

6.06

-

347.9

... More
Demolishing brick work manually/by mechanical means i/c stacking of serviceable material & disposal of unserviceable material within 50m lead as per direction of engineer in charge in cement mortar

22.78

-

1698.45

... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

59.12

-

286.85

... More
Providing orange colour safty footrest of 6mm thick plastic encapsulated as IS 10910 on 12mm dia steel bar confirming to IS 1786 having min cross section as 32mm 25mm & overall min length 263mm & width as 165mm with min 112 mm space between protruded legs

20

-

487.1

... More
Providing leak proof rockas in 150 mm dia to 300 mm dia running sewer line with earth filled in empty (PVC) cement bags including removal of the same after completion of work.

30

-

764.5

... More
Brick work with common burnt clay F.P.S ( non modular) bricks of class desination 75 in foundation & plinth in C.M 1:4

31.9

-

6882

... More
15 mm cement plaster on rough side of single in halt brick wall of mix 1:4 (1 cement : 4 coarse sand)

339.12

-

354.5

... More
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4(1 cement:4 fine sand)

116.66

-

307.25

... More
Neat Cement Punning

116.66

-

67.8

... More
Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50m lead and disposal of unserviceable materials into municipal dumps:100 mm dia

14.7

-

73.35

... More
Supply and stacking at site precast concrete manhole cover with steel fibre of ISI mark confirming to IS 12592 part I of EHD-35 with matching frame of class EHD-35 IS 12592 part II with 875mm external dia. And clear 560 mmi nternal dia

180

-

1565.4

... More
P/L/J and glazed stoneware pipes class SP-1 with stiff mixture of cement mortor in the proportion of 1:1 (1 cement :1 fine sand) i/c testing of joints etc. complete 100 mm dia.

14.7

-

375.75

... More
P/L C.C 1:5;10(1 cement :5 coarse sand:10 graded stone aggregate 40 mm nominal size ) upto haunches of S.W pipes i./c bed concrete 100 mm dia. S.W pipe

11.4

-

425.6

... More
Pumping out water by providing pump sets of 4000 liters per hours for a working shift of 8 hours per day i?c the cost of pump labour & fuel and watch & ward etc. complete as directed by Engineer-in-charge.

20

-

936.55

... More
Fixing of manhole cover and frame 560mm dia HD-20 / EHD-35.

180

-

67.5

... More
Filling available excavated earth (excluding rock) in plinth, sides of foundation etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming 7 watering lead upto 50m & lift upto 1.50m

47.3

-

253.95

... More
P/L 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading ,well ramming ,consolidaing and grouting with jamuna sand, including finisihing smooth etc. complete as per direction of engineer -in- charge

295.58

-

196.3

... More
Providing and laying in position cement concrete of specific grade excluding the cost of centering and shuttering all work uoto plinth level. 1:2:4 (1cement :2 Coarse sand : 4 Graded stone aggregate 20 mm nominal rate.

44.34

-

7365.15

... More
Carriage of material by mechanical transport i/c loading unloading & stacking lime morrum, building rubbish, earth, manure or sludge & excavated rocks lead upto 5.0 KM Building rubbish

84.3

-

217.16

... More
Desilting of sewer line based on bucket system in running and foul condition for depth not exceeding 1.5 mtr including removal silt, stones, brick bats, garbage such etc. and stacking the same on the bank of sewer manhole line at a distance up to 50 mtr

78

-

1004.2

... More
Hiring of mini suction and mini jetting machine ( mini super sucker machine) mounted on TATA 407 vehicle with driver, operator and operating fuel along with 04 labours complete in all respect to carry out desilting of sewer lines for 08 hours shift. (including all taxes)

40

-

18500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.